CN203891067U - Cover and excavation top-down waterproof outer-side wall system - Google Patents

Cover and excavation top-down waterproof outer-side wall system Download PDF

Info

Publication number
CN203891067U
CN203891067U CN201420274637.5U CN201420274637U CN203891067U CN 203891067 U CN203891067 U CN 203891067U CN 201420274637 U CN201420274637 U CN 201420274637U CN 203891067 U CN203891067 U CN 203891067U
Authority
CN
China
Prior art keywords
side wall
wall
external wall
outside
epimere
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420274637.5U
Other languages
Chinese (zh)
Inventor
李崇
刘红跃
宋振宁
马硕
薛梦
杨志元
张小燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Rail Transit Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Original Assignee
Rail Transit Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Rail Transit Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd filed Critical Rail Transit Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority to CN201420274637.5U priority Critical patent/CN203891067U/en
Application granted granted Critical
Publication of CN203891067U publication Critical patent/CN203891067U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a cover and excavation top-down waterproof outer-side wall system and solves the problem that an existing cover and excavation top-down outer-side wall is uncompacted in combining of an upper-section side wall body and a lower-section side wall body and poor in subsequent waterproof effect. The cover and excavation top-down waterproof outer-side wall system is characterized in that an outer-side wall enclosure (3) is arranged between the lateral side of a middle plate (1) and that of a top plate (2), the bottom end face of an upper-section outer-side wall body (4) is an upper joint face upwards inclining by 30-45 degrees from outside to inside, an outer-side wall shaping combined formwork system (5) is arranged on the middle plate (1) on the inner side of the outer-side wall enclosure (3), a lower-section outer-side wall body (7) poured by concrete is arranged between the outer-side wall enclosure (3) and the outer-side wall shaping combined formwork system (5), and a rubber water-stopping sealing strip (8) and a full-section grouting pipe (9) are arranged at a joint between the upper-section outer-side wall body (4) and the lower-section outer-side wall body (7). By the cover and excavation top-down waterproof outer-side wall system, water in the outer-side wall enclosure can be effectively prevented from entering inside an outer-side wall.

Description

Lid digs the contrary waterproof external wall system of doing
Technical field
The utility model relates to a kind of lid and digs the contrary external wall system of making agent structure, and particularly a kind of lid digs the contrary waterproof external wall system in agent structure of doing.
Background technology
In the civil engineering of subway station, it is to complete after the space enclosing structure of station that lid digs adverse construction method method, from pushing up to a kind of method of bottom application work civil engineering agent structure.It is short that this method has the unlimited activity duration, little on surrounding enviroment impacts, to advantages such as road holding time are short; Agent structure itself has larger rigidity as the support system of space enclosing structure, can alleviate significantly the distortion that surrounding enviroment are caused because of excavation of foundation pit.Therefore, lid digs adverse construction method method, be in commercial area, the good construction method at building dense district and transport hub place.Dig contrary work in the civil engineering of agent structure at lid, after every layer of structural slab constructed, the external wall of agent structure starts to construct, wherein the epimere of external wall is built and is formed in advance together with top level structure plate, the hypomere of external wall forms by setting up cast-in-place the building of side wall fixed form combination shuttering system, bonding crack between epimere side wall body and hypomere side wall body is traditionally arranged to be common horizontal joint, exists epimere side wall body to be combined the poor technical problem of leakiness and later stage waterproof effect with hypomere side wall body.
Summary of the invention
The utility model provides a kind of lid to dig and contrary has made waterproof external wall system, has solved existing lid and has dug and contraryly make epimere side wall body that external wall exists and be combined the poor technical problem of leakiness and later stage waterproof effect with hypomere side wall body.
The utility model is to solve by the following technical programs above technical problem:
A kind of lid digs the contrary waterproof external wall system of doing, comprise middle plate and top board, between the avris of middle plate and the avris of top board, being provided with external wall goes along with sb. to guard him, inside the avris of top board, on bottom surface, be provided with top board and build in advance body of wall outside the epimere of moulding simultaneously, outside epimere, the bottom face of body of wall is the upper joint face of 30-45 degree of being inclined upwardly from outside to inside, external wall go along with sb. to guard him inner side middle plate on be provided with external wall fixed form combination shuttering system, be provided with external wall builds and uses introversion charging aperture on the top of external wall fixed form combination shuttering system, go along with sb. to guard him and built body of wall outside concrete hypomere between external wall fixed form combination shuttering system at external wall, outside epimere, outside body of wall and hypomere, the seam crossing between body of wall is respectively arranged with rubber water-proof weather strip and Full-face pouring pipe.
Outside epimere, the bottom face of body of wall is the upper joint face of 40 degree of being inclined upwardly from outside to inside.
The utility model is, by the seam crossing between body of wall outside body of wall outside epimere and hypomere, inside acclivitous constuction joint interface is set, in the time of cast-in-place lower section concrete external wall, after making cast-in-place concrete casting completely, push up along inside acclivitous angle to charging aperture, this inside acclivitous construction interface seam greatly reduces because concrete shrinkage deformation causes outside epimere the probability of body of wall disengaging outside body of wall and hypomere, and can effectively prevent that the water of external wall in going along with sb. to guard him from entering into external wall inside.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is elaborated:
A kind of lid digs the contrary waterproof external wall system of doing, comprise middle plate 1 and top board 2, between the avris of middle plate 1 and the avris of top board 2, be provided with external wall and go along with sb. to guard him 3, inside the avris of top board 2, on bottom surface, be provided with top board 2 and build in advance body of wall 4 outside the epimere of moulding simultaneously, outside epimere, the bottom face of body of wall 4 is the upper joint face of 30-45 degree of being inclined upwardly from outside to inside, go along with sb. to guard him at external wall on the middle plate 1 of 3 inner sides and be provided with external wall fixed form combination shuttering system 5, be provided with external wall builds with introversion charging aperture 6 on the top of external wall fixed form combination shuttering system 5, external wall go along with sb. to guard him 3 and external wall fixed form combination shuttering system 5 between built body of wall 7 outside concrete hypomere, outside epimere, outside body of wall 4 and hypomere, the seam crossing between body of wall 7 is respectively arranged with rubber water-proof weather strip 8 and Full-face pouring pipe 9.
Outside epimere, the bottom face of body of wall 4 is the upper joint face of 40 degree of being inclined upwardly from outside to inside.
Specific construction step of the present utility model is: after external wall is gone along with sb. to guard him 3 structure and completed, the excavation pit earthwork, then, construct from top to bottom top board 2 and middle plate 1, when top board 2 and middle plate 1 are constructed, downwards, along the reinforcing bar that connects body of wall 7 outside construction hypomere, after middle plate 1 completes, can on middle plate 1, set up external wall fixed form combination shuttering system 5; It should be noted that: in the time of the pouring construction of top board 2, want build in advance body of wall 4 outside epimere simultaneously, outside epimere, the bottom face of body of wall 4 will water the upper joint face that builds up the 30-45 degree that is inclined upwardly from outside to inside, when outside hypomere, body of wall 7 is built like this, can make concrete in the better combination of seam crossing, and reach the effect of effective waterproof.In the time that external wall is built, build and concrete is sent to outside hypomere in body of wall 7 with introversion charging aperture 6 by external wall, want to vibrate while building, when last concrete closes up, external wall to be built with introversion charging aperture 6 and together water and expire and vibration compacting, can avoid like this concrete shrinkage or heat of hydration distortion to cause hypomere external wall concrete and epimere to build in advance the disengaging of the outside body of wall of moulding.Finally, when the concrete of external wall reaches after design strength, while removing external wall fixed form combination shuttering system 5, first the external wall of building moulding is built with the concrete chisel removal of building on introversion charging aperture 6 to design size more.

Claims (2)

1. a lid digs the contrary waterproof external wall system of doing, comprise middle plate (1) and top board (2), between the avris of middle plate (1) and the avris of top board (2), be provided with external wall and go along with sb. to guard him (3), inside the avris of top board (2), on bottom surface, be provided with top board (2) and build in advance body of wall (4) outside the epimere of moulding simultaneously, it is characterized in that, the bottom face of body of wall outside epimere (4) is the upper joint face of 30-45 degree of being inclined upwardly from outside to inside, go along with sb. to guard him at external wall (3) inner side middle plate (1) on be provided with external wall fixed form combination shuttering system (5), be provided with external wall builds with introversion charging aperture (6) on the top of external wall fixed form combination shuttering system (5), go along with sb. to guard him at external wall and between (3) and external wall fixed form combination shuttering system (5), built body of wall (7) outside concrete hypomere, seam crossing outside body of wall outside epimere (4) and hypomere between body of wall (7) is respectively arranged with rubber water-proof weather strip (8) and Full-face pouring pipe (9).
2. a kind of lid according to claim 1 digs and contraryly makes waterproof external wall system, it is characterized in that, the bottom face of body of wall (4) is the upper joint face of 40 degree of being inclined upwardly from outside to inside outside epimere.
CN201420274637.5U 2014-05-27 2014-05-27 Cover and excavation top-down waterproof outer-side wall system Expired - Lifetime CN203891067U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420274637.5U CN203891067U (en) 2014-05-27 2014-05-27 Cover and excavation top-down waterproof outer-side wall system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420274637.5U CN203891067U (en) 2014-05-27 2014-05-27 Cover and excavation top-down waterproof outer-side wall system

Publications (1)

Publication Number Publication Date
CN203891067U true CN203891067U (en) 2014-10-22

Family

ID=51717488

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420274637.5U Expired - Lifetime CN203891067U (en) 2014-05-27 2014-05-27 Cover and excavation top-down waterproof outer-side wall system

Country Status (1)

Country Link
CN (1) CN203891067U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105155589A (en) * 2015-09-21 2015-12-16 中国矿业大学(北京) Transverse joint waterproof structure based on EPDM (Ethylene-Propylene-Diene Monomer) water bars
CN114934544A (en) * 2022-07-25 2022-08-23 中国建筑第六工程局有限公司 Construction method for covering and digging top-down side wall

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105155589A (en) * 2015-09-21 2015-12-16 中国矿业大学(北京) Transverse joint waterproof structure based on EPDM (Ethylene-Propylene-Diene Monomer) water bars
CN114934544A (en) * 2022-07-25 2022-08-23 中国建筑第六工程局有限公司 Construction method for covering and digging top-down side wall
CN114934544B (en) * 2022-07-25 2022-11-04 中国建筑第六工程局有限公司 Construction method for covering and digging top-down side wall

Similar Documents

Publication Publication Date Title
CN103981898B (en) A kind of inverse underground engineering construction method done of overall open cut node
CN105926802B (en) A kind of reinforcement structure of 3D printing reinforced masonry shear wall structure
CN102653945B (en) Foundation reinforcing and replacing structure and construction method thereof
CN206298900U (en) A kind of diaphram wall built-in type steel encloses purlin plug system
CN102561402B (en) Treatment method for construction joint between top plate and wall of individual underground civil air defense project constructed by covered top-down excavation method
CN104404983B (en) A kind of ride well device and construction method thereof for jacking construction
CN206376287U (en) Subway station main body and the float Structure of accessory structure interface
CN201588207U (en) Concreting device at construction joints
CN203891067U (en) Cover and excavation top-down waterproof outer-side wall system
CN103614998B (en) Inwall pouring concrete based on diaphragm wall is inverse makes method
CN103669422B (en) Waterproof construction method of pile head of anchor rod static pressure pile
CN103122642B (en) Construction method of vertical post support change
CN204282399U (en) A kind of subway space enclosing structure
CN204059417U (en) A kind of complete inverse impervious node structure of method wall beam
CN103334771A (en) Concrete pouring method of side wall and joint of middle plate and vault by means of underground excavation reverse construction method
CN105862894B (en) A kind of installation method of catch pit anti-floating integral mold plate
CN211395755U (en) Prefabricated square inspection shaft
CN103397661B (en) The construction technology of combined exterior wall structure under shaped steel-concrete ground
CN203716167U (en) Inverted structure for basement bearing platform bottom plate in fluidal plastic earthiness
CN203514332U (en) Casing for blocking dewatering tube well of post-cast strip
CN102926403B (en) Roof construction method by cover-excavation method
CN103374915B (en) Continuous closed hanging-upside-down shotcreting supporting system and construction method thereof
CN212835365U (en) Construction structure of PHC tubular pile
CN106013254B (en) A kind of construction method of the concrete works swaging die with skeleton
CN106436721A (en) Underground diaphragm wall embedded steel enclosing purlin plug system and construction method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant