CN106441962A - Method for real-time monitoring of performance of fan of boiler in power station - Google Patents

Method for real-time monitoring of performance of fan of boiler in power station Download PDF

Info

Publication number
CN106441962A
CN106441962A CN201610782247.2A CN201610782247A CN106441962A CN 106441962 A CN106441962 A CN 106441962A CN 201610782247 A CN201610782247 A CN 201610782247A CN 106441962 A CN106441962 A CN 106441962A
Authority
CN
China
Prior art keywords
fan
measurement section
pressure
flow measurement
real
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610782247.2A
Other languages
Chinese (zh)
Inventor
何翔
马达夫
孟永杰
周文台
魏增涛
王克
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Power Equipment Research Institute Co Ltd
Original Assignee
Shanghai Power Equipment Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Power Equipment Research Institute Co Ltd filed Critical Shanghai Power Equipment Research Institute Co Ltd
Priority to CN201610782247.2A priority Critical patent/CN106441962A/en
Publication of CN106441962A publication Critical patent/CN106441962A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M99/00Subject matter not provided for in other groups of this subclass
    • G01M99/005Testing of complete machines, e.g. washing-machines or mobile phones
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M99/00Subject matter not provided for in other groups of this subclass
    • G01M99/008Subject matter not provided for in other groups of this subclass by doing functionality tests
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/34Testing dynamo-electric machines

Abstract

The invention provides a method for real-time monitoring of the performance of a fan of a boiler in a power station. The method is characterized in that the method includes following steps: step 1, an inlet air duct of the fan is provided with a fan inlet pressure measuring device, a thermocouple, and a fan inlet back-supported tube, an outlet air duct of the fan is provided with a fan outlet pressure measuring device, a computer acquires data acquired at the fan inlet pressure measuring device, the fan inlet back-supported tube, and the fan outlet pressure measuring device through a pressure transmitter group, and the computer acquires data acquired at the thermocouple through a data acquisition device; and step 2, operation parameters are obtained. According to the method, the defect that in the conventional measuring method, the performance of the fan is difficult to be measured and grasped in real time is overcome, the fan test data acquired in real time and the related DCS operation parameters are combined, the current practical operation efficiency and the operating point of the fan are obtained through calculation and can be displayed in a fan performance curve, and the reference is provided for operation personnel of a power supply plant for determination of the security and economy of the fan.

Description

A kind of method of Air Fans of Utility Boilers performance real-time monitoring
Technical field
The present invention relates to a kind of method of Air Fans of Utility Boilers performance real-time monitoring.
Background technology
The primary air fan that coal-burning power plant is equipped with, pressure fan are important subsidiary engines, mainly have centrifugal, two kinds of axial-flow type.Logical Often the unit more than 600MW grade typically adopts axial fan, is divided into stator blade or the movable vane can according to blade adjustments mode again Mode.
Whether safe fan operation is is directly connected to boiler operatiopn safety.In recent years because fluctuating in coal market, power plant adopts Purchase fuel is with the market price as Main Basiss mostly, less uses design coal.Because the replacing of coal, operating condition fluctuate Frequently, equipment old the problems such as so that under boiler different load, the power producing characteristics of blower fan are also being continually changing, First air wind Coal ratio, First air pulverized-coal concentration, operation oxygen amount, total blast volume etc. are all different with operation characteristic during design.In addition, run people The operation custom of member, season (rainwater multi fuel is wet, air pressure is high low) all have an impact to fan operation characteristic.If blower fan is in peace It is possible to have an accident when near the border of row for the national games, surge during such as low load operation and higher load operation When stall, now blower fan can only reduce blast, unit have to reduce load to run, can cause if especially stall is serious Fan blade ruptures, and boiler has to shut down.
Before and after the big light maintenance of unit, power plant is usually to entrust the units such as DianKeYuan to carry out performance to blower fan in different load section Test, after being modified calculating further according to blower fan plant equipment characteristic curve, draws blowing machine on the basis of test data The important curve such as actual motion performance curve, especially blast and air quantity, efficiency and blast, by these results, just can find out Actual motion scope and the distance of stall point, but result of the test is not real-time, and operating mode when testing and true operation When again can not possibly be completely the same, if real traffic coverage typically adopts close to stall point, then power plant in high load capacity Reduce blast to run, to ensure the safety of fan operation.
But such mode can cause a series of problems, such as boiler combustion performance, blower fan economy.Such as when need more Many First air and blower fan will not stall when, due to having forced down blast operation, it is not enough to allow for primary air ratio, affects powder system processed The economy of system is run, the burning structure of boiler tissue;When such as pressure fan reduces blast operation again, boiler requisite oxygen can be caused Amount is not enough so that unburned carbon in flue dust improves, and boiler economics decline.
Operations staff so how is allowed to know that the real-time operation characteristic of blower fan just seems particularly significant.Generally Power Plant DCS system Blower fan data on system only has the parameters such as electric current, blast, air quantity (air quantity is typically again inaccurate), but these parameters are inadequate, Fan operation characteristic can not be obtained comprehensively, need to be combined together necessary test data and fan operation data, The real-time characteristic of fan operation can be drawn.Here it is by the measuring cell of key parameter, data transfer, data calculates and result is put Together, form set of device.
Content of the invention
The technical problem to be solved in the present invention:Draw the real-time characteristic of fan operation.
In order to solve above-mentioned technical problem, the technical scheme is that to provide a kind of Air Fans of Utility Boilers performance real-time The method of monitoring is it is characterised in that comprise the following steps:
The first step, on fans entrance air channel install fans entrance pressure gauge, thermocouple, fans entrance backrest Pipe, installs fan outlet pressure gauge on fan outlet air channel, and computer gathers blower fan by pressure transmitter group and enters The data that mouth pressure gauge, fans entrance backing tube and fan outlet pressure gauge are collected, computer passes through number Gather the data that thermocouple is collected according to Acquisition Instrument;
Second step, acquisition operational factor, this operational factor includes:
Average dynamic pressure p at flow measurement sectiond,In formula, pdiRepresent n in flow measurement section Time average dynamic pressure on mesh point, is obtained by fans entrance backing tube (8) measurement;
Flow q at flow measurement sectionv,In formula, A represents the area in flow measurement section, and ρ represents Media density at flow measurement section,ρ0Represent the close of flue gas or air under standard state Degree, PaRepresent the atmospheric pressure at flow measurement, PsRepresent the static pressure at flow measurement section, by fans entrance pressure measxurement Measurement device obtains, and t represents the medium temperature at flow measurement section, is obtained by thermocouple measurement;
The relevant parameter in addition to air quantity being collected using the existing DCS system of power plant;
Fan outlet static pressure, is obtained by fan outlet pressure gauge measurement;
Fan electromotor input power Pe, Pe=1.732V × I × cos φ, in formula, V represents motor voltage value, passes through The existing DCS system of power plant obtains, and I represents motor current value, is obtained by the existing DCS system of power plant, cos φ represent power because Element.
Preferably, also include:
3rd step, the operational factor drafting characteristic curve of fan being obtained according to second step, and in real time result of calculation is shown Picture to the existing DCS system of power plant.
The drawbacks of method that the present invention provides overcomes difficult to reach in conventional measuring method to measure grasp fan performance in real time, The fan test data of Real-time Collection is combined with associated DC S operational factor, is calculated the effect of the currently practical operation of blower fan Rate and operating point it is possible to be shown in characteristic curve of fan, electric power supply plant operations staff with reference to the safety judging blower fan and Economy.
Brief description
Fig. 1 is the device scheme of installation in the inventive method;
Fig. 2 is the inventive method data acquisition and calculation flow chart;
Fig. 3 is the master drawing being eventually displayed in DCS system.
Specific embodiment
For making the present invention become apparent, hereby with preferred embodiment, and accompanying drawing is coordinated to be described in detail below.
A kind of method of Air Fans of Utility Boilers performance real-time monitoring that the present invention provides is it is characterised in that include following walking Suddenly:
The first step, combine Fig. 1, fans entrance pressure gauge 3, thermocouple 4, blower fan are installed on fans entrance air channel Entrance backing tube 8, installs fan outlet pressure gauge 7 on fan outlet air channel, and computer passes through pressure transmitter group 1 And rubber tube 2 gathers fans entrance pressure gauge 3, fans entrance backing tube 8 and fan outlet pressure gauge 7 and collects The data arriving, computer gathers, by data collecting instrument 5, the data that thermocouple 4 is collected;
Second step, acquisition operational factor, in conjunction with Fig. 2, this operational factor includes air quantity, fan outlet static pressure, fan motor Machine input power Pe and the such as electric current being collected by the existing DCS system of power plant, outlet blast, blower fan power consumption it Other related operational factors of class.
The calculation procedure of air quantity includes:
Step 1, calculated flow rate measure the average dynamic pressure p at sectiond,In formula, pdiRepresent that flow is surveyed Time average dynamic pressure on n mesh point in amount section, is obtained by fans entrance backing tube 8 measurement;
Step 2, calculated flow rate measure the flow q at sectionv, as air quantity,In formula, A represents flow The area in measurement section, ρ represents the Media density at flow measurement section,ρ0Expression standard The density of flue gas or air, P under stateaRepresent the atmospheric pressure at flow measurement, PsRepresent the static pressure at flow measurement section, Obtained by fans entrance pressure gauge 3 measurement, t represents the medium temperature at flow measurement section, is surveyed by thermocouple 4 Measure.
Fan outlet static pressure, is obtained by fan outlet pressure gauge 7 measurement;
Fan electromotor input power Pe, Pe=1.732V × I × cos φ, in formula, V represents motor voltage value, passes through The existing DCS system of power plant obtains, and I represents motor current value, is obtained by the existing DCS system of power plant, cos φ represent power because Element.
3rd step, the operational factor drafting characteristic curve of fan being obtained according to second step, and in real time result of calculation is shown To the picture of the existing DCS system of power plant, can intuitively show performance and the secure border of blowing machine, as shown in Figure 3.
The method that the present invention provides has safely provided and has intuitively ensured not just for the operation of blower fan, but also drops for energy-conservation Consumption provides in real time intuitively foundation.

Claims (2)

1. a kind of method of Air Fans of Utility Boilers performance real-time monitoring is it is characterised in that comprise the following steps:
The first step, on fans entrance air channel install fans entrance pressure gauge (3), thermocouple (4), fans entrance backrest Pipe (8), installs fan outlet pressure gauge (7) on fan outlet air channel, and computer is adopted by pressure transmitter group (1) Wind collector inlet pressure measurement apparatus (3), fans entrance backing tube (8) and fan outlet pressure gauge (7) are collected Data, computer gathers, by data collecting instrument (5), the data that thermocouple (4) is collected;
Second step, acquisition operational factor, this operational factor includes:
Average dynamic pressure p at flow measurement sectiond,In formula, pdiRepresent n grid in flow measurement section Time average dynamic pressure on point, is obtained by fans entrance backing tube (8) measurement;
Flow q at flow measurement sectionv,In formula, A represents the area in flow measurement section, and ρ represents flow Media density at measurement section,ρ0Represent the density of flue gas or air under standard state, Pa Represent the atmospheric pressure at flow measurement, PsRepresent the static pressure at flow measurement section, by fans entrance pressure gauge (3) measurement obtains, and t represents the medium temperature at flow measurement section, is obtained by thermocouple (4) measurement;
The relevant parameter in addition to air quantity being collected using the existing DCS system of power plant;
Fan outlet static pressure, is obtained by fan outlet pressure gauge (7) measurement;
Fan electromotor input power Pe, Pe=1.732V × I × cos φ, in formula, V represents motor voltage value, by power plant Existing DCS system obtains, and I represents motor current value, is obtained by the existing DCS system of power plant, cos φ represents power factor (PF).
2. as claimed in claim 1 a kind of method of Air Fans of Utility Boilers performance real-time monitoring it is characterised in that also including:
3rd step, the operational factor drafting characteristic curve of fan being obtained according to second step, and show result of calculation to electricity in real time The picture of the existing DCS system of factory.
CN201610782247.2A 2016-08-30 2016-08-30 Method for real-time monitoring of performance of fan of boiler in power station Pending CN106441962A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610782247.2A CN106441962A (en) 2016-08-30 2016-08-30 Method for real-time monitoring of performance of fan of boiler in power station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610782247.2A CN106441962A (en) 2016-08-30 2016-08-30 Method for real-time monitoring of performance of fan of boiler in power station

Publications (1)

Publication Number Publication Date
CN106441962A true CN106441962A (en) 2017-02-22

Family

ID=58090994

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610782247.2A Pending CN106441962A (en) 2016-08-30 2016-08-30 Method for real-time monitoring of performance of fan of boiler in power station

Country Status (1)

Country Link
CN (1) CN106441962A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109099001A (en) * 2018-09-14 2018-12-28 国网河北省电力有限公司电力科学研究院 Measure the detection platform and method of station boiler air inducing engine efficiency
CN110469530A (en) * 2019-07-30 2019-11-19 广西电网有限责任公司电力科学研究院 Station boiler axle induced-draft fan Performance Test System and its Efficiency test method
CN111536554A (en) * 2020-05-21 2020-08-14 哈尔滨工业大学 Induced draft fan stall control method for preventing boiler MFT from being triggered
CN112412861A (en) * 2020-11-19 2021-02-26 国能开远发电有限公司 Method and system for realizing visualization of running working point of axial flow fan
CN112594208A (en) * 2020-12-07 2021-04-02 广州市耀安实业发展有限公司 Fan flow detection method and system, computer equipment and storage medium
CN113253018A (en) * 2021-04-20 2021-08-13 苏州西热节能环保技术有限公司 Electric energy balance monitoring method for coal-fired power plant
CN113379217A (en) * 2021-05-31 2021-09-10 浙江浙能技术研究院有限公司 Power station boiler fan efficiency real-time online calculation method based on DCS parameters
CN113669294A (en) * 2021-07-29 2021-11-19 华能(浙江)能源开发有限公司玉环分公司 Induced draft fan stall early warning method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1303017A (en) * 2001-02-26 2001-07-11 电站锅炉煤清洁燃烧国家工程研究中心 In-line monitor method and device for flow and concentration of dust-contained airflow
US7222048B2 (en) * 2005-04-21 2007-05-22 General Electric Company Methods and systems for diagnosing machinery
CN102854338A (en) * 2012-08-31 2013-01-02 黑龙江省电力科学研究院 Method for selecting smoke gas average flow rate measure point of desulfurized flue gas online monitoring system of coal-fired power plant
CN103336735A (en) * 2013-07-18 2013-10-02 国家电网公司 On-line monitoring system for energy efficiency of blowers and water pumps
CN104005977A (en) * 2014-05-26 2014-08-27 杭州展德软件技术有限公司 General fan operation parameter integration measuring method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1303017A (en) * 2001-02-26 2001-07-11 电站锅炉煤清洁燃烧国家工程研究中心 In-line monitor method and device for flow and concentration of dust-contained airflow
US7222048B2 (en) * 2005-04-21 2007-05-22 General Electric Company Methods and systems for diagnosing machinery
CN102854338A (en) * 2012-08-31 2013-01-02 黑龙江省电力科学研究院 Method for selecting smoke gas average flow rate measure point of desulfurized flue gas online monitoring system of coal-fired power plant
CN103336735A (en) * 2013-07-18 2013-10-02 国家电网公司 On-line monitoring system for energy efficiency of blowers and water pumps
CN104005977A (en) * 2014-05-26 2014-08-27 杭州展德软件技术有限公司 General fan operation parameter integration measuring method

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
中国电力企业联合会标准化中心: "《火力发电厂技术标准汇编 第7卷 试验标准上》", 31 December 2002 *
刘利军: "《电气控制与节电系统设计 最新版》", 31 January 2013, 中国电力出版社 *
夏马群: "《风机的节能监测》", 31 January 2016, 北京冶金工业出版社 *
廖宏楷: "《电站锅炉试验》", 30 November 2007, 中国电力出版社 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109099001A (en) * 2018-09-14 2018-12-28 国网河北省电力有限公司电力科学研究院 Measure the detection platform and method of station boiler air inducing engine efficiency
CN110469530A (en) * 2019-07-30 2019-11-19 广西电网有限责任公司电力科学研究院 Station boiler axle induced-draft fan Performance Test System and its Efficiency test method
CN111536554A (en) * 2020-05-21 2020-08-14 哈尔滨工业大学 Induced draft fan stall control method for preventing boiler MFT from being triggered
CN111536554B (en) * 2020-05-21 2022-02-08 哈尔滨工业大学 Induced draft fan stall control method for preventing boiler MFT from being triggered
CN112412861A (en) * 2020-11-19 2021-02-26 国能开远发电有限公司 Method and system for realizing visualization of running working point of axial flow fan
CN112594208A (en) * 2020-12-07 2021-04-02 广州市耀安实业发展有限公司 Fan flow detection method and system, computer equipment and storage medium
CN113253018A (en) * 2021-04-20 2021-08-13 苏州西热节能环保技术有限公司 Electric energy balance monitoring method for coal-fired power plant
CN113379217A (en) * 2021-05-31 2021-09-10 浙江浙能技术研究院有限公司 Power station boiler fan efficiency real-time online calculation method based on DCS parameters
CN113669294A (en) * 2021-07-29 2021-11-19 华能(浙江)能源开发有限公司玉环分公司 Induced draft fan stall early warning method

Similar Documents

Publication Publication Date Title
CN106441962A (en) Method for real-time monitoring of performance of fan of boiler in power station
CN204693738U (en) Air conditioner with separate hot pump actual motion energy efficiency detection system
CN103291544B (en) Digitizing Wind turbines power curve method for drafting
CN104794347B (en) A kind of wind turbine cabin transmission function Separate Fit method
CN104747367B (en) Power curves of wind-driven generator sets Characteristics Detection system
Chong et al. The experimental study on the wind turbine’s guide-vanes and diffuser of an exhaust air energy recovery system integrated with the cooling tower
BRPI0713876A2 (en) turbo charger performance rating method and apparatus
CN105424105B (en) Dust pelletizing system is responsible for air volume detecting method and on-line measuring device
CN109118057A (en) A kind of Wind turbines power output evaluation method based on realtime power curve
CN104344852B (en) The diagnosis of energy saving method and diagnosis of energy saving system of boiler heating system
CN109099001B (en) Method for measuring efficiency of induced draft fan of power station boiler
CN107940668A (en) A kind of public building heating ventilation air-conditioning system diagnostic method based on multiple-objection optimization
CN206207506U (en) Range hood and constant air volume adjusting system thereof
CN107229736A (en) A kind of wind power plant wind information estimating and measuring method
CN106523300A (en) Wind turbine generator power loss evaluating method based on cabin anemograph
Chong et al. Exhaust air energy recovery system for electrical power generation in future green cities
CN102607007A (en) Control method and control device for primary fan system of coal-fired unit
CN210738891U (en) Axial flow type induced draft fan performance test system for power station boiler
CN104454381A (en) Method for optimizing power improvement in wind energy capturing process of wind turbines
CN201548399U (en) Aviation air cycle machine program controlled testing system
CN105928568A (en) Novel method and system for measuring fan delivery
CN110469530A (en) Station boiler axle induced-draft fan Performance Test System and its Efficiency test method
CN102889174A (en) Method of preventing idle running of wind generating set
CN205805980U (en) A kind of test system of blower fan
CN112377374A (en) Wind generating set power characteristic detection system based on altitude

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170222