CN205838665U - Anaerobic sequencing batch sludge bulking bed is flowed up on intermittent water inflow - Google Patents

Anaerobic sequencing batch sludge bulking bed is flowed up on intermittent water inflow Download PDF

Info

Publication number
CN205838665U
CN205838665U CN201620562139.XU CN201620562139U CN205838665U CN 205838665 U CN205838665 U CN 205838665U CN 201620562139 U CN201620562139 U CN 201620562139U CN 205838665 U CN205838665 U CN 205838665U
Authority
CN
China
Prior art keywords
cylinder
sludge bulking
gas skirt
water inflow
sequencing batch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620562139.XU
Other languages
Chinese (zh)
Inventor
刘川
刘晓川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongchuan Wuhan Tap Water Science And Technology Development Co Ltd
Original Assignee
Dongchuan Wuhan Tap Water Science And Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongchuan Wuhan Tap Water Science And Technology Development Co Ltd filed Critical Dongchuan Wuhan Tap Water Science And Technology Development Co Ltd
Priority to CN201620562139.XU priority Critical patent/CN205838665U/en
Application granted granted Critical
Publication of CN205838665U publication Critical patent/CN205838665U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Purification Treatments By Anaerobic Or Anaerobic And Aerobic Bacteria Or Animals (AREA)

Abstract

Anaerobic sequencing batch sludge bulking bed is flowed up, including cylinder on the open a kind of intermittent water inflow of this utility model;Internal circulation apparatus, including interior circulation water inlet pipe, interior recycling outlet, internal recycle pipeline pump, controller;Three phase separator, including gas skirt, mud chamber, drain pipe, exhaust chamber and reflecting plate, gas skirt outer rim is connected with cylinder, upper end, mud chamber connects gas skirt, lower end is connected with reflecting plate, and between mud chamber and gas skirt, form sediment space and collection headroom, drain pipe one end connects with sediment space, the other end extends to outside cylinder, and exhaust chamber connects with collection headroom.On the one hand this utility model carries out intermittent water inlet, stirring by internal circulation apparatus, thus batch-type carries out sludge bulking in cylinder, it is conducive to improving anaerobic reaction efficiency, and the stability that improve water outlet, give vent to anger, on the other hand Novel three-phase separator is set, is conducive to improving biogas gas collecting efficiency, strengthening solid-liquid separation effect, reduction drainage turbidity.

Description

Anaerobic sequencing batch sludge bulking bed is flowed up on intermittent water inflow
Technical field
This utility model relates to sewage disposal technology, especially relates to flow up anaerobic sequencing batch mud on a kind of intermittent water inflow Expanded bed.
Background technology
Conventional anaerobic sludge reactor has UASB, EGSB, IC etc., and its waste water handling principle is essentially, pending dirt Water is introduced reactor the most uniformly, and sewage is by comprising the Sludge Bed of granule sludge or floc sludge, and anaerobic reaction is sent out The raw process contacted with mud granule at waste water.The biogas (mainly methane and carbon dioxide) produced under anaerobic state causes Circulation inside, this is favourable for formation and the maintenance of granule sludge.Some gases formed at sludge blanket are attached to mud On granule, adhering to and do not have the gas of attachment to rise to reactor head, the mud rising to surface clashes into phase reactor gas The bottom of body emitter, causes the mud flco of bubbles attached to deaerate, and after bubble release, mud granule will be deposited to Sludge Bed Surface, adheres to and does not has the gas of attachment to be collected into the collection chamber of three phase separator of reactor head.It is placed in collection chamber list Acting as gas launcher and preventing biogas bubble from entering settling zone of baffle plate under unit gap, otherwise will cause settling zone Wadding is dynamic, granule can be hindered to precipitate, comprise the liquid of some remaining solids and mud granule through entrance settling zone, separator gap. Owing to the area of passage of the skew wall settling zone of separator increases when close to the water surface, therefore upflow velocity is dropping close to emission point Low, flow velocity reduces mud flco and can flocculate and precipitate in settling zone, and accumulation mud flco on three phase separator is necessarily To exceed its frictional force being maintained on skew wall in degree, it will slide back to reaction zone, and this partial sludge again will be with entering organic matter of water React.
Although the sewage disposal principle of above-mentioned anaerobic sludge reactor is essentially identical, also have different in sewage disposal Advantage and feature, but still there is anaerobic reaction inefficiency, three phase separator inferior separating effect and stable in it The defect that property, aerofluxus and draining stability are the highest.
Utility model content
The purpose of this utility model is to overcome above-mentioned technical deficiency, proposes to flow up anaerobic sequencing batch on a kind of intermittent water inflow Sludge bulking bed, solves anaerobic reaction inefficiency, three phase separator separation that in prior art, anaerobic sludge reactor exists Weak effect and the highest technical problem of line stabilization, aerofluxus and draining stability.
For reaching above-mentioned technical purpose, the technical solution of the utility model provides and flows up anaerobic on a kind of intermittent water inflow Formula sludge bulking bed, including,
The cylinder being vertically arranged;
One internal circulation apparatus, described internal circulation apparatus includes the interior circulation water inlet pipe near cylinder top setting, near institute State the interior recycling outlet of cylinder bottom setting, drive current to be moved to described interior recycling outlet by described interior circulation water inlet pipe Internal recycle pipeline pump and one control described internal recycle pipeline pump make intermittence drive controller;And
Three phase separator, described three phase separator includes gas skirt, mud chamber, drain pipe, exhaust chamber and reflecting plate, described Gas skirt outer rim is connected with described cylinder open top end, and upper end, described mud chamber is coaxially connected in described gas skirt following table Face, lower end are connected with described reflecting plate by multiple fixing posts, and form precipitation sky between described mud chamber inwall and gas skirt Between, form collection headroom between described mud chamber outer wall and described gas skirt, described drain pipe one end and described sediment space are even Logical, the other end extends to outside described cylinder, and described exhaust chamber connects with described collection headroom.
Preferably, described gas skirt is umbrella.
Preferably, described mud chamber is tubular and internal diameter is from top to bottom gradually reduced.
Preferably, described reflecting plate is tapered and is coaxially disposed with described mud chamber, multiple described equal one end of fixing post with Described mud chamber connects, the other end is connected on the conical surface of described reflecting plate.
Preferably, described gas skirt upper surface is provided with multiple support bar, and multiple described support bars are along described gas skirt top End is evenly arranged in lonizing radiation.
Preferably, it is provided with water inlet distributor in described cylinder.
Preferably, it is provided with probe tube in described cylinder and thermometer is installed pipe, described probe tube and thermometer and installed Guan Jun Arrange near described cylinder body bottom.
Preferably, described cylinder body bottom is provided with a discharge pipeline
Preferably, described gas skirt top is coaxially arranged with manhole on, and described cylinder lateral wall is provided with near bottom Manhole once.
Compared with prior art, on the one hand this utility model carries out intermittent water inlet, stirring by internal circulation apparatus, thus Batch-type carries out sludge bulking in cylinder, and it is conducive to improving anaerobic reaction efficiency, and the stability that improve water outlet, give vent to anger, On the other hand arranging Novel three-phase separator, it is conducive to improving biogas gas collecting efficiency, strengthening solid-liquid separation effect, reduction draining Turbidity.
Accompanying drawing explanation
Fig. 1 is the attachment structure schematic diagram flowing up anaerobic sequencing batch sludge bulking bed on intermittent water inflow of the present utility model;
Fig. 2 is the A-A direction view of Fig. 1 of the present utility model.
Detailed description of the invention
In order to make the purpose of this utility model, technical scheme and advantage clearer, below in conjunction with accompanying drawing and enforcement Example, is further elaborated to this utility model.Should be appreciated that specific embodiment described herein is only in order to explain This utility model, is not used to limit this utility model.
Referring to Fig. 1, Fig. 2, embodiment of the present utility model provides and flows up anaerobic sequencing batch dirt on a kind of intermittent water inflow Mud expanded bed, including the cylinder 1 being vertically arranged, internal circulation apparatus 2 and three phase separator 3.
Wherein, internal circulation apparatus 2 includes the interior circulation water inlet pipe 21 arranged near cylinder 1 top, near described cylinder 1 end Interior recycling outlet 22, driving current that end is arranged are moved to described interior recycling outlet 22 by described interior circulation water inlet pipe 21 The controller 24 of intermittent driving made by internal recycle pipeline pump 23 and a described internal recycle pipeline pump 23 of control.Its Concrete workflow Cheng Wei: internal recycle pipeline pump 23 drives the sewage of cylinder 1 upper end to be moved to interior recycling outlet 22 by interior circulation water inlet pipe 21, interior Sewage in recycling outlet 22 has certain flow rate under internal recycle pipeline pump 23 acts on and enters bottom cylinder 1, and then to cylinder The mud staticly settled bottom body 1 produces stirring action, makes sludge bulking, improves anaerobic reaction efficiency, it is possible in controlling The Water discharge flow speed controlling interior recycling outlet 22 of circulating pipe pump 23, i.e. controls the water inlet flow velocity bottom cylinder 1, it is achieved to dirt The control of mud swelling degree.Bottom cylinder 1 after water inlet stirring certain time, internal recycle pipeline pump 23 stops driving, and anaerobic reaction fills Distribution is raw, and the bubble of generation rises and passes through three phase separator 3 and carries out three phase separation;After standing certain time, in being again started up Circulating pipe pump 23, mud reexpands, and again promotes anaerobic reaction.Under above-mentioned intermittent water inlet, stirring, in cylinder 1 Intermittent quickening anaerobic reaction, advantageously ensures that the stability that integral device is run, and is also beneficial to going out of three phase separator 3 Water, stability of giving vent to anger.
The present embodiment three phase separator 3 includes gas skirt 31, mud chamber 32, drain pipe 33, exhaust chamber 34 and reflecting plate 35, Described gas skirt 31 outer rim is connected with described cylinder 1 open top end, and upper end, described mud chamber 32 is coaxially connected in described Gas skirt 31 lower surface, lower end are connected with described reflecting plate 35 by multiple fixing posts 36, and described mud chamber 32 inwall and collection Form sediment space between gas hood 31, between described mud chamber 32 outer wall and described gas skirt 31, form collection headroom, described row Water pipe 33 one end connects with described sediment space, the other end extends to outside described cylinder 1, and described exhaust chamber 34 is empty with described gas collection Between connect.Wherein, described gas skirt 31 is in umbrella, thus covers whole cylinder 1 upper end, is conducive to increasing gas collecting efficiency.Aerofluxus Room 34 may be disposed at gas skirt 31 top.
Mud chamber 32 described in the present embodiment is in tubular and internal diameter is from top to bottom gradually reduced, so that described mud chamber 32 Inwall forms a taper sedimentation face, in order to increase solid-liquid separation effect, settles the folder between face and horizontal plane described in the present embodiment Angle is set to 30~60 °, preferably 45 °.
Wherein, described reflecting plate 35 is tapered and is coaxially disposed with described mud chamber 32, and multiple described fixing posts 36 are homogeneous End is connected with described mud chamber 32, the other end is connected on the conical surface of described reflecting plate 35, shape between adjacent two fixing posts 36 The solidliquid mixture entrance of Cheng Youyu sediment space connection, corresponding, solidliquid mixture passes through precipitation, concentrates in mud chamber After, its proportion is more than relatively big, therefore can precipitate, along the taper of mud chamber 32, the flowing that faces down, and from solidliquid mixture entrance stream Go out, be then precipitated to bottom cylinder 1.Reflecting plate 35 arranges tapered, is conducive to avoiding accumulating on reflecting plate 35 mud, it is simple to Mud has solidliquid mixture entrance to flow out smoothly.The fixing post 36 of the present embodiment is evenly arranged along described mud chamber 32 circumference, and Multiple equal one end of fixing post 36 are connected on the inwall of mud chamber 32, owing to the easy turnover to solidliquid mixture of fixed column 36 produces one Fixed inhibition, therefore the fixing post 36 of the present embodiment is preferably arranged to three.
Owing to gas skirt 31 has area greatly, in order to ensure that it has enough intensity, collect described in the present embodiment Gas hood 31 upper surface is provided with multiple support bar 37, and multiple described support bars 37 are that lonizing radiation are uniform along described gas skirt 31 top Arrange.
When arranging, it is provided with water inlet distributor 4, probe tube 5 and thermometer in the cylinder 1 of the present embodiment and pipe 6 is installed, enter Water water-locator 4 is so that water inlet water distribution uniformity in cylinder 4, to promote the harmony of reaction.Wherein, described probe tube 5 and temperature Meter is installed pipe 6 and is close to bottom described cylinder 1 arrange, in order to accurately detects multiple parameters of anaerobic reaction, carries out anaerobism anti- The control answered.
In actual application, need regular equipment is overhauled, in order to improve the convenience of maintenance, this reality Execute example and be coaxially arranged with manhole 38 on described gas skirt top 31, at described cylinder 1 sidewall, bottom is provided with one Lower manhole 11, can overhaul three phase separator 3 by upper manhole 38, each parts in overhauling cylinder 1 by lower manhole 11.
A discharge pipeline 7 it is provided with, in order to discharge mud in cylinder 14 bottom cylinder 1 described in the present embodiment.
Compared with prior art, on the one hand this utility model carries out intermittent water inlet, stirring by internal circulation apparatus, thus Batch-type carries out sludge bulking in cylinder, and it is conducive to improving anaerobic reaction efficiency, and the stability that improve water outlet, give vent to anger, On the other hand arranging Novel three-phase separator, it is conducive to improving biogas gas collecting efficiency, strengthening solid-liquid separation effect, reduction draining Turbidity.
The above detailed description of the invention of the present utility model, is not intended that the restriction to this utility model protection domain. Any various other made according to technology of the present utility model design change and deformation accordingly, should be included in this practicality In novel scope of the claims.

Claims (9)

1. flow up anaerobic sequencing batch sludge bulking bed on an intermittent water inflow, it is characterised in that include,
The cylinder being vertically arranged;
One internal circulation apparatus, described internal circulation apparatus includes the interior circulation water inlet pipe near cylinder top setting, near described cylinder Body bottom arrange interior recycling outlet, drive current by described interior circulation water inlet pipe to described interior recycling outlet move in Circulating pipe pump and one controls described internal recycle pipeline pump and makees the controller that intermittence drives;And
Three phase separator, described three phase separator includes gas skirt, mud chamber, drain pipe, exhaust chamber and reflecting plate, described gas collection Cover outer rim is connected with described cylinder open top end, upper end, described mud chamber coaxially connected in described gas skirt lower surface, Lower end is connected with described reflecting plate by multiple fixing posts, and formation sediment space between described mud chamber inwall and gas skirt, Collection headroom is formed between described mud chamber outer wall and described gas skirt, described drain pipe one end connects with described sediment space, The other end extends to outside described cylinder, and described exhaust chamber connects with described collection headroom.
Anaerobic sequencing batch sludge bulking bed is flowed up, it is characterised in that described collection on intermittent water inflow the most according to claim 1 Gas hood is umbrella.
Anaerobic sequencing batch sludge bulking bed is flowed up, it is characterised in that institute on intermittent water inflow the most according to claim 1 and 2 State mud chamber and be tubular and internal diameter is from top to bottom gradually reduced.
On intermittent water inflow the most according to claim 3 flow up anaerobic sequencing batch sludge bulking bed, it is characterised in that described instead Penetrating plate tapered and be coaxially disposed with described mud chamber, multiple described equal one end of fixing post are connected with described mud chamber, the other end It is connected on the conical surface of described reflecting plate.
Anaerobic sequencing batch sludge bulking bed is flowed up, it is characterised in that institute on intermittent water inflow the most according to claim 1 and 2 Stating gas skirt upper surface and be provided with multiple support bar, multiple described support bars are the uniform cloth of lonizing radiation along described gas skirt top Put.
Anaerobic sequencing batch sludge bulking bed is flowed up, it is characterised in that institute on intermittent water inflow the most according to claim 1 and 2 It is provided with water inlet distributor in stating cylinder.
Anaerobic sequencing batch sludge bulking bed is flowed up, it is characterised in that institute on intermittent water inflow the most according to claim 1 and 2 It is provided with probe tube in stating cylinder and thermometer is installed pipe, described probe tube and thermometer installation pipe and is close to described cylinder body bottom and sets Put.
Anaerobic sequencing batch sludge bulking bed is flowed up, it is characterised in that institute on intermittent water inflow the most according to claim 1 and 2 State cylinder body bottom and be provided with a discharge pipeline.
Anaerobic sequencing batch sludge bulking bed is flowed up, it is characterised in that institute on intermittent water inflow the most according to claim 1 and 2 Stating gas skirt top and be coaxially arranged with manhole on, described cylinder lateral wall is provided with manhole near bottom.
CN201620562139.XU 2016-06-12 2016-06-12 Anaerobic sequencing batch sludge bulking bed is flowed up on intermittent water inflow Expired - Fee Related CN205838665U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620562139.XU CN205838665U (en) 2016-06-12 2016-06-12 Anaerobic sequencing batch sludge bulking bed is flowed up on intermittent water inflow

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620562139.XU CN205838665U (en) 2016-06-12 2016-06-12 Anaerobic sequencing batch sludge bulking bed is flowed up on intermittent water inflow

Publications (1)

Publication Number Publication Date
CN205838665U true CN205838665U (en) 2016-12-28

Family

ID=58152850

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620562139.XU Expired - Fee Related CN205838665U (en) 2016-06-12 2016-06-12 Anaerobic sequencing batch sludge bulking bed is flowed up on intermittent water inflow

Country Status (1)

Country Link
CN (1) CN205838665U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111777171A (en) * 2020-07-10 2020-10-16 盐城工学院 Rural domestic sewage treatment plant of ASBR

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111777171A (en) * 2020-07-10 2020-10-16 盐城工学院 Rural domestic sewage treatment plant of ASBR
CN111777171B (en) * 2020-07-10 2022-02-08 盐城工学院 Rural domestic sewage treatment plant of ASBR

Similar Documents

Publication Publication Date Title
US11254596B2 (en) High-concentration sewage treatment system and method for self-sufficiency of energy
CN104773919B (en) A kind of pharmacy waste water advanced treatment system
CN206014509U (en) A kind of two-phase laminated flow inner-outer circulation anaerobic reactor
CN104787966A (en) System for treating waste water and odor from waste oil recycling and processing
CN107459213A (en) A kind of drum type brake integrated sewage treating apparatus
CN109761449A (en) A kind of novel anaerobic reactor and processing system based on UASB
CN205241342U (en) Circulation formula anaerobic reactor
CN107384753A (en) A kind of efficient anaerobic fermentation bioreactor of dynamic membrane
CN205838665U (en) Anaerobic sequencing batch sludge bulking bed is flowed up on intermittent water inflow
CN205687912U (en) A kind of from air supporting efficient anaerobe reactor
CN201713366U (en) Flow guide type tapered sedimentation tank
CN205838792U (en) Three unit sewage disposal systems
CN208949075U (en) Novel anaerobic reactor
CN205838793U (en) The colored sewage disposal system of high concentration
CN105884141A (en) Multiunit sewage treatment system and method
CN207525100U (en) A kind of drum type brake integrated sewage treating apparatus
CN205838664U (en) Three phase separator for sewage disposal
CN105731641A (en) Internal circulation anaerobic reactor with large diameter of more than or equal to 3m
CN105884021A (en) Intermittent anaerobic wastewater treatment system and method
CN205556392U (en) Sewage treatment equipment
CN205710072U (en) A kind of more than 3 meters big footpath internal-circulation anaerobic reactors
CN209113580U (en) A kind of sewage treatment anaerobic digestion device
CN205838668U (en) Intermittently anaerobism sewage disposal system
CN205838794U (en) Multiple-unit sewage disposal system
CN104787968B (en) Chlortetracycline wastewater processing system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161228

Termination date: 20210612