CN205805980U - A kind of test system of blower fan - Google Patents
A kind of test system of blower fan Download PDFInfo
- Publication number
- CN205805980U CN205805980U CN201620656198.3U CN201620656198U CN205805980U CN 205805980 U CN205805980 U CN 205805980U CN 201620656198 U CN201620656198 U CN 201620656198U CN 205805980 U CN205805980 U CN 205805980U
- Authority
- CN
- China
- Prior art keywords
- blower fan
- test
- tested
- fan
- processor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The test system of a kind of blower fan described herein, including tested blower fan (1), test main cabinet (2), the main cabinet of described test (2) is provided with processor, processor is electrically connected with tested blower fan (1), and the running status of tested blower fan (1) is detected and real time record, the right edge of tested blower fan (1) is provided with accessory fan (3), test pipeline (4) it is fixedly connected with between tested blower fan (1) and accessory fan (3), tested blower fan (1) is fixed on same level platform with accessory fan (3) and test pipeline (4);At least have and solve manual record and draw the loaded down with trivial details of curve, automatically process and calculate the electrical quantity of blower fan, total head, static pressure, air quantity, wind speed, total head power, the data such as efficiency, automatically form the effect of testing journal sheet.
Description
Technical field
The application relates to the test system of a kind of blower fan, in the test of blower fan.
Background technology
Blower fan is that the custom of gas compression and gas conveying machinery is called for short by China, and usually said blower fan includes ventilating
Machine, aerator, wind-driven generator.
Blower fan key to the transmission & distribution energy consumption of system, is the most crucial part of building energy conservation.According to country's air-conditioning equipment matter
Amount Supervision Test Center aerator supervision for many years shows that a lot of blower fan is problematic in that under declared working condition, needs in strict accordance with product
Standard-required produces and manufactures blower fan, it is therefore desirable to superior test equipment carries out performance Data Detection.
The shortcoming of prior art:
Test blower fan quickly cannot be carried out data record analysis and draw curve, use pitot tube to test especially
When air quantity, wind speed, need to manually calculate, manufacturer be required, and efficiently production is the most applicable, it is impossible to by blower fan at static pressure be
Data when zero are measured.
The application will carry out compbined test to fan performance targetedly, it is provided that complete fan performance data and form.
In consideration of it, how to design the test system of a kind of blower fan, overcome the defect in the presence of above-mentioned prior art,
It is those skilled in the art's technical problems urgently to be resolved hurrily.
Utility model content
The application aims to overcome that technical problem present in prior art, and provides the test system of a kind of blower fan
System.
The purpose of the application completes by following technical solution, and the test system of a kind of blower fan, including tested wind
Machine, testing main cabinet, be provided with processor in the main cabinet of described test, processor is electrically connected with tested blower fan, and to tested blower fan
Running status carries out detecting and real time record, and the right edge of tested blower fan is provided with accessory fan, tested blower fan and accessory fan it
Between be fixedly connected with test pipeline, tested blower fan is fixed on same level platform with accessory fan and test pipeline.
It is installed with thermohygrometer on described test pipeline.
Described thermohygrometer is electrically connected with the processor tested in main cabinet.
Described test pipeline is provided with two anemobarometers that is first anemobarometer and the second anemobarometer.
Described first anemobarometer, the second anemobarometer are electrically connected with the processor tested in main cabinet.
Regulation valve it is installed with on described accessory fan.
Described regulation valve is electrically connected with the processor tested in main cabinet.
Connect on described tested blower fan and have electric parameters testing module.
Described electric parameters testing module is electrically connected with the processor tested in main cabinet.
The application compared with prior art, at least has following obvious advantage and an effect:
1 solves manual record and draws the loaded down with trivial details of curve, automatically processes and calculate the electrical quantity of blower fan, total head, static pressure,
Air quantity, wind speed, total head power, the data such as efficiency, automatically form testing journal sheet.
2. realize the separate analogue to fan performance and test.
The most easy and simple to handle, highly versatile, data comprehensively, be easy to analyze.
Accompanying drawing explanation
Accompanying drawing described herein is used for providing further understanding of the present application, constitutes the part of the application, this Shen
Schematic description and description please is used for explaining the application, is not intended that the improper restriction to the application.In the accompanying drawings:
Fig. 1 is the overall structure schematic diagram of the application.
Detailed description of the invention
For making the purpose of the application, technical scheme and advantage clearer, below in conjunction with the application specific embodiment and
Technical scheme is clearly and completely described by corresponding accompanying drawing.Obviously, described embodiment is only the application one
Section Example rather than whole embodiments.Based on the embodiment in the application, those of ordinary skill in the art are not doing
Go out the every other embodiment obtained under creative work premise, broadly fall into the scope of the application protection.
The test system of a kind of blower fan described herein, including tested blower fan 1, tests main cabinet 2, and described test is main
Being provided with processor in cabinet 2, processor is electrically connected with tested blower fan 1, and the running status of tested blower fan 1 is carried out detection with real
Shi Jilu, the right edge of tested blower fan 1 is provided with accessory fan 3, is fixedly connected with test between tested blower fan 1 and accessory fan 3
Pipeline 4, tested blower fan 1 is fixed on same level platform with accessory fan 3 and test pipeline 4;At least there is the artificial note of solution
Record and draw the loaded down with trivial details of curve, automatically processes and calculates the electrical quantity of blower fan, total head, static pressure, air quantity, wind speed, total head power,
The data such as efficiency, automatically form the effect of testing journal sheet.
In the embodiment of the present application, fixedly mount one at tested blower fan 1 and test main cabinet 2, by a test main cabinet 2 to quilt
Survey blower fan 1 to record and test, and then realize the effect testing the main cabinet 2 real time record to tested blower fan 1 with detection in real time.
Wherein, testing in main cabinet 2 and be fixedly installed a processor, can arrange memorizer on a processor, these central authorities process
Utensil has storage function, can be to the electrical quantity of blower fan, total head, static pressure, air quantity, and wind speed, total head power carries out record.
Processor, it would however also be possible to employ industrial computer makes, has the detection data that storage obtains with record.
See shown in Fig. 1, the test system of a kind of blower fan, including tested blower fan 1, test main cabinet 2, the main cabinet of described test
Being provided with processor in 2, processor is electrically connected with tested blower fan 1, and the running status of tested blower fan 1 is carried out detection with in real time
Record, the right edge of tested blower fan 1 is provided with accessory fan 3, is fixedly connected with testing tube between tested blower fan 1 and accessory fan 3
Road 4,
Tested blower fan 1 is fixed on same level platform with accessory fan 3 and test pipeline 4, it is simple to install it
With fixing, and when test, data are relatively stable.
Memorizer in the main cabinet of observing and controlling 2 has special industrial computer and special fan Performance measurement software: software
Meet corresponding Standard, have data display function, data preserve function, database management function, graphic analyses function,
Slave computer controls function and interface etc..
Connecting in processor and have test module, wherein, test module includes electric parameters testing module the 8, first wind speed and pressure
Test table 6 and the second wind speed and pressure test table 7 and thermohygrometer 5.
Blower voltage, electric current, power, power factor, the isoparametric survey of frequency can be realized by electric parameters testing module 8
Amount.
Wherein, the electric connection of processor is equipped with RS232 communication interface, has electric connection stable, and communication stability is high
Feature.
In the embodiment of the present application,
It is installed with thermohygrometer 5 on described test pipeline 4.
Utilize described thermohygrometer 5 to be electrically connected with the processor tested in main cabinet 2 to be communicatively coupled, pass through processor
Humiture data are carried out record.
In the embodiment of the present application,
Described test pipeline 4 is provided with two anemobarometers that is first anemobarometer 6 and the second anemobarometer 7.
Described first anemobarometer the 6, second anemobarometer 7 is electrically connected with the processor tested in main cabinet 2.
The left and right sides along test pipeline 4 is respectively provided with an anemobarometer, it is to avoid anemobarometer detection obtains
Data inaccurate or change.
Wherein, fix the second anemobarometer 7 along test pipeline 4 left end, fix the first wind along test pipeline 4 right-hand member
Speed draft gauge 6, and then realize the detection of left and right sides flow in test pipeline 4.
In the embodiment of the present application,
Regulation valve 31 it is installed with on described accessory fan 3.
Regulation valve 31 is utilized to be electrically connected with the processor tested in main cabinet 2, by processor to the tune on accessory fan 3
Joint valve 31 is controlled, and then is adjusted the size of flow.
Realize the control of wind flow in test pipeline 4.
In the embodiment of the present application,
Connect on described tested blower fan 1 and have electric parameters testing module 8.
Utilizing electric parameters testing module 8 to be electrically connected with the processor tested in main cabinet 2, electric parameters testing module 8 is electricity
Circuit detector, such as voltmeter, ammeter etc..
Utilize the circuit detector in circuit to be connected with processor, by processor, data are stored, and then formed automatically
Detection.
The foregoing is only embodiments herein, and, the title that in the application, parts are taken can not also
With, the title being not limiting as in the application.To those skilled in the art, the application can have various modifications and variations.
Any modification, equivalent substitution and improvement etc. made within all designs in the application and principle, should be included in the power of the application
Within profit claimed range.
Claims (9)
1. a test system for blower fan, including tested blower fan (1), tests main cabinet (2), it is characterised in that: the main cabinet of described test
(2) being provided with processor in, processor is electrically connected with tested blower fan (1), and detects the running status of tested blower fan (1)
With real time record, the right edge of tested blower fan (1) is provided with accessory fan (3), solid between tested blower fan (1) and accessory fan (3)
Determining connection has test pipeline (4), tested blower fan (1) to be fixed on same level platform with accessory fan (3) and test pipeline (4)
On.
2. the test system of blower fan as claimed in claim 1, it is characterised in that: it is installed with on described test pipeline (4)
Thermohygrometer (5).
3. the test system of blower fan as claimed in claim 2, it is characterised in that: described thermohygrometer (5) and the main cabinet of test (2)
In processor be electrically connected with.
4. the test system of blower fan as claimed in claim 1, it is characterised in that: described test pipeline (4) is provided with two wind
Speed draft gauge that is first anemobarometer (6) and the second anemobarometer (7).
5. the test system of blower fan as claimed in claim 4, it is characterised in that: described first anemobarometer (6), the second wind
Speed draft gauge (7) is electrically connected with the processor tested in main cabinet (2).
6. the test system of blower fan as claimed in claim 1, it is characterised in that: described accessory fan is installed with on (3)
Regulation valve (31).
7. the test system of blower fan as claimed in claim 6, it is characterised in that: described regulation valve (31) and the main cabinet of test (2)
In processor be electrically connected with.
8. the test system of blower fan as claimed in claim 1, it is characterised in that: the upper connection of described tested blower fan (1) has electricity ginseng
Number test module (8).
9. the test system of blower fan as claimed in claim 8, it is characterised in that: described electric parameters testing module (8) and test
Processor in main cabinet (2) is electrically connected with.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620656198.3U CN205805980U (en) | 2016-06-23 | 2016-06-23 | A kind of test system of blower fan |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620656198.3U CN205805980U (en) | 2016-06-23 | 2016-06-23 | A kind of test system of blower fan |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205805980U true CN205805980U (en) | 2016-12-14 |
Family
ID=57506132
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620656198.3U Expired - Fee Related CN205805980U (en) | 2016-06-23 | 2016-06-23 | A kind of test system of blower fan |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205805980U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107764576A (en) * | 2017-10-16 | 2018-03-06 | 北京北交新能科技有限公司 | A kind of air cooling effect test platform |
CN109899312A (en) * | 2019-04-30 | 2019-06-18 | 深圳市星禾宏泰自动化设备有限公司 | A kind of blower decompression performance test methods |
-
2016
- 2016-06-23 CN CN201620656198.3U patent/CN205805980U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107764576A (en) * | 2017-10-16 | 2018-03-06 | 北京北交新能科技有限公司 | A kind of air cooling effect test platform |
CN109899312A (en) * | 2019-04-30 | 2019-06-18 | 深圳市星禾宏泰自动化设备有限公司 | A kind of blower decompression performance test methods |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204357740U (en) | A kind of vehicle ventilator test platform for comprehensive performance | |
CN205067520U (en) | Particle scanning and wind speed homogeneity tester of wind gap and fan filter bank | |
CN105424105B (en) | Dust pelletizing system is responsible for air volume detecting method and on-line measuring device | |
CN205805980U (en) | A kind of test system of blower fan | |
CN106441962A (en) | Method for real-time monitoring of performance of fan of boiler in power station | |
CN102133496A (en) | Dust filtering performance testing method and system of air filter for cab of vehicle on road | |
CN102128665B (en) | Device for detecting accuracy of mechanical water meter | |
CN203616052U (en) | A pressure gauge calibrating device | |
CN203337792U (en) | Motor type test system | |
CN201916177U (en) | Fan test table | |
WO2016015637A1 (en) | Photovoltaic air conditioning system, and performance detection method and performance detection device therefor | |
CN105550383B (en) | A kind of design method of unsteady aerodynamic force measurement pilot system | |
CN205229427U (en) | D.C. high -current power calibrating installation | |
CN202093077U (en) | Humidity influence eliminating device | |
CN109580262A (en) | A kind of air conditioner test device | |
CN108827456A (en) | A kind of method and system of test equipment noise | |
CN103292872A (en) | Performance detecting system of air quality flowmeter | |
CN208833442U (en) | A kind of pressure gauge connection air-tightness detection device | |
CN106533360A (en) | Portable outdoor power test device and test method for photovoltaic assemblies | |
CN202109851U (en) | Blind hole impeller bounce detector | |
CN204302431U (en) | Indoor electric line fault testing device | |
CN206695933U (en) | A kind of online blower fan system efficiency detection and Evaluation on Energy Saving system | |
CN203241842U (en) | Air feed device used for gasoline octane value measuring machine | |
CN205014967U (en) | Aperture detector | |
CN205483950U (en) | Measurement device for be used for accurate position of car |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161214 Termination date: 20190623 |