CN205863780U - The assembly of lifting lead wire - Google Patents
The assembly of lifting lead wire Download PDFInfo
- Publication number
- CN205863780U CN205863780U CN201620774916.7U CN201620774916U CN205863780U CN 205863780 U CN205863780 U CN 205863780U CN 201620774916 U CN201620774916 U CN 201620774916U CN 205863780 U CN205863780 U CN 205863780U
- Authority
- CN
- China
- Prior art keywords
- groove
- fastener
- lead wire
- assembly
- leading screw
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- WABPQHHGFIMREM-UHFFFAOYSA-N lead(0) Chemical compound [Pb] WABPQHHGFIMREM-UHFFFAOYSA-N 0.000 title claims abstract description 32
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims abstract description 11
- 229910052742 iron Inorganic materials 0.000 claims abstract description 5
- 238000005299 abrasion Methods 0.000 claims description 13
- 229910000838 Al alloy Inorganic materials 0.000 claims description 3
- 239000000956 alloy Substances 0.000 claims description 3
- 238000004806 packaging method and process Methods 0.000 abstract description 5
- 239000012212 insulator Substances 0.000 description 7
- 229910000831 Steel Inorganic materials 0.000 description 5
- 238000000034 method Methods 0.000 description 5
- 239000010959 steel Substances 0.000 description 5
- 239000000463 material Substances 0.000 description 3
- 208000031481 Pathologic Constriction Diseases 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000000630 rising effect Effects 0.000 description 2
- 210000001215 vagina Anatomy 0.000 description 2
- 206010014357 Electric shock Diseases 0.000 description 1
- 229910052782 aluminium Inorganic materials 0.000 description 1
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 238000002372 labelling Methods 0.000 description 1
- -1 leading screw Chemical compound 0.000 description 1
- 229910052751 metal Inorganic materials 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 238000011017 operating method Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
Landscapes
- Electric Cable Installation (AREA)
Abstract
This utility model provides the assembly of a kind of lifting lead wire, including: the first end of leading screw has the first connecting portion;Operation handle includes handle main body and the screw shell of the first end with handle main body, and screw shell is suitable with leading screw;First end of pull bar has the second connecting portion, and it is detachably connected that the second end of pull bar has wire auxiliary section, the first connecting portion and the second connecting portion;The centre of fastener has through hole, the internal diameter of through hole is more than the external diameter of leading screw, leading screw passes fastener, fastener is arranged between operation handle and the first connecting portion, the lower surface of fastener has seat slot so that seat slot matches with the back-to-back angle bar on high voltage iron tower, and fastener can be passed by the gap of back-to-back angle bar;The external diameter of locating part is more than the internal diameter of through hole, and leading screw is through locating part and makes locating part fastener and operation handle.The technical solution of the utility model solve of the prior art when lifting lead wire packaging efficiency low, work unsafe problem.
Description
Technical field
This utility model relates to the technical field of the work facility of power construction, in particular to a kind of lifting lead wire
Assembly.
Background technology
Overhead transmission line is when carrying out linear insulator chain and changing, and the mode that leading screw can be used to connect pull bar carries as wire
The instrument of liter.At present, when installing this hoisting tool, be all that split is transferred on tower, by leading screw in the middle of the back-to-back angle steel from
Penetrate under and, then be connected with pull bar.Such reason done is that the fixture that leading screw is supported on back-to-back angle steel is wide, nothing
Method penetrates from below to up.There is packaging efficiency on tower during operation low, work unsafe problem.
Utility model content
Main purpose of the present utility model is to provide the assembly of a kind of lifting lead wire, to solve of the prior art carrying
When rising wire, packaging efficiency is low, and work unsafe problem.
To achieve these goals, this utility model provides the assembly of a kind of lifting lead wire, including: leading screw, leading screw
First end has the first connecting portion;Operation handle, operation handle includes handle main body and the spiral shell of the first end with handle main body
Stricture of vagina sleeve, screw shell is suitable with leading screw;Pull bar, the first end of pull bar has the second connecting portion, and the second end of pull bar has
Wire auxiliary section, the first connecting portion and the second connecting portion are detachably connected;Fastener, the centre of fastener has through hole, through hole
Internal diameter passes fastener more than the external diameter of leading screw, leading screw, and fastener is arranged between operation handle and the first connecting portion, the following table of fastener
Mask has seat slot so that seat slot matches with the back-to-back angle bar on high voltage iron tower, and fastener can be worn by the gap of back-to-back angle bar
Cross;Locating part, the external diameter of locating part is more than the internal diameter of through hole, and leading screw is through locating part and makes locating part be positioned at fastener and manipulator
Between handle.
Further, seat slot includes that the first groove and the second groove, the first groove and the second groove are arranged on the phase of through hole
To both sides, the groove depth of the first groove is identical with the height of back-to-back angle bar, the groove depth of the second groove and the groove depth phase of the first groove
Deng.
Further, seat slot includes that the 3rd groove and the 4th groove, the 3rd groove and the 4th groove are arranged on the another of through hole
Outer opposite sides, the 3rd groove and the first groove and the second groove all intersect vertically, the 4th groove and the first groove and second
Groove all intersects vertically, and the groove depth of the 3rd groove is identical with the height of back-to-back angle bar, the groove depth of the 4th groove and the 3rd groove
Groove depth equal.
Further, fastener is rectangular structure, and the long limit of rectangular structure is more than the gap between back-to-back angle bar, long
The minor face of cube structure is less than the gap between back-to-back angle bar.
Further, the through hole of fastener has the chamfering suitable with locating part.
Further, locating part also includes locating part main body and anti-abrasion structure, anti-abrasion structure be arranged on locating part main body with
Between fastener.
Further, anti-abrasion structure is bearing, and bearing is nested in locating part main body, and fastener abuts against with anti-abrasion structure.
Further, fastener is made up of aluminum alloy material.
Further, the assembly of lifting lead wire also includes card-bit part, and card-bit part has the screwed hole suitable with leading screw, silk
Thick stick passes card-bit part, and card-bit part is positioned at the side away from fastener of operation handle so that manipulator's handle type is become screens.
Further, pull bar is made up of insulant.
Application the technical solution of the utility model, first will operate handle, pull bar, fastener and locating part and install to leading screw
On, then the assembly of lifting lead wire is passed in the gap of back-to-back angle bar from bottom to top.When fastener is through back-to-back angle bar
Behind gap, by the seat slot seat on fastener on back-to-back angle bar.Then wire is hung on pull bar, by operation handle rotating wire
Thick stick, by lifting wire, at this moment hangs and draws the insulator of this wire to be not subjected to pulling force, thus can easily change insulator.Should
With the technical solution of the utility model efficiently solve of the prior art when lifting lead wire packaging efficiency low, work uneasiness
Full problem.
Accompanying drawing explanation
The Figure of description of the part constituting the application is used for providing being further appreciated by of the present utility model, this practicality
Novel schematic description and description is used for explaining this utility model, is not intended that improper restriction of the present utility model.
In the accompanying drawings:
Fig. 1 shows the local schematic front view of the embodiment of the assembly according to lifting lead wire of the present utility model;
Fig. 2 shows the schematic side view of the embodiment of the assembly of the lifting lead wire of Fig. 1;And
Fig. 3 shows the schematic top plan view of the embodiment of the assembly of the lifting lead wire of Fig. 1.
Wherein, above-mentioned accompanying drawing includes the following drawings labelling:
10, leading screw;20, fastener;21, seat slot;30, locating part.
Detailed description of the invention
It should be noted that in the case of not conflicting, the embodiment in the application and the feature in embodiment can phases
Combination mutually.Describe this utility model below with reference to the accompanying drawings and in conjunction with the embodiments in detail.
It it is noted that described further below is all exemplary, it is intended to provide further instruction to the application.Unless it is another
Indicating, all technology used herein and scientific terminology have usual with the application person of an ordinary skill in the technical field
The identical meanings understood.
For the ease of describing, space relative terms here can be used, as " ... on ", " ... top ",
" at ... upper surface ", " above " etc., be used for describing such as a device shown in the figure or feature and other devices or spy
The spatial relation levied.It should be appreciated that space relative terms is intended to comprise except the described in the drawings orientation of device
Outside different azimuth in use or operation.Such as, if the device in accompanying drawing is squeezed, then it is described as " at other devices
Part or structure above " or " other devices or structure on " device after will be positioned as " other devices or construct under
Side " or " under other devices or structure ".Thus, exemplary term " ... top " can include " ... top " and
" in ... lower section " two kinds of orientation.This device can also other different modes location (90-degree rotation or be in other orientation), and
And space used herein above described relatively make respective explanations.
Now, it is more fully described with reference to the accompanying drawings according to illustrative embodiments of the present utility model.But, these show
Example embodiment can be implemented by multiple different form, and should not be construed to be limited solely to reality set forth herein
Execute mode.It should be appreciated that these embodiments are provided so that disclosure of the present utility model is thorough and complete, and
The design of these illustrative embodiments is fully conveyed to those of ordinary skill in the art, in the accompanying drawings, for the sake of clarity,
Expand the thickness in layer and region, and make to be presented with like reference characters identical device, thus by omit to they
Describe.
As it is shown in figure 1, the assembly of the lifting lead wire of the present embodiment includes: leading screw 10, operation handle, pull bar, fastener 20 and
Locating part 30.First end of leading screw 10 has the first connecting portion.Operation handle include handle main body and with handle main body the
The screw shell of one end, screw shell is suitable with leading screw.First end of pull bar has the second connecting portion, the second end tool of pull bar
There are wire auxiliary section, the first connecting portion and the second connecting portion detachably connected.The centre of fastener 20 has through hole, through hole interior
Footpath is more than the external diameter of leading screw 10, and leading screw 10 is through fastener 20, and fastener 20 is arranged between operation handle and the first connecting portion, fastener
The lower surface of 20 has seat slot 21 so that seat slot 21 matches with the back-to-back angle bar on high voltage iron tower, and fastener 20 can be by back-to-back
Pass in the gap of angle bar.The external diameter of locating part 30 is more than the internal diameter of through hole, and leading screw 10 is through locating part 30 and makes locating part 30
Between fastener 20 and operation handle.
The technical scheme of application the present embodiment, first installs operation handle, pull bar, fastener 20 and locating part 30 to leading screw
On 10, then the assembly of lifting lead wire is passed in the gap of back-to-back angle bar from bottom to top.When fastener is through back-to-back angle bar
Gap after, by the seat slot on fastener 20 21 on back-to-back angle bar.Then wire is hung on pull bar, by operation handle
Rotating threaded shaft 10, by lifting wire, at this moment hangs and draws the insulator of this wire to be not subjected to pulling force, thus can easily change
Insulator.Application the present embodiment technical scheme efficiently solve of the prior art when lifting lead wire packaging efficiency low,
Work unsafe problem.
As shown in Figure 1 to Figure 3, in the technical scheme of the present embodiment, seat slot 21 includes the first groove and the second groove, the
One groove and the second groove are arranged on the opposite sides of through hole, and the groove depth of the first groove is identical with the height of back-to-back angle bar, the
The groove depth of two grooves and the groove depth of the first groove are equal.Specifically, angle bar is made up of two firm materials of strip, and two firm materials of strip hang down
Straight setting, the groove depth of the first groove is identical with the height on angle bar limit, and (height of the strip steel on one limit of angle bar deducts
The thickness of strip steel), after so making clip seat enter angle bar, fastener fits with the other iron plate of angle bar, such fastener
20 can preferably coordinate with angle bar so that fastener 20 is more firm with the installation of angle bar.
As shown in Figure 1 to Figure 3, in the technical scheme of the present embodiment, seat slot 21 includes the 3rd groove and the 4th groove, the
Three grooves and the 4th groove are arranged on the other opposite sides of through hole, and the 3rd groove and the first groove and the second groove are the most vertical
Intersecting, the 4th groove and the first groove and the second groove all intersect vertically, the groove depth of the 3rd groove and the height of back-to-back angle bar
Identical, the groove depth of the 4th groove and the groove depth of the 3rd groove are equal.Said structure ensure that fastener 20 can adapt to different model
Angle bar, expand the versatility of the present embodiment.
As shown in Figure 1 to Figure 3, in the technical scheme of the present embodiment, fastener 20 is rectangular structure, rectangular structure
Long limit is more than the gap between back-to-back angle bar, and the minor face of rectangular structure is less than the gap between back-to-back angle bar.So exist
During by gap between back-to-back angle bar, can first rotate and upgrade the assembly of wire, make the minor face of fastener 20 through back-to-back
The gap of angle bar, rotates and upgrades the assembly of wire the most again, makes the seat slot on the long limit of fastener 20 coordinate with angle bar.Said structure
Handling ease, easy to operate.
In the technical scheme of the present embodiment, the through hole of fastener 20 has the chamfering suitable with locating part 30.Above-mentioned knot
Structure makes locating part 30 preferably be combined together with fastener 20.Specifically, locating part 30 has the spiral shell matched with leading screw 10
Stricture of vagina, the lower surface of fastener 20 abuts with angle bar, and the upper surface of fastener 20 abuts against with locating part 30, thus achieves lifting and leads
The suspension to wire of the assembly of line.
In the technical scheme of the present embodiment, locating part 30 also includes locating part main body and anti-abrasion structure, and anti-abrasion structure sets
Put between locating part main body and fastener 20.Said structure, when operating rotatable handle, reduces between leading screw 10 and fastener 20
Frictional force.On the one hand said structure reduces exerting oneself of operator, on the other hand decreases fastener 20, locating part 30 and operation
Abrasion between handle.Specifically, anti-abrasion structure is bearing, and bearing is nested on locating part 30, fastener 20 and anti-abrasion structure phase
Abut.First operation handle, pull bar, fastener 20 and locating part 30 are installed to leading screw 10, then by the assembly of lifting lead wire from
Pass from bottom to top in the gap of angle bar back-to-back.After fastener passes the gap of back-to-back angle bar, by the seat slot on fastener 20
21 on back-to-back angle bar.Then wire is hung on pull bar, by operation handle rotating threaded shaft 10 by lifting wire, in rotation
When turning leading screw 10, locating part 30 rotates together with leading screw 10, owing to having anti-attrition part between locating part main body and fastener 20, so
Frictional force between locating part main body and fastener 20 is less, and operator's is the least.When the assembly of lifting lead wire bears wire
Gravity after, hang and draw the insulator of this wire to be not subjected to pulling force, thus can easily change insulator.
In the technical scheme of the present embodiment, fastener 20 is made up of aluminum alloy material.On the one hand said structure ensure that and carries
The assembly rising wire can bear bigger pulling force, and specifically pulling force is between 2 to 6 tons, on the other hand the assembly of lifting lead wire
Lighter.
As it is shown in figure 1, in the technical scheme of the present embodiment, the assembly of lifting lead wire also includes card-bit part, card-bit part has
Have the screwed hole suitable with leading screw 10, leading screw pass card-bit part, card-bit part be positioned at operation handle away from fastener side with
Manipulator's handle type is become screens.Card-bit part is tube-in-tube structure, so will not be due to the operation of mistake when operating rotatable handle
Operation handle is made to deviate from leading screw 10.
In the technical scheme of the present embodiment, pull bar is made up of insulant.Said structure avoids at lifting lead wire
During operator have the risk of electric shock.Specifically, the two ends of pull bar can be made of metal, such as aluminum, ferrum or rustless steel
Deng.The mid portion of pull bar can be made up of the material that resistance to tension is strong.
In sum, use the technical scheme of the present embodiment to be easy to operating personnel's Self-operating, grasp with integral form
Make, simplify operating procedure, remove fast with installation rate, shorten working hours, improve work efficiency, while improving safety
Reduce operating personnel's labor intensity.
It should be noted that term used herein above merely to describe detailed description of the invention, and be not intended to restricted root
Illustrative embodiments according to the application.As used herein, unless the context clearly indicates otherwise, otherwise singulative
It is also intended to include plural form, additionally, it should be understood that, when using term " to comprise " in this manual and/or " bag
Include " time, it indicates existing characteristics, step, operation, device, assembly and/or combinations thereof.
It should be noted that term " first " in specification and claims of the present utility model and above-mentioned accompanying drawing,
" second " etc. are for distinguishing similar object, without being used for describing specific order or precedence.Should be appreciated that so
Use data can exchange in the appropriate case, in order to embodiment example of the present utility model described herein if with
Order in addition to those here illustrating or describing is implemented.Additionally, term " includes " and " having " and they appoint
What deformation, it is intended that cover non-exclusive comprising, such as, contain series of steps or the process of unit, method, system,
Product or equipment are not necessarily limited to those steps or the unit clearly listed, but can include the most clearly listing or for
Other step that these processes, method, product or equipment are intrinsic or unit.
The foregoing is only preferred embodiment of the present utility model, be not limited to this utility model, for this
For the technical staff in field, this utility model can have various modifications and variations.All in spirit of the present utility model and principle
Within, any modification, equivalent substitution and improvement etc. made, within should be included in protection domain of the present utility model.
Claims (10)
1. the assembly of a lifting lead wire, it is characterised in that including:
Leading screw (10), the first end of described leading screw (10) has the first connecting portion;
Operation handle, described operation handle includes handle main body and the screw shell of the first end with described handle main body, institute
State screw shell suitable with described leading screw (10);
Pull bar, the first end of described pull bar has the second connecting portion, and the second end of described pull bar has a wire auxiliary section, and described
A junction and described second connecting portion are detachably connected;
Fastener (20), the centre of described fastener (20) has through hole, and the internal diameter of described through hole is more than the external diameter of described leading screw (10),
Described leading screw (10) passes described fastener (20), described fastener (20) be arranged on described operation handle and described first connecting portion it
Between, the lower surface of described fastener (20) has seat slot (21) so that described seat slot (21) and the back-to-back angle bar phase on high voltage iron tower
Coordinating, described fastener (20) can be passed by the gap of described back-to-back angle bar;
Locating part (30), the external diameter of described locating part (30) passes described limit more than the internal diameter of described through hole, described leading screw (10)
Position part (30) also makes described locating part (30) be positioned between described fastener (20) and described operation handle.
The assembly of lifting lead wire the most according to claim 1, it is characterised in that described seat slot (21) include the first groove and
Second groove, described first groove and described second groove are arranged on the opposite sides of described through hole, the groove of described first groove
Deep identical with the height of described back-to-back angle bar, the groove depth of described second groove and the groove depth of described first groove are equal.
The assembly of lifting lead wire the most according to claim 2, it is characterised in that described seat slot (21) include the 3rd groove and
4th groove, described 3rd groove and described 4th groove be arranged on the other opposite sides of described through hole, described 3rd recessed
Groove and described first groove and described second groove all intersect vertically, described 4th groove and described first groove and described second
Groove all intersects vertically, and the groove depth of described 3rd groove is identical with the height of described back-to-back angle bar, the groove of described 4th groove
Deep and described 3rd groove groove depth is equal.
The assembly of lifting lead wire the most according to claim 3, it is characterised in that described fastener (20) is rectangular structure,
The long limit of described rectangular structure is more than the gap between described back-to-back angle bar, and the minor face of described rectangular structure is less than described
Gap between angle bar back-to-back.
The assembly of lifting lead wire the most according to claim 4, it is characterised in that the through hole of described fastener (20) has and institute
State the chamfering that locating part (30) is suitable.
The assembly of lifting lead wire the most according to any one of claim 1 to 5, it is characterised in that described locating part (30)
Also include locating part main body and anti-abrasion structure, described anti-abrasion structure be arranged on described locating part main body and described fastener (20) it
Between.
The assembly of lifting lead wire the most according to claim 6, it is characterised in that described anti-abrasion structure is bearing, described axle
Holding and be nested in described locating part main body, described fastener (20) abuts against with described anti-abrasion structure.
The assembly of lifting lead wire the most according to claim 7, it is characterised in that described fastener (20) is by aluminum alloy material system
Become.
The assembly of lifting lead wire the most according to claim 1, it is characterised in that the assembly of described lifting lead wire also includes card
Position part, described card-bit part has the screwed hole suitable with described leading screw (10), and described leading screw (10) passes described card-bit part, institute
State card-bit part and be positioned at the side away from described fastener (20) of described operation handle so that described manipulator's handle type is become screens.
The assembly of lifting lead wire the most according to claim 1, it is characterised in that described pull bar is made up of insulant.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620774916.7U CN205863780U (en) | 2016-07-21 | 2016-07-21 | The assembly of lifting lead wire |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620774916.7U CN205863780U (en) | 2016-07-21 | 2016-07-21 | The assembly of lifting lead wire |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205863780U true CN205863780U (en) | 2017-01-04 |
Family
ID=57648157
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620774916.7U Active CN205863780U (en) | 2016-07-21 | 2016-07-21 | The assembly of lifting lead wire |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205863780U (en) |
-
2016
- 2016-07-21 CN CN201620774916.7U patent/CN205863780U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204150929U (en) | A kind of suspender | |
CN205863780U (en) | The assembly of lifting lead wire | |
CN208858298U (en) | Rotary drilling rig connection frame, connection frame group and rotary drilling rig | |
CN207401033U (en) | The safety belt suspension device of for transformer | |
CN103414122A (en) | Hanging type tool box | |
CN102602794B (en) | Special tool for lifting bushing | |
CN205603067U (en) | Portable gallows that overhauls | |
CN106786158A (en) | A kind of replacing servicing unit for conductor spacer on UHV transmission line | |
CN206299347U (en) | Top drive guide rail connector and top drive guide rail assembly | |
CN207008154U (en) | A kind of Optical hanger with upper arm and clamp | |
CN202625632U (en) | Overhead working hanging basket for crane | |
CN206855318U (en) | Wire harness general assembly quick change frock panel assembly | |
CN206431286U (en) | Radar site adjusting means and the Radar Measurement System with it | |
CN206427967U (en) | A kind of high reliability balancer interval positioner | |
CN207570639U (en) | Magnetic turning plate liquid level meter correcting device | |
CN206071801U (en) | A kind of maintenance frock for wind turbine cabin equipment | |
CN207383390U (en) | Vermicelli frame | |
CN104444906B (en) | Hoisting device | |
CN205677916U (en) | Fixed knot constructs and has its pipeline purifier | |
CN206563027U (en) | Lift bolt | |
CN105262005A (en) | Auxiliary supporting device for pole overhead ground wire and OPGW optical cable | |
CN206014242U (en) | A kind of aid for lifting insulator | |
CN207010173U (en) | A kind of high-tension electricity turns to rigging | |
CN213326018U (en) | Multifunctional instrument cable pay-off tool | |
CN207375661U (en) | A kind of derrick car with swivel mount limiting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |