CN205822195U - A kind of pier concreting in lifts construction joint alignment means - Google Patents

A kind of pier concreting in lifts construction joint alignment means Download PDF

Info

Publication number
CN205822195U
CN205822195U CN201620498322.8U CN201620498322U CN205822195U CN 205822195 U CN205822195 U CN 205822195U CN 201620498322 U CN201620498322 U CN 201620498322U CN 205822195 U CN205822195 U CN 205822195U
Authority
CN
China
Prior art keywords
alignment means
construction joint
pier
concreting
lifts
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620498322.8U
Other languages
Chinese (zh)
Inventor
陆刘平
贾宝珠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN PORT ENGINEERING DESIGN&CONSULTING Co Ltd OF CCCC FIRST HARBOR ENGINEERING Co Ltd
CCCC First Harbor Engineering Co Ltd
Original Assignee
TIANJIN PORT ENGINEERING DESIGN&CONSULTING Co Ltd OF CCCC FIRST HARBOR ENGINEERING Co Ltd
CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN PORT ENGINEERING DESIGN&CONSULTING Co Ltd OF CCCC FIRST HARBOR ENGINEERING Co Ltd, CCCC First Harbor Engineering Co Ltd filed Critical TIANJIN PORT ENGINEERING DESIGN&CONSULTING Co Ltd OF CCCC FIRST HARBOR ENGINEERING Co Ltd
Priority to CN201620498322.8U priority Critical patent/CN205822195U/en
Application granted granted Critical
Publication of CN205822195U publication Critical patent/CN205822195U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

This utility model relates to a kind of pier concreting in lifts construction joint alignment means, is similar to angle steel, its cross section drift angle be 60 degree and both sides isometric, welded and installed is on the steel form of pier construction joint position, and length is equal with steel form length.Plugging sheet at the two ends of alignment means each welded and installed one equilateral triangle.This alignment means welded and installed is on the steel form of pier construction joint position, and concreting position control, at alignment means position, solves the appearance qualities such as pier concrete construction joint is the most straight, aberration is big.

Description

A kind of pier concreting in lifts construction joint alignment means
Technical field
This utility model belongs to marine traffic engineering Wharf Construction field, relates to the concreting in lifts construction of pier, especially It it is a kind of pier concreting in lifts construction joint alignment means.
Background technology
At present, marine traffic engineering harbour pier waterborne volume is relatively big, and concrete construction is by construction technology, construction intensity, coagulation Soil temperature control measures, mechanical equipment fault and weather impact etc., need construction in layer, and inevitable just occur " executing in xoncrete structure Work is stitched ".The existence of concrete construction joint, certainly will affect the globality of structure, durability and presentation quality." marine traffic engineering coagulation Soil job specfication " indwelling of concrete construction joint, process etc. there are is concrete regulation.In current construction, engineers and technicians Pay attention to the inherent quality problem control such as in terms of structural integrity, durability to process, and despise presentation quality aspect.
Owing to concreting in lifts is constructed, creating construction joint lines uneven, not straight, some two ends discrepancy in elevation is relatively big, has In excessive waveform, the appearance quality such as upper and lower two layer concrete aberration are big, after often taking form removal, then use dry-mixed mortar Carry out smearing process, both caused engineering waste and also created personal safety hidden danger.
Utility model content
In place of the purpose of this utility model is to overcome the deficiencies in the prior art, it is provided that a kind of pier concreting in lifts Construction joint alignment means, solves the appearance qualities such as pier concrete construction joint is the most straight, aberration is big.
This utility model solves technical problem and be the technical scheme is that
A kind of pier concreting in lifts construction joint alignment means, is similar to angle steel, and its cross section drift angle is 60 degree and both sides Isometric, welded and installed is on the steel form of pier construction joint position, and length is equal with template length.
And, at the plugging sheet of the two ends of alignment means each welded and installed one equilateral triangle.
And, the both sides width of described alignment means is 1.4~1.6cm, preferably 1.5cm.
Advantage of the present utility model and good effect be:
1, this alignment means welded and installed is on the steel form of pier construction joint position, and concreting position control is right Neat device position, solves the appearance qualities such as pier concrete construction joint is the most straight, aberration is big.
2, this alignment means simple in construction, convenient and practical, effectively reduces artificial secondary and carries out pier treatment of construction joints Labor intensity, decreases the use of personnel and plant equipment, is greatly saved cost and ensure that workmen's safety.
Accompanying drawing explanation
Fig. 1 is structure chart of the present utility model;
Fig. 2 is installation diagram of the present utility model.
Detailed description of the invention
The utility model is described in further detail below in conjunction with the accompanying drawings and by specific embodiment, and following example are simply retouched The property stated, be not determinate, it is impossible to limit protection domain of the present utility model with this.
A kind of pier concreting in lifts construction joint alignment means, is similar to angle steel 2, and its cross section drift angle is 60 degree and both sides Isometric, depending on length is according to each piece of steel form length, the plugging sheet 1 of a triangle, this alignment means welding peace are respectively installed in two ends It is contained in 3 (template uses piecemeal entirety large-scale steel form) on the steel form of pier construction joint position.
The both sides thickness of described alignment means is equal, and width is 1.4~1.6cm.
In pier concrete delamination is constructed, concreting position control, at alignment means position, controls as far as possible Alignment means centre, does not allows to be more or less than alignment means, after pier concrete has all poured, and template of dismantling, point The construction joint of layer is in alignment means position.Layering horizontal construction joint is just embedded in alignment means position, does not has upper and lower two in appearance Layer pours the vestige of faying face, the most thoroughly solves the appearance quality of above-mentioned existence.
Above-described is only preferred implementation of the present utility model, it is noted that for the ordinary skill of this area For personnel, on the premise of conceiving without departing from utility model, it is also possible to making some deformation and improvement, these broadly fall into this reality With novel protection domain.

Claims (3)

1. a pier concreting in lifts construction joint alignment means, it is characterised in that: likeness in form angle steel, its cross section drift angle is 60 Degree and both sides are isometric, and welded and installed is on the steel form of pier construction joint position, and length is equal with template length.
Pier concreting in lifts construction joint alignment means the most according to claim 1, it is characterised in that: at alignment dress The plugging sheet of two ends each welded and installed one equilateral triangle put.
Pier concreting in lifts construction joint alignment means the most according to claim 1, it is characterised in that: described alignment The both sides width of device is 1.4~1.6cm.
CN201620498322.8U 2016-05-27 2016-05-27 A kind of pier concreting in lifts construction joint alignment means Expired - Fee Related CN205822195U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620498322.8U CN205822195U (en) 2016-05-27 2016-05-27 A kind of pier concreting in lifts construction joint alignment means

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620498322.8U CN205822195U (en) 2016-05-27 2016-05-27 A kind of pier concreting in lifts construction joint alignment means

Publications (1)

Publication Number Publication Date
CN205822195U true CN205822195U (en) 2016-12-21

Family

ID=57558728

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620498322.8U Expired - Fee Related CN205822195U (en) 2016-05-27 2016-05-27 A kind of pier concreting in lifts construction joint alignment means

Country Status (1)

Country Link
CN (1) CN205822195U (en)

Similar Documents

Publication Publication Date Title
CN106436777B (en) A kind of subway station skin-type waterproof construction and its construction method
CN104863274B (en) Building dilatation joint waterproof structure
CN207436373U (en) A kind of assembled is bolted steel core concrete column entirely
CN103225285B (en) A kind of steel membrane rock
CN102926504A (en) Connecting steel construction member for steel and concrete overlapped beam combined part and construction method thereof
CN204771228U (en) A protection canopy for longitudinal seam welding of steel pipe tube coupling
CN109914666A (en) Profiled sheet Combined concrete flooring large area pouring construction method
CN207538502U (en) A kind of novel reinforced concrete frame beam column reinforcing joint
CN205822195U (en) A kind of pier concreting in lifts construction joint alignment means
CN204343722U (en) swimming pool gutter
CN204551219U (en) The stage transverse prestress structure of oblique hinged precast hollow slab beam bridge
CN204418658U (en) Integrated hydraulic creeping formwork periphery protection unit
CN109779226A (en) A kind of opposite sex chimney construction security platform structure and its construction method
CN104453045B (en) Separate prefabricated truss frame floor bearing plate and construction method thereof
CN204282609U (en) A kind of separate type precast truss frame floor support plate
CN205476083U (en) Concrete beam's cover to reinforcement structure
CN204266404U (en) A kind of outer-wall crack-resisting anti-leakage structure
CN203961373U (en) Switchbox protection canopy
CN206616872U (en) Build the protector of post-cast strip
CN206667743U (en) New sunk type floor hoisting die structure
CN106193456A (en) A kind of high-layer shear force wall reinforcing steel bar Exact Location Method and truss strength fixing device
CN205725588U (en) A kind of clump crane span structure fixed structure
CN206858018U (en) A kind of tool-type tower crane passageway
CN207032321U (en) Rubber water-proof band model at a kind of raft plate level seam
CN204960187U (en) Stair angle bead bone shape single face structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161221