CN209398949U - A kind of comprehensive support for Pipe installing - Google Patents

A kind of comprehensive support for Pipe installing Download PDF

Info

Publication number
CN209398949U
CN209398949U CN201822197750.9U CN201822197750U CN209398949U CN 209398949 U CN209398949 U CN 209398949U CN 201822197750 U CN201822197750 U CN 201822197750U CN 209398949 U CN209398949 U CN 209398949U
Authority
CN
China
Prior art keywords
bar
fixed
riser
support bar
starting stave
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822197750.9U
Other languages
Chinese (zh)
Inventor
谷远辉
陈琳
张军
杨晔
刘汉兴
金灿平
丁强
盛伟
龚灿华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Weisian Architectural Technology Co Ltd
Original Assignee
Jiangsu Weisian Architectural Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Weisian Architectural Technology Co Ltd filed Critical Jiangsu Weisian Architectural Technology Co Ltd
Priority to CN201822197750.9U priority Critical patent/CN209398949U/en
Application granted granted Critical
Publication of CN209398949U publication Critical patent/CN209398949U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model relates to a kind of comprehensive supports for Pipe installing, including two vertical bars disposed in parallel, the lower support bar being fixed on vertical bar, the upper support bar being arranged in above lower support bar, the both ends of lower support bar are fixed with two vertical bars respectively, and the adjusting component for adjusting upper support bar height is provided on vertical bar;Vertical bar includes starting stave, the second riser, third riser, link block, starting stave is arranged in parallel with the second riser, the side of third riser is fixed with starting stave, and the other side is fixed with the second riser, starting stave, the second riser, third riser bottom end be each attached on link block;Adjusting component includes the rack gear being fixed on the second riser, the gear being engaged with rack, for the locking member of limiting gear rotation, and the extending direction of rack gear is consistent with the short transverse of the second riser, and gear is rotatably connected on the end of upper support bar.The utility model can adjust the distance between upper support bar and lower support bar according to the caliber of pipeline.

Description

A kind of comprehensive support for Pipe installing
Technical field
The utility model relates to the technical fields of comprehensive support, more particularly, to a kind of comprehensive branch for Pipe installing Frame.
Background technique
Support of pipelines refers to a kind of structural member for making somebody a mere figurehead roughing-in bearing on the ground, is divided into fixed bracket, sliding branch Frame, guiding trestle, rolling support etc..Support of pipelines can all be used in any place for having pipeline to be laid with, its branch as pipeline Support structure plays a significant role in terms of Pipe installing.
Notification number is that the Chinese patent of CN203963265U discloses a kind of pipeline layout bracket, including upper support bar, lower branch Strut, left support bar and right support bar, upper support bar are fixedly connected with left and right supporting bar top respectively, lower support bar respectively with Position is fixedly connected among left and right support rod;Upper support bar and lower support bar are equipped with tapped through hole, left and right support rod bottom end It is fixedly connected respectively with bracket embedded part, bracket embedded part is equipped with threaded hole;T is fixedly connected between upper support bar and lower support bar Type bracket, upper and lower support rod are equipped with U-shaped card, cover extinguishing pipe, Heater hose, air-conditioning water pipe, cable testing bridge.The pipeline The pipeline layout of comprehensive support is clearly beautiful, reduces suspension and support quantity, and line distribution is reasonable, is convenient for later maintenance.
Prior art among the above have the following deficiencies: upper support bar and lower support bar respectively with left and right support rod Fixed, the distance between upper support bar and lower support bar are fixed, and upper support bar can not be adjusted according to the practical caliber of pipeline under The distance between support rod.
Utility model content
The purpose of the utility model is to provide a kind of comprehensive support for Pipe installing, can according to the caliber of pipeline, The distance between upper support bar and lower support bar are adjusted, has the effect of being applicable in a variety of caliber Pipe installings.
The above-mentioned technical purpose of the utility model has the technical scheme that a kind of for Pipe installing Comprehensive support, including two vertical bars disposed in parallel, the lower support bar being fixed on vertical bar, be arranged in above lower support bar Upper support bar, the both ends of the lower support bar are fixed with two vertical bars respectively, are provided on the vertical bar for adjusting The adjusting component of support rod height;The vertical bar includes starting stave, the second riser, third riser, link block, and described first is perpendicular Plate is arranged in parallel with second riser, and side and the starting stave of the third riser are fixed, the other side and described the Two risers are fixed, the starting stave, the second riser, third riser bottom end be each attached on the link block;The adjusting Component includes the rack gear being fixed on the second riser, the gear being engaged with rack, for the locking member of limiting gear rotation, institute The extending direction for stating rack gear is consistent with the short transverse of second riser, and the gear is rotatably connected on the upper support bar End.
By using above-mentioned technical proposal, before pipe laying, adjusts the spacing between upper and lower support rod and to prop up above and below Spacing between strut is suitble to the caliber of pipeline.In the mobile upper support bar of vertical direction, gear turns along the length direction of rack gear Dynamic, to change the height of upper support bar, after carrier wheel to suitable position, locking member limiting gear is continued to rotate, thus Realize the fixation of upper support bar.
The utility model is further arranged to: the locking member includes the slide bar being slidably connected with starting stave, fixation The fixture block that is engaged with gear in slide bar one end, the limit plate for being fixed on the slide bar other end, the spring being set on slide bar, the cunning Bar is vertically arranged with the starting stave, and the spring one end is fixed with the limit plate, and the other end and the starting stave are solid It is fixed.
By using above-mentioned technical proposal, spring is in confined state always, under the elastic force effect of spring, fixture block card Enter onto gear, gear can not realize the fixation of upper support bar and vertical bar along racks turn.Need to adjust the height of upper support bar When spending, slide bar is pulled to slide to the direction far from rack gear, fixture block is detached from from gear, the height of mobile upper support bar to suitable position When setting, fixture block is again pushed into the card slot of gear, realizes the fixation of upper support bar.
The utility model is further arranged to: the limit plate is fixed with pull ring far from one end of the slide bar.
By using above-mentioned technical proposal, the pull ring of setting facilitates pulling sliding bar.
The utility model is further arranged to: locking member spaced set at least two on the starting stave It is a.
By using above-mentioned technical proposal, multiple locking members are set, are conveniently adjusted between upper support bar and lower support bar Spacing, allow the comprehensive support to be applicable in the caliber of pipelines.
The utility model is further arranged to: the both ends of the upper support bar are respectively fixed with telescopic rod, the telescopic rod One end far from the upper support bar is fixed with the lower support bar.
By using above-mentioned technical proposal, the telescopic rod of setting can reduce load-bearing of the upper and lower support rod to pipeline, stretch Bar can undertake the gravity of section of tubing.Length of telescopic bar changes with the variation of upper and lower support distance between tie rods.
The utility model is further arranged to: being mounted on pipe clamp on the upper support bar and the lower support bar.
By using above-mentioned technical proposal, the pipe clamp of setting facilitates the installation of pipeline, and pipe clamp releasable connection is conveniently adjusted After the distance between upper and lower support rod, then pipe clamp is installed.
The utility model is further arranged to: being fixed with sheet rubber on the inner wall of the pipe clamp.
Have that medium flow field is out-of-date by using above-mentioned technical proposal, in pipeline, medium can generate impact to pipeline, and then to comprehensive It closes bracket and generates certain impact, if things go on like this, comprehensive support is easily-deformable.The sheet rubber of setting has certain elastic deformation, It can reduce the impact that pipe vibration generates comprehensive support with the vibration of buffering pipe, extend the use duration of comprehensive support.
The utility model is further arranged to: one end on the vertical bar far from the upper support bar is provided with mounting base, The mounting base is set on the vertical bar, and the mounting base is connect with the vertical bar by bolt thread.
By using above-mentioned technical proposal, the mounting base of setting facilitates comprehensive support to be mounted in wall top.
In conclusion the advantageous effects of the utility model are as follows:
1. adjusting the distance between upper support bar and lower support bar according to the caliber size of pipeline, expand the suitable of comprehensive support Use range;
2. the sheet rubber being arranged has certain elastic deformation, pipe vibration can be reduced to comprehensive with the vibration of buffering pipe The impact that bracket generates is closed, the use duration of comprehensive support is extended;
3. the telescopic rod being arranged can reduce pipeline to the gravity of support rod, the length of tube that stretches is between upper and lower support rod Away from variation and change.
Detailed description of the invention
Fig. 1 is the overall structure diagram of the utility model;
Fig. 2 is the local explosion structure diagram that the utility model adjusts component;
Fig. 3 is the structural schematic diagram of the locking member of the utility model.
Appended drawing reference: 1, vertical bar;11, starting stave;12, the second riser;13, third riser;14, link block;2, lower branch Strut;3, upper support bar;4, component is adjusted;41, rack gear;42, gear;43, locking member;431, slide bar;432, fixture block;433, Limit plate;4331, pull ring;434, spring;5, telescopic rod;6, pipe clamp;61, sheet rubber;7, mounting base;71, bolt.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
It referring to Fig.1, is a kind of comprehensive support for Pipe installing disclosed by the utility model, including two are arranged in parallel Vertical bar 1, be fixed on vertical bar 1 lower support bar 2, the top of lower support bar 2 is set upper support bar 3, for adjusting upper branch The adjusting component 4 of 3 height of strut.
As shown in Figure 1, it includes starting stave 11, the second riser 12, third riser 13, link block that vertical bar 1, which includes vertical bar 1, 14, starting stave 11 is arranged in parallel with the second riser 12.The side of third riser 13 and starting stave 11 are fixed, the other side and the Two risers 12 are fixed, starting stave 11, the second riser 12, third riser 13 bottom end be each attached on link block 14, lower support The both ends of bar 2 are separately fixed on the side wall of link block 14.
As shown in Fig. 2, adjusting component 4 includes rack gear 41, gear 42, the locking member 43 for fixing gear 42, rack gear 41 are fixed on the second riser 12, and the extending direction of rack gear 41 is consistent with the short transverse of the second riser 12.The rotation of gear 42 connects It connects in the end of upper support bar 3, gear 42 is engaged with rack gear 41, and by mobile upper support bar 3, gear 42 is in 41 length side of rack gear To rotation, to change the height of upper support bar 3, the distance between upper support bar 3 and lower support bar 2 are adjusted.
As shown in Fig. 2, locking member 43 is arranged on starting stave 11, locking member 43 is in the height side of starting stave 11 It is multiple to spaced set.In conjunction with Fig. 3, locking member 43 includes the slide bar 431 being slidably connected with starting stave 11, is fixed on cunning Fixture block 432 that 431 one end of bar is engaged with gear 42, is set on slide bar 431 limit plate 433 for being fixed on 431 other end of slide bar Spring 434.Slide bar 431 is vertically arranged with starting stave 11, and 434 one end of spring and limit plate 433 are fixed, the other end and first Riser 11 is fixed, and limit plate 433 is fixed with pull ring 4331 on the end face far from slide bar 431.Spring 434 is always in by compression shape State, under the elastic force effect of spring 434, fixture block 432 is snapped on gear 42, and gear 42 can not be rotated along rack gear 41, realizes The fixation of upper support bar 3 and vertical bar 1.When needing to adjust the height of upper support bar 3, pull slide bar 431 to the side far from rack gear 41 To sliding, fixture block 432 is detached from from gear 42, and when moving height to the suitable position of upper support bar 3, fixture block 432 is pushed away again Enter to the card slot of gear 42, realizes the fixation of upper support bar 3.
As shown in Figure 1, the both ends of upper support bar 3 are respectively fixed with telescopic rod 5, the one end of telescopic rod 5 far from upper support bar 3 It is fixed with lower support bar 2.The telescopic rod 5 of setting can reduce load-bearing of the upper and lower support rod 2 to pipeline, and telescopic rod 5 can undertake The gravity of section of tubing.5 length of telescopic rod changes with the variation of upper and lower 2 spacing of support rod.
As shown in Figure 1, being mounted on pipe clamp 6 on upper support bar 3 and lower support bar 2, rubber is fixed on the inner wall of pipe clamp 6 Piece 61.There is medium flow field out-of-date in pipeline, medium can generate impact to pipeline, and then generate certain impact to comprehensive support, long This is previous, and comprehensive support is easily-deformable.The sheet rubber 61 of setting has certain elastic deformation, can be subtracted with the vibration of buffering pipe Small pipeline shakes the impact generated to comprehensive support, extends the use duration of comprehensive support.
As shown in Figure 1, connector is provided with mounting base 7 far from one end of upper support bar 3, mounting base 7 is set in connector On, mounting base 7 is threadedly coupled with connector by bolt 71.The mounting base 7 of setting facilitates comprehensive support to be mounted in wall top.
The implementation principle of the present embodiment are as follows: before pipe laying, adjust the spacing between upper and lower support rod 2 and to prop up above and below Spacing between strut 2 is suitble to the caliber of pipeline.In the mobile upper support bar 3 of vertical direction, gear 42 along rack gear 41 length Direction rotation, to change the height of upper support bar 3.Spring 434 is in confined state always, makees in the elastic force of spring 434 Under, fixture block 432 is snapped on gear 42, and gear 42 can not be rotated along rack gear 41, and realization upper support bar 3 is consolidated with vertical bar 1 It is fixed.When needing to adjust the height of upper support bar 3, slide bar 431 is pulled to slide to the direction far from rack gear 41, fixture block 432 is from gear It is detached from 42, when moving height to the suitable position of upper support bar 3, fixture block 432 is again pushed into the card slot of gear 42, it is real The fixation of existing upper support bar 3.The comprehensive support for Pipe installing of the utility model can be adjusted according to the caliber of pipeline The distance between upper support bar 3 and lower support bar 2 have the effect of being applicable in a variety of caliber Pipe installings.
The embodiment of present embodiment is the preferred embodiment of the utility model, and not limitation is originally practical new according to this The protection scope of type, therefore: the equivalence changes that all structures, shape, principle according to the utility model are done should all be covered by practical Within novel protection scope.

Claims (8)

1. a kind of comprehensive support for Pipe installing, including two vertical bars (1) disposed in parallel, it is fixed on vertical bar (1) Lower support bar (2) is arranged upper support bar (3) above lower support bar (2), and the both ends of the lower support bar (2) are respectively with two Vertical bar described in root (1) is fixed, and the adjusting component (4) for adjusting upper support bar (3) height is provided on the vertical bar (1), Be characterized in that: the vertical bar (1) includes starting stave (11), the second riser (12), third riser (13), link block (14), institute It states starting stave (11) to be arranged in parallel with second riser (12), the side of the third riser (13) and the starting stave (11) fixed, the other side and second riser (12) are fixed, the starting stave (11), the second riser (12), third riser (13) bottom end is each attached on the link block (14);The adjusting component (4) includes being fixed on the second riser (12) Rack gear (41) and rack gear (41) meshed gears (42), the locking member (43) for being used for limiting gear (42) rotation, the rack gear (41) extending direction is consistent with the short transverse of second riser (12), and the gear (42) is rotatably connected on the upper branch The end of strut (3).
2. the comprehensive support according to claim 1 for Pipe installing, it is characterised in that: locking member (43) packet It includes the slide bar (431) being slidably connected with starting stave (11), be fixed on the fixture block engaged with gear (42) slide bar (431) one end (432), the limit plate (433) for being fixed on slide bar (431) other end, the spring (434) being set on slide bar (431), the cunning Bar (431) is vertically arranged with the starting stave (11), and described spring (434) one end and the limit plate (433) are fixed, another End is fixed with the starting stave (11).
3. the comprehensive support according to claim 2 for Pipe installing, it is characterised in that: the limit plate (433) is remote One end from the slide bar (431) is fixed with pull ring (4331).
4. the comprehensive support according to claim 1 for Pipe installing, it is characterised in that: the locking member (43) exists Spaced set at least two on the starting stave (11).
5. the comprehensive support according to claim 1 for Pipe installing, it is characterised in that: the upper support bar (3) Both ends are respectively fixed with telescopic rod (5), the telescopic rod (5) one end and the lower support bar far from the upper support bar (3) (2) fixed.
6. the comprehensive support according to claim 1 for Pipe installing, it is characterised in that: the upper support bar (3) with Pipe clamp (6) are mounted on the lower support bar (2).
7. the comprehensive support according to claim 6 for Pipe installing, it is characterised in that: the inner wall of the pipe clamp (6) On be fixed with sheet rubber (61).
8. the comprehensive support according to claim 1 for Pipe installing, it is characterised in that: separate on the vertical bar (1) One end of the upper support bar (3) is provided with mounting base (7), and the mounting base (7) is set on the vertical bar (1), the peace Dress seat (7) is threadedly coupled with the vertical bar (1) by bolt (71).
CN201822197750.9U 2018-12-25 2018-12-25 A kind of comprehensive support for Pipe installing Active CN209398949U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822197750.9U CN209398949U (en) 2018-12-25 2018-12-25 A kind of comprehensive support for Pipe installing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822197750.9U CN209398949U (en) 2018-12-25 2018-12-25 A kind of comprehensive support for Pipe installing

Publications (1)

Publication Number Publication Date
CN209398949U true CN209398949U (en) 2019-09-17

Family

ID=67896275

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822197750.9U Active CN209398949U (en) 2018-12-25 2018-12-25 A kind of comprehensive support for Pipe installing

Country Status (1)

Country Link
CN (1) CN209398949U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111059354A (en) * 2019-12-31 2020-04-24 杨国丽 Connecting equipment for assembly type building pipeline
CN111503377A (en) * 2020-04-14 2020-08-07 江苏奇佩建筑装配科技有限公司 Assembled gallows
CN112413237A (en) * 2020-11-10 2021-02-26 艾肯(江苏)工业技术有限公司 Pipe fitting connecting flange
CN114636020A (en) * 2022-03-17 2022-06-17 陕西建工第九建设集团有限公司 Heavy detachable support of electromechanical pipeline synthesis
CN115111458A (en) * 2022-05-20 2022-09-27 河北冶金建设集团有限公司 Pipeline sealing device with adjustable pipe diameter and used for pipeline hydrostatic test

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111059354A (en) * 2019-12-31 2020-04-24 杨国丽 Connecting equipment for assembly type building pipeline
CN111059354B (en) * 2019-12-31 2021-12-10 嘉兴新博信息科技有限公司 Connecting equipment for assembly type building pipeline
CN111503377A (en) * 2020-04-14 2020-08-07 江苏奇佩建筑装配科技有限公司 Assembled gallows
CN112413237A (en) * 2020-11-10 2021-02-26 艾肯(江苏)工业技术有限公司 Pipe fitting connecting flange
CN112413237B (en) * 2020-11-10 2022-03-22 艾肯(江苏)工业技术有限公司 Pipe fitting connecting flange
CN114636020A (en) * 2022-03-17 2022-06-17 陕西建工第九建设集团有限公司 Heavy detachable support of electromechanical pipeline synthesis
CN114636020B (en) * 2022-03-17 2023-09-05 陕西建工第九建设集团有限公司 Heavy detachable support is synthesized to electromechanical pipeline
CN115111458A (en) * 2022-05-20 2022-09-27 河北冶金建设集团有限公司 Pipeline sealing device with adjustable pipe diameter and used for pipeline hydrostatic test

Similar Documents

Publication Publication Date Title
CN209398949U (en) A kind of comprehensive support for Pipe installing
CN208329288U (en) A kind of building curtain wall support construction
CN206561403U (en) A kind of adjustable civil engineering pipe fitting rack
CN205976416U (en) Girder steel hanging flower basket device
CN209688251U (en) A kind of vertically and horizontally adjustable conduit saddle
CN208565819U (en) A kind of adjustable suspension and support
CN204163398U (en) A kind of horizontal climbing form system device
CN205296456U (en) Tuned mass damper
CN209398948U (en) A kind of comprehensive support for pipe installation
CN204717144U (en) A kind of concrete pump pipe setting tool cribbing
CN207092308U (en) Stone curtain-wall hanging part device
CN207453462U (en) Hang mould support device in cigarette air passage
CN206072548U (en) Efficient spring support hanging frame
CN204006613U (en) A kind of collector lifting fixed support
CN112762238A (en) Stable pipe gallery support and hanger
CN209760456U (en) Height-adjustable net rack support
CN207401032U (en) A kind of novel safety belt fixing device
CN207092307U (en) Stone curtain wall fixed structure
CN207098452U (en) A kind of portable cable support
CN213481946U (en) Light gauge steel detection device for building
CN208934466U (en) A kind of tool-type riding track
CN208415113U (en) A kind of bridge avris surface construction hanger
CN201493664U (en) Adjustable steel wire suspension bracket
CN207814655U (en) A kind of high efficient protected combined type suspension and support
CN209429501U (en) A kind of hanging basket fixed bracket assembly

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant