CN205840884U - A kind of concrete shield duct piece of pre-buried curved channel - Google Patents
A kind of concrete shield duct piece of pre-buried curved channel Download PDFInfo
- Publication number
- CN205840884U CN205840884U CN201620690362.2U CN201620690362U CN205840884U CN 205840884 U CN205840884 U CN 205840884U CN 201620690362 U CN201620690362 U CN 201620690362U CN 205840884 U CN205840884 U CN 205840884U
- Authority
- CN
- China
- Prior art keywords
- duct piece
- curved channel
- shield duct
- buried
- reinforcement cage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The utility model discloses the concrete shield duct piece of a kind of pre-buried curved channel; its drip irrigation device is to include shield duct piece body and be circumferentially embedded in the intrinsic curved channel of shield duct piece; shield duct piece is the most internal is embedded with steel reinforcement cage; do not come in contact between curved channel and steel reinforcement cage or be provided with insulator spacer; after this shield segment assembling completes; all kinds of supports can be connected with liner structure by pre-buried curved channel, has reached not destroy shield duct piece, the purpose of protection liner structure safety.
Description
Technical field
This utility model relates to the concrete shield duct piece of a kind of pre-buried curved channel, mixed in shield method tunnel construction
The assembly of solidifying soil liner structure.
Background technology
Concrete shield duct piece is the structure component of shield method tunnel construction, and the permanent support being formed tunnel by assembly is tied
Structure.Existing shield duct piece refers to the Chinese patent of Application No. 201320410659.5.
In order to meet the needs of later stage operation, when after tunnel holing through, generally will be at assembled concrete shield duct piece
On perforate artificially, to install all kinds of support, set up all kinds of pipelines such as electromechanics, fire-fighting, draining, communication, to concrete shield pipe
The destruction of sheet is quite serious, and section of jurisdiction is prone to cracking, seepage, affects structural safety and service life, and later period maintenance operational difficulties,
Maintenance cost is high, even jeopardizes operation security.Additionally, artificial drilling efficiency is low, construction period is longer, and construction quality cannot
Ensureing, in work progress, the noise of generation, dust, vibrations etc. have a strong impact on workers ' health simultaneously, do not meet national green construction
Developing direction.
Utility model content
The purpose of this utility model is to provide a kind of installation safe ready, structural strength is higher, do not destroy shield duct piece, guarantor
Protect the concrete shield duct piece of the pre-buried curved channel of liner structure safety.
Above-mentioned technical purpose of the present utility model has the technical scheme that a kind of pre-buried curved channel
Concrete shield duct piece, including shield duct piece body and be circumferentially embedded in the intrinsic curved channel of shield duct piece, shield
This internal steel reinforcement cage that is embedded with of structure section of jurisdiction, is provided with insulator spacer between curved channel and steel reinforcement cage.
By using technique scheme, the curved channel being embedded in concrete shield duct piece does not connects with steel reinforcement cage
Touching or be dielectrically separated from contact point, can avoid the generation of stray electrical current, the structure of arc can be divided to a certain extent simultaneously
Dissipate active force, it is ensured that installation safe ready, structural strength are higher.After this shield duct piece completes assembly, can be in tunnel-liner
Cambered surface forms the equally spaced curved channel being distributed ringwise, and all kinds of supports, support etc. are tied with tunnel-liner by curved channel
Structure is connected, and has reached not destroy shield duct piece, the purpose of protection liner structure safety, and easy for installation, construction environment is good, work
Efficiency is high, can effective reduction of erection time, and avoid concrete shield duct piece perforate, it is ensured that the safety of xoncrete structure.
It is also preferred that the left insulator spacer is external series gap.
By using technique scheme, insulating effect can be played to a certain extent, the most effectively avoid stray electrical
The generation of stream.
It is also preferred that the left insulator spacer is insulation spacer, insulation spacer is made up of insulant.
By using technique scheme, insulating effect can be played to a certain extent, the most effectively avoid stray electrical
The generation of stream, is simultaneously connected with relatively stable, and structural strength is higher.
It is also preferred that the left be provided with cambered surface grout hole and hand hole on shield duct piece body, curved channel be positioned at cambered surface grout hole and
Between hand hole.
By using technique scheme, structure arranges relatively reasonable so that structure is the most stable.
It is also preferred that the left be provided with dowel radially between shield duct piece body and curved channel.
By using technique scheme, play certain stiffening effect, the requirement for bearing capacity that pipeline is installed can be met.
It is also preferred that the left curved channel is positioned at the compass of steel reinforcement cage.
By using technique scheme, it is to avoid destroy structure too much, it is ensured that overall structural strength.
In sum, this utility model has the advantages that the curved channel being embedded in concrete shield duct piece
Do not come in contact with steel reinforcement cage or be dielectrically separated from contact point, the generation of stray electrical current, the simultaneously structure of arc can be avoided
Can dissipation of ferees to a certain extent, it is ensured that safe ready, structural strength are installed higher.
Accompanying drawing explanation
Fig. 1 is the front view of the concrete shield duct piece of pre-buried curved channel in embodiment 1;
Fig. 2 is the top plan view of the concrete shield duct piece of pre-buried curved channel;
Fig. 3 is the front view of the concrete shield duct piece of pre-buried curved channel in embodiment 2.
In figure, 1, shield duct piece body;2, curved channel;3, hand hole;4, cambered surface grout hole;5, dowel;6, grouting head;7、
Insulation spacer.
Detailed description of the invention
Below in conjunction with accompanying drawing, this utility model is described in further detail.The most identical parts are with identical accompanying drawing
Labelling represents.It should be noted that the word "front", "rear" used in describing below, "left", "right", "up" and "down" refer to
Being the direction in accompanying drawing, word " bottom surface " and " end face ", " interior " and " outward " refer respectively to towards or away from particular elements geometry
The direction at center.
Embodiment 1: the concrete shield duct piece of a kind of pre-buried curved channel 2, including shield duct piece body 1, shield duct piece
Being embedded with curved channel 2 in body 1, curved channel 2 is distributed ringwise.
The interior of shield duct piece body 1 is also embedded with steel reinforcement cage simultaneously, and steel reinforcement cage plays stiffening effect, curved channel 2
And it is provided with insulator spacer between steel reinforcement cage.
Insulator spacer is actual can be external series gap, i.e. curved channel 2 and steel reinforcement cage does not comes in contact.
Being provided with cambered surface grout hole 4 and hand hole 3 on shield duct piece body 1, curved channel 2 is positioned at cambered surface grout hole 4 and hands
Between hole 3, it is provided with grouting 6 when grouting at cambered surface grout hole 4.Curved channel 2 is positioned at the compass of steel reinforcement cage.
Embodiment 2: as it is shown on figure 3, insulator spacer is insulation spacer 7, insulation spacer 7 is made up of insulant, permissible
It it is elastomeric material.It is provided with dowel 5 radially between shield duct piece body 1 and curved channel 2 simultaneously.
First curved channel 2 is fastened between die bottom plate grout hole and hand hole 3, then shield duct piece steel reinforcement cage is put into mould
In tool, adjust steel reinforcement cage and the position of curved channel 2 and cover to reinforcement distance, in the portion that steel reinforcement cage contacts with curved channel 2
Position placement insulation spacer.Matched moulds after-pouring concrete, ascending by vibration force, gradually open vibrator.By concrete shield
The production technology of section of jurisdiction is shaped, the steam-cured and demoulding, produces the concrete shield duct piece of pre-buried curved channel 2.
This specific embodiment is only that it is not to restriction of the present utility model, ability to explanation of the present utility model
The present embodiment can be made after reading this specification by field technique personnel as required does not has the amendment of creative contribution, but
As long as all being protected by Patent Law in right of the present utility model.
Claims (6)
1. the concrete shield duct piece of a pre-buried curved channel, it is characterised in that: include shield duct piece body (1) and along ring
Curved channel (2) in being embedded in shield duct piece body (1), shield duct piece body is embedded with steel reinforcement cage, curved channel in (1)
And between steel reinforcement cage, be provided with insulator spacer (2).
The concrete shield duct piece of pre-buried curved channel the most according to claim 1, it is characterised in that: insulator spacer is
External series gap.
The concrete shield duct piece of pre-buried curved channel the most according to claim 1, it is characterised in that: insulator spacer is
Insulation spacer (7), insulation spacer (7) is made up of insulant.
The concrete shield duct piece of pre-buried curved channel the most according to claim 1, it is characterised in that: shield duct piece body
(1) being provided with cambered surface grout hole (4) and hand hole (3) on, curved channel (2) is positioned between cambered surface grout hole (4) and hand hole (3).
The concrete shield duct piece of pre-buried curved channel the most according to claim 1, it is characterised in that: shield duct piece body
(1) dowel (5) radially and it is provided with between curved channel (2).
The concrete shield duct piece of pre-buried curved channel the most according to claim 1, it is characterised in that: curved channel (2)
It is positioned at the compass of steel reinforcement cage.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620690362.2U CN205840884U (en) | 2016-07-01 | 2016-07-01 | A kind of concrete shield duct piece of pre-buried curved channel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620690362.2U CN205840884U (en) | 2016-07-01 | 2016-07-01 | A kind of concrete shield duct piece of pre-buried curved channel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205840884U true CN205840884U (en) | 2016-12-28 |
Family
ID=58149734
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620690362.2U Active CN205840884U (en) | 2016-07-01 | 2016-07-01 | A kind of concrete shield duct piece of pre-buried curved channel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205840884U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107725068A (en) * | 2017-11-06 | 2018-02-23 | 山东建筑大学 | A kind of assembled supporting construction and its construction method based on outside steel arch-shelf and inner side concrete slab |
CN112031817A (en) * | 2019-06-04 | 2020-12-04 | 南通铁建建设构件有限公司 | High-safety convenient installation shield segment with sliding groove |
-
2016
- 2016-07-01 CN CN201620690362.2U patent/CN205840884U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107725068A (en) * | 2017-11-06 | 2018-02-23 | 山东建筑大学 | A kind of assembled supporting construction and its construction method based on outside steel arch-shelf and inner side concrete slab |
CN112031817A (en) * | 2019-06-04 | 2020-12-04 | 南通铁建建设构件有限公司 | High-safety convenient installation shield segment with sliding groove |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205840884U (en) | A kind of concrete shield duct piece of pre-buried curved channel | |
CN104631507B (en) | A kind of manufacture method of concrete combined manhole cover | |
CN204984424U (en) | Prevent submerged cushion device of opening shield tail pipe piece | |
CN105401604A (en) | Reserved connecting port structure for underground pipe gallery and implementation method thereof | |
CN104047232B (en) | Road and bridge concreting preformed hole or built-in fitting are from active and inactive mold stripper apparatus | |
CN204732811U (en) | The dynamo-electric embedded box device of a kind of cast-in-situ clear-water concrete wall | |
CN205178422U (en) | Cast -in -place clear water concrete embedded box device | |
CN102865087B (en) | Embedded grout pipe device in lining concrete of chamber and construction method | |
CN105332375A (en) | Fixing method for base of pile driver for static-pressed pile by anchor rods | |
CN206554511U (en) | A kind of improved water-stop opposite-pulling screw rod device | |
CN113235652A (en) | Leakage plugging method for deformation joint of comprehensive pipe gallery | |
CN207959944U (en) | A kind of built-in pipe aperture protective cap | |
CN105317230A (en) | Fixing method of beam and wall pre-embedded horizontal sleeve | |
CN207475147U (en) | A kind of half assembly type cable slot of vcehicular tunnel | |
CN105064217A (en) | Mortar leakage preventing device for bridge cap beam bottom mold | |
CN202081579U (en) | Waterproof device for finished tie bar cable at position of embedded pipe orifice | |
CN202401469U (en) | Connection type prefabricated communication tower foundation | |
CN106120656B (en) | A kind of application method of the underwater constructing device for changing waterstop | |
CN203891067U (en) | Cover and excavation top-down waterproof outer-side wall system | |
CN104264992B (en) | Construction method for high-rise building pipe rooms | |
CN107762245B (en) | Tower protection device for isolating filling pressure and installation method thereof | |
CN206468357U (en) | A kind of covered structure of built-in groove | |
CN106142288A (en) | Shuttering precast concrete slightly vibrates technology | |
CN204715766U (en) | A kind of pneumatic flat-plate vibrator | |
CN205934985U (en) | Novel inspection well cover |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |