CN205802184U - A kind of ore storage bin inclined chute connects ore deposit buffer platform - Google Patents

A kind of ore storage bin inclined chute connects ore deposit buffer platform Download PDF

Info

Publication number
CN205802184U
CN205802184U CN201620522595.1U CN201620522595U CN205802184U CN 205802184 U CN205802184 U CN 205802184U CN 201620522595 U CN201620522595 U CN 201620522595U CN 205802184 U CN205802184 U CN 205802184U
Authority
CN
China
Prior art keywords
ore
buffer platform
inclined chute
storage bin
ore deposit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620522595.1U
Other languages
Chinese (zh)
Inventor
付光年
郭慧高
邹龙
许赢沛
陈仲杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinchuan Group Co Ltd
Original Assignee
Jinchuan Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinchuan Group Co Ltd filed Critical Jinchuan Group Co Ltd
Priority to CN201620522595.1U priority Critical patent/CN205802184U/en
Application granted granted Critical
Publication of CN205802184U publication Critical patent/CN205802184U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

A kind of ore storage bin inclined chute connects ore deposit buffer platform, and described buffer platform is positioned at in the inclined chute of ore drawing dustpan homonymy, and the facade of described buffer platform and bottom surface are provided with laying end muscle;Described laying end muscle is affixed with the end muscle of crude ore bin.This utility model, by setting up buffer platform, makes liner plate only by the vertical power of Ore thus protects inclined chute and liner plate thereof;Vertically it is provided with anchor pole on each facade of buffer platform and bottom surface, anchor pole is connected with backplate, backplate is connected with the guard rail identical with ore deposit flow path direction, kept out the impulsive force of Ore, protected buffer platform.

Description

A kind of ore storage bin inclined chute connects ore deposit buffer platform
Technical field
This utility model relates to a kind of ore storage bin structure, particularly relates to a kind of ore storage bin inclined chute and connects ore deposit buffer platform.
Background technology
Existing crude ore bin accepts to be discharged into from 850 plane mine truck row to reprint, with 1000-850m, the Ore that drop shaft is put into, When Ore is in time reprinting drop shaft releasing, the protection liner plate above inclined chute will be impacted.
Ore stream is from reprinting drop shaft drop impact inclined chute liner plate, and the discharge point inclined chute bottom steel liner plate territory, mining area that falls is subject to Impulsive force maximum, the impulsive force of Ore can be analyzed to power and the active force on vertical liner plate inclined-plane glided along liner plate inclined-plane. And the ore deposit point stress that falls is got at concentration, impact force is the strongest, is easiest to be destroyed.
Through the long-term impact of Ore and vibrations, the liner plate in the some inclined chute of ore deposit that falls occurs in that coming off in various degree in succession Phenomenon, and after the first piece of steel liner plate that come off, owing to poised state mutually nested between liner plate is changed, continue along with producing Using, the exfoliation rates of liner plate can substantially be accelerated, and substantially reduces liner plate and reprocesses the cycle, crushes to downstream, transports, lifting system Bring potential safety hazard, have impact on the stability of ore storage bin the most to a certain extent.
Utility model content
This utility model is by providing a kind of ore storage bin inclined chute to connect ore deposit buffer platform, to protect inclined chute and liner plate thereof, from And lengthen liner plate and reprocess the cycle, eliminate that downstream exists crush, transport, potential safety hazard in lifting system, also improve ore deposit The stability in storehouse.
This utility model is solved the technical problem that to adopt the following technical scheme that and realize:
A kind of ore storage bin inclined chute connects ore deposit buffer platform, described buffer platform be positioned at in the inclined chute of ore drawing dustpan homonymy, The facade of described buffer platform and bottom surface are provided with laying end muscle;Described laying end muscle is affixed with the end muscle of crude ore bin.
Vertically it is provided with fixing anchor bar on described buffer platform facade and bottom surface, described fixing anchor bar is connected with backplate, institute State and on backplate, be connected with the guard rail identical with ore deposit flow path direction.
It is provided with hitch in described inclined chute and buffer platform joint, in described hitch, is provided with I-shaped part.
The beneficial effects of the utility model: by setting up buffer platform, make liner plate only by the vertical power of Ore thus protect Inclined chute and liner plate thereof are protected;Vertically it is provided with anchor pole on each facade of buffer platform and bottom surface, anchor pole is connected with backplate, on backplate It is connected with the guard rail identical with ore deposit flow path direction, has kept out the impulsive force of Ore, protected buffer platform.
Accompanying drawing explanation
Fig. 1 is the location drawing of the present utility model;
Fig. 2 is front view of the present utility model;
Fig. 3 is side view of the present utility model;
Fig. 4 is top view of the present utility model.
In figure: 1 ore drawing dustpan;2 inclined chutes;3 buffer platform;4 lay end muscle;5 crude ore bins;6 backplates; 7 guard rails;8 holes;9 I-shaped parts, 10 liner plates;11 fixing anchor bars.
Detailed description of the invention
For the technological means making this utility model realize, creation characteristic, achieve the goal and effect is readily apparent from, below knot Close accompanying drawing this utility model is described in further detail:
Participating in Fig. 1, Fig. 2, Fig. 3 and Fig. 4, a kind of ore storage bin inclined chute connects ore deposit buffer platform, described buffer platform 3 be positioned at In the inclined chute 2 of ore drawing dustpan 1 homonymy, the facade of described buffer platform 3 and bottom surface are provided with laying end muscle 4;Described paving If end muscle 4 is affixed with the end muscle of crude ore bin.
Described buffer platform 3 facade and bottom surface are vertically provided with fixing anchor bar 11, the most affixed on described fixing anchor bar 11 There is backplate 6, described backplate 6 be connected with the guard rail 7 identical with ore deposit flow path direction, make ore deposit when falling, first fall on guard rail 7, Fall then along guard rail 7, protect buffer platform 3.
It is provided with hitch in described inclined chute 2 with both sides, buffer platform about 3 joint, in described hitch, is provided with I-shaped part 9, in order to protect the muscle hinged place, the end laying end muscle 4 with crude ore bin 5.
Specific implementation process of the present utility model: destroy journey according to liner plate 10 at the fall position of ore deposit point of crude ore bin 5 inclined chute 2 Degree and the size in region, determine that buffer platform 3 is excavated in position, and making ore drawing dustpan put the 1 Ore stream put into, to fall directly on buffering flat On the fine ore of platform 3 natural packing, no longer directly steel liner plate is smashed in impact.After buffer platform 3 has been excavated, standing of buffer platform 3 Face and bottom surface are provided with muscle 4 at the bottom of the laying mutually overlapped by screw-thread steel;Muscle 4 at the bottom of this laying is affixed with the end muscle of crude ore bin, Push down laying the end muscle 4 muscle hinged place, the end I-shaped part 9 with crude ore bin.Buffer platform 3 facade and bottom surface are vertically provided with Fixing anchor bar 11, described fixing anchor bar 11 is connected with backplate 6, and described backplate 6 is connected with the guard rail 7 identical with ore deposit flow path direction, Making ore deposit when falling, first fall and pile up on guard rail 7, the Ore fallen thereafter just falls on the fine ore of builds up ahead, protects Buffer platform 3, finally the hole 8 of gas cutting interval 800mm, a diameter of 150mm on backplate 6, is used for beating note anchor pole and pouring element Concrete is used.

Claims (3)

1. an ore storage bin inclined chute connects ore deposit buffer platform, it is characterised in that: described buffer platform (3) is positioned at and ore drawing dustpan (1) In the inclined chute (2) of homonymy, the facade of described buffer platform (3) and bottom surface are provided with laying end muscle (4);At the bottom of described laying Muscle (4) is affixed with the end muscle of crude ore bin (5).
A kind of ore storage bin inclined chute the most according to claim 1 connects ore deposit buffer platform, it is characterised in that: in described buffer platform (3) being vertically provided with fixing anchor bar (11) on facade and bottom surface, described fixing anchor bar (11) is connected with backplate (6), described backplate (6) On be connected with the guard rail (7) identical with ore deposit flow path direction.
A kind of ore storage bin inclined chute the most according to claim 1 connects ore deposit buffer platform, it is characterised in that: in described inclined chute (2) it is provided with I-shaped part (9) with buffer platform (3) joint.
CN201620522595.1U 2016-06-01 2016-06-01 A kind of ore storage bin inclined chute connects ore deposit buffer platform Expired - Fee Related CN205802184U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620522595.1U CN205802184U (en) 2016-06-01 2016-06-01 A kind of ore storage bin inclined chute connects ore deposit buffer platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620522595.1U CN205802184U (en) 2016-06-01 2016-06-01 A kind of ore storage bin inclined chute connects ore deposit buffer platform

Publications (1)

Publication Number Publication Date
CN205802184U true CN205802184U (en) 2016-12-14

Family

ID=57501498

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620522595.1U Expired - Fee Related CN205802184U (en) 2016-06-01 2016-06-01 A kind of ore storage bin inclined chute connects ore deposit buffer platform

Country Status (1)

Country Link
CN (1) CN205802184U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107676129A (en) * 2017-10-18 2018-02-09 中国恩菲工程技术有限公司 Discharge point
CN110259460A (en) * 2019-06-21 2019-09-20 铜陵有色金属集团股份有限公司 A kind of inclined chute forming method of kaolin suspension
CN112960427A (en) * 2021-03-04 2021-06-15 中国恩菲工程技术有限公司 Underground mine unloading station

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107676129A (en) * 2017-10-18 2018-02-09 中国恩菲工程技术有限公司 Discharge point
CN110259460A (en) * 2019-06-21 2019-09-20 铜陵有色金属集团股份有限公司 A kind of inclined chute forming method of kaolin suspension
CN110259460B (en) * 2019-06-21 2021-01-05 铜陵有色金属集团股份有限公司 Inclined chute forming method of high-pass shaft
CN112960427A (en) * 2021-03-04 2021-06-15 中国恩菲工程技术有限公司 Underground mine unloading station

Similar Documents

Publication Publication Date Title
CN207392069U (en) A kind of Falling Rocks guard system
CN104763425A (en) Pressure relief presplitting blasting gob-side entry retaining pillar-free mining method
CN205802184U (en) A kind of ore storage bin inclined chute connects ore deposit buffer platform
CN205825826U (en) A kind of mine slope presplit blasting big gun pore structure
CN204552814U (en) Drop shaft system that the upper and lower segmentation of mining tunnel is noiseless
CN208531397U (en) Alpine skiing place chute is unpowered gravelly soil transport device and system
CN204184816U (en) A kind of blanking device
CN202970778U (en) Sliding chute concrete delivery device for long inclined shaft
CN105905465A (en) Method and device for weakening impact of stone on front wall of storage bin
CN203702241U (en) Unloading pit connecting unloading chamber and drop shaft
CN204250691U (en) Material bin cone headwall anticollision device
CN207348076U (en) The municipal civil engineering side slope reinforcing apparatus of one kind building
CN203584450U (en) Anchor steel composite support for mining roadway of steep seam
CN212534194U (en) Mountain road rock slope supporting retaining wall
CN206073827U (en) Draw shaft blocking blasting device
CN202673355U (en) Coal mine mining with filling underground feed buffer
CN201581906U (en) Self-switching and self-disassembling type U-shaped steel support
CN205778899U (en) A kind of vertical shaft ore storage bin buffering connects ore deposit chamber
CN107859525A (en) A kind of large deformation stope drift active workings replace canopy Surrounding Rock Control Technology except Mao Kuo lanes
CN106837410A (en) A kind of mine drop shaft borehole wall double buffering guard method
CN203877472U (en) Belt conveyor transferring point V-type buffering chute
CN207470224U (en) A kind of drop shaft hopper-bottom structure
CN205686910U (en) Device for weakening impact of stone on front wall of storage bin
CN206827459U (en) A kind of chute with buffer unit
CN110102364A (en) A kind of non-coal ore underground drop shaft weight crushing system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161214

CF01 Termination of patent right due to non-payment of annual fee