CN205781412U - A kind of supporting construction installed for pressure pipeline - Google Patents

A kind of supporting construction installed for pressure pipeline Download PDF

Info

Publication number
CN205781412U
CN205781412U CN201620748551.0U CN201620748551U CN205781412U CN 205781412 U CN205781412 U CN 205781412U CN 201620748551 U CN201620748551 U CN 201620748551U CN 205781412 U CN205781412 U CN 205781412U
Authority
CN
China
Prior art keywords
hoop
pressure pipeline
seat
supporting
supporting construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620748551.0U
Other languages
Chinese (zh)
Inventor
张文化
王少军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Deer Smart Factory Technology Co Ltd
Original Assignee
Guangdong Deer Smart Factory Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Deer Smart Factory Technology Co Ltd filed Critical Guangdong Deer Smart Factory Technology Co Ltd
Priority to CN201620748551.0U priority Critical patent/CN205781412U/en
Application granted granted Critical
Publication of CN205781412U publication Critical patent/CN205781412U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

This utility model discloses a kind of supporting construction installed for pressure pipeline, and this supporting construction being used for pressure pipeline installation includes: base;Supporting seat, this support seat is installed on base in height-adjustable mode, and this support seat upper end is provided with the arcuate groove for supporting pressure pipeline;Hoop ligation structure group, it includes that two are installed on the hoop ligation structure supporting seat rear and front end in the way of scalable is relative to position, each hoop ligation structure includes being installed on the hoop bundle supporting seat end by a support component, this hoop is pricked has the clamping space for sandwiching fixation pressure pipeline, and this hoop bundle two ends are fastened by locking mechanism, and can be by the size of locking mechanism regulation clamping space.This utility model can being can also adjust the relative altitude supported between seat and base, so that meeting different installation requirements, making this utility model have the high market competitiveness by hoop ligation structure group by pressure pipeline stable position on the arcuate groove supported in seat.

Description

A kind of supporting construction installed for pressure pipeline
Technical field:
This utility model relates to pipeline support technical field, refers in particular to a kind of supporting construction installed for pressure pipeline.
Background technology:
In various integrated mills, residential houses and public building, feedwater, draining, heating and air conditioning system number of lines Many, kind is many.Therefore the Pipe installing proportion that occupation ratio is bigger in whole architectural engineering, outside pipeline is not only to whole building Sight has an impact, and is the whole building important step that there is potential safety hazard.Support of pipelines is as the supporting construction of pipeline, root According to behavior in service and the arrangement requirement of pipeline, pipe support is divided into fixed and movable two kinds, and the place arranging fixing point becomes fixing Frame, arranges the local employing activity pipe support of intermediate supports.
At present, most piping support structure generally comprises bearing and is arranged at bearing upper end and for placing pipeline Tube seat, wherein, tube seat is typically placed on bearing by pillar, and it there will be following problem, pipeline in production application It is placed in tube seat, owing to there is no clamp device, to cause pipeline to be susceptible to displacement, causes pipeline to have and come off from tube seat Risk.
In view of this, the present inventor proposes techniques below scheme.
Utility model content:
The purpose of this utility model is to overcome the deficiencies in the prior art, it is provided that a kind of support installed for pressure pipeline Structure.
In order to solve above-mentioned technical problem, this utility model have employed following technical proposals: this is used for pressure pipeline and installs Supporting construction include: base;Supporting seat, this support seat is installed on base in height-adjustable mode, and this support seat Upper end is provided with the arcuate groove for supporting pressure pipeline;Hoop ligation structure group, it include two with scalable relative to the side of position Formula is installed on the hoop ligation structure supporting seat rear and front end, and each hoop ligation structure includes being installed on support seat end by a support component Hoop prick, this hoop is pricked has a clamping space for sandwiching fixation pressure pipeline, and this hoop is pricked two ends and fastened by locking mechanism, And can be by the size of locking mechanism regulation clamping space.
Furthermore, in technique scheme, inside described hoop bundle, it is further fixed on anti-skidding silica gel strip.
Furthermore, in technique scheme, inside described anti-skidding silica gel strip, be additionally provided with convex closure, this convex closure cross section in Arc-shaped.
Furthermore, in technique scheme, described hoop is pricked outer wall both sides and is respectively arranged with lug;Described support seat end Portion is provided with and stretches out and the boss corresponding with lug;Described support component includes first be connected between boss and lug Screw rod and the first nut coordinated with the first screw rod, prick the height of relative support seat by tightening the first nut scalable hoop.
Furthermore, in technique scheme, described hoop bundle two ends outwards bend and are formed with folding ear, and this folding ear is provided with Perforation;Described locking mechanism fastens the second screw rod including the perforation through folding ear and the second spiral shell coordinated with the second screw rod Female.
Furthermore, in technique scheme, described arcuate groove is provided with the rhone of axial distribution.
Furthermore, in technique scheme, described base upper end has thread segment;Described support seat lower end is provided with The thread groove adaptive with this thread segment, this thread segment spiral is fixed in thread groove, makes base and supports seat formation scalable height Degree structure.
After using technique scheme, this utility model has the advantages that this practicality compared with prior art During novel use, the locking mechanism first pricked hoop unlocks, and order hoop is pricked in opened condition, now pressure pipeline is positioned over support On arcuate groove in Zuo, and this pressure pipeline also falls within hoop bundle, then by locking mechanism, hoop is pricked locking, to cause hoop bundle steady Fixed teamed pressure pipeline, then can be pricked the height of relative support seat, make hoop prick relative support seat by a support component adjusting hoop Stagger certain position up and down, can also adjust support seat with this by pressure pipeline stable position on the arcuate groove supported in seat And the relative altitude between base, so that meet different installation requirements.
Accompanying drawing illustrates:
Fig. 1 is structural representation of the present utility model;
Detailed description of the invention:
Below in conjunction with specific embodiments and the drawings, this utility model is further illustrated.
As shown in Figure 1, for a kind of for pressure pipeline install supporting construction, comprising: base 1, with adjustable-height Mode be installed on base 1 support seat 2 and be installed on the hoop ligation structure group supported on seat 2, and this support seat 2 upper end is arranged Having the arcuate groove for supporting pressure pipeline, this hoop ligation structure group is for being locked in arcuate groove by pressure pipeline.
Described base 1 is fixed by blast screw and ground or wall or other object.
Described hoop ligation structure group includes that two are installed on the hoop supporting seat 2 rear and front end in the way of scalable is relative to position Ligation structure 3, this hoop ligation structure 3 lays respectively at outside arcuate groove rear and front end.
Each hoop ligation structure 3 includes being installed on the hoop bundle 31 supporting seat 2 end by a support component 4, and this hoop is pricked 31 and had For sandwiching the clamping space of fixation pressure pipeline, and this hoop is pricked 31 two ends and is fastened by locking mechanism 32, and can be by locking Structure 32 regulates the size of clamping space, in order to install, and the manometer tube that applicable locking various sizes size is more or less the same Road.
Described hoop is pricked and is further fixed on anti-skidding silica gel strip 33 inside 31, so that after 31 clamping pressure pipelines pricked by hoop, this is prevented Sliding silica gel strip 33 and pressure pipeline wall contacts, lock more to fasten so that hoop pricks 31 by pressure pipeline.It addition, it is described anti-skidding Being additionally provided with convex closure inside silica gel strip 33, this convex closure cross section is arc-shaped, this convex closure and pressure pipeline wall contacts, carries further High anti-skidding effect, and make locking effect more preferable.
Described hoop is pricked 31 outer wall both sides and is respectively arranged with lug 311;Described support seat 2 end be provided with stretch out and with The boss 21 of lug 311 correspondence;Described support component 4 include the first screw rod 41 of being connected between boss 21 and lug 311 and The first nut 42 coordinated with the first screw rod 41, pricks the height of 31 relative support seats 2 by tightening the first nut 42 scalable hoop, When hoop bundle 31 is raised and lowered by needs, it is only necessary to necessarily unclamp the first nut 42 or tighten the first nut 42 and can realize, Regulation is got up convenient.
Described hoop bundle 31 two ends outwards bend and are formed with folding ear 312, and this folding ear 312 is provided with perforation;Described locking mechanism 32 fasten the second screw rod 321 including the perforation through folding ear 312 and the second nut 322 coordinated with the second screw rod 321.
It is provided with the rhone of axial distribution on described arcuate groove, by this rhone, the water on arcuate groove is drained, can Prevent the pressure pipeline being fixed on arcuate groove from being corroded to a certain extent, improve the service life of pressure pipeline.
Described base 1 upper end has thread segment 11;Described support seat 2 lower end is provided with and the screw thread of this thread segment 11 adaptation Groove 20, this thread segment 11 spiral is fixed in thread groove 20, makes base 1 form adjustable-height structure with supporting seat 2.
During this utility model use, the locking mechanism 32 first pricked hoop on 31 unlocks, and order binds round bundle 31 in opened condition, now Pressure pipeline is positioned on the arcuate groove supported in seat 2, and this pressure pipeline also falls within hoop and pricks in 31, then pass through locking mechanism Hoop is pricked 31 lockings by 32, stablizes teamed pressure pipeline to cause hoop to prick 31, then can prick 31 phases by support component 4 adjusting hoop To supporting the height of seat 2, make hoop prick 31 relative support seats about 2 and stagger certain position, can be by pressure pipeline stable position with this On the arcuate groove supported in seat 2, can also adjust the relative altitude supported between seat 2 and base 1, so that meeting different installations Requirement.
Certainly, the foregoing is only specific embodiment of the utility model, not limit this utility model and implement Scope, all equivalence changes done according to structure, feature and principle described in this utility model claim or modification, all should wrap Include in this utility model claim.

Claims (7)

1. the supporting construction installed for pressure pipeline, it is characterised in that: comprising:
Base (1);
Supporting seat (2), this support seat (2) is installed on base (1) in height-adjustable mode, and this support seat (2) upper end It is provided with the arcuate groove for supporting pressure pipeline;
Hoop ligation structure group, it includes that two are installed on the hoop bundle supporting seat (2) rear and front end in the way of scalable is relative to position Structure (3), each hoop ligation structure (3) includes being installed on hoop bundle (31) supporting seat (2) end, this hoop by a support component (4) Prick (31) and there is the clamping space for sandwiching fixation pressure pipeline, and this hoop pricks (31) two ends by locking mechanism (32) tightly Gu, and the size of locking mechanism (32) regulation clamping space can be passed through.
A kind of supporting construction installed for pressure pipeline the most according to claim 1, it is characterised in that: described hoop is pricked (31) inner side is further fixed on anti-skidding silica gel strip (33).
A kind of supporting construction installed for pressure pipeline the most according to claim 2, it is characterised in that: described anti-skidding silicon Adhesive tape (33) inner side is additionally provided with convex closure, and this convex closure cross section is arc-shaped.
A kind of supporting construction installed for pressure pipeline the most according to claim 1, it is characterised in that: described hoop is pricked (31) outer wall both sides are respectively arranged with lug (311);Described support seat (2) end be provided with stretch out and with lug (311) Corresponding boss (21);Described support component (4) includes the first screw rod (41) being connected between boss (21) and lug (311) And the first nut (42) coordinated with the first screw rod (41), prick (31) relative support by tightening the first nut (42) scalable hoop The height of seat (2).
A kind of supporting construction installed for pressure pipeline the most according to claim 1, it is characterised in that: described hoop is pricked (31) two ends outwards bend and are formed with folding ear (312), and this folding ear (312) is provided with perforation;Described locking mechanism (32) fastening bag The second screw rod (321) including the perforation through folding ear (312) and the second nut (322) coordinated with the second screw rod (321).
A kind of supporting construction installed for pressure pipeline the most according to claim 1, it is characterised in that: described arcuate groove On be provided with the rhone of axial distribution.
A kind of supporting construction installed for pressure pipeline the most according to claim 1, it is characterised in that: described base (1) upper end has thread segment (11);Described support seat (2) lower end is provided with the thread groove (20) adaptive with this thread segment (11), This thread segment (11) spiral is fixed in thread groove (20), makes base (1) form adjustable-height structure with supporting seat (2).
CN201620748551.0U 2016-07-14 2016-07-14 A kind of supporting construction installed for pressure pipeline Active CN205781412U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620748551.0U CN205781412U (en) 2016-07-14 2016-07-14 A kind of supporting construction installed for pressure pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620748551.0U CN205781412U (en) 2016-07-14 2016-07-14 A kind of supporting construction installed for pressure pipeline

Publications (1)

Publication Number Publication Date
CN205781412U true CN205781412U (en) 2016-12-07

Family

ID=58122671

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620748551.0U Active CN205781412U (en) 2016-07-14 2016-07-14 A kind of supporting construction installed for pressure pipeline

Country Status (1)

Country Link
CN (1) CN205781412U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106704712A (en) * 2016-12-30 2017-05-24 南通中远船务工程有限公司 Support pipe boot
CN107489146A (en) * 2017-07-01 2017-12-19 中建三局集团有限公司 A kind of tool-type annular anti-float anchor rod reinforcing bar setting tool
CN110296283A (en) * 2018-03-21 2019-10-01 福鸣环保科技(深圳)有限公司 Panel slide block structure in flange semi arch
CN111998136A (en) * 2020-08-28 2020-11-27 浙江钱塘江水利建筑工程有限公司 Mounting structure and mounting method of water diversion steel pipe for tunnel

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106704712A (en) * 2016-12-30 2017-05-24 南通中远船务工程有限公司 Support pipe boot
CN107489146A (en) * 2017-07-01 2017-12-19 中建三局集团有限公司 A kind of tool-type annular anti-float anchor rod reinforcing bar setting tool
CN110296283A (en) * 2018-03-21 2019-10-01 福鸣环保科技(深圳)有限公司 Panel slide block structure in flange semi arch
CN111998136A (en) * 2020-08-28 2020-11-27 浙江钱塘江水利建筑工程有限公司 Mounting structure and mounting method of water diversion steel pipe for tunnel

Similar Documents

Publication Publication Date Title
CN205781412U (en) A kind of supporting construction installed for pressure pipeline
CN206691027U (en) Back braces after telescoping tube type is vehicle-mounted
CN207421515U (en) A kind of single tube earthquake-resisting support device
CN203671031U (en) Pipeline fixing hoop
CN2350232Y (en) Adjustable locating structure of shade device for windscreen of car
CN204756154U (en) Car oil pipe buckle
US3506229A (en) Meter mounting apparatus
CN206708558U (en) A kind of unstressed installation high-pressure oil pipe combination fastener
CN205278555U (en) But expansion card hoop
CN113737976B (en) Flexible breeze vibration turbulence suppression device for power transmission steel pipe tower and installation method thereof
CN205273229U (en) Car back and car
CN204006816U (en) The micro-channel condenser mounting structure of Teat pump boiler
CN205618823U (en) Double bracing formula elastic supporting tube card mechanism
CN208360296U (en) A kind of protective cradle
CN209705423U (en) A kind of fixed bracket of vehicle fuel filler pipe
CN207005452U (en) A kind of route of pipe line fixed card buckle of variable-diameter
CN208417958U (en) The dotted leak source patcher of pipeline
CN204184182U (en) Automobile sunshade awning
CN205978831U (en) Easily fixable's air conditioner bellows
CN105835674B (en) A kind of automobile sun-shading cover
CN219655433U (en) Reinforced air conditioner heat preservation pipeline installation fixed knot constructs
CN205618498U (en) Quick detachable inflation screw
CN205618831U (en) Double bracing double bottom seat formula elastic supporting tube card mechanism
CN205593078U (en) Connecting pipe subassembly and air conditioning system
CN206202026U (en) A kind of anti-dropout conduit

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Supporting structure of be used for pipeline under pressure installation

Effective date of registration: 20191012

Granted publication date: 20161207

Pledgee: China Co truction Bank Corp Dongguan branch

Pledgor: Guangdong Del wisdom Factory Technology Co., Ltd.

Registration number: Y2019440000126

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20220328

Granted publication date: 20161207

Pledgee: China Co. truction Bank Corp Dongguan branch

Pledgor: GUANGDONG DEER SMART FACTORY TECHNOLOGY CO.,LTD.

Registration number: Y2019440000126