Prior art keywords
pipeline
suspension
steel plate
support
suspension rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201521110713.XU
Other languages
Chinese (zh)
Inventor
冯幸慧
邱丽
刘娇
许泽龙
胡井龙
夏峰
李江涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electromechanical Engineering Co Ltd Of Zhongjian No3 Bureau
Original Assignee
Electromechanical Engineering Co Ltd Of Zhongjian No3 Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electromechanical Engineering Co Ltd Of Zhongjian No3 Bureau filed Critical Electromechanical Engineering Co Ltd Of Zhongjian No3 Bureau
Priority to CN201521110713.XU priority Critical patent/CN205806703U/en
Application granted granted Critical
Publication of CN205806703U publication Critical patent/CN205806703U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a kind of novel suspension and support connected for horizontal multi-pipeline boil on the nape opposite the mouth, including fixing component, suspension rod and cross-arm.Fixing component includes fixation steel plate and two the hanger steel plates being welded on fixation steel plate, and fixation steel plate is fixed on concrete roof.Suspension rod includes link, flower basket bolt and harness cord suspension rod, and link upper end is connected with hanger steel plate by screw bolt and nut, and link lower end is connected with flower basket bolt upper end, and flower basket bolt lower end is connected with harness cord suspension rod upper end;Cross-arm is made up of Two bors d's oeuveres channel-section steel, and Two bors d's oeuveres channel-section steel two ends are welded together by welding steel, and harness cord hanger erection is in the centre of Two bors d's oeuveres channel-section steel.Novel suspension and support of the present utility model can allow pipeline realize left and right up-down adjustment in installation process, solve the problem that many pipeline butts connect, on ground, support is completed assembling with many pipelines fix, support and pipeline integral hoisting, greatly improve dynamo-electric installation unit efficiency of construction and reduce work high above the ground.

Description

A kind of novel suspension and support connected for horizontal multi-pipeline boil on the nape opposite the mouth
Technical field
This utility model relates to civil buildings electromechanics installing area, connects for horizontal multi-pipeline boil on the nape opposite the mouth particularly to one Novel suspension and support.
Background technology
Along with the development of modern society, more and more higher to the quality requirements of building, in building, Mechatronic Systems is also Become increasingly complex, cause dynamo-electric installation task amount to be continuously increased.The construction cycle is shorter and shorter in contrast, When job site possesses dynamo-electric installation condition, the engineering time leaving dynamo-electric installation unit for is the most comparatively short, and the time is short, appoint Business weighs, often occurs robbing work, and this is dynamo-electric installation unit frequently problem.Traditional pipeline construction is first to complete pipeline to prop up The installation of frame, then one one, pipeline carries out lifting installation, and not only efficiency of construction is low, and workman's work high above the ground is many, and high-altitude is made Industry auxiliary equipment is set up frequently.Therefore, the most quickly realize lifting pipeline and become crucial.
Therefore, how to allow pipeline realize left and right adjusting and up-down adjustment in installation process simultaneously, and many pipes can be solved The problem that road boil on the nape opposite the mouth connects, and support and many pipelines on ground, are completed assembling and fix, support and pipeline integral hoisting, improve Dynamo-electric installation unit efficiency of construction, minimizing work high above the ground, become current urgent problem.
Summary of the invention
Technical problem to be solved in the utility model is to provide a kind of novel connected for horizontal multi-pipeline boil on the nape opposite the mouth Suspension bracket, the boil on the nape opposite the mouth of its ground assembling, integral hoisting and Duo Gen pipeline of realizing the many pipelines that civil buildings electromechanics is installed connects, Allow pipeline realize left and right adjusting and up-down adjustment in installation process simultaneously, the efficiency of construction substantially overcoming prior art is low, Work high above the ground is many, work high above the ground auxiliary equipment sets up the shortcomings such as frequent.
Technical problem to be solved in the utility model is achieved through the following technical solutions:
A kind of novel suspension and support connected for horizontal multi-pipeline boil on the nape opposite the mouth, including fixing component, suspension rod and cross-arm.Fixing structure Part includes fixation steel plate and two the hanger steel plates being welded on described fixation steel plate, and fixation steel plate is fixed on concrete roof On;Suspension rod includes link, flower basket bolt, harness cord suspension rod and the bolt being connected with hanger steel plate, nut, and spiral shell is passed through in link upper end Screw bolt and nut is connected with hanger steel plate, and link lower end is connected with flower basket bolt upper end, flower basket bolt lower end and harness cord suspension rod upper end It is connected;And cross-arm is made up of Two bors d's oeuveres channel-section steel, harness cord hanger erection, in the centre of Two bors d's oeuveres channel-section steel, is reserved for suspension rod and passes in the middle of channel-section steel Gap, Two bors d's oeuveres channel-section steel two ends by welding steel welding shut together, make Two bors d's oeuveres channel-section steel become an entirety.
Preferably, fixation steel plate offering four slotted eyes passed for expansion bolt, fixation steel plate is by swollen Swollen it is bolted on concrete roof.
Preferably, hanger steel plate offers the circular hole passed for bolt, described hanger steel plate by described bolt with Described link is fixing to be connected.
Preferably, being provided with the gap passed for harness cord suspension rod in the middle of Two bors d's oeuveres channel-section steel, harness cord suspension rod passes through pad, suspension rod nut Fix with Two bors d's oeuveres channel-section steel and be connected.
Preferably, above-mentioned suspension rod and many group U-tube cards are arranged in the gap of Two bors d's oeuveres channel-section steel.
Preferably, novel suspension and support also includes jack, and jack is fixed on concrete roof by suspension centre.
The construction method of a kind of novel suspension and support connected for horizontal multi-pipeline boil on the nape opposite the mouth, comprises the following steps:
Step 1: install fixing component and jack suspension centre fixture.Need according to design, according to Deepen Design drawing, with red Outside line measuring instrument, will be fixing with expansion bolt according to unwrapping wire position to fixing component and jack fixture installation site surveying setting-out Component and four set jack suspension centre fixtures are fixed on concrete roof;
Step 2: pipeline ground assembles and transport.The multiple pipelines completed are fastened by U-tube respectively and is arranged on On cross-arm, harness cord hanger erection is in the gap of the centre of cross-arm.Arranging pipe prefabrication job shop at the construction field (site), pipeline section is pressed Carrying out prefabricated processing according to 6 meters one section, the branch pipe interface on preserved pipeline during pipeline processing, each pipeline section is pacified at 1.5 meters, both sides Fill novel suspension and support, pipeline and novel suspension and support to install on shipping platform.Pipeline section transport uses tractor-drawn shipping platform Transport, first determine transit route before transport, it is ensured that transit route is unimpeded;In transportation, gait of march is the most too fast, Traveling process should there is special messenger transportation whole process is guarded.After transporting lifting scene to, can after tractor parking is steady, flame-out Start construction.
Step 3: prepare before lifting.Four set jacks are fixed with jack suspension centre, and checks that chain sling parts stand intact, transmission Part and hoisting chain lubrication are good, and dallying all right can be continuing with, after the pipeline assembled transports erecting bed to, and will Four set jack hoisting chains are fixed with cross-arm both sides.
Step 4: pipeline integral hoisting.After guide chain hoisting chain is fixing with pipeline section cross-arm, four worker stands are on the ground first Slowly pull jack to pull chain to carry out examination and hang, determine that errorless rear four workmans pull chain to lift, side one people simultaneously It is responsible for observing commander, keeps assembling pipeline section level to rise.When a rear pipeline rises to height identical with previous pipeline, at harness cord Flower basket bolt, link and hanger steel plate are installed in suspension rod upper end.
Step 5: pipeline connects.Multi-pipeline boil on the nape opposite the mouth regulates, by the U-tube in the flower basket bolt on suspension rod and Two bors d's oeuveres channel-section steel Card realizes the boil on the nape opposite the mouth of pipeline and connects, thus the overall boil on the nape opposite the mouth realizing multiple pipeline connects, and after having connected, unloading jack suspension centre is solid Locking member and jack.Realize jack suspension centre fixture to reuse, then carry out the integral hoisting of next pipeline section.
Preferably, step 5 also includes: pipeline up-down adjustment, realizes pipeline up-down adjustment by flower basket bolt, wherein, suitable Hour hands rotate flower basket bolt pipeline and decline, and rotate counterclockwise flower basket bolt pipeline and rise.
Preferably, step 5 also includes: pipeline left and right adjusting, is stuck in Two bors d's oeuveres channel-section steel gap left and right by U-tube and adjusts real Existing, after pipeline butt has connected, by the fixing nut screwing clamping of U-tube card.
This utility model technique scheme, has the advantages that
Compared with prior art, novel suspension and support can allow pipeline realize left and right up-down adjustment in installation process, solves The problem that many pipeline butts connect, completes assembling with many pipelines on ground by support and fixes, support and pipeline integral hoisting, Greatly improve dynamo-electric installation unit efficiency of construction and reduce work high above the ground.Additionally, this utility model only need to once lift Complete multi-pipeline to install, it is to avoid traditional handicraft pipeline repeatedly lifts, and work high above the ground is many, work high above the ground auxiliary equipment is set up frequently Situation, improve on-the-spot dynamo-electric pipeline installation effectiveness, reduction of erection time, reduce work high above the ground, it is ensured that workman's construction safety.
Accompanying drawing explanation
Fig. 1 is a kind of novel suspension and support schematic diagram connected for horizontal multi-pipeline boil on the nape opposite the mouth of the present utility model.
Fig. 2 is the fixing component signal of a kind of novel suspension and support connected for horizontal multi-pipeline boil on the nape opposite the mouth of the present utility model Figure.
Fig. 3 is that a kind of master for the cross-arm of the novel suspension and support of horizontal multi-pipeline boil on the nape opposite the mouth connection of the present utility model regards Figure.
Fig. 4 is the vertical view of the cross-arm of a kind of novel suspension and support for the connection of horizontal multi-pipeline boil on the nape opposite the mouth of the present utility model Figure.
Fig. 5 is the left view of the cross-arm of a kind of novel suspension and support for the connection of horizontal multi-pipeline boil on the nape opposite the mouth of the present utility model Figure.
Fig. 6 is that a kind of multi-pipeline entirety for the novel suspension and support of horizontal multi-pipeline boil on the nape opposite the mouth connection of the present utility model is hung Dress technique.
1-fixation steel plate, 2-hanger steel plate, 3-expansion bolt, 4-bolt, 5-nut, 6-concrete roof, 7-link, 8- Flower basket bolt, 9-harness cord suspension rod, 10-Two bors d's oeuveres channel-section steel, 11-U type pipe clamp, 12-pipeline, 13-welding steel, 14-pad, 15-hangs Stem nut, 16-jack chain drum, 17-jack pulls chain, 18-jack hoisting chain.
Detailed description of the invention
Below specific embodiment of the utility model is described in detail, in order to be further appreciated by this utility model.
Fig. 1 is the schematic diagram of a kind of novel suspension and support connected for horizontal multi-pipeline boil on the nape opposite the mouth of the present utility model.Fig. 2 is The fixing component of a kind of novel suspension and support connected for horizontal multi-pipeline boil on the nape opposite the mouth of the present utility model.Fig. 3-Fig. 5 is respectively this The front view of cross-arm, top view and the left view of a kind of novel suspension and support connected for horizontal multi-pipeline boil on the nape opposite the mouth of utility model Figure.Please also refer to Fig. 1-Fig. 5, as it can be seen, novel suspension and support of the present utility model includes fixing component, suspension rod and cross-arm. Specifically:
Fixing component includes fixation steel plate 1 and two the hanger steel plates 2 being welded on this fixation steel plate 1, and fixation steel plate 1 is solid It is scheduled on concrete roof.Wherein, fixation steel plate 1 offers the slotted eye passed for expansion bolt 3, fixation steel plate 1 It is fixed on concrete roof by expansion bolt 3.The quantity of above-mentioned slotted eye is preferably four.Offer on hanger steel plate 2 Having the circular hole passed for bolt 4, this hanger steel plate 2 is connected by bolt 4 is fixing with the link 7 of suspension rod.Thus realize fixing Connection between component and suspension rod.
Suspension rod includes link 7, flower basket bolt 8, harness cord suspension rod 9 and the bolt 4 being connected with hanger steel plate 2, nut 5, hangs Ring 7 upper end is connected with hanger steel plate 2 by bolt 4 and nut 5, and link (7) lower end is connected with flower basket bolt 8 upper end, gaily decorated basket spiral shell Bolt 8 lower end is connected with harness cord suspension rod 9 upper end.
Cross-arm is made up of Two bors d's oeuveres channel-section steel 10, and harness cord suspension rod 9 is installed on the centre of Two bors d's oeuveres channel-section steel 10, is reserved for hanging in the middle of channel-section steel The gap that bar passes, Two bors d's oeuveres channel-section steel 10 two ends by welding steel welding shut together, make Two bors d's oeuveres channel-section steel 10 become one whole Body.Being provided with the circular hole passed for harness cord suspension rod 9 in the middle of Two bors d's oeuveres channel-section steel 10, harness cord suspension rod 9 passes through pad 14, suspension rod nut 15 with double Spell the fixing connection of channel-section steel 10.Above-mentioned suspension rod and many group U-tube cards are arranged in the gap of Two bors d's oeuveres channel-section steel 10.Fig. 6 is that this practicality is new A kind of multi-pipeline integral hoisting technique of the novel suspension and support connected for horizontal multi-pipeline boil on the nape opposite the mouth of type.As it can be seen, it is novel Suspension and support also includes jack, and this jack is fixed on concrete roof by suspension centre.Specifically, this jack includes jack suspension centre Fixture, jack face 16, jack pull chain 17, jack hoisting chain 18.
The construction method of a kind of novel suspension and support connected for horizontal multi-pipeline boil on the nape opposite the mouth, comprises the following steps:
(1) pipeline ground assembles.Arranging pipe prefabrication job shop at the construction field (site), pipeline section carries out pre-according to 6 meters one section System processing, the branch pipe interface on preserved pipeline during pipeline processing, each pipeline section is installed novel suspension and support at 1.5 meters, both sides, is managed Road and novel suspension and support are installed on shipping platform.
(2) pipeline transportation.Pipeline section transport uses tractor-drawn shipping platform to transport, and first determines transport before transport Route, it is ensured that transit route is unimpeded;In transportation, gait of march is the most too fast, should have special messenger to transporting in traveling process Cheng Quancheng guards.After transporting lifting scene to, after tractor parking is steady, flame-out, construction can be started.
(3) suspension and support is installed and fixes component and jack suspension centre fixture.According to Deepen Design drawing, with red before Pipe installing Suspension and support is fixed component and jack fixture installation site surveying setting-out by outside line measuring instrument, according to unwrapping wire position expansion bolt Suspension and support is fixed component and jack suspension centre fixture is fixed on concrete roof by 3.
(4) prepare before lifting.Four set jacks are fixed with suspension centre, and check that chain sling parts are excellent, running part and Hoisting chain lubrication is good, and dallying all right can be continuing with.After the pipeline 12 assembled transports erecting bed to, four sets are fallen Chain hoisting chain 18 is fixed with novel suspension and support cross-arm both sides.
(5) pipeline integral hoisting.After guide chain hoisting chain 18 is fixing with pipeline section cross-arm, four workmans first slowly pull jack Pull chain 17 to carry out examination and hang, determine that errorless rear four workmans pull jack to pull chain 17 simultaneously and lift, side one people It is responsible for observing commander, keeps assembling pipeline section level to rise.
(6) pipeline connects.Multi-pipeline boil on the nape opposite the mouth regulates, and realizes pipeline by the flower basket bolt 8 on novel suspension and support suspension rod Up-down adjustment, is realized the left and right adjusting of pipeline, and then realizes multi-pipeline by the U-tube card 11 in regulation channel-section steel Two bors d's oeuveres cross-arm Overall boil on the nape opposite the mouth connects.
(7) unloading assembly.After pipeline has connected, jack suspension centre fixture is unloaded with jack, it is achieved jack suspension centre is solid Locking member is reused, and then carries out the integral hoisting of next pipeline section.
Specifically, as shown in Figure 6, according to construction in-depth drawing, before Pipe installing, unwrapping wire is measured with infrared ray instrument, Suspension and support is fixed component expansion bolt be fixed on concrete roof.The pipeline 12 that blanking completes, with U-tube card 11 Being fixedly mounted on cross-arm, U-tube card 11 is installed in cross-arm Two bors d's oeuveres channel-section steel 10 gap, and harness cord suspension rod 9 is installed in cross-arm both sides.Peace Dress jack, is connected fixing, the integral hoisting that four construction worker pull jack to realize pipeline on ground by jack with cross-arm.
When pipeline rises to height identical with previous pipeline section, flower basket bolt 8 and link 7 are installed in harness cord suspension rod 9 upper end, Link 7 bolt 4, nut 5 are fixed the hanger steel plate 2 of component and are connected fixing with suspension and support.Pipeline fine setting carries out pipeline butt even Connecing, on suspension and support suspension rod, flower basket bolt 8 upper end is connected with link 7, and lower end is connected with harness cord suspension rod 9, rotates clockwise gaily decorated basket spiral shell Bolt 8, pipeline declines;Rotating counterclockwise flower basket bolt 8, pipeline rises;During pipeline up-down adjustment, the jack of cross-arm both sides is joined Close up-down adjustment;Finely tune about pipeline to be adjusted by U-tube card 11 left and right in Two bors d's oeuveres channel-section steel 10 gap and realize, work as pipeline butt After having connected, by the fixing nut screwing clamping of U-tube card 11.By level measurement Pipeline Water Pingdu, fall by adjusting another two groups Chain realizes pipe level.So integral hoisting of pipeline completes, and removes jack and carries out the lifting of next pipeline section.
This utility model has the advantage that
1. realizing multi-pipeline ground to install, integral hoisting, aerial multi-pipeline boil on the nape opposite the mouth connects, greatly improves Pipe installing Efficiency of construction, shortens the construction period.
2. decrease high-altitude work, work high above the ground auxiliary equipment sets up situation frequently, it is ensured that workman's construction safety.
Although this utility model is open as above with embodiment, so it is not intended to limit this utility model, any ability Field technique personnel, without departing from spirit and scope of the present utility model, all can make various different selection and amendment, therefore originally The protection domain of utility model is limited by claims and equivalents thereof.

Claims (6)

1. the novel suspension and support connected for horizontal multi-pipeline boil on the nape opposite the mouth, including fixing component, suspension rod and cross-arm, its feature exists In,
Described fixing component includes fixation steel plate (1) and two the hanger steel plates (2) being welded on described fixation steel plate (1), institute State fixation steel plate (1) to be fixed on concrete roof;
Described suspension rod includes link (7), flower basket bolt (8) and harness cord suspension rod (9), and bolt (4) and nut are passed through in link (7) upper end (5) being connected with described hanger steel plate (2), link (7) lower end is connected with flower basket bolt (8) upper end, and flower basket bolt (8) lower end is with logical Silk suspension rod (9) upper end is connected;And
Described cross-arm is made up of Two bors d's oeuveres channel-section steel (10), and described Two bors d's oeuveres channel-section steel (10) two ends are welded on one by welding steel (13) Rising, described harness cord suspension rod (9) is installed on the centre of described Two bors d's oeuveres channel-section steel (10).
The novel suspension and support connected for horizontal multi-pipeline boil on the nape opposite the mouth the most according to claim 1, it is characterised in that described solid Determining to offer the slotted eye passed for expansion bolt (3) on steel plate (1), described fixation steel plate (1) passes through described expanding screw Bolt (3) is fixed on described concrete roof.
The most according to claim 1 for horizontal multi-pipeline boil on the nape opposite the mouth connect novel suspension and support, it is characterised in that described in hang Offering the circular hole passed for bolt (4) on ear steel plate (2), described hanger steel plate (2) is by described bolt (4) and described extension Ring (7) is fixing to be connected.
The novel suspension and support connected for horizontal multi-pipeline boil on the nape opposite the mouth the most according to claim 1, it is characterised in that described double Spelling and be provided with the gap passed for described harness cord suspension rod (9) in the middle of channel-section steel (10), described harness cord suspension rod (9) is passed through pad (14), is hung Stem nut (15) is fixing with described Two bors d's oeuveres channel-section steel (10) to be connected.
The novel suspension and support connected for horizontal multi-pipeline boil on the nape opposite the mouth the most according to claim 4, it is characterised in that described double Spell installation settings in the described gap of channel-section steel (10) and have many groups U-tube card (11).
The most according to claim 1 for horizontal multi-pipeline boil on the nape opposite the mouth connect novel suspension and support, it is characterised in that described newly Type suspension and support also includes that jack, described jack are fixed on described concrete roof by suspension centre.
CN201521110713.XU 2015-12-29 2015-12-29 A kind of novel suspension and support connected for horizontal multi-pipeline boil on the nape opposite the mouth Withdrawn - After Issue CN205806703U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521110713.XU CN205806703U (en) 2015-12-29 2015-12-29 A kind of novel suspension and support connected for horizontal multi-pipeline boil on the nape opposite the mouth

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521110713.XU CN205806703U (en) 2015-12-29 2015-12-29 A kind of novel suspension and support connected for horizontal multi-pipeline boil on the nape opposite the mouth

Publications (1)

Publication Number Publication Date
CN205806703U true CN205806703U (en) 2016-12-14

Family

ID=58143972

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521110713.XU Withdrawn - After Issue CN205806703U (en) 2015-12-29 2015-12-29 A kind of novel suspension and support connected for horizontal multi-pipeline boil on the nape opposite the mouth

Country Status (1)

Country Link
CN (1) CN205806703U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105443871A (en) * 2015-12-29 2016-03-30 中建三局机电工程有限公司 Novel support hanger and construction process for butting connection of horizontal multiple pipelines
CN107061868A (en) * 2017-05-18 2017-08-18 江苏电力装备有限公司 Gravity balance formula anti-rotation pipe clamp cross arm
CN108758083A (en) * 2018-06-08 2018-11-06 中铁十七局集团电气化工程有限公司 A kind of construction method of the comprehensive suspension and support anti-seismic performance of enhancing

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105443871A (en) * 2015-12-29 2016-03-30 中建三局机电工程有限公司 Novel support hanger and construction process for butting connection of horizontal multiple pipelines
CN105443871B (en) * 2015-12-29 2018-03-09 中建三局机电工程有限公司 A kind of new suspension and support and construction technology for the connection of horizontal multi-pipeline counterpart
CN107061868A (en) * 2017-05-18 2017-08-18 江苏电力装备有限公司 Gravity balance formula anti-rotation pipe clamp cross arm
CN107061868B (en) * 2017-05-18 2023-08-11 江苏电力装备有限公司 Gravity center balance type anti-rotation pipe clamp cross arm
CN108758083A (en) * 2018-06-08 2018-11-06 中铁十七局集团电气化工程有限公司 A kind of construction method of the comprehensive suspension and support anti-seismic performance of enhancing

Similar Documents

Publication Publication Date Title
CN105443871B (en) A kind of new suspension and support and construction technology for the connection of horizontal multi-pipeline counterpart
CN104195948B (en) Bridge suspension pipe pushing installation construction method
CN205806703U (en) A kind of novel suspension and support connected for horizontal multi-pipeline boil on the nape opposite the mouth
CN207830730U (en) A kind of combined type installation suspension and support
CN103821372A (en) Method for installing trusses with different heights
CN103883129B (en) A kind of steel structural roof beam installation method
CN203799586U (en) Signboard mounting support for power transmission line steel tube tower
CN101177959A (en) Curtain wall unit hanging equipment and construction method thereof
CN107662881A (en) Integral riser erecting device and its installation method in a kind of high stove pipe well
CN109048299A (en) The connecting rod bearing shell mounting tool and method of marine diesel
CN109826082B (en) Construction method for installing decorative structure in multi-tower combined space of cable-stayed bridge
CN104153586B (en) A kind of suspension cable hangs the construction method of mounting purlines
CN104692261A (en) Symmetrical dismounting construction method for attachment device of tower crane
CN105834272B (en) A kind of large aluminium-board stretching-machine equipment installation method under restricted clearance
CN202953690U (en) Hoisting tool used for hoisting locomotive members
CN206770787U (en) A kind of rolling support of pipe network internal pipeline installation
CN105152052A (en) Glass curtain wall component lifting device and glass curtain wall component installing method
CN104264781A (en) Grid-shaped, cylindrical-surface and steel structured latticed shell and construction method thereof
CN109083395A (en) A kind of Excitations for Long Span Suspension operating platform and its erection method
CN104805816B (en) Pile leg section folding tool and mounting method of pile leg section supporting pipe to be mounted
CN102635732A (en) Process for mounting relatively long pipeline
CN104416352B (en) Installed using radial type, remove the method that the constructing device of straddle truck is constructed
CN206220624U (en) The helicopter servicing unit of extra-high voltage wine glass tower tower head
CN110255396A (en) A kind of electric power holding pole structure that fuselage jacks certainly
CN205669647U (en) A kind of oil pump and oil tube connection device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20161214

Effective date of abandoning: 20180309

AV01 Patent right actively abandoned