CN205823258U - Horizontal well sits six sections of fracturing strings of pressure - Google Patents

Horizontal well sits six sections of fracturing strings of pressure Download PDF

Info

Publication number
CN205823258U
CN205823258U CN201620799610.7U CN201620799610U CN205823258U CN 205823258 U CN205823258 U CN 205823258U CN 201620799610 U CN201620799610 U CN 201620799610U CN 205823258 U CN205823258 U CN 205823258U
Authority
CN
China
Prior art keywords
seating nipple
sections
oil pipe
pressure
sanding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620799610.7U
Other languages
Chinese (zh)
Inventor
周婷婷
张晓君
唐少东
赵公利
兰乘宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daqing Oilfield Co Ltd
China Petroleum and Natural Gas Co Ltd
Original Assignee
Daqing Oilfield Co Ltd
China Petroleum and Natural Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daqing Oilfield Co Ltd, China Petroleum and Natural Gas Co Ltd filed Critical Daqing Oilfield Co Ltd
Priority to CN201620799610.7U priority Critical patent/CN205823258U/en
Application granted granted Critical
Publication of CN205823258U publication Critical patent/CN205823258U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

This utility model relates to a kind of horizontal well and sits six sections of fracturing strings of pressure.Mainly solve the problem that existing fractured horizontal well long construction period, working environment are severe.It is characterized in that: described straight well section seating nipple (2) is respectively connected with oil pipe plug valve (1) in two ends up and down, the oil pipe plug valve (1) of lower end is connected with horizontal segment seating nipple (21), horizontal segment seating nipple (21) other end connects hydraulic anchor (4) by safety joint (3), the other end of hydraulic anchor (4) is sequentially connected with 7 packers, the most each packer (6) two ends are respectively and fixedly provided with spiral centering device (5), are connected by sanding machine between adjacent two-stage screw centralizer.This horizontal well sit six sections of fracturing strings of pressure can fracturing without pulling string six sections, close oil pipe space during proposing tubing string after pressure break, have that efficiency of construction is high, the feature of safety and environmental protection.

Description

Horizontal well sits six sections of fracturing strings of pressure
Technical field
This utility model relates to oilfield, and a kind of horizontal well sits six sections of fracturing strings of pressure.
Background technology
Along with the continuous propelling of fractured horizontal well region and the degree of depth, reservoir properties condition worse and worse, Regional tectonic conditions Also become increasingly complex, cause fracturing reform difficulty to increase further.The double envelope single deck tape-recorder of the many employings of fractured horizontal well at present carries on layer by layer Mode construct, need pressure release before upper lifting pipe post, cause that long construction period, resource occupation are many, working environment is severe; Meet after pressure coefficient height block pressure break 2-3 section, bottom pressure height cause tubing string be difficult on carry, it is impossible to complete anticipated number of plies construction, Causing and lose layer, abandon layer, unrealized horizontal well full well reservoir is effectively employed, and affects horizontal well production.
Summary of the invention
In order to overcome the severe deficiency of existing fractured horizontal well long construction period, working environment, this utility model provides A kind of horizontal well sits six sections of fracturing strings of pressure, this horizontal well sit six sections of fracturing strings of pressure can fracturing without pulling string six sections, in pressure Close oil pipe space during proposing tubing string after splitting, there is efficiency of construction height, the feature of safety and environmental protection.
The technical solution of the utility model is: a kind of horizontal well sits six sections of fracturing strings of pressure, including straight well section seating nipple and Horizontal segment seating nipple, the upper and lower two ends of described straight well section seating nipple are respectively connected with oil pipe plug valve, the oil pipe plug valve of lower end and water Flat section seating nipple is connected, and the horizontal segment seating nipple other end connects hydraulic anchor by safety joint, and the other end of hydraulic anchor connects successively Connecing 7 packers, the most each packer two ends are respectively and fixedly provided with spiral centering device, by spray between adjacent two-stage screw centralizer Sand device connects.
Described sanding machine is 6, be followed successively by one-level sanding machine, two grades of sanding machines, three grades of sanding machines, level Four sanding machine, five Level sanding machine, six grades of sanding machines, above-mentioned one-level is sequentially reduced from left to right to the sliding sleeve internal diameter of Pyatyi sanding machine, wherein six grades of sprays Connect on the spiral centering device of sand device right-hand member and have plug.
This utility model has the advantages that owing to taking such scheme, and this horizontal well sits six sections of fracturing strings of pressure Horizontal segment oil pipe on contacted 7 inflatable packers and 6 sanding machines, sanding machine sliding sleeve internal diameter size is from top to bottom by greatly To minispread, it is equipped with the steel ball of different-diameter respectively.By packer will pressure break interval insulate, utilize subordinate to be in work Make the sanding machine pressure break orlop section of state, then use the mode of pitching skidding set to complete the construction of 5 fracturing sections above.? After pressure break complete tubing string activity is opened, coordinate straight well section seating nipple above is thrown by oil pipe plug valve switch and block up, on tripping out After the straight well section seating nipple in face, the horizontal segment seating nipple on following tool string top is thrown stifled.Thus efficiently solve oil field compression fracture After trip out the problem of oil pipe overflow during tubing string, solve simultaneously and oilfield horizontal well pressing crack construction need carry on layer by layer to lead The long construction period of cause, part interval abandon the problem of pressure, one-trip string pressure break six sections, close during proposing tubing string after pressure break Oil pipe space, efficiency of construction is high, safety and environmental protection.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
1-oil pipe plug valve in figure, 2-straight well section seating nipple, 3-safety joint, 4-hydraulic anchor, 5-spiral centering device, 6-seals Every device, 8-plug, 21-horizontal segment seating nipple, 71-one-level sanding machine, bis-grades of sanding machines of 72-, tri-grades of sanding machines of 73-, 74-level Four Sanding machine, 75-Pyatyi sanding machine, six grades of sanding machines of 76-.
Detailed description of the invention
The utility model is described in further detail below in conjunction with the accompanying drawings:
As shown in Figure 1, a kind of horizontal well sits six sections of fracturing strings of pressure, including straight well section seating nipple 2 and horizontal segment seating nipple 21, described straight well section seating nipple about 2 two ends are respectively connected with oil pipe plug valve 1, and straight well section seating nipple about 2 two ends respectively connect two It is connected with short circuit between individual oil pipe plug valve 1, and two oil pipe plug valves 1.Oil pipe plug valve 1 and the horizontal segment seating nipple of lower end 21 are connected, horizontal segment seating nipple 21 other end attachment security joint 3, and safety joint 3 other end connects hydraulic anchor 4, hydraulic anchor 4 The other end is sequentially connected with 7 packers 6, and each packer 6 two ends are respectively and fixedly provided with spiral centering device 5, and adjacent two-stage packer 6 Connecting between the spiral centering device 5 at two ends and have sanding machine, the spiral centering device 5 of low order end connects plug 8.Described sanding machine Be 6, be followed successively by one-level sanding machine 72, three grades of sanding machines 73 of 71, two grades of sanding machines, level Four sanding machine 74, Pyatyi sanding machine 75, Six grades of sanding machines 76, above-mentioned one-level is sequentially reduced from left to right to the sliding sleeve internal diameter of Pyatyi sanding machine, and its internal diameter size is by a left side extremely The right side is followed successively by φ A, φ B, φ C, φ D, φ E, and wherein six grades of sanding machines 76 are without sliding sleeve, straight by the nozzle in sanding machine main body Connect and add sand.
Time actually used, first successively by oil pipe plug valve 1, seating nipple 2, safety joint 3, hydraulic anchor 4, spiral shell on oil pipe Rotation centralizer 5, packer at different levels 6, sanding machine at different levels and plug 8 connect as illustrated.After connecting, the six of subordinate Level sanding machine 76 is in open mode, and other sanding machines at different levels are in closed mode, injects highly pressurised liquid and make envelope in tubing string Set every device, carry out the pressing crack construction of bottommost interval.After the construction of this layer, Pyatyi sanding machine opened by the steel ball putting into φ E The liquid outlet of 75, carries out the pressing crack construction of last layer section, and the rest may be inferred completes whole pressing crack construction process.When tripping out tubing string, first Movable open tubular column, then closes straight well section oil pipe plug valve 1 topmost, slowly lays down the oil pipe above it, then on mention The next oil pipe plug valve that short circuit is ined succession, closes this valve, opens oil pipe plug valve above, the supporting blocking of cylinder of devoting oneself to work Device, cuts out oil pipe plug valve above, after opening following oil pipe plug valve, then opens oil pipe plug valve above, according to throwing Straight well seating nipple 2 is carried out throwing by stifled standard to be blocked up.After tripping out this seating nipple, two oil pipes that straight well section seating nipple 2 lower end is connected Plug valve repeats above-mentioned action, and it is stifled that the horizontal segment seating nipple 21 connecting tool string top carries out throwing.Thus effectively solve Need to carry on layer by layer the long construction period that causes in oilfield horizontal well pressing crack construction, part interval abandons the problem of pressure, one-trip string Pressure break six sections, closes oil pipe space during proposing tubing string after pressure break, and efficiency of construction is high, safety and environmental protection.

Claims (2)

1. horizontal well sits six sections of fracturing strings of pressure, including straight well section seating nipple (2) and horizontal segment seating nipple (21), its feature It is: described straight well section seating nipple (2) is respectively connected with oil pipe plug valve (1) in two ends up and down, the oil pipe plug valve (1) of lower end and water Flat section seating nipple (21) is connected, and horizontal segment seating nipple (21) other end connects hydraulic anchor (4), hydraulic anchor by safety joint (3) (4) the other end is sequentially connected with 7 packers, and the most each packer (6) two ends are respectively and fixedly provided with spiral centering device (5), adjacent Connected by sanding machine between two-stage screw centralizer.
Horizontal well the most according to claim 1 sits six sections of fracturing strings of pressure, it is characterised in that: described sanding machine is 6, depends on Secondary for one-level sanding machine (71), two grades of sanding machines (72), three grades of sanding machines (73), level Four sanding machine (74), Pyatyi sanding machines (75), six grades of sanding machines (76), above-mentioned one-level is sequentially reduced from left to right to the sliding sleeve internal diameter of Pyatyi sanding machine, wherein six grades of sprays The upper connection of the spiral centering device (5) of sand device (76) right-hand member has plug (8).
CN201620799610.7U 2016-07-27 2016-07-27 Horizontal well sits six sections of fracturing strings of pressure Active CN205823258U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620799610.7U CN205823258U (en) 2016-07-27 2016-07-27 Horizontal well sits six sections of fracturing strings of pressure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620799610.7U CN205823258U (en) 2016-07-27 2016-07-27 Horizontal well sits six sections of fracturing strings of pressure

Publications (1)

Publication Number Publication Date
CN205823258U true CN205823258U (en) 2016-12-21

Family

ID=57556464

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620799610.7U Active CN205823258U (en) 2016-07-27 2016-07-27 Horizontal well sits six sections of fracturing strings of pressure

Country Status (1)

Country Link
CN (1) CN205823258U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107219127A (en) * 2017-06-28 2017-09-29 中国地质调查局油气资源调查中心 Use for laboratory visualizes hydraulic fracturing physical simulating device and method
CN112554856A (en) * 2020-12-01 2021-03-26 大庆油田有限责任公司 Pipe post is pressed to successive layer shutoff formula multilayer seat suitable for big liquid measure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107219127A (en) * 2017-06-28 2017-09-29 中国地质调查局油气资源调查中心 Use for laboratory visualizes hydraulic fracturing physical simulating device and method
CN112554856A (en) * 2020-12-01 2021-03-26 大庆油田有限责任公司 Pipe post is pressed to successive layer shutoff formula multilayer seat suitable for big liquid measure

Similar Documents

Publication Publication Date Title
CN101270639A (en) Packer packing multi-layer hydropower abrasive perforating and fracturing integrated technique
CN205823258U (en) Horizontal well sits six sections of fracturing strings of pressure
CN204113261U (en) A kind of layered fracturing pipe string
CN203961938U (en) Packer staged fracturing technology tube pillar in a kind of horizontal well tube
CN106437605A (en) Packer
CN202338316U (en) Five-layer layered compression fracture technology pipe column capable of mechanical isolating and progressive unpacking
CN201412134Y (en) Small-casing pipe string for multilayer fracturing
CN202832438U (en) Deep well long-lasting separated layer water injection tubular column
CN104196492A (en) Pressurized dragging down-hole blocking valve
CN203188991U (en) Sliding sleeve type layered eight-level fracturing pipe column
CN204851207U (en) Multiple fracturing technology tubular column and fracturing instrument cluster thereof
CN112576230A (en) Perforation fracturing gun and hydraulic sand blasting perforation bridge plug combined fracturing string
CN203614088U (en) Gas-well two-layer fracturing tool
CN204041042U (en) A kind of coiled tubing drag fracturing tubing string
CN201778771U (en) Fixed tubular column hydraulic jetting layer separating and fracturing integral tubular column
CN201730603U (en) Large-delivery capacity and large-sand capacity sand sprayer
CN208122840U (en) A kind of protection sleeve pipe volume fracturing tubing string
CN111188590A (en) Plugging integrated efficient water plugging pipe column and oil extraction method
CN201265389Y (en) Lower-pressure deblocking type bridge plug and deblocking suspension
CN202047782U (en) Swabbing steel wire rope spray-prevention device
CN201013255Y (en) Back-off sub
CN205387926U (en) Fracturing safety backwash well valve
CN201460802U (en) Insertion pipe packer
CN101906955B (en) Oil and gas well underground straddle packing layer-by-layer fracture acidizing tool tubular column structure
CN204357410U (en) A kind of wear-resisting straight well multilayer seam net fracturing technology tubing string

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant