CN204113261U - A layered fracturing string - Google Patents
A layered fracturing string Download PDFInfo
- Publication number
- CN204113261U CN204113261U CN201420562823.9U CN201420562823U CN204113261U CN 204113261 U CN204113261 U CN 204113261U CN 201420562823 U CN201420562823 U CN 201420562823U CN 204113261 U CN204113261 U CN 204113261U
- Authority
- CN
- China
- Prior art keywords
- packer
- string
- layered fracturing
- fracturing string
- claw
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Earth Drilling (AREA)
Abstract
本实用新型公开了一种分层压裂管柱,属于石油开采井下施工设备领域,包括依次连接的至少两级管柱,每级管柱均设有封隔器,相邻封隔器之间设置有解封丢手短节,解封丢手短节包括上接头、筒状的外套、螺帽、连接爪、活塞、连接头及中心管;上接头、外套以及螺帽依次连接,连接爪的一端套装在上接头内,连接爪的另一端为呈收缩状态的锁爪,活塞套装在锁爪外,活塞夹设于锁爪与外套之间并与上接头之间间隔一定距离,连接爪与活塞之间通过启动销钉连接;连接头的一端卡接于锁爪内,中心管的一端与连接头的另一端通过丢手销钉连接,螺帽套接在中心管的外侧壁上,连接头与螺帽之间间隔一定距离,减轻了封隔器的解封负载,可逐级丢手解卡。
The utility model discloses a layered fracturing pipe string, which belongs to the field of downhole construction equipment for oil exploitation, and comprises at least two stages of pipe strings connected in sequence, each stage of pipe string is provided with a packer, and the gap between adjacent packers is There is an unblocking and throwing short joint, which includes an upper joint, a cylindrical jacket, a nut, a connecting claw, a piston, a connecting head and a central tube; the upper joint, the jacket and the nut are connected in sequence, and one end of the connecting claw Set in the upper joint, the other end of the connecting claw is a contracted locking claw, the piston is set outside the locking claw, the piston is sandwiched between the locking claw and the outer casing and at a certain distance from the upper joint, the connecting claw and the piston One end of the connector is clamped in the lock claw, one end of the central tube is connected with the other end of the connector by a loose pin, the nut is sleeved on the outer wall of the central tube, the connector and the screw There is a certain distance between the caps, which reduces the unpacking load of the packer, and can be unstuck step by step.
Description
技术领域technical field
本实用新型涉及石油、天然气开采井下施工设备技术领域,特别涉及一种分层压裂管柱。The utility model relates to the technical field of underground construction equipment for oil and natural gas exploitation, in particular to a layered fracturing pipe string.
背景技术Background technique
国内外分层压裂技术自上世纪以来取得得到了长足的发展,压裂井型的选择从直井发展到了大斜度井、大位移井、水平井等方向,分层压裂管柱逐渐形成了卡封保护压裂管柱、填砂(打水泥塞或下桥塞)压裂管柱、投球分压管柱、双封拖动压裂管柱以及滑套式多级分层压裂管柱等类型。The layered fracturing technology at home and abroad has made great progress since the last century. The selection of fracturing wells has developed from vertical wells to highly deviated wells, extended reach wells, and horizontal wells. Layered fracturing strings have gradually formed The fracturing string is protected by card sealing, sand filling (cement plug or lower bridge plug) fracturing string, ball-pitching partial pressure string, double-seal dragging fracturing string and sliding sleeve multi-stage layered fracturing pipe type of column.
目前滑套式多级分层压裂管柱在现场得到普遍应用,多级分层压裂管柱的多级封隔器在解封和遇卡时是整体一起解封或解卡。At present, the sliding sleeve type multi-stage layered fracturing string is widely used in the field, and the multi-stage packer of the multi-stage layered fracturing string is unsealed or unstuck as a whole when it is unsealed or stuck.
在实现本实用新型的过程中,发明人发现现有技术至少存在以下问题:In the process of realizing the utility model, the inventor finds that the prior art has at least the following problems:
由于大斜度井的井筒轴线严重偏离垂线,分层压裂用的井下工具的工作状态比直井更恶劣,现有的多级分层压裂管柱在解封和遇卡时由于是多级封隔器整体进行解封解卡,多级封隔器的解封载荷、起出负荷叠加,造成管柱解封困难、起出负荷大,使得管柱不易被打捞出井。Since the wellbore axis of highly deviated wells seriously deviates from the vertical line, the working conditions of the downhole tools used for layered fracturing are worse than those of vertical wells. The single-stage packer is unblocked and unjammed as a whole, and the unpacking load and lifting load of the multi-stage packers are superimposed, which makes it difficult to unseal the pipe string and has a large lifting load, making it difficult for the pipe string to be pulled out of the well.
实用新型内容Utility model content
为了解决现有技术的问题,本实用新型实施例提供了一种分层压裂管柱,技术方案如下:In order to solve the problems of the prior art, the embodiment of the utility model provides a layered fracturing string, and the technical solution is as follows:
本实用新型实施例提供了一种分层压裂管柱,所述分层压裂管柱包括依次连接的至少两级管柱,每级管柱均设有封隔器,相邻的两个所述封隔器之间设置有解封丢手短节,所述解封丢手短节包括上接头、筒状的外套、螺帽、连接爪、活塞、连接头及中心管;The embodiment of the utility model provides a layered fracturing string, the layered fracturing string includes at least two stages of pipe strings connected in sequence, each stage of pipe string is equipped with a packer, and the adjacent two An unpacking and discarding short joint is arranged between the packers, and the unsealing and discarding sub joint includes an upper joint, a cylindrical jacket, a nut, a connecting claw, a piston, a connecting head and a central pipe;
所述上接头、所述外套以及所述螺帽依次同轴连接,所述连接爪、所述活塞、所述连接头及所述中心管均设置在所述外套内,The upper joint, the jacket and the nut are connected coaxially in sequence, and the connecting claws, the piston, the connecting head and the central pipe are all arranged in the jacket,
所述连接爪的一端套装在所述上接头内,所述连接爪的另一端为呈收缩状态的锁爪,所述活塞套装在所述锁爪外,所述连接爪与所述外套之间设有间隙,所述活塞夹设于所述锁爪与所述外套之间并与所述上接头间隔一定距离,所述连接爪与所述活塞之间通过启动销钉连接;One end of the connecting claw is set in the upper joint, the other end of the connecting claw is a locking claw in a retracted state, the piston is set outside the locking claw, and the connecting claw and the outer sleeve There is a gap, the piston is sandwiched between the locking pawl and the outer casing and is spaced a certain distance from the upper joint, and the connecting claw and the piston are connected by a starting pin;
所述连接头的一端卡接于所述锁爪内,所述连接头的另一端与所述中心管的一端通过丢手销钉连接,所述螺帽套接在所述中心管的外侧壁上,所述中心管与所述外套之间设有间隙,所述连接头与所述螺帽间隔一定距离。One end of the connecting head is clamped in the locking pawl, the other end of the connecting head is connected with one end of the central tube through a loose pin, and the nut is sleeved on the outer wall of the central tube , there is a gap between the central tube and the jacket, and a certain distance is set between the connecting head and the nut.
进一步地,所述分层压裂管柱的靠近井底的一端设置有坐封喷砂滑套。Further, the end of the layered fracturing string near the bottom of the well is provided with a setting sandblasting sliding sleeve.
进一步地,多个所述封隔器的滑套球座的内径沿井底向井口方向逐个增大。Further, the inner diameters of the sliding sleeve ball seats of the plurality of packers increase one by one from the bottom of the well to the head of the well.
进一步地,所述分层压裂管柱的最靠近井口的一个所述封隔器为Y341型可洗井液压封隔器。Further, the packer closest to the wellhead of the layered fracturing string is a Y341 type washable hydraulic packer.
进一步地,所述分层压裂管柱的中部的所述封隔器为Y241型滑套式液压封隔器。Further, the packer in the middle of the layered fracturing string is a Y241 sliding sleeve hydraulic packer.
进一步地,所述分层压裂管柱的最靠近井底的一个所述封隔器为Y241型液压封隔器。Further, one of the packers closest to the bottom of the layered fracturing string is a Y241 hydraulic packer.
进一步地,所述多级管柱中,除最靠近井底的所述管柱和最靠近井口的所述管柱之外,每级所述管柱均包括依次连接的封隔器、滑套喷砂器、水力锚和解封丢手短节。Further, in the multi-stage tubing string, except for the tubing string closest to the bottom of the well and the tubing string closest to the wellhead, each stage of the tubing string includes a packer, a sliding sleeve connected in sequence Sand blasters, hydraulic anchors and unblocking drop-off subs.
进一步地,所述多级管柱中,最靠近井口的所述管柱上设置有液压安全接头。Further, among the multi-stage pipe strings, the pipe string closest to the wellhead is provided with a hydraulic safety joint.
进一步地,所述液压安全接头和所述封隔器之间连接有水力锚。Further, a hydraulic anchor is connected between the hydraulic safety joint and the packer.
本实用新型实施例提供的技术方案的有益效果是:The beneficial effect of the technical scheme that the utility model embodiment provides is:
通过设置带多级封隔器的分层压裂管柱,封隔器之间设置解封丢手短节,可以通过加压沿井底往井口方向依次坐封封隔器,同时配以投球憋压实现管柱的分层压裂;当启动销钉被剪断时,上接头带动外套和螺帽可以与中心管相对移动,螺帽与连接头之间的距离为封隔器的解封提供了足够行程,减轻了封隔器的解封载荷,当管柱遇卡时,继续上提管柱可剪断丢手销钉,连接头与中心管脱离实现丢手,减小管柱的起出负荷,实现分段打捞起出管柱。By setting up a multi-layered fracturing string with multi-stage packers, the unpacking and throwing subs are set between the packers, and the packers can be set and sealed sequentially from the bottom of the well to the wellhead by pressurization, and at the same time, they are equipped with a ball dropper The compression realizes the layered fracturing of the pipe string; when the activation pin is cut off, the upper joint drives the jacket and the nut to move relative to the central pipe, and the distance between the nut and the connector provides enough space for the unsealing of the packer. stroke, which reduces the unpacking load of the packer. When the string is stuck, the pin can be cut off by continuing to lift the string, and the connection head is separated from the central pipe to realize the drop-off, which reduces the pull-out load of the string and realizes The pipe string is salvaged in sections.
附图说明Description of drawings
为了更清楚地说明本实用新型实施例中的技术方案,下面将对实施例描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the accompanying drawings that need to be used in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings in the following description are only some implementations of the present invention. For example, those of ordinary skill in the art can also obtain other drawings based on these drawings on the premise of not paying creative efforts.
图1是本实用新型实施例提供的一种分层压裂管柱的结构示意图;Fig. 1 is a schematic structural view of a layered fracturing string provided by an embodiment of the present invention;
图2是本实用新型实施例提供的第一解封丢手短节的结构示意图。Fig. 2 is a schematic diagram of the structure of the first unblocking and discarding short joint provided by the embodiment of the utility model.
具体实施方式Detailed ways
为使本实用新型的目的、技术方案和优点更加清楚,下面将结合附图对本实用新型实施方式作进一步地详细描述。In order to make the purpose, technical solutions and advantages of the present utility model clearer, the implementation of the present utility model will be further described in detail below in conjunction with the accompanying drawings.
实施例Example
参见图1-2,本实用新型实施例提供了一种分层压裂管柱,分层压裂管柱包括依次连接的至少两级管柱,每级管柱均设有封隔器1,相邻的两个封隔器1之间设置有解封丢手短节2,Referring to Fig. 1-2, the embodiment of the utility model provides a layered fracturing string. The layered fracturing string includes at least two stages of strings connected in sequence, and each stage of the string is equipped with a packer 1, An unpacking and throwing short joint 2 is arranged between two adjacent packers 1,
解封丢手短节2包括上接头21、筒状的外套22、螺帽23、连接爪24、活塞25、连接头26及中心管27;上接头21、外套22以及螺帽23依次同轴连接,连接爪24、活塞25、连接头26及中心管27均设置在外套22内,The unpacking and throwing short joint 2 includes an upper joint 21, a cylindrical jacket 22, a nut 23, a connecting claw 24, a piston 25, a connecting head 26 and a central tube 27; the upper joint 21, the outer jacket 22 and the nut 23 are connected coaxially in sequence , the connecting claw 24, the piston 25, the connecting head 26 and the central tube 27 are all arranged in the outer jacket 22,
连接爪24的一端套装在上接头21内,连接爪24的另一端为呈收缩状态的锁爪24a,活塞25套装在锁爪24a外,连接爪24与外套22之间设有间隙,活塞25夹设于锁爪24a与外套22之间并与上接头21之间间隔一定距离,连接爪24与活塞25之间通过启动销钉28连接;One end of the connecting claw 24 is set in the upper joint 21, the other end of the connecting claw 24 is a locking claw 24a in a contracted state, and the piston 25 is set outside the locking claw 24a. Interposed between the locking pawl 24a and the outer casing 22 and at a certain distance from the upper joint 21, the connecting pawl 24 and the piston 25 are connected by a starting pin 28;
连接头24的一端卡接于锁爪24a内,连接头26的另一端与中心管27的一端通过丢手销钉29连接,螺帽23套接在中心管27的外侧壁上,中心管27与外套22之间设有间隙,连接头26与螺帽23之间间隔一定距离。One end of the connecting head 24 is clamped in the locking pawl 24a, the other end of the connecting head 26 is connected with one end of the central pipe 27 by a pin 29, the nut 23 is sleeved on the outer wall of the central pipe 27, and the central pipe 27 is connected with the central pipe 27. There is a gap between the jackets 22 , and there is a certain distance between the connecting head 26 and the nut 23 .
在压裂施工完成后需要解封各个封隔器并上提起出压裂管柱,现有技术中分层压裂管柱上的相邻的封隔器之间未设置可伸缩部件,使得单级封隔器在解封时没有足够的行程空间,解封的同时会带动相邻的封隔器移动,最终会导致多级封隔器解封时整体一起解封,解封负荷很大解封操作比较困难,而本实施例中解封丢手短节2通过液压控制,沿井口往井底的方向依次分段一级一级解封封隔器1,先从井口处打入高压流体,流体经管柱从中心管27处进入第一级管柱的解封丢手短节2的内部,并填充于活塞25和连接头26之间,接着推动活塞25朝上接头21移动,当流体压力升高达到设定值时启动销钉28被剪断,此时连接爪24一端的锁爪24a失去活塞25的支撑与连接头26脱离并解锁,上接头21带动外套22和螺帽23与中心管27和连接头26相对移动,螺帽23与连接头21之间的距离为第一级管柱的封隔器1的解封提供了足够行程,解封第一级封隔器1的同时没有带动第二级封隔器1,减轻了第一级封隔器1的解封载荷,第一级封隔器1解封完成之后,高压流体进入第二级管柱的解封丢手短节2的内部,辅助完成第二级封隔器1的解封,存在多级封隔器时,可以分段逐级解封。After the fracturing construction is completed, each packer needs to be unsealed and the fracturing string should be lifted out. In the prior art, there is no retractable part between the adjacent packers on the layered fracturing string, so that a single The first-stage packer does not have enough travel space when it is unsealed, and it will drive the adjacent packers to move at the same time, which will eventually lead to the unseal of the multi-stage packer as a whole when unsealed, and the unsealed load is very large. The sealing operation is relatively difficult, but in this embodiment, the unsealing sub-joint 2 is hydraulically controlled, and the unsealing packer 1 is segmented one by one along the direction from the wellhead to the bottom of the well. The fluid enters the inside of the first-stage pipe string from the center pipe 27 through the pipe string, and fills between the piston 25 and the connection head 26, and then pushes the piston 25 to move toward the upper joint 21. When the fluid pressure rises When the height reaches the set value, the starting pin 28 is cut off. At this time, the locking claw 24a at one end of the connecting claw 24 loses the support of the piston 25 and the connecting head 26 is disengaged and unlocked. The connecting head 26 moves relatively, and the distance between the nut 23 and the connecting head 21 provides enough travel for the unsealing of the first-stage packer 1 of the tubing string, and the unsealing of the first-stage packer 1 does not drive the second The second-stage packer 1 reduces the unpacking load of the first-stage packer 1. After the first-stage packer 1 is unpacked, the high-pressure fluid enters the interior of the second-stage string's unpacked hand sub-joint 2 , to assist in completing the unsealing of the second-stage packer 1. When there are multi-stage packers, the unsealing can be performed stage by stage.
当管柱遇卡时,上提管柱时的起出负荷很大,持续上提管柱达到一定力度时会剪断第一级管柱中的解封丢手短节2的丢手销钉29,此时连接头26与中心管27脱离实现第一级管柱的丢手然后打捞出部分管柱,接下来可使用其他井下工具配合打捞第二级管柱,在第二级管柱的解封丢手短节2的丢手销钉29被剪断后再打捞起出部分管柱,最后依次分段打捞一级一级起出管柱,整个分层压裂管柱分段逐级打捞,降低了在遇卡时的起出负荷。When the pipe string is stuck, the lifting load when lifting the pipe string is very large, and when the continuous lifting of the pipe string reaches a certain strength, the throwing pin 29 of the unsealed throwing joint 2 in the first-stage pipe string will be cut off. When the connecting head 26 is separated from the center pipe 27, the first-stage pipe string can be discarded, and then part of the pipe string can be salvaged. Next, other downhole tools can be used to cooperate with the salvage of the second-stage pipe string. After the lost hand pin 29 of the hand pup joint 2 is cut off, part of the pipe string is salvaged, and finally the pipe string is salvaged step by step, and the whole layered fracturing pipe string is salvaged step by step, which reduces the risk of accidental accidents. Lifting load when stuck.
进一步地,该分层压裂管柱的靠近井底的一端设置有坐封喷砂滑套3。Further, the end of the layered fracturing string near the bottom is provided with a setting sandblasting sliding sleeve 3 .
具体地,坐封喷砂滑套3下入到靠近人工井底的位置,在进行分层压裂施工时,首先会对管柱打液压坐封靠近坐封喷砂滑套3的一个封隔器1,继续加压后控制坐封喷砂滑套3先坐封然后压裂最下层。Specifically, the setting and sandblasting sliding sleeve 3 is lowered to a position close to the bottom of the artificial well. When performing layered fracturing, the hydraulic setting is first applied to the pipe string to seal an isolation near the setting sandblasting sliding sleeve 3. Device 1, after continuing to pressurize, control setting and sandblasting sliding sleeve 3 to set first and then fracture the bottom layer.
进一步地,多个封隔器1的滑套球座的内径沿井底向井口方向逐个增大。Further, the inner diameters of the sliding sleeve ball seats of the plurality of packers 1 increase one by one along the direction from the bottom of the well to the head of the well.
具体地,在完成最下层压裂层的施工后,接下来需要通过投球依次打开往上一级压裂层的封隔器1的坐封液流通道和该层滑套喷砂器4的进液通道,同时投入的球会落在最下层封隔器1的球座处进行封堵,最下层压裂通道被封堵后,即可实施滑套喷砂器4对应压裂层的压裂施工,封隔器1的滑套球座的内径应满足从上层往底层逐个减小,方便依次投入不同大小的球实现相应压裂层的封堵以及下一压裂层的施工。Specifically, after the construction of the lowest fracturing layer is completed, it is necessary to successively open the setting fluid flow channel of the packer 1 to the upper fracturing layer and the inlet of the sliding sleeve sand blaster 4 by throwing balls. At the same time, the balls put in will fall on the ball seat of the lowest layer packer 1 for sealing. After the lowermost layer fracturing channel is blocked, the fracturing of the corresponding fracturing layer by the sliding sleeve sandblasting device 4 can be carried out During construction, the inner diameter of the sliding sleeve ball seat of the packer 1 should be reduced one by one from the upper layer to the bottom layer, so that balls of different sizes can be put in order to realize the plugging of the corresponding fracturing layer and the construction of the next fracturing layer.
进一步地,该分层压裂管柱的最靠近井口的一个封隔器1采用的是Y341型可洗井液压封隔器。该分层压裂管柱的中部的封隔器1为Y241型滑套式液压封隔器。该分层压裂管柱的最靠近井底的一个封隔器1为Y241型液压封隔器。Further, the packer 1 closest to the wellhead of the multi-layer fracturing string adopts a Y341 type washable hydraulic packer. The packer 1 in the middle of the layered fracturing string is a Y241 sliding sleeve hydraulic packer. The packer 1 closest to the bottom of the layered fracturing string is a Y241 hydraulic packer.
具体地,本实施例中,封隔器1及其配套工具均采用液压控制,相对于现有技术中常用的Y221封隔器的机械坐封方式,在进行深井、大斜度井的分层压裂时坐封力能够高效传递,减小了坐封失败的风险,Y241型封隔器属于较为成熟的封隔器,坐封稳定效率较高,Y341型可洗井液压封隔器在完成坐封后还具备辅助洗井功能。Specifically, in this embodiment, the packer 1 and its supporting tools are all hydraulically controlled. Compared with the mechanical setting method of the Y221 packer commonly used in the prior art, the stratification of deep wells and highly deviated wells The setting force can be efficiently transmitted during fracturing, reducing the risk of setting failure. The Y241 packer is a relatively mature packer with high setting stability efficiency. The Y341 well-washable hydraulic packer is being completed After setting, it also has the function of auxiliary well washing.
进一步地,多级管柱中,除最靠近井底的管柱和最靠近井口的管柱之外,每级管柱均包括依次连接的封隔器1、滑套喷砂器4、水力锚5和解封丢手短节2。Furthermore, in the multi-stage string, except for the string closest to the bottom of the well and the string closest to the wellhead, each string includes a packer 1, a sliding sleeve sand blaster 4, and a hydraulic anchor connected in sequence. 5 and unsealed throw short section 2.
具体地,本实施例中,最靠近井底的管柱上设置了坐封喷砂滑套3,最靠近井口的管柱上设置有液压安全接头等装置,中间可以设置多级包括封隔器1、解封丢手短节2、滑套喷砂器4、水力锚5的管柱,施工作业时,从管柱的油管内打入高压流体后,水力锚5的锚爪在高压的作用下会压缩自身的内压簧和外压簧,锚爪被推向套管壁,最终卡紧在套管内壁上,以此来克服管柱在作业施工中产生的轴向推力,起到固定水力锚5附近的一段管柱的作用,在油套压力平衡后,水力锚5的锚爪可以在自身弹簧作用力下收回,解除锚定。Specifically, in this embodiment, a setting sandblasting sliding sleeve 3 is installed on the pipe string closest to the bottom of the well, a hydraulic safety joint and other devices are installed on the pipe string closest to the wellhead, and multi-stage packers can be installed in the middle. 1. Unsealing the drop-off short joint 2. Sliding sleeve sandblasting device 4. The pipe string of hydraulic anchor 5. During construction, after injecting high-pressure fluid from the tubing of the pipe string, the fluke of hydraulic anchor 5 is under the action of high pressure It will compress its own inner compression spring and outer compression spring, and the anchor claw will be pushed to the casing wall, and finally clamped on the inner wall of the casing, so as to overcome the axial thrust generated by the pipe string during operation and construction, and achieve a fixed hydraulic force. The effect of a section of pipe string near the anchor 5, after the pressure of the oil jacket is balanced, the anchor fluke of the hydraulic anchor 5 can be retracted under the force of its own spring to release the anchor.
进一步地,多级管柱中,最靠近井口的管柱上设置有液压安全接头6。液压安全接头6和封隔器1之间连接有水力锚5。Further, among the multi-stage pipe strings, the pipe string closest to the wellhead is provided with a hydraulic safety joint 6 . A hydraulic anchor 5 is connected between the hydraulic safety joint 6 and the packer 1 .
具体地,液压安全接头6是一种易于脱扣、对扣的安全工具,一般安装在管柱的需要脱开的位置,可以同管柱一起传送扭矩和承受各种复合应力,在井内发生故障时,可以通过井口操作完成作业管柱的脱扣、对扣。Specifically, the hydraulic safety joint 6 is a safety tool that is easy to release and buckle. It is generally installed at the position where the pipe string needs to be released. It can transmit torque and withstand various composite stresses together with the pipe string. , the tripping and stabbing of the operating string can be completed through wellhead operations.
本实用新型实施例提供的一种分层压裂管柱,通过设置带多级封隔器的分层压裂管柱,封隔器之间设置解封丢手短节,可以通过加压沿井底往井口方向依次坐封封隔器,同时配以投球憋压实现管柱的分层压裂;当启动销钉被剪断时,上接头带动外套和螺帽可以与中心管相对移动,螺帽与连接头之间的距离为封隔器的解封提供了足够行程,减轻了封隔器的解封载荷,当管柱遇卡时,继续上提管柱可剪断丢手销钉,连接头与中心管脱离实现丢手,减小管柱的起出负荷,实现分段打捞起出管柱。In the layered fracturing string provided by the embodiment of the utility model, by setting the layered fracturing string with multi-stage packers, and setting the unpacking and throwing short joints between the packers, it can be pressurized along the well The packers are set in sequence from the bottom to the wellhead, and at the same time, they are equipped with balls to suppress the pressure to realize the layered fracturing of the pipe string; when the starting pin is cut off, the upper joint drives the jacket and the nut to move relative to the central pipe, and the nut and the The distance between the connectors provides enough travel for the unsealing of the packer, which reduces the unpacking load of the packer. When the pipe string is stuck, continue to lift the pipe string to cut off the lost pin. The connector and the center The pipe is separated to realize hands-off, reduce the lifting load of the pipe string, and realize segmental salvage and lifting of the pipe string.
以上所述仅为本实用新型的较佳实施例,并不用以限制本实用新型,凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above descriptions are only preferred embodiments of the present utility model, and are not intended to limit the present utility model. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present utility model shall be included in this utility model. within the scope of protection of utility models.
Claims (9)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420562823.9U CN204113261U (en) | 2014-09-28 | 2014-09-28 | A layered fracturing string |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420562823.9U CN204113261U (en) | 2014-09-28 | 2014-09-28 | A layered fracturing string |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204113261U true CN204113261U (en) | 2015-01-21 |
Family
ID=52330585
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201420562823.9U Expired - Fee Related CN204113261U (en) | 2014-09-28 | 2014-09-28 | A layered fracturing string |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204113261U (en) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106437664A (en) * | 2016-12-16 | 2017-02-22 | 华鼎鸿基石油工程技术(北京)有限公司 | Anti-erosion and no sand card fracturing sliding bush |
| CN106703706A (en) * | 2015-07-24 | 2017-05-24 | 中国石油天然气股份有限公司 | Injection string and method of using same |
| CN107100572A (en) * | 2017-07-04 | 2017-08-29 | 唐山冀东石油机械有限责任公司 | Gradually deblocking is segmented releasing tool |
| CN108868673A (en) * | 2018-06-28 | 2018-11-23 | 唐山冀东石油机械有限责任公司 | Multiple-string packer Back-off Pipe String and its remove method |
| CN110145292A (en) * | 2019-05-18 | 2019-08-20 | 中国石油天然气股份有限公司 | An elastic lock sleeve sand blaster |
| CN111927339A (en) * | 2020-09-06 | 2020-11-13 | 中国石油天然气集团有限公司 | Safety joint for staged fracturing pipe column |
-
2014
- 2014-09-28 CN CN201420562823.9U patent/CN204113261U/en not_active Expired - Fee Related
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106703706A (en) * | 2015-07-24 | 2017-05-24 | 中国石油天然气股份有限公司 | Injection string and method of using same |
| CN106703706B (en) * | 2015-07-24 | 2018-11-16 | 中国石油天然气股份有限公司 | Injection string and method of using same |
| CN106437664A (en) * | 2016-12-16 | 2017-02-22 | 华鼎鸿基石油工程技术(北京)有限公司 | Anti-erosion and no sand card fracturing sliding bush |
| CN106437664B (en) * | 2016-12-16 | 2019-01-04 | 华鼎鸿基石油工程技术(北京)有限公司 | Fluid erosion prevention exempts from sand card fracturing sliding bush |
| CN107100572A (en) * | 2017-07-04 | 2017-08-29 | 唐山冀东石油机械有限责任公司 | Gradually deblocking is segmented releasing tool |
| CN108868673A (en) * | 2018-06-28 | 2018-11-23 | 唐山冀东石油机械有限责任公司 | Multiple-string packer Back-off Pipe String and its remove method |
| CN110145292A (en) * | 2019-05-18 | 2019-08-20 | 中国石油天然气股份有限公司 | An elastic lock sleeve sand blaster |
| CN111927339A (en) * | 2020-09-06 | 2020-11-13 | 中国石油天然气集团有限公司 | Safety joint for staged fracturing pipe column |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN204113261U (en) | A layered fracturing string | |
| CN108166965B (en) | Sand blasting perforation, fracturing and packing integrated device | |
| CN104929603B (en) | Infinite stage sectional fracturing method for casing | |
| CN103452542B (en) | Switchable fracturing sliding sleeve | |
| CN110454129A (en) | Gas well separate-layer fracturing and water control integrated process pipe column | |
| CN202531097U (en) | A slip packer for gas well fracturing | |
| CN104563955B (en) | Steel pipe hydraulic expansion type external casing packer | |
| CN112814640B (en) | Multilayer pressured fracturing operation device for medium-low pressure well and application method | |
| CN105888639A (en) | Feeding-controlling full-bore sliding sleeve sectional fracturing tube column | |
| CN203879432U (en) | Ball-thrown deblocking type hydraulic tubing anchor | |
| CN108561107A (en) | Multistage water injection process pipe string and its remove method | |
| CN205445569U (en) | A construction string capable of realizing layered volume fracturing in directional wells | |
| CN108301785A (en) | A sand control completion pipe string and method | |
| CN105156088A (en) | Multiple-completion packer staged fracturing string with dual-channel injection function and using method thereof | |
| CN202338316U (en) | Five-layer layered fracturing process string with mechanical isolation and step-by-step unsealing | |
| CN104806196A (en) | Casing floating system for horizontal well | |
| CN104295255A (en) | Spring-based hydraulic device and method for suspending riser string | |
| CN103982153B (en) | Ball injecting de-blocking hydraulic tubing anchor | |
| CN210293914U (en) | Sand control is with full tubular column oil pipe pressure testing instrument of safe environment-friendly | |
| CN103291235A (en) | Tool for sending hydraulic packer into well | |
| CN203347718U (en) | Running tool for hydraulic packer | |
| CN203685094U (en) | Long-section casing damage well expansion pipe multi-card casing layered isolation repair device | |
| CN204041042U (en) | A kind of coiled tubing drag fracturing tubing string | |
| CN107795297A (en) | Multistage a chain of Cut Block blocking | |
| CN113445954B (en) | Pump-down circulating oil pipe hydraulic control environmental protection blowout prevention device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150121 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |