CN205802184U - A kind of ore storage bin inclined chute connects ore deposit buffer platform - Google Patents
A kind of ore storage bin inclined chute connects ore deposit buffer platform Download PDFInfo
- Publication number
- CN205802184U CN205802184U CN201620522595.1U CN201620522595U CN205802184U CN 205802184 U CN205802184 U CN 205802184U CN 201620522595 U CN201620522595 U CN 201620522595U CN 205802184 U CN205802184 U CN 205802184U
- Authority
- CN
- China
- Prior art keywords
- ore
- buffer platform
- inclined chute
- storage bin
- ore deposit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Emergency Lowering Means (AREA)
Abstract
A kind of ore storage bin inclined chute connects ore deposit buffer platform, and described buffer platform is positioned at in the inclined chute of ore drawing dustpan homonymy, and the facade of described buffer platform and bottom surface are provided with laying end muscle;Described laying end muscle is affixed with the end muscle of crude ore bin.This utility model, by setting up buffer platform, makes liner plate only by the vertical power of Ore thus protects inclined chute and liner plate thereof;Vertically it is provided with anchor pole on each facade of buffer platform and bottom surface, anchor pole is connected with backplate, backplate is connected with the guard rail identical with ore deposit flow path direction, kept out the impulsive force of Ore, protected buffer platform.
Description
Technical field
This utility model relates to a kind of ore storage bin structure, particularly relates to a kind of ore storage bin inclined chute and connects ore deposit buffer platform.
Background technology
Existing crude ore bin accepts to be discharged into from 850 plane mine truck row to reprint, with 1000-850m, the Ore that drop shaft is put into,
When Ore is in time reprinting drop shaft releasing, the protection liner plate above inclined chute will be impacted.
Ore stream is from reprinting drop shaft drop impact inclined chute liner plate, and the discharge point inclined chute bottom steel liner plate territory, mining area that falls is subject to
Impulsive force maximum, the impulsive force of Ore can be analyzed to power and the active force on vertical liner plate inclined-plane glided along liner plate inclined-plane.
And the ore deposit point stress that falls is got at concentration, impact force is the strongest, is easiest to be destroyed.
Through the long-term impact of Ore and vibrations, the liner plate in the some inclined chute of ore deposit that falls occurs in that coming off in various degree in succession
Phenomenon, and after the first piece of steel liner plate that come off, owing to poised state mutually nested between liner plate is changed, continue along with producing
Using, the exfoliation rates of liner plate can substantially be accelerated, and substantially reduces liner plate and reprocesses the cycle, crushes to downstream, transports, lifting system
Bring potential safety hazard, have impact on the stability of ore storage bin the most to a certain extent.
Utility model content
This utility model is by providing a kind of ore storage bin inclined chute to connect ore deposit buffer platform, to protect inclined chute and liner plate thereof, from
And lengthen liner plate and reprocess the cycle, eliminate that downstream exists crush, transport, potential safety hazard in lifting system, also improve ore deposit
The stability in storehouse.
This utility model is solved the technical problem that to adopt the following technical scheme that and realize:
A kind of ore storage bin inclined chute connects ore deposit buffer platform, described buffer platform be positioned at in the inclined chute of ore drawing dustpan homonymy,
The facade of described buffer platform and bottom surface are provided with laying end muscle;Described laying end muscle is affixed with the end muscle of crude ore bin.
Vertically it is provided with fixing anchor bar on described buffer platform facade and bottom surface, described fixing anchor bar is connected with backplate, institute
State and on backplate, be connected with the guard rail identical with ore deposit flow path direction.
It is provided with hitch in described inclined chute and buffer platform joint, in described hitch, is provided with I-shaped part.
The beneficial effects of the utility model: by setting up buffer platform, make liner plate only by the vertical power of Ore thus protect
Inclined chute and liner plate thereof are protected;Vertically it is provided with anchor pole on each facade of buffer platform and bottom surface, anchor pole is connected with backplate, on backplate
It is connected with the guard rail identical with ore deposit flow path direction, has kept out the impulsive force of Ore, protected buffer platform.
Accompanying drawing explanation
Fig. 1 is the location drawing of the present utility model;
Fig. 2 is front view of the present utility model;
Fig. 3 is side view of the present utility model;
Fig. 4 is top view of the present utility model.
In figure: 1 ore drawing dustpan;2 inclined chutes;3 buffer platform;4 lay end muscle;5 crude ore bins;6 backplates;
7 guard rails;8 holes;9 I-shaped parts, 10 liner plates;11 fixing anchor bars.
Detailed description of the invention
For the technological means making this utility model realize, creation characteristic, achieve the goal and effect is readily apparent from, below knot
Close accompanying drawing this utility model is described in further detail:
Participating in Fig. 1, Fig. 2, Fig. 3 and Fig. 4, a kind of ore storage bin inclined chute connects ore deposit buffer platform, described buffer platform 3 be positioned at
In the inclined chute 2 of ore drawing dustpan 1 homonymy, the facade of described buffer platform 3 and bottom surface are provided with laying end muscle 4;Described paving
If end muscle 4 is affixed with the end muscle of crude ore bin.
Described buffer platform 3 facade and bottom surface are vertically provided with fixing anchor bar 11, the most affixed on described fixing anchor bar 11
There is backplate 6, described backplate 6 be connected with the guard rail 7 identical with ore deposit flow path direction, make ore deposit when falling, first fall on guard rail 7,
Fall then along guard rail 7, protect buffer platform 3.
It is provided with hitch in described inclined chute 2 with both sides, buffer platform about 3 joint, in described hitch, is provided with I-shaped part
9, in order to protect the muscle hinged place, the end laying end muscle 4 with crude ore bin 5.
Specific implementation process of the present utility model: destroy journey according to liner plate 10 at the fall position of ore deposit point of crude ore bin 5 inclined chute 2
Degree and the size in region, determine that buffer platform 3 is excavated in position, and making ore drawing dustpan put the 1 Ore stream put into, to fall directly on buffering flat
On the fine ore of platform 3 natural packing, no longer directly steel liner plate is smashed in impact.After buffer platform 3 has been excavated, standing of buffer platform 3
Face and bottom surface are provided with muscle 4 at the bottom of the laying mutually overlapped by screw-thread steel;Muscle 4 at the bottom of this laying is affixed with the end muscle of crude ore bin,
Push down laying the end muscle 4 muscle hinged place, the end I-shaped part 9 with crude ore bin.Buffer platform 3 facade and bottom surface are vertically provided with
Fixing anchor bar 11, described fixing anchor bar 11 is connected with backplate 6, and described backplate 6 is connected with the guard rail 7 identical with ore deposit flow path direction,
Making ore deposit when falling, first fall and pile up on guard rail 7, the Ore fallen thereafter just falls on the fine ore of builds up ahead, protects
Buffer platform 3, finally the hole 8 of gas cutting interval 800mm, a diameter of 150mm on backplate 6, is used for beating note anchor pole and pouring element
Concrete is used.
Claims (3)
1. an ore storage bin inclined chute connects ore deposit buffer platform, it is characterised in that: described buffer platform (3) is positioned at and ore drawing dustpan (1)
In the inclined chute (2) of homonymy, the facade of described buffer platform (3) and bottom surface are provided with laying end muscle (4);At the bottom of described laying
Muscle (4) is affixed with the end muscle of crude ore bin (5).
A kind of ore storage bin inclined chute the most according to claim 1 connects ore deposit buffer platform, it is characterised in that: in described buffer platform
(3) being vertically provided with fixing anchor bar (11) on facade and bottom surface, described fixing anchor bar (11) is connected with backplate (6), described backplate (6)
On be connected with the guard rail (7) identical with ore deposit flow path direction.
A kind of ore storage bin inclined chute the most according to claim 1 connects ore deposit buffer platform, it is characterised in that: in described inclined chute
(2) it is provided with I-shaped part (9) with buffer platform (3) joint.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620522595.1U CN205802184U (en) | 2016-06-01 | 2016-06-01 | A kind of ore storage bin inclined chute connects ore deposit buffer platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620522595.1U CN205802184U (en) | 2016-06-01 | 2016-06-01 | A kind of ore storage bin inclined chute connects ore deposit buffer platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205802184U true CN205802184U (en) | 2016-12-14 |
Family
ID=57501498
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620522595.1U Expired - Fee Related CN205802184U (en) | 2016-06-01 | 2016-06-01 | A kind of ore storage bin inclined chute connects ore deposit buffer platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205802184U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107676129A (en) * | 2017-10-18 | 2018-02-09 | 中国恩菲工程技术有限公司 | Discharge point |
CN110259460A (en) * | 2019-06-21 | 2019-09-20 | 铜陵有色金属集团股份有限公司 | A kind of inclined chute forming method of kaolin suspension |
CN112960427A (en) * | 2021-03-04 | 2021-06-15 | 中国恩菲工程技术有限公司 | Underground mine unloading station |
-
2016
- 2016-06-01 CN CN201620522595.1U patent/CN205802184U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107676129A (en) * | 2017-10-18 | 2018-02-09 | 中国恩菲工程技术有限公司 | Discharge point |
CN110259460A (en) * | 2019-06-21 | 2019-09-20 | 铜陵有色金属集团股份有限公司 | A kind of inclined chute forming method of kaolin suspension |
CN110259460B (en) * | 2019-06-21 | 2021-01-05 | 铜陵有色金属集团股份有限公司 | Inclined chute forming method of high-pass shaft |
CN112960427A (en) * | 2021-03-04 | 2021-06-15 | 中国恩菲工程技术有限公司 | Underground mine unloading station |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207392069U (en) | A kind of Falling Rocks guard system | |
CN104763425A (en) | Pressure relief presplitting blasting gob-side entry retaining pillar-free mining method | |
CN205802184U (en) | A kind of ore storage bin inclined chute connects ore deposit buffer platform | |
CN205825826U (en) | A kind of mine slope presplit blasting big gun pore structure | |
CN204552814U (en) | Drop shaft system that the upper and lower segmentation of mining tunnel is noiseless | |
CN208531397U (en) | Alpine skiing place chute is unpowered gravelly soil transport device and system | |
CN204184816U (en) | A kind of blanking device | |
CN202970778U (en) | Sliding chute concrete delivery device for long inclined shaft | |
CN105905465A (en) | Method and device for weakening impact of stone on front wall of storage bin | |
CN203702241U (en) | Unloading pit connecting unloading chamber and drop shaft | |
CN204250691U (en) | Material bin cone headwall anticollision device | |
CN207348076U (en) | The municipal civil engineering side slope reinforcing apparatus of one kind building | |
CN203584450U (en) | Anchor steel composite support for mining roadway of steep seam | |
CN212534194U (en) | Mountain road rock slope supporting retaining wall | |
CN206073827U (en) | Draw shaft blocking blasting device | |
CN202673355U (en) | Coal mine mining with filling underground feed buffer | |
CN201581906U (en) | Self-switching and self-disassembling type U-shaped steel support | |
CN205778899U (en) | A kind of vertical shaft ore storage bin buffering connects ore deposit chamber | |
CN107859525A (en) | A kind of large deformation stope drift active workings replace canopy Surrounding Rock Control Technology except Mao Kuo lanes | |
CN106837410A (en) | A kind of mine drop shaft borehole wall double buffering guard method | |
CN203877472U (en) | Belt conveyor transferring point V-type buffering chute | |
CN207470224U (en) | A kind of drop shaft hopper-bottom structure | |
CN205686910U (en) | Device for weakening impact of stone on front wall of storage bin | |
CN206827459U (en) | A kind of chute with buffer unit | |
CN110102364A (en) | A kind of non-coal ore underground drop shaft weight crushing system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161214 |
|
CF01 | Termination of patent right due to non-payment of annual fee |