CN205855867U CN201620858862.2U CN201620858862U CN205855867U CN 205855867 U CN205855867 U CN 205855867U CN 201620858862 U CN201620858862 U CN 201620858862U CN 205855867 U CN205855867 U CN 205855867U
Authority
CN
China
Prior art keywords
structural member
jib
fixed
tower
tower top
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620858862.2U
Other languages
Chinese (zh)
Inventor
许定光
陈赣平
吴永刚
姚金柯
梁志文
陈功
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Co Ltd Of Guangdong Construction Machinery Factory
Institute of Building Mechanization of Chinese Academy of Building Research
Original Assignee
Co Ltd Of Guangdong Construction Machinery Factory
Institute of Building Mechanization of Chinese Academy of Building Research
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Co Ltd Of Guangdong Construction Machinery Factory, Institute of Building Mechanization of Chinese Academy of Building Research filed Critical Co Ltd Of Guangdong Construction Machinery Factory
Priority to CN201620858862.2U priority Critical patent/CN205855867U/en
Application granted granted Critical
Publication of CN205855867U publication Critical patent/CN205855867U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model proposes a kind of double horizontal arm tower crane and receive arm mechanism, including the tower top structural member being fixed on above slewing tower and the horizontally hinged jib in tower top structural member root both sides, also include two winding plants being arranged on below tower top structural member.Two groups of fixed pulleys are fixed at the top of tower top structural member.Both sides jib winds up and is respectively equipped with movable pulley, and steel wire rope is drawn from winding plant, passes sequentially through fixed pulley and movable pulley, and termination is fixed on jib or tower top structural member.This utility model is by arranging independent receipts arm mechanism, complete the receipts arm work of double horizontal arm tower crane, it is to avoid again pass around steel wire rope operation during receipts arm, be conducive to improving work efficiency, promote the safety of disassembly process, there is substantive distinguishing features and progress.

Description

A kind of double horizontal arm tower crane receives arm mechanism
Technical field
This utility model relates to power transmission tower frame technical field of construction, is specifically related to a kind of double horizontal arm tower crane and receives arm Mechanism.
Background technology
Part specific use derrick crane such as power transmission tower installation double horizontal arm tower crane, needs in demolishing process Jib reclaimed and to be brought to tower top.In prior art, the receipts arm mechanism of double horizontal arm tower crane is performing receipts arm operation Time, need again to pass around hoisting mechanism steel wire rope, utilize lifting mechanism to complete to receive arm as power.Again steel wire rope is passed around Work, needs manually to complete in high-altitude, and one carrys out workload relatively greatly, and two exist potential safety hazard.
Utility model content
The utility model proposes a kind of double horizontal arm tower crane and receive arm mechanism, solve double horizontal arm tower in prior art Formula crane, when performing to receive arm operation, needs the technical problem manually again passed around by hoisting mechanism steel wire rope in high-altitude.
The technical solution of the utility model is achieved in that a kind of double horizontal arm tower crane receives arm mechanism, including It is fixed on the tower top structural member above slewing tower and is hinged on the jib of tower top structural member root both sides, also including being arranged on tower Two winding plants below roof construction part.Two groups of fixed pulleys are fixed at the top of tower top structural member, and both sides jib winds up and sets respectively Having movable pulley, steel wire rope is drawn from winding plant, passes sequentially through fixed pulley and movable pulley, and termination can be fixed on arm as required On frame or tower top structural member, form many multiplying powers assembly pulley and receive arm mechanism.When derrick crane work jib is in level, Operation controls winding plant makes steel wire rope loosen, and does not affect jib and other structures, mechanism's work;When needing to pack up jib, behaviour Make winding plant rolling steel wire rope, make jib rotate near tower top around root hinge.
The both sides of described tower top structural member are provided with the connection seat of fixing jib, and described jib correspondence position is provided with described Connecting the otic placode that seat matches, described otic placode is fixed with the described seat that is connected by bearing pin.When receiving arm, when jib revolves around root hinge Turn near tower top rear stop in place, with bearing pin, otic placode is fixed with being connected seat, it is ensured that safety.
This utility model is not against the lifting mechanism of derrick crane, by arranging independent receipts arm mechanism, completes double water The receipts arm work of flat arm derrick crane, it is to avoid again pass around steel wire rope operation during receipts arm, is conducive to improving work effect Rate, promotes the safety of disassembly process, has substantive distinguishing features and progress.
Accompanying drawing explanation
In order to be illustrated more clearly that this utility model embodiment, the required accompanying drawing used in embodiment being described below It is briefly described, it should be apparent that, the accompanying drawing in describing below is only embodiments more of the present utility model, for ability From the point of view of the those of ordinary skill of territory, on the premise of not paying creative work, it is also possible to obtain the attached of other according to these accompanying drawings Figure.
Fig. 1 is that this utility model one double horizontal arm tower crane receives arm mechanism schematic diagram.
Labelling in figure, 1, fixed pulley;2, steel wire rope;3, seat is connected;4, tower top structural member;5, winding plant;6, movable pulley; 7, end fixing device;8, jib;9, jib winds up;10, slewing tower;11, otic placode.
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of this utility model rather than whole Embodiment.Based on the embodiment in this utility model, those of ordinary skill in the art are not under making creative work premise The every other embodiment obtained, broadly falls into the scope of this utility model protection.
Being that a kind of double horizontal arm tower crane receives arm mechanism shown in figure, tower top structural member 4 is hingedly fixed in turret The top of body 10, jib 8 is hinged on the both sides of tower top structural member 4 root, in the lower section of tower top structural member 4, arranges two elevators Device 5, the top of tower top structural member 4 fixes two groups of fixed pulleys 1, and the jib of both sides winds up and is respectively equipped with end fixing device 7 on 9 With one group of movable pulley 6, steel wire rope 2 is drawn from winding plant 5 respectively, is passed sequentially through fixed pulley group 1 and movable pulley 6, according to again Rate needs to be fixed on end fixing device 7 or on tower top structural member 4 after fixed pulley group 1 returns, and forms many multiplying powers assembly pulley Receive arm mechanism.
The both sides of tower top structural member 4 are provided with the connection seat 3 of fixing jib 8, and the correspondence position of jib 8 is provided with and is connected seat The otic placode 11 of 3 couplings, is connected and can be fixed by pivot pin between seat 3 and otic placode 11.
When jib 8 is in level, operation control winding plant 5 makes steel wire rope 2 loosen, do not affect jib 8 and His structure, mechanism's work;When needing to pack up jib 8, operate winding plant 5 rolling steel wire rope 2, make jib 8 revolve around root hinge Turn near tower top structural member 4, rear stop in place, with bearing pin, connection seat 3 is fixed with otic placode 11, complete one and receive arm work.
The foregoing is only preferred embodiment of the present utility model, not in order to limit this utility model, all at this Within the spirit of utility model and principle, any modification, equivalent substitution and improvement etc. made, should be included in this utility model Protection domain within.

Claims (2)

1. double horizontal arm tower crane receives an arm mechanism, including the tower top structural member being fixed on slewing tower (10) top And the horizontally hinged jib (8) in tower top structural member (4) root both sides (4), it is characterised in that: also include being arranged on tower top structure Two winding plants (5) of part (4) lower section, the top of tower top structural member (4) fixes two groups of fixed pulleys (1), and both sides jib winds up (9) being respectively equipped with movable pulley (6), steel wire rope (2) is drawn from winding plant (5), passes sequentially through fixed pulley (1) and movable pulley (6), termination is fixed on jib (8) or tower top structural member (4).
A kind of double horizontal arm tower crane the most according to claim 1 receives arm mechanism, it is characterised in that: described tower top is tied The both sides of component (4) are provided with the connection seat (3) of fixing jib (8), and described jib (8) correspondence position is provided with and is connected seat with described (3) otic placode (11) matched, described otic placode (11) is fixed with the described seat (3) that is connected by bearing pin.
CN201620858862.2U 2016-08-10 2016-08-10 A kind of double horizontal arm tower crane receives arm mechanism Active CN205855867U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620858862.2U CN205855867U (en) 2016-08-10 2016-08-10 A kind of double horizontal arm tower crane receives arm mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620858862.2U CN205855867U (en) 2016-08-10 2016-08-10 A kind of double horizontal arm tower crane receives arm mechanism

Publications (1)

Publication Number Publication Date
CN205855867U true CN205855867U (en) 2017-01-04

Family

ID=57657501

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620858862.2U Active CN205855867U (en) 2016-08-10 2016-08-10 A kind of double horizontal arm tower crane receives arm mechanism

Country Status (1)

Country Link
CN (1) CN205855867U (en)

Similar Documents

Publication Publication Date Title
CN201971572U (en) Movable arm type tower crane with suspension arm possible of being folded for dismounting
CN203284095U (en) Tower crane for cooling tower
CN203820334U (en) Device for descending and disassembling arm through turning back of tower cane in air
CN106115500A (en) A kind of high-rise building is special to be hung and certainly tears method open from tearing formula roofing open
CN204690604U (en) A kind of rotating in air suspender being applied to the stiff girder lifting of suspension bridge steel purlin and installing
CN204474085U (en) A kind of elevator high-altitude maintenance job platform
CN103991800A (en) Roof surface crane for building
CN107720569B (en) A kind of dismounting inner climbing crane tower is hung with masts type roofing
CN107840255A (en) A kind of both arms safe tower crane machine
CN205855867U (en) A kind of double horizontal arm tower crane receives arm mechanism
CN203382424U (en) Portable man-capstan for maintenance of distribution network
CN206735669U (en) Safety rotating formula builds loop wheel machine
CN207165365U (en) A kind of outdoor transformer installation support frame
CN207361667U (en) A kind of lifting device of town road well lid
CN204607534U (en) Electric force pole tower or line bar machinery climbing device
CN204402335U (en) A kind of strain insulator Special maintenance tool
CN204897249U (en) Swing arm tower crane
CN107601301A (en) A kind of steel reinforcement cage lifting device and hoisting method
CN208500178U (en) A kind of building hanging basket for house construction engineering
CN206917808U (en) A kind of wind tower construction maintenance platform
CN107359539A (en) Ground wire changes special crossing frame
CN202175522U (en) Device for hoisting concrete pole
CN203728451U (en) Adjustable variable arm joint for crane boom
CN204967133U (en) Transmission of electricity is led ground wire foreign matter and is draged slide hook instrument of cleaing away
CN206457788U (en) A kind of water conservancy lock for being easy to cleaning stands device for hoisting