CN205838494U - Elevator construction operation platform - Google Patents
Elevator construction operation platform Download PDFInfo
- Publication number
- CN205838494U CN205838494U CN201620659936.XU CN201620659936U CN205838494U CN 205838494 U CN205838494 U CN 205838494U CN 201620659936 U CN201620659936 U CN 201620659936U CN 205838494 U CN205838494 U CN 205838494U
- Authority
- CN
- China
- Prior art keywords
- bottom girder
- connecting rod
- press strip
- column
- pulling rope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
This utility model relates to a kind of elevator construction operation platform, including left bottom girder, right bottom girder, left press strip, right press strip, lower connecting rod, left column, right column, upper connecting rod, left pulling rope and right pulling rope;Lower connecting rod left end is connected with left bottom girder rear end, and lower connecting rod right-hand member is connected with right bottom girder rear end;It is equipped with pedal on left bottom girder and right bottom girder, left press strip and right press strip are all stacked in above pedal, left press strip is positioned at directly over left bottom girder, right press strip is positioned at directly over right bottom girder, left column lower end is connected with the left side wall in the middle part of left bottom girder, right column lower end is connected with the right side wall in the middle part of right bottom girder, and upper connecting rod left end is connected with left column top, and upper connecting rod right-hand member is connected with right column top;One end of left pulling rope and right pulling rope is all connected with upper connecting rod, and the other end is all connected with lower connecting rod.This utility model is not only simple in structure, and safety is high, and is convenient to mount and dismount, repeatable recycling, advantageously reduces installation cost and improves work efficiency.
Description
Technical field
This utility model relates to construction operation platform, is specifically related to a kind of elevator construction operation platform.
Background technology
Elevator is a kind of vertical conveyor with motor as power.Elevator is loaded in vertical hoistway, and it has a sedan-chair
Railway carriage or compartment, operate at least two vertical or inclinations angle of row less than the rigid guideway of 15 between.Need in elevator hoistways that elevator is installed to lead
Rail, lift car, elevator safety gear, traction steel-cable, Elevator weight sensor and each layer hall door etc., the installation of elevator typically requires at electricity
In stair shaft road, erection construction job platform is carried out.
At present, the construction operation platform used by elevator is installed and mostly uses the console model fastener steel tube foot being arranged in hoistway
Hand cradle, and at floor, build scaffold board.When setting up scaffold, need to start successively to build from pit ground, scaffold
Typically setting up into " well " font, four root posts support, every 800mm sets up cross bar, and scaffold the most all pushes up on the wall.
The mode setting up scaffold not only needs to expend substantial amounts of human and material resources, and operates relatively hazardous, it is difficult to meet executing of higher floor
Work requirement;Meanwhile, the dismounting of later stage scaffold is the most loaded down with trivial details but also to expend the time long;Additionally, need at well when setting up scaffold
Road internal drilling burrows, and follow-up repairing bothers.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of elevator construction operation platform, and this construction operation is put down
Platform is not only simple in structure, and safety is high, and is convenient to mount and dismount, repeatable recycling, advantageously reduces installation cost and improves
Work efficiency.The technical scheme used is as follows:
A kind of elevator construction operation platform, it is characterised in that include left bottom girder, right bottom girder, left press strip, right press strip, lower connection
Bar, left column, right column, upper connecting rod, left pulling rope and right pulling rope;Left bottom girder is parallel to each other with right bottom girder, lower connecting rod
Left end is connected with left bottom girder rear end, and lower connecting rod right-hand member is connected with right bottom girder rear end;It is equipped with foot-operated on left bottom girder and right bottom girder
Plate, pedal is positioned on front side of lower connecting rod, and left press strip and right press strip are all stacked in above pedal, and left press strip is parallel to left bottom girder
And it being positioned at the surface of left bottom girder, left press strip two ends are all connected with left bottom girder, and right press strip is parallel to right bottom girder and is positioned at right bottom girder
Surface, the two ends of right press strip are all connected with right bottom girder;Left column is parallel to each other with right column, left column lower end and left bottom girder
The left side wall at middle part connects, and right column lower end is connected with the right side wall in the middle part of right bottom girder, upper connecting rod left end and left column top
Connecting, upper connecting rod right-hand member is connected with right column top;About left pulling rope and right pulling rope side by side, left pulling rope one end is with upper
Connecting rod connects, and the left pulling rope other end is connected with lower connecting rod, and right pulling rope one end is connected with upper connecting rod, and right pulling rope is another
One end is connected with lower connecting rod.
When installing above-mentioned elevator construction operation platform, elevator is stretched at left bottom girder rear portion, right bottom girder rear portion in the horizontal direction
In road, elevator hoistways is laterally cut off by the pedal being laid on left bottom girder and right bottom girder, is formed for putting down that operator stand
Platform;Left bottom girder bottom girder front portion anterior, right is in outside elevator hoistways and is fixed in floor ground, and left column, right column are then
On the wall of the left and right sides being adjacent to and being fixed on elevator hoistways hall door, it is achieved elevator construction operation platform and the company of building
Connect;Left pulling rope forms left triangle supporting construction with left column, left bottom girder, and right pulling rope and right column, right bottom girder form the right side
Triangular support structure, to strengthen the weight capacity of elevator construction operation platform so that it is sound construction, it is ensured that safety;Left pressure
Pedal is compressed by bar and right press strip jointly, can prevent pedal from loosening or tilt, it is ensured that safety.
In a kind of concrete scheme, above-mentioned pedal is made up of multiple foot-pedal units, these multiple foot-pedal units from front extremely
Rear close-packed arrays.
In preferred version, the right side wall of above-mentioned left column lower end is provided with multiple the first connecting hole from up to down arranged,
The left side wall of left bottom girder front portion is provided with many groups of the second connecting holes arranged from front to back, often organizes the second connecting hole and includes and first
Connecting hole quantity is identical and the most multiple second connecting hole;The left side wall of right column lower end be provided with multiple from up to down
3rd connecting hole of arrangement, the anterior right side wall of right bottom girder is provided with many groups of the 4th connecting holes arranged from front to back, often organizes the
Four connecting holes include identical with the 3rd connecting hole quantity and the most multiple 4th connecting hole.According to elevator hoistways front and back
Size upwards, selects suitable one group of second connecting hole to be directed at and penetrate bolt locking one by one with each first connecting hole, can be real
The position adjustments of existing left column, selects suitable one group of the 4th connecting hole be directed at one by one with each 3rd connecting hole and penetrate bolt lock
Tightly, the position adjustments of right column can be realized, so, make the rear end of left bottom girder and right bottom girder and hoistway rear wall near or contact
Time, the rear side of left column and right column can be fitted with the wall of elevator hoistways hall door both sides, to adapt to various sizes of elevator
Road.
Additionally, securing plate can be installed additional between above-mentioned left column lower end and left bottom girder, and at right column lower end and right bottom girder
Between install securing plate additional.To increase the intensity of faying face between column and bottom girder, strengthen simultaneously and connect between them.
In preferred version, above-mentioned left bottom girder and right bottom girder position-adjustable in the lateral direction, upper connecting rod is up and down
Position-adjustable on direction.So, left bottom girder and right bottom girder can be regulated in right and left according to the width dimensions of hoistway hall door mouth
Position upwards, makes on the left of left bottom girder and the width of spacing on the right side of right bottom girder and hoistway hall door matches, and according to the hoistway Room
The height dimension on doorway, the position on the above-below direction of regulation upper connecting rod, make upper connecting rod omit than the upper door frame of hoistway hall door
Low (preventing the edge of visiting that left pulling rope and right pulling rope touch hoistway hall door), to adapt to the hoistway Room of differing heights and width
Doorway.After determining the position of left bottom girder and right bottom girder, tighten fixing bolt, by lower connecting rod by left bottom girder and right bottom girder
Position is fixed up;After determining the position of upper connecting rod, tighten fixing bolt, upper connecting rod is fixed on left column and the right side is stood
On the front side of post.
Generally, this elevator construction operation platform is arranged in the hoistway of building top layer.When installing elevator, workmen stands
This job platform first lifts counterweight framework, and loads onto about identical with car frame deadweight to pouring weight in advance;Resuspend traction steel
Cord (puts on steel wire rope by the design specification of elevator), and is located on counterweight framework one end of steel wire rope, another of steel wire rope
The car frame of the Duan Yu building first floor connects, and so, counterweight framework and car frame can be made to form unsettled self-balancing system (now sedan-chair
Railway carriage or compartment frame forms a work platforms moving up and down);After the lower elevator construction operation platform of dismounting, workmen stands in car frame
On be gradually completing the installation of elevator components in hoistway from bottom to top.So, it is not necessary in elevator hoistways, set up scaffold, can be complete
Become the installation of elevator.
Compared with prior art, this utility model is not only simple in structure, it is easy to uses, and is convenient to mount and dismount, and repeatable follows
Ring uses, and advantageously reduces installation cost and improves work efficiency.
Accompanying drawing explanation
Fig. 1 is the structural representation of this utility model preferred embodiment.
Detailed description of the invention
As it is shown in figure 1, this elevator construction operation platform include left bottom girder 1, right bottom girder 2, left press strip 3, right press strip 4, under
Connecting rod 5, left column 6, right column 7, upper connecting rod 8, left pulling rope 9 and right pulling rope 10;Left bottom girder 1 is mutual with right bottom girder 2
Parallel, lower connecting rod 5 left end is connected with left bottom girder 1 rear end, and lower connecting rod 5 right-hand member is connected with right bottom girder 2 rear end;Left bottom girder 1 He
Being equipped with pedal 11 on right bottom girder 2, pedal 11 is positioned on front side of lower connecting rod 5;Left press strip 3 and right press strip 4 are all stacked in foot
Above pedal 11, left press strip 3 is parallel to left bottom girder 1 and is positioned at the surface of left bottom girder 1, and left press strip 3 two ends are all with left bottom girder 1 even
Connecing, right press strip 4 is parallel to right bottom girder 2 and is positioned at the surface of right bottom girder 2, and the two ends of right press strip 4 are all connected with right bottom girder 2.?
In the present embodiment, pedal 11 is made up of multiple foot-pedal units, and these multiple foot-pedal units are from A-P close-packed arrays.Zuo Li
Post 6 is parallel to each other with right column 7, and left column 6 lower end is connected with the left side wall in the middle part of left bottom girder 1, right column 6 lower end and right bottom girder
Right side wall connection in the middle part of in the of 2 (in the present embodiment, is installed securing plate 12 additional, and is stood on the right side between left column 6 lower end and left bottom girder 1
Securing plate 13 is installed additional) between post 7 lower end and right bottom girder 2;Upper connecting rod 8 left end is connected with left column 1 top, and upper connecting rod 8 is right
End is connected with right column 2 top;With right pulling rope about 10 side by side, left pulling rope 9 one end is with upper connecting rod 8 even for left pulling rope 9
Connecing, left pulling rope 9 other end is connected with lower connecting rod 5, and right pulling rope 10 one end is connected with upper connecting rod 8, and right pulling rope 10 is another
One end is connected with lower connecting rod 5.
In the present embodiment, the right side wall of left column 6 lower end is provided with multiple the first connecting hole 14 from up to down arranged,
The left side wall of left bottom girder 1 front portion is provided with many groups of the second connecting holes 15 arranged from front to back, often organizes the second connecting hole 15 and includes
Identical with the first connecting hole 14 quantity and the most multiple second connecting holes 15;The left side wall of right column 7 lower end is provided with
Multiple the 3rd connecting holes 16 from up to down arranged, the right side wall of right bottom girder 2 front portion is provided with many groups and arranges many from front to back
Individual 4th connecting hole 17, often group the 4th connecting hole 17 includes and one to one fourth connection identical with the 3rd connecting hole 16 quantity
Hole 17.According to the size on elevator hoistways fore-and-aft direction, select suitable one group of second connecting hole 15 and each first connecting hole 14
It is directed at and penetrates bolt locking one by one, the position adjustments of left column 6 can be realized, select suitable one group of the 4th connecting hole 17 with each
3rd connecting hole 16 is directed at and penetrates bolt locking one by one, can realize the position adjustments of right column 7, so, make left bottom girder 1 and the right side
When the rear end of bottom girder 2 is close with hoistway rear wall or contacts, the rear side of left column 6 and right column 7 can be with elevator hoistways hall door two
The wall laminating of side, to adapt to various sizes of elevator hoistways.
Left bottom girder 1 and right bottom girder 2 position in the lateral direction can be regulated according to the width dimensions of hoistway hall door mouth, make
Spacing on the left of left bottom girder 1 and on the right side of right bottom girder 2 matches with the width of hoistway hall door, and according to the height gauge of hoistway hall door mouth
Very little, on the above-below direction of regulation upper connecting rod 8 position, makes that upper connecting rod 8 is more lower slightly than the upper door frame of hoistway hall door (prevents the left side from leading
Stay cord 9 and right pulling rope 10 touch the edge of visiting of hoistway hall door), to adapt to the hoistway hall door mouth of differing heights and width.Really
After reserving the position of left bottom girder 1 and right bottom girder 2, tighten fixing bolt, by lower connecting rod 5 by left bottom girder 1 and the position of right bottom girder 2
Put and be fixed up;After determining the position of upper connecting rod 8, tighten fixing bolt, upper connecting rod 8 is fixed on left column 6 and the right side
On the front side of column 7.
The mounting means (with reference to Fig. 1) of brief description this elevator construction operation platform once:
First, by left bottom girder 1, right bottom girder 2, lower connecting rod 5, left column 6, right column 7, upper connecting rod 8, left pulling rope 9
Get up with the installing of right pulling rope 10;Then, left bottom girder 1 rear portion, right bottom girder 2 rear portion are stretched in elevator hoistways in the horizontal direction,
Left bottom girder 1 bottom girder 2 anterior, right front portion is made to be in outside elevator hoistways, and by fixing bolt by them with being fixed on floor
On face;Meanwhile, on the wall of the left and right sides that left column 6, right column 7 are adjacent to elevator hoistways hall door, and by fixing spiral shell
They are fixed by bolt;Finally, pedal 11 is laid on left bottom girder 1 and right bottom girder 2, and upper left press strip 3, right press strip are installed
4, pedal 11 can be made laterally to be cut off by elevator hoistways, form the platform stood for operator.
This utility model is not limited to above-mentioned detailed description of the invention, every according to technical spirit of the present utility model to
Any simple modification, equivalent variations and the modification that upper embodiment is made, all falls within the protection domain of technical solutions of the utility model
In.
Claims (3)
1. an elevator construction operation platform, it is characterised in that include left bottom girder, right bottom girder, left press strip, right press strip, lower connection
Bar, left column, right column, upper connecting rod, left pulling rope and right pulling rope;Left bottom girder is parallel to each other with right bottom girder, lower connecting rod
Left end is connected with left bottom girder rear end, and lower connecting rod right-hand member is connected with right bottom girder rear end;It is equipped with foot-operated on left bottom girder and right bottom girder
Plate, pedal is positioned on front side of lower connecting rod, and left press strip and right press strip are all stacked in above pedal, and left press strip is parallel to left bottom girder
And it being positioned at the surface of left bottom girder, left press strip two ends are all connected with left bottom girder, and right press strip is parallel to right bottom girder and is positioned at right bottom girder
Surface, the two ends of right press strip are all connected with right bottom girder;Left column is parallel to each other with right column, left column lower end and left bottom girder
The left side wall at middle part connects, and right column lower end is connected with the right side wall in the middle part of right bottom girder, upper connecting rod left end and left column top
Connecting, upper connecting rod right-hand member is connected with right column top;About left pulling rope and right pulling rope side by side, left pulling rope one end is with upper
Connecting rod connects, and the left pulling rope other end is connected with lower connecting rod, and right pulling rope one end is connected with upper connecting rod, and right pulling rope is another
One end is connected with lower connecting rod.
Elevator construction operation platform the most according to claim 1, it is characterised in that: described pedal is by multiple pedal lists
Unit's composition, these multiple foot-pedal units are from A-P close-packed arrays.
Elevator construction operation platform the most according to claim 1 and 2, it is characterised in that: the right side of described left column lower end
Wall is provided with multiple the first connecting hole from up to down arranged, and the left side wall of left bottom girder front portion is provided with many groups and arranges from front to back
The second connecting hole, often organize the second connecting hole include identical with the first connecting hole quantity and the most multiple second connect
Hole;The left side wall of right column lower end is provided with multiple the 3rd connecting hole from up to down arranged, on the right side wall that right bottom girder is anterior
Being provided with many groups of the 4th connecting holes arranged from front to back, often group the 4th connecting hole includes identical with the 3rd connecting hole quantity and one by one
Corresponding multiple 4th connecting holes.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620659936.XU CN205838494U (en) | 2016-06-29 | 2016-06-29 | Elevator construction operation platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620659936.XU CN205838494U (en) | 2016-06-29 | 2016-06-29 | Elevator construction operation platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205838494U true CN205838494U (en) | 2016-12-28 |
Family
ID=57621387
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620659936.XU Active CN205838494U (en) | 2016-06-29 | 2016-06-29 | Elevator construction operation platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205838494U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108715431A (en) * | 2018-07-10 | 2018-10-30 | 中铁大桥局武汉桥梁特种技术有限公司 | A kind of hanger platform of T beams maintenance and reinforcement |
-
2016
- 2016-06-29 CN CN201620659936.XU patent/CN205838494U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108715431A (en) * | 2018-07-10 | 2018-10-30 | 中铁大桥局武汉桥梁特种技术有限公司 | A kind of hanger platform of T beams maintenance and reinforcement |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102216545A (en) | Mobile cantilever platforms and methods of installation thereof | |
CN105692470A (en) | Internal climbing tower crane and operating method thereof | |
CN108016971A (en) | The installation method of elevator | |
CN207048345U (en) | Construction discharge platform device | |
CN205838494U (en) | Elevator construction operation platform | |
CN111119461A (en) | A operation platform that is used for steel construction elevator well installation top hoisting point | |
CN206051232U (en) | Safe elevator | |
CN203143872U (en) | Mobile platform for elevator installation construction | |
CN110397259A (en) | A kind of hanging basket crossbeam end fixing method | |
CN102232050A (en) | Elevator system including control electronics supported on an elevator machine support | |
EP1647512B1 (en) | Working scaffold system of elevator | |
CN106121252B (en) | A kind of hydraulic stepping is from climbing material transfering device and method | |
KR101203134B1 (en) | Fit segment structure for highrise elevator fit | |
CN204754150U (en) | Dish -type node formula scaffold | |
CN206189834U (en) | Double -deck integrally lift up formula operation platform of elevartor shaft | |
CN107187998B (en) | A kind of elevator easy to repair | |
CN106065712B (en) | Hanging rack system Fast Installation construction method for low level jacking formwork system | |
CN205531262U (en) | Steel construction construction platform can rise automatically | |
CN107128764B (en) | A kind of detachable elevator | |
CN212835920U (en) | Movable electric lifting scaffold | |
CN110304521A (en) | Super high-rise building overweight equipment handling apparatus | |
CN114150856B (en) | Installation method of sectional type climbing frame | |
CN215326257U (en) | Machine-room-less car roof maintenance platform | |
CN109292583A (en) | A kind of elevator mounting process | |
CN211419276U (en) | Construction platform assembly for construction elevator |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20180530 Address after: 515000 Hukou village, East Lake village, Haojiang District, Shantou, Guangdong Patentee after: Guangdong Bao Hui Architectural Engineering Co., Ltd. Address before: 515000 Zhongshan Road, Shantou, Guangdong Province, No. 54 Patentee before: Construction work Co., Ltd of Guangdong Province second |
|
TR01 | Transfer of patent right |