CN205822177U - Stake is dug in a kind of multistage reaming rotation - Google Patents
Stake is dug in a kind of multistage reaming rotation Download PDFInfo
- Publication number
- CN205822177U CN205822177U CN201520790607.4U CN201520790607U CN205822177U CN 205822177 U CN205822177 U CN 205822177U CN 201520790607 U CN201520790607 U CN 201520790607U CN 205822177 U CN205822177 U CN 205822177U
- Authority
- CN
- China
- Prior art keywords
- diameter
- section
- stake
- reaming
- dry
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
Stake is dug in a kind of multistage reaming rotation, dry and one or more levels reaming section including stake, it is characterised in that reaming section includes epimere, DS section, hypomere.Epimere and hypomere are disc-shaped, and DS section is column.The diameter of DS section is more than the dry diameter of stake, and epimere top diameter diameter dry with stake is consistent, and base diameter is consistent with DS section diameter;The top diameter of hypomere is consistent with DS section diameter, and base diameter is more than the dry diameter of stake, less than DS section diameter.This utility model can improve bearing capacity, and little by formation influence, can complete expanding and formation rule reaming section in compared with hard formation, and pile quality is high, reduces concrete and the consumption of bar material, reduces construction costs.
Description
Technical field
This utility model relates to the foundation construction field of the engineering such as buildings or structures, municipal administration, especially with a kind of multistage reaming
The structure that stake is dug in rotation is relevant.
Background technology
The position that the hole-expanding pile being presently used for foundation engineering mostly is the squeezed technique of employing different in boring side is formed some
Individual branch and the deposited reinforced concrete pile of bearing capacity dish, the most existing expanding branch grouting pile.Compacted bearing disk pile is by squeezed
The squeezed effect of machine changes pile body area of section, carries out squeezed branch, passed by branch by load in the stratum that bearing capacity is high
It is delivered in soil layer, is i.e. layered carrying, one by one off-load.Support disk pile has given full play to the end resistance of stake, expands loading end simultaneously
Long-pending, reach the purpose of the supporting force improving bored concrete pile.
But owing to compacted bearing disk pile is the most squeezed perfusion after common drilled pile pore-forming completes, therefore the engineering time is relatively
Long;In squeezing process by soil layer performance impact relatively greatly, soil compaction effect is obvious, and in soft layer or hard soil layer, one-tenth dish all compares
Difficulty, or dish type is irregular, causes branch quality discreteness bigger;The angle that force bearing disk is formed up and down easily causes stress collection
In, by the biggest shearing, there is the risk cut off by disk body in stake disk body and pile body connecting portion bear external force when;Branch
When using mud off, mud mud skin is thicker, and sediment of the hole bottom is thicker, as scarfing cinder is not clean, can affect the performance of pile bearing capacity.
Utility model content
This utility model provides a kind of multistage reaming rotation to dig stake, not enough to solve above-mentioned prior art, improves bearing capacity, and
Little by formation influence, expanding and formation rule reaming section can be completed in compared with hard formation, pile quality is high, reduces concrete and steel
The consumption of muscle material.
In order to realize the purpose of this utility model, plan employing techniques below:
Stake is dug in a kind of multistage reaming rotation, dry and one or more levels reaming section including stake, it is characterised in that described reaming section bag
Include epimere, DS section, hypomere.
Further, described epimere and hypomere are disc-shaped, and DS section is column.
Further, the diameter of described DS section is more than the dry diameter of stake, and epimere top diameter diameter dry with stake is consistent, bottom
Diameter is consistent with DS section diameter;The top diameter of hypomere is consistent with DS section diameter, and base diameter is more than the dry diameter of stake, is less than
DS section diameter.
The beneficial effects of the utility model are:
1, this utility model uses rotary drilling rig pore-forming, is expanded by rotation and forms reaming section, compared with traditional squeezed technique,
Affected by formation condition less, can be applied in relatively hard formation, formed reaming sector hole type stable;
2, existing compacted bearing disk pile is generally after boring completes, and needs to use special squeeze equipment to carry out into dish,
In squeezing process, the soil body is formed cavity by compacted and " precompressed ", and after squeeze equipment is withdrawn from, the soil body being extruded can occur one
Determining the resilience of degree, especially go up force bearing disk, under Gravitative Loads, resilience is bigger;And this utility model uses rotation to dig expansion
Hole technique is constructed, less to soil disturbance;
3, according to squeezed technique, then it is first pore-forming, more squeezed, the location of the most squeezed section often there will be deviation;And this
Utility model rotation is dug chambering process and is constructed, and can be done directly reaming when creeping into preferable stratum, to ensure reaming position
The accuracy put, and efficiency of construction is high;
4, in existing support disk pile, the angle between its upper and lower section (dish), sediment is difficult to discharge, leverages and prop up
The quality of dish;Rotation of the present utility model is expanded stake and be there is DS section between upper and lower section, between fold-line edge and the straight line of formation
Angle be obtuse angle, sediment is difficult to retain;
5, destruction is easily cut off in common support disk pile pile body and disk body junction, and this utility model sets between upper and lower section
Put DS section, original reaming section prolate pile-type is improved, form pier stud stake, change original force-mechanism, be effectively improved
Bearing capacity.
Accompanying drawing explanation
Fig. 1 shows front view of the present utility model.
Fig. 2 shows plan view of the present utility model.
Detailed description of the invention
As shown in Fig. 1~2, stake is dug in a kind of multistage reaming rotation, does 1 and one or more levels reaming section 2, described reaming including stake
Section 2 includes epimere 21, DS section 22, hypomere 23.
Concrete, described epimere 21 and hypomere 23 are disc-shaped, and DS section 22 is in column.
Concrete, the diameter of described DS section 22 does 1 diameter more than stake, and 1 diameter is done in described epimere 21 top diameter and stake
Unanimously, base diameter is consistent with DS section 22 diameter;The top diameter of described hypomere 23 is consistent with DS section 22 diameter, and bottom is straight
1 diameter is done, less than DS section 22 diameter more than stake in footpath.
Construction method of the present utility model is as follows:
1, pore-creating: revolve the most in two steps by design requirement every one-level reaming and dig, first does the diameter construction of 1 to this grade of expansion by stake
Absolute altitude at the bottom of the section of hole, then carries out reaming at appointment absolute altitude, forms reaming section 2.1 diameter and each section of reaming section 2 are done in aperture and stake
Diameter matches, is specifying stratum to set one or more levels reaming section 2, reaming section 2 length and progression according to construction requirement and demand
Can design according to formation condition;
2, steel reinforcement cage is laid: after pore-forming, hangs steel reinforcement cage, until delivering to projected depth;
3, casting concrete: after steel reinforcement cage is in place, secondary scarfing cinder, complete inner concrete pour, maintenance.
Compared with common compacted bearing disk pile, between upper and lower force bearing disk, it is regular cylindrical body, is possible not only to improve raising and holds
Load power, and little by formation influence, expanding and formation rule reaming section can be completed in compared with hard formation, pile quality is high, reduces mixed
Solidifying soil and the consumption of bar material, reduce construction costs.
Claims (2)
1. a stake is dug in multistage reaming rotation, including stake dry (1) and one or more levels reaming section (2), it is characterised in that described reaming
Section (2) includes that epimere (21), DS section (22), hypomere (23), described epimere (21) and hypomere (23) are disc-shaped, described DS section
(22) in column, the diameter of described DS section (22) is more than dry (1) diameter of stake, and described epimere (21) top diameter is dry (1) with stake
Diameter is consistent, and base diameter is consistent with DS section (22) diameter.
Stake is dug in multistage reaming the most according to claim 1 rotation, it is characterised in that the diameter of described DS section (22) is more than stake
Dry (1) diameter, the top diameter of described hypomere (23) is consistent with DS section (22) diameter, base diameter be more than stake do (1) diameter,
Less than DS section (22) diameter.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520790607.4U CN205822177U (en) | 2015-10-13 | 2015-10-13 | Stake is dug in a kind of multistage reaming rotation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520790607.4U CN205822177U (en) | 2015-10-13 | 2015-10-13 | Stake is dug in a kind of multistage reaming rotation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205822177U true CN205822177U (en) | 2016-12-21 |
Family
ID=58147397
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520790607.4U Active CN205822177U (en) | 2015-10-13 | 2015-10-13 | Stake is dug in a kind of multistage reaming rotation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205822177U (en) |
-
2015
- 2015-10-13 CN CN201520790607.4U patent/CN205822177U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103993611B (en) | A kind of deep layer rotating spraying cement-soil plate and anchor pole combine the construction method of anti-floating pile raft structure | |
CN101812976B (en) | Adjustable multiple coil extruding and expanding drilling tool | |
CN206346205U (en) | A kind of sawtooth anchor formula miniature steel pipe concrete-pile for slope treatment | |
CN105421445A (en) | Construction method for non-prestressed centrifugal high-strength concrete pile planted pile | |
CN105649073A (en) | Static root drilling type construction method for planting piles | |
CN206035386U (en) | Two waist hoop drill bits of drilling bored concrete pile three wings of drilling rod are pull in area | |
CN206752454U (en) | One kind perfusion embedded pile | |
CN203866852U (en) | Anti-floating pile structure composited by deep spiral-spraying cement soil plate and anchor rod | |
CN106759295A (en) | The quiet combined pile and its construction method for boring extruding-enlarging branch tray and pile tube | |
CN206607583U (en) | Spiral resistance to plucking foundation pile | |
CN204000840U (en) | Concrete floral tube slip casting uplift pile | |
CN205822177U (en) | Stake is dug in a kind of multistage reaming rotation | |
CN203947468U (en) | A kind of Near Ground place expands the compacted bearing disk pile of section | |
CN206233232U (en) | A kind of upper and lower part expansion type soil cement is combined pile tube | |
CN206246052U (en) | Soil compaction rotary-jetting bottom-expanding pile shaped device | |
CN201650154U (en) | Adjustable multi-stage helical extruding type drilling tool | |
CN206721875U (en) | A kind of pressure-bearing type boulder and cobble soil layer enlarging anchor rod | |
CN206015511U (en) | One implant post steel pipe column | |
CN205918362U (en) | Take drill bit of bore bit | |
CN201520973U (en) | Precast pile with grouting hole | |
CN104895066B (en) | The construction method of overlength churning strength core built pile | |
CN204000846U (en) | Floral tube slip casting uplift pile | |
CN106930285B (en) | Pressure-bearing type gravel soil layer expanded anchor rod and construction method thereof | |
CN106401466A (en) | Soil-squeezing jet grouting pedestal pile forming device and construction method thereof | |
CN207959245U (en) | A kind of load-bearing pile foundation structure |