CN205869529U - Fixed frock of pipe drilling - Google Patents

Fixed frock of pipe drilling Download PDF

Info

Publication number
CN205869529U
CN205869529U CN201620816149.1U CN201620816149U CN205869529U CN 205869529 U CN205869529 U CN 205869529U CN 201620816149 U CN201620816149 U CN 201620816149U CN 205869529 U CN205869529 U CN 205869529U
Authority
CN
China
Prior art keywords
pipe
section steel
channel
fixed
curved pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620816149.1U
Other languages
Chinese (zh)
Inventor
王笛
张发荣
何志涛
姜殿忠
程登
金欣
张�林
夏远炎
杨杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Jinggong Industrial Building System Co., Ltd.
Original Assignee
Hubei Seiko Steel Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Seiko Steel Construction Co Ltd filed Critical Hubei Seiko Steel Construction Co Ltd
Priority to CN201620816149.1U priority Critical patent/CN205869529U/en
Application granted granted Critical
Publication of CN205869529U publication Critical patent/CN205869529U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses a fixed frock of pipe drilling, mount (2) including fixed pipe (1), its characterized in that: the both ends of pipe (1) are fixed with one mount (2) respectively, it to follow movable drilling machine fixed platform (3) around pipe (2) to lie in on pipe (1) to be equipped with between two mount (2), it has been overcome when the bolt hole on the pipe component is drilld among the prior art, because of the area of contact between pipe component and the magnetic drill is little, magnetic drill fixed insecure phenomenon on the pipe shortcoming often can appear, has simple structure, convenient operation, saves the cost of labor, avoids the hole site to bore the inclined to one side wrong fixed frock of pipe drilling that bores.

Description

A kind of pipe boring fixing tool
Technical field
This utility model relates to a kind of pipe drilling technique field, in particular to a kind of pipe boring fixing tool.
Background technology
At present, when the bolt hole on dome-like roof being holed in construction steel structure industry, because of dome-like roof with Contact area between magnetic drill is little, often occurs that magnetic drill fixes unstable phenomenon on pipe, so can cause hole The brill of position is inclined, bore the mistakes such as wrong, and bolt hole therefore can be caused to have necessarily with the intersecting mouth location dimension of dome-like roof termination Difference and in-site installation requirement cannot be met.Meanwhile, factory, when making pipe boring, is generally joined by two to three workmans Close and make, not only waste substantial amounts of manual labor, and borehole accuracy size does not reaches far away design drawing requirement.
Summary of the invention
The purpose of this utility model is to overcome the weak point of above-mentioned background technology, and it is fixing to propose a kind of pipe boring Frock.
This utility model pipe boring fixing tool, including the fixed mount of fixing pipe, the two ends of described pipe are solid respectively Surely there is a fixed mount;Being provided with between two fixed mounts on described pipe can be fixing flat along the boring machine of pipe fore-aft travel Platform.
In technique scheme: described boring machine fixed platform includes surface plate, channel-section steel, the first curved pipe and screw rod; Described channel-section steel includes channel-section steel and lower channel-section steel, and described surface plate is placed in parallel and is fixed on described upper channel-section steel;Described first arc Shape pipe box is put in pipe periphery and is arranged between channel-section steel and lower channel-section steel;Described first curved pipe is respectively provided on two sides with screw rod, institute Stating screw rod and be respectively perpendicular through lower channel-section steel and upper channel-section steel, described upper channel-section steel is provided with and coordinates fixing screwed hole with described screw rod, The screw rod of the lower section being positioned at described lower channel-section steel is provided with traveling nut, and described traveling nut upwards can fasten pipe by bolt;
In technique scheme: described fixed mount includes base, support bar and the second curved pipe;Described second curved pipe Be respectively provided on two sides with wing plate with threaded hole;One end of described support bar is fixed on base, and its other end is provided with external screw thread And be screwed with the internal thread hole on described wing plate and to be connected.
In technique scheme: described first curved pipe and the second curved pipe are formed by the pipe of two piece of 1/3 circular arc.
In technique scheme: be equipped with rubber blanket on described first curved pipe and the outer wall of the second curved pipe and inwall Circle.
The utility model has the advantage of: 1, simple to operate, this utility model, when fixing pipe is holed, only needs a people The semicircle distance size of regulation frock is used for fixing dome-like roof.2, borehole accuracy is high, will not be because of boring machine after pipe is fixing Shake cause the position of component that deviation occurs, it is to avoid the generation of the bolt hole drill inclined phenomenon on component.3, make simple, make Valency is low, this frock making low cost.4, saving labour cost, this frock in use, only needs one and manually can complete all behaviour Make, it is not necessary to manually carrying out additionally assists fixing pipe.
Accompanying drawing explanation
Fig. 1 is the use structural representation of this utility model pipe boring fixing tool.
Fig. 2 is the structural representation of boring machine fixed platform in this utility model.
Fig. 3 be in this utility model boring machine fixed platform face structural representation.
Fig. 4 is the structural representation of fixed mount in this utility model.
In figure: pipe 1, fixed mount 2, base 2.1, support bar 2.2, boring machine fixed platform 3, surface plate 4, channel-section steel 5, on Channel-section steel 5.1, lower channel-section steel the 5.2, first curved pipe 6, the second curved pipe 6.1, screw rod 7, traveling nut 8, wing plate 9, boring machine 10.
Detailed description of the invention
Describe performance of the present utility model below in conjunction with the accompanying drawings in detail, but they are not intended that of the present utility model Limit, the most for example, simultaneously by illustrating that advantage of the present utility model will become clearer from easy to understand.
As Figure 1-4: this utility model one pipe boring fixing tool, including the fixed mount 2 of fixing pipe 1, institute That states pipe 1 is respectively fixed at two ends with a fixed mount 2;Being provided with between two fixed mounts 2 on described pipe 1 can be along pipe The boring machine fixed platform 3 of 1 fore-aft travel.
Described boring machine fixed platform 3 includes surface plate 4, channel-section steel the 5, first curved pipe 6 and screw rod 7, and surface plate 4 can be selected for The steel plate of 450*200*5mm;Described channel-section steel 5 includes channel-section steel 5.1 and lower channel-section steel 5.2, and the length of channel-section steel 5 is chosen as 450mm length No. 10 channel-section steels;Described surface plate 4 is placed in parallel and is welded in the notch plane of described upper channel-section steel 5.1, and boring machine 10 is placed On the surface plate 4 of boring machine fixed platform 3, the boring machine 10 that the present embodiment uses is magnetic drill;Described first curved pipe 6 overlaps Put in pipe 1 periphery and be arranged between channel-section steel 5.1 and lower channel-section steel 5.2;Described first curved pipe 6 is respectively provided on two sides with screw rod 7, Described screw rod 7 is respectively perpendicular through lower channel-section steel 5.2 and upper channel-section steel 5.1, and described upper channel-section steel 5.1 is provided with and coordinates with described screw rod 7 Fixing screwed hole, the screw rod 7 of the lower section being positioned at described lower channel-section steel 5.2 is provided with traveling nut 8, and described traveling nut 8 is upwards Bolt fastens pipe 1.
Described fixed mount 2 includes base 2.1, support bar 2.2 and the second curved pipe 6.1, and described base 2.1 is chosen as 500* The steel plate of 500*20mm;Described second curved pipe 6.1 be respectively provided on two sides with wing plate 9 with threaded hole;Described support bar 2.2 One end is fixed on base 2.1, and its other end is provided with external screw thread being screwed with the internal thread hole on described wing plate 9 and is connected, Wing plate 9 can be selected for the steel plate of 100*80*5mm.
Described first curved pipe 6 and the second curved pipe 6.1, by the pipe composition of two piece of 1/3 circular arc, can be selected for a diameter of The pipe of 121mm.
It is equipped with rubber washer on described first curved pipe 6 and the outer wall of the second curved pipe 6.1 and inwall.
Above-mentioned unspecified part is prior art.

Claims (5)

1. a pipe boring fixing tool, including the fixed mount (2) of fixing pipe (1), it is characterised in that: described pipe (1) Be respectively fixed at two ends with a fixed mount (2);It is positioned on described pipe (1) that be provided with between two fixed mounts (2) can be along pipe (2) the boring machine fixed platform (3) of fore-aft travel;Described boring machine fixed platform (3) include surface plate (4), channel-section steel (5), One curved pipe (6) and screw rod (7);Described channel-section steel (5) includes channel-section steel (5.1) and lower channel-section steel (5.2), and described surface plate (4) is put down Row is placed and secured on described upper channel-section steel (5.1);Described first curved pipe (6) is nested with on pipe (1) outer surface and arranges Between channel-section steel (5.1) and lower channel-section steel (5.2);Described first curved pipe (6) is respectively provided on two sides with screw rod (7), described screw rod (7) Being respectively perpendicular through lower channel-section steel (5.2) and upper channel-section steel (5.1), described upper channel-section steel (5.1) is provided with and coordinates with described screw rod (7) admittedly Fixed screwed hole, the screw rod (7) of the lower section being positioned at described lower channel-section steel (5.2) is provided with traveling nut (8), described traveling nut (8) upwards bolt fastens pipe (1).
Pipe the most according to claim 1 boring fixing tool, it is characterised in that: described fixed mount (2) includes base (2.1), support bar (2.2) and the second curved pipe (6.1);Being respectively provided on two sides with of described second curved pipe (6.1) is with threaded hole Wing plate (9);One end of described support bar (2.2) is fixed on base (2.1), its other end be provided with external screw thread and with the described wing Internal thread hole on plate (9) is screwed connection.
Pipe the most according to claim 1 and 2 boring fixing tool, it is characterised in that: described first curved pipe (6) and the Two curved pipes (6.1) are formed by the pipe of two piece of 1/3 circular arc.
Pipe the most according to claim 3 boring fixing tool, it is characterised in that: described first curved pipe (6) and second It is equipped with rubber washer on the outer wall of curved pipe (6.1) and inwall.
Pipe the most according to claim 4 boring fixing tool, it is characterised in that: described first curved pipe (6) and second It is equipped with rubber washer on the outer wall of curved pipe (6.1) and inwall.
CN201620816149.1U 2016-07-29 2016-07-29 Fixed frock of pipe drilling Expired - Fee Related CN205869529U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620816149.1U CN205869529U (en) 2016-07-29 2016-07-29 Fixed frock of pipe drilling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620816149.1U CN205869529U (en) 2016-07-29 2016-07-29 Fixed frock of pipe drilling

Publications (1)

Publication Number Publication Date
CN205869529U true CN205869529U (en) 2017-01-11

Family

ID=57700230

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620816149.1U Expired - Fee Related CN205869529U (en) 2016-07-29 2016-07-29 Fixed frock of pipe drilling

Country Status (1)

Country Link
CN (1) CN205869529U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108580959A (en) * 2018-03-20 2018-09-28 上海亚明照明有限公司 Device for drilling on the body of rod
CN108772602A (en) * 2018-05-31 2018-11-09 南京同旺铝业有限公司 A kind of cutting tool of aluminium bar
CN108890761A (en) * 2018-07-20 2018-11-27 哈尔滨理工大学 One kind thermoplasticity drilling equipment on large diameter thin wall pipe
CN109014972A (en) * 2018-08-22 2018-12-18 中建八局第建设有限公司 The fixed bracket of mobile hole making drill
CN109623057A (en) * 2018-12-20 2019-04-16 象山谢海家具有限公司 A kind of thin-walled handware fixture
CN111266621A (en) * 2020-03-27 2020-06-12 上海力行工程技术发展有限公司 Shield constructs articulated sealed slot radial drilling frock
CN113245882A (en) * 2021-06-22 2021-08-13 中煤特殊凿井有限责任公司 Perforating machine for manufacturing hydrological hole of freezing pipe
CN115156584A (en) * 2022-07-08 2022-10-11 中国核动力研究设计院 Drilling device and method for omega sealing weld of control rod driving mechanism assembly

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108580959A (en) * 2018-03-20 2018-09-28 上海亚明照明有限公司 Device for drilling on the body of rod
CN108772602A (en) * 2018-05-31 2018-11-09 南京同旺铝业有限公司 A kind of cutting tool of aluminium bar
CN108890761A (en) * 2018-07-20 2018-11-27 哈尔滨理工大学 One kind thermoplasticity drilling equipment on large diameter thin wall pipe
CN109014972A (en) * 2018-08-22 2018-12-18 中建八局第建设有限公司 The fixed bracket of mobile hole making drill
CN109623057A (en) * 2018-12-20 2019-04-16 象山谢海家具有限公司 A kind of thin-walled handware fixture
CN109623057B (en) * 2018-12-20 2020-04-21 象山谢海家具有限公司 Thin-wall hardware clamp
CN111266621A (en) * 2020-03-27 2020-06-12 上海力行工程技术发展有限公司 Shield constructs articulated sealed slot radial drilling frock
CN113245882A (en) * 2021-06-22 2021-08-13 中煤特殊凿井有限责任公司 Perforating machine for manufacturing hydrological hole of freezing pipe
CN115156584A (en) * 2022-07-08 2022-10-11 中国核动力研究设计院 Drilling device and method for omega sealing weld of control rod driving mechanism assembly

Similar Documents

Publication Publication Date Title
CN205869529U (en) Fixed frock of pipe drilling
CN102513839B (en) Drilling device of flange face bolt
CN201891171U (en) Integral bolt assembling frame
CN206438605U (en) A kind of steel crane beam attachment structure
CN204250111U (en) Weld car transport trolley guiding and lifting registration device
CN203603405U (en) Dry hanging universal rotating mounting structure of vertical-face aluminum plate
CN202380740U (en) Opposite-pull bolt for building templates
CN105674843A (en) Novel rectangle device pillar pre-assembling device
CN206732598U (en) One kind is exclusively used in hinge and bores milling unitary clip
CN206614176U (en) Framework positions transition frock
CN205225967U (en) Inflation connecting device
CN204240903U (en) Novel rectangular equipment pillar preassembling device
CN205382700U (en) Embedded nut formula is wall spare even
CN204615298U (en) Chute curb girder overhead support
CN204265232U (en) A kind of I-beam section uses stressed suspension rod
CN204873621U (en) Adjustable tower crane attaches wall connecting rod
CN203738439U (en) Horizontal throw hole drilling fixture for cranks
CN203393906U (en) Steel bar and steel structural part connecting device
CN203171183U (en) Crank arm welding clamp
CN203796997U (en) Valve rod
CN203047773U (en) Structural steel fixing device
CN206645071U (en) Easy-to-dismount vacuum packing machine steel box
CN207790927U (en) One kind attaching together guider
CN205630420U (en) A device for crossing board connects fixes a position
CN205733632U (en) Adjustable welding fixture device

Legal Events

Date Code Title Description
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Zeng Weifeng

Inventor after: Xia Yuanyan

Inventor after: Yang Jie

Inventor after: Wu Liangyong

Inventor after: Wang Di

Inventor after: Zhang Farong

Inventor after: He Zhitao

Inventor after: Jiang Dianzhong

Inventor after: Cheng Deng

Inventor after: Jin Xin

Inventor after: Zhang Lin

Inventor before: Wang Di

Inventor before: Zhang Farong

Inventor before: He Zhitao

Inventor before: Jiang Dianzhong

Inventor before: Cheng Deng

Inventor before: Jin Xin

Inventor before: Zhang Lin

Inventor before: Xia Yuanyan

Inventor before: Yang Jie

CB03 Change of inventor or designer information
TR01 Transfer of patent right

Effective date of registration: 20180514

Address after: 430312 Chutian Industrial Park, Panlong City, Huangpi, Wuhan, Hubei

Patentee after: Hubei Jinggong Industrial Building System Co., Ltd.

Address before: 430312 Hubei Wuhan Hubei Wuhan city Huangpi District Panlong City Chutian Avenue special 8

Patentee before: Hubei Seiko steel construction Co., Ltd

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170111

Termination date: 20200729

CF01 Termination of patent right due to non-payment of annual fee