CN202953690U - Hoisting tool used for hoisting locomotive members - Google Patents
Hoisting tool used for hoisting locomotive members Download PDFInfo
- Publication number
- CN202953690U CN202953690U CN 201220656207 CN201220656207U CN202953690U CN 202953690 U CN202953690 U CN 202953690U CN 201220656207 CN201220656207 CN 201220656207 CN 201220656207 U CN201220656207 U CN 201220656207U CN 202953690 U CN202953690 U CN 202953690U
- Authority
- CN
- China
- Prior art keywords
- hoisting
- rod
- steel plate
- tool
- suspension rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model discloses a hoisting tool used for hoisting locomotive members. A hoisting ring (1) is connected with a hoisting rod (3) through main hoisting ropes (2); movable hoisting components (4) are sleeved on the hoisting rod (3) and are enabled to move along the axial direction of the hoisting rod (3); the hoisting rod (3) is a circular steel tube or a channel beam tube; screwed holes are formed in the hoisting rod (3) so as to fix the main hoisting rods; each movable hoisting component (4) comprises a sleeve ring (5), a triangular steel plate (6), hoisting hooks (7), hoisting ropes (8) and a fixing pin (9); the sleeve ring (5) is fixed with the triangular steel plate (6) in a welding mode; the hooks (7) are connected with the triangular steel plate (6) through the hoisting ropes (8); the sleeve ring (5) is sleeved on the hoisting rod (3) and is fixed in position through the fixing pin (9). When the hoisting tool is used for hoisting a pipeline, better stability in hoisting is achieved; by adjusting the positions of the sleeves to match with the geometric shape and physical gravity center of the hoisted pipeline and fixing the movable hoisting components on the hoisting tool, the hoisting of pipelines of different models is realized; and such hoisting tool can accomplish the hoisting working of various super long pipelines, and the space for holding the hoisting tool and the manufacturing cost of the hoisting tool are saved.
Description
Technical field
The utility model relates to a kind of suspender, relates in particular to a kind of hoisting locomotive parts suspender.
Background technology
In locomotive crew's process of assembling, some airlines, electric wiring (hereinafter to be referred as pipeline) are arranged under car after pre-assembled completing, need integral hoisting to get on the bus, present locomotive main airline and circuit all adopt under car pre-assembled, reach more than 20 meters, and this pre-assembled good pipeline belongs to the overlength parts, the lifting of overlength parts, adopted a plurality of soft bands, segmented sheathing, the method for integral hoisting in the past.But prior art operation suit complex steps, the Heave Here is few, can not guarantee lifting steadily, easy damage lifting part in hoisting process, serious meeting causes pipeline to be revealed or circuit damages, and causes pre-assembled good pipeline to do over again.
The utility model content
The technical matters that the utility model solves is to overcome the deficiencies in the prior art, provides a kind of easy and simple to handle, can lift by crane by multiple spot lifting process pulsation-free hoisting locomotive parts suspender.
The technical solution adopted in the utility model is hoisting locomotive parts suspenders, and suspension ring are connected with suspension rod by main lifting rope, and the mobile crane arrangement is enclosed within on suspension rod, can moving axially along suspension rod.
Suspension rod is round steel pipe or is the channel-section steel pipe.Suspension rod is provided with tapped bore, is used for fixing main lifting rope.
The mobile crane arrangement comprises the collar, triangular steel plate, suspension hook, lifting rope and set pin, and the collar and triangular steel plate are welded and fixed, and suspension hook is connected with triangular steel plate by lifting rope, and the collar is enclosed within on suspension rod, by the set pin fixed position.
Suspension rod and main lifting rope complete when lifting load-bearing work.Removable suspension hook and set pin are housed above the mobile crane arrangement, first lifting rope is hung over when lifting on the lifting route of pipe line, then come adjustment by the position of mobile hanging component on suspension rod, at last set pin is tightened on suspension rod, begin lifting, after lifting is completed, take off lifting rope and can carry out next step the erection work of next same line.
The beneficial effects of the utility model are that this apparatus structure is simple, are easy to processing, and the tapped bore of diverse location above suspension rod is used for main lifting rope is installed, and the lifting center of gravity that different installation sites is different can lift the pipeline of multiple center of gravity.
When using this suspender lifting pipeline, can make to be lifted with better stability.Suspender mobile crane arrangement high tensile steel plate is welded, and the collar of top and set pin guarantee the balance of lifting, and structural safety is easy to use.Position by adjustment collar, after the geometric shape and physics center of gravity of coupling lifting pipeline, mobile crane arrangement on fixed spreader, satisfy the pipeline lifting to different model, a kind of like this suspender can be completed the lifting work of multiple extraordinary pipeline, has saved hanger storage place and suspender manufacturing cost.
Description of drawings
Fig. 1 is hoisting locomotive parts suspender front view of the present utility model;
Fig. 2 is hoisting locomotive parts suspender left view of the present utility model.Be labeled as in (removing suspension ring 1 and main lifting rope 2) figure: 1-suspension ring, 2-master's lifting rope, 3-suspension rod, 4-mobile crane arrangement, the 5-collar, 6-triangular steel plate, 7-suspension hook, 8-lifting rope, 9-set pin.
The specific embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
Hoisting locomotive parts suspender, suspension ring 1 are connected with suspension rod 3 by main lifting rope 2, and mobile crane arrangement 4 is enclosed within on suspension rod 3, can moving axially along suspension rod 3.
This suspender all is comprised of steel structure, and except mobile crane arrangement 4 is welded with triangular steel plate 6, all the other are machined piece, and selection is common, are easy to processing.
The hoisting locomotive parts are with the using method of suspender: first lift in advance, the suspension hook of crane is hooked on suspension ring 1, the lifting of suspender level, then respectively the removable suspension hook 7 on mobile crane arrangement 4 is hung on the pre-assembled row's of pipeline lifting point, along each mobile crane arrangement 4 of suspension rod 3 axial adjustment, until whole suspender and quilt lifting pipeline level are sling, complete pre-lifting.After completing pre-lifting, will lift pipeline and fall gently, the collar 5 will be fixed on suspension rod 3 by set pin 9, begin lifting.After lifting is completed, take off lifting rope 8 and can carry out next step erection work of pipeline.
When using this suspender lifting pipeline, can make to be lifted with better stability.Suspender mobile crane arrangement high tensile steel plate is welded, and the collar of top and set pin guarantee the balance of lifting, and structural safety is easy to use.Position by adjustment collar, after the geometric shape and physics center of gravity of coupling lifting pipeline, mobile crane arrangement on fixed spreader, satisfy the pipeline lifting to different model, a kind of suspender like this can be completed the lifting work of multiple overlength pipeline, has saved hanger storage place and suspender manufacturing cost.
It should be noted that at last: although abovely described the specific embodiment of the present utility model; but those skilled in the art are to be understood that; these are only casehistorys; can make various changes or modifications to these specific embodiment; and not deviating from principle of the present utility model and essence, protection domain of the present utility model is defined by the claims.
Claims (4)
1. hoisting locomotive parts suspender is characterized in that: suspension ring (1) are connected with suspension rod (3) by main lifting rope (2), and mobile crane arrangement (4) is enclosed within on suspension rod (3), can moving axially along suspension rod (3).
2. hoisting locomotive parts suspender according to claim 1 is characterized in that: suspension rod (3) is for round steel pipe or be the channel-section steel pipe.
3. hoisting locomotive parts suspender according to claim 1 and 2, it is characterized in that: suspension rod (3) is provided with tapped bore.
4. a kind of hoisting locomotive parts suspender according to claim 1, it is characterized in that: mobile crane arrangement (4) comprises the collar (5), triangular steel plate (6), suspension hook (7), lifting rope (8) and set pin (9), the collar (5) is welded and fixed with triangular steel plate (6), suspension hook (7) is connected with triangular steel plate (6) by lifting rope (8), the collar (5) is enclosed within on suspension rod (3), by set pin (9) fixed position.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220656207 CN202953690U (en) | 2012-11-30 | 2012-11-30 | Hoisting tool used for hoisting locomotive members |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220656207 CN202953690U (en) | 2012-11-30 | 2012-11-30 | Hoisting tool used for hoisting locomotive members |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202953690U true CN202953690U (en) | 2013-05-29 |
Family
ID=48459272
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220656207 Expired - Fee Related CN202953690U (en) | 2012-11-30 | 2012-11-30 | Hoisting tool used for hoisting locomotive members |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202953690U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105483802A (en) * | 2015-12-10 | 2016-04-13 | 重庆红岩方大汽车悬架有限公司 | Electrophoretic paint lifting tool |
CN106429792A (en) * | 2016-11-17 | 2017-02-22 | 有利华建材(惠州)有限公司 | Three dimensional prefabricated lifting tool and lifting transfer method |
CN110171772A (en) * | 2019-05-28 | 2019-08-27 | 沪东中华造船(集团)有限公司 | A kind of method that shipbuilding quickly adjusts split fix in the process |
-
2012
- 2012-11-30 CN CN 201220656207 patent/CN202953690U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105483802A (en) * | 2015-12-10 | 2016-04-13 | 重庆红岩方大汽车悬架有限公司 | Electrophoretic paint lifting tool |
CN105483802B (en) * | 2015-12-10 | 2023-09-15 | 重庆红岩方大汽车悬架有限公司 | Electrophoresis paint lifting appliance |
CN106429792A (en) * | 2016-11-17 | 2017-02-22 | 有利华建材(惠州)有限公司 | Three dimensional prefabricated lifting tool and lifting transfer method |
CN110171772A (en) * | 2019-05-28 | 2019-08-27 | 沪东中华造船(集团)有限公司 | A kind of method that shipbuilding quickly adjusts split fix in the process |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201381166Y (en) | Hanging-point adjustable transverse hanging beam | |
CN202953690U (en) | Hoisting tool used for hoisting locomotive members | |
CN103953200B (en) | Wallboard mounting machine | |
CN203382365U (en) | Lifting appliance system for lifting thin, long and thin-wall equipment integrally | |
CN102992203B (en) | Simple hoisting device for steel structure bridge installation | |
CN203486756U (en) | Lifting tool suitable for I-shaped steel | |
CN202864675U (en) | Shaft-type part hoisting tool | |
CN202558448U (en) | Electrohydraulic balance hoisting beam | |
CN201999638U (en) | Hoisting device for ascending pipe and bridge pipe of coke oven | |
CN103738861A (en) | Integral hoisting method for A type column of steel pipe of ultra-high voltage transformer station | |
CN203781677U (en) | Trial mass device of crane | |
CN202967922U (en) | Simple hoisting device for mounting steel structural bridge | |
CN103738852B (en) | Hoisting crane test mass device | |
CN103470057B (en) | A kind of high-altitude component hoisting construction method | |
CN103803397B (en) | A kind of suspender for installed vertical rolling mill universal axle and using method | |
CN105110205A (en) | Reverse disassembling method for tower crane | |
CN212609006U (en) | Hoisting tool for cooling pipeline of flexible direct-current converter valve | |
CN203513104U (en) | Hoisting sling for pipeline | |
CN203545529U (en) | Crane of hydraulic jacking device | |
CN202988576U (en) | Simple and easy chain hoist lifting support | |
CN210764029U (en) | Hoisting tool for repairing pipe bracket valve | |
CN204569138U (en) | A kind of set cap welding tilter | |
CN201298682Y (en) | transformer substrate isolating switch lifting appliance | |
CN205932999U (en) | Hanger | |
CN204847836U (en) | Balance beam is hung to multi -functional lifting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130529 Termination date: 20161130 |