CN105089186B - A kind of full glass curtain wall supporting construction and full glass curtain wall installation method - Google Patents
A kind of full glass curtain wall supporting construction and full glass curtain wall installation method Download PDFInfo
- Publication number
- CN105089186B CN105089186B CN201510490964.3A CN201510490964A CN105089186B CN 105089186 B CN105089186 B CN 105089186B CN 201510490964 A CN201510490964 A CN 201510490964A CN 105089186 B CN105089186 B CN 105089186B
- Authority
- CN
- China
- Prior art keywords
- glass
- hole
- connector
- curtain wall
- rib
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Load-Bearing And Curtain Walls (AREA)
Abstract
The present invention relates to a kind of full glass curtain wall supporting construction, by the position for adjusting fixture vertical direction of long lumbar hole or strip hole in packing ring, so as to the height of adjusting connector, the fixed position between connector and Glass Rib is allowd to make certain regulation according to the fixed position of glass panel and connector, the problem of overcoming the fixed position of connector and Glass Rib and being mismatched with the height of the fixed position of glass panel because of mismachining tolerance, Glass Rib or glass panel fragmentation are prevented, ensures Glass Rib and glass panel safety.In addition; because fixture is located in long lumbar hole or strip hole; thus; after the effect of glass curtain wall wind-engaging power produces micro-strain; fixture still will not be contacted with the top and bottom inwall of packing ring, thus the gravity of glass panel would not be delivered on Glass Rib along fixture, and the gravity of glass panel is all born by pull bar or drag-line all the time; thus also it is prevented that Glass Rib fragmentation, the safety of protective glass rib.
Description
Technical field
The present invention relates to a kind of full glass curtain wall supporting construction and full glass curtain wall installation method, belongs to curtain wall fixed installation
Technical field.
Background technology
In some heavy constructions, can usually use full glass curtain wall, full glass curtain wall include curtain wall panel, connector and
Glass Rib, the junction between two pieces of glass panels are provided with the Glass Rib vertical with glass panel, make glass by connector
Panel is fixed on Glass Rib, resists the blast that glass panel is born.
As Chinese patent literature CN202658775U discloses a kind of supporting construction of full glass curtain wall, the main body in house
Drag-line (drag-line is usually located between roof and room bottom) is vertically installed with structure, connector is set on drag-line to be fixedly connected
Glass Rib and glass panel, in theory, the gravity of glass panel are delivered on drag-line by connector, and glass is born by drag-line
The weight of panel, the blast of glass panel are delivered on Glass Rib by connector, and the wind of glass panel is born by Glass Rib
Pressure.
But the position of connector and Glass Rib is unadjustable in the document, this results in consolidating when connector and Glass Rib
When the height that the fixed position with connector and glass panel is put in positioning mismatches because of mismachining tolerance, because glass is fragility material
Material, if connecting Glass Rib and glass panel by force, will be produced in the junction of Glass Rib or glass panel and connector should
Power acts on, and Glass Rib or glass panel easily produce fragmentation under stress.The high glass curtain wall system especially for weight
System, easily superposition forms larger error to small error, and this shortcoming is with regard to more obvious.Even if in addition, connector and Glass Rib
Fixed position and the height of the fixed position of connector and glass panel there is no error, in the use process of full glass curtain wall
In, if glass panel own wt is larger or is deformed by blast, drag-line or pull bar have the trend being stretched, glass surface
The part gravity of plate can be also delivered on Glass Rib along connector, and Glass Rib also can be fragile by glass panel Action of Gravity Field
Split.
The content of the invention
Therefore, the technical problem to be solved in the present invention is to overcome stress when Glass Rib is easily installed in the prior art
Or glass panel Action of Gravity Field and the problem of fragmentation, a kind of can ensure the complete of Glass Rib and glass panel safety so as to provide
Glass curtain wall supporting construction.
In addition, the present invention also provides a kind of full glass curtain wall installation side that can ensure Glass Rib and glass panel safety
Method.
In order to solve the above technical problems, a kind of full glass curtain wall supporting construction of the present invention, including, vertically set
Pull bar or drag-line, be provided with connector on the pull bar or drag-line, one end of the connector is connected with glass panel, described
Storage tank is set on the other end of connector, some described storage tank of insertion of the Glass Rib is connected with the connector,
Through hole is provided with the part that the Glass Rib is located in holding tank, mounting hole is set on the cell wall of the holding tank, it is described logical
Packing ring is set in hole, and the packing ring has the long lumbar hole or bar hole arranged vertically, and fixture passes through installation from connector side
The mounting hole of long lumbar hole or bar hole and connector opposite side in hole, packing ring fixes the connector and Glass Rib, institute
State that fixture is located at the centre position of long lumbar hole or bar hole and the top and bottom inwall of long lumbar hole or bar hole is respectively provided with one
Fixed gap.
The full glass curtain wall supporting construction of the present invention, filling in the space between the packing ring and the through hole of the Glass Rib
There is glass cement.
The full glass curtain wall supporting construction of the present invention, the packing ring are made up of 6063 aluminium alloys.
The full glass curtain wall supporting construction of the present invention, the long lumbar hole or bar hole are fixture in the length of vertical direction
1.5-3 times of cross-sectional diameter.
The ratio in the full glass curtain wall supporting construction of the present invention, the external diameter of the packing ring and the aperture of through hole is 1: 0.8-1:
Between 0.95.
The full glass curtain wall supporting construction of the present invention, the fixture is bolt connection piece.
The present invention also provides a kind of installation method of the full glass curtain wall with above-mentioned full glass curtain wall supporting construction, wraps
Include following steps:
Vertically positioned installation Glass Rib and pull bar or drag-line;
Packing ring is inserted in the through hole of Glass Rib;
Connector is set on pull bar or drag-line, and make fixture from connector side through mounting hole, packing ring in
The mounting hole of long lumbar hole or bar hole and connector opposite side fixes the connector with Glass Rib, and fixture is arranged on
The centre position of long lumbar hole or bar hole and the top and bottom inwall of long lumbar hole or bar hole are respectively provided with certain interval;
After the installation for completing whole connectors, glass panel is fixed on connector successively from bottom to up along short transverse
On.
Full glass curtain wall installation method of the present invention, after packing ring is inserted in the through hole of Glass Rib, also including the use of glass
Glass glue is by the space between the packing ring and the Glass Rib through hole the step of filling glass glue, then installs.
The above-mentioned technical proposal of the present invention has advantages below compared with prior art:
(1) full glass curtain wall supporting construction of the invention, fixture make connector be fixedly connected with Glass Rib, pass through regulation
The fixture upper-lower position of long lumbar hole or strip hole (position of vertical direction) in packing ring, to adjust the height of fixture
Degree, so as to the height of adjusting connector so that the fixed position between connector and Glass Rib can be according to glass panel and company
Certain regulation is made in the fixed position of fitting, the fixed position between connector and Glass Rib and glass panel and connector
Fixed position is adapted, overcome connector and Glass Rib fixed position and with the height of the fixed position of glass panel because plus
Work error and the problem of mismatch, prevent Glass Rib or glass panel fragmentation, ensure Glass Rib and glass panel safety.In addition,
Because fixture is located in long lumbar hole or strip hole, thus, after the effect of glass curtain wall wind-engaging power produces micro-strain, drag-line or drawing
Bar is stretched or compressed, and fixture makes certain vertical displacement in long lumbar hole or strip hole, and fixture still will not be with
The top and bottom inwall contact of packing ring, thus the gravity of glass panel would not be delivered on Glass Rib along fixture, glass
The gravity of panel is all born by pull bar or drag-line all the time, thus also it is prevented that Glass Rib fragmentation, the safety of protective glass rib.
Allow the full glass curtain wall supporting construction of the present invention the higher full glass curtain wall of Glass Rib bearing height (can be highly reached
10 to 30 meters), pull bar or drag-line bear the gravity of glass panel, Glass Rib be solely subjected to glass panel transmission because blast produces
Horizontal loading.
(2) full glass curtain wall supporting construction of the invention, will be filled out in the space between the through hole of packing ring and the Glass Rib
It filled with glass cement, can prevent packing ring from being moved in the through hole of the Glass Rib, prevent packing ring from hitting the through hole of Glass Rib and causing
Glass Rib ruptures, and further improves the security of Glass Rib.
(3) full glass curtain wall supporting construction of the invention, the packing ring are made up of 6063 aluminium alloys.6063 aluminium alloys it is hard
Spend moderate, on the one hand make fixture fixing-stable, on the other hand the hardness of 6063 aluminium alloys is also prevented from packing ring in special feelings
The through hole hole wall of Glass Rib is hit under condition and causes Glass Rib fragmentation.
(4) full glass curtain wall supporting construction of the invention, it is straight to be arranged to fixture cross section by the length L of the long lumbar hole
1.5-3 times of footpath so that the adjustable range of position of the fixture in long lumbar hole is 1.5-3 times of its cross-sectional diameter, very well
Ground has adapted to the height error of the position of opening of Glass Rib connecting hole, and on the other hand will not also cause admittedly because of long lumbar hole is long
The connection for determining part and Glass Rib is unstable.
(5) full glass curtain wall installation method of the invention, has above-mentioned full glass curtain wall supporting construction, has above-mentioned
Advantage.
Brief description of the drawings
In order that present disclosure is more likely to be clearly understood, specific embodiment and combination below according to the present invention
Accompanying drawing, the present invention is further detailed explanation, wherein
Fig. 1 is the cross-sectional structural representation of the full glass curtain wall supporting construction of the embodiment of the present invention;
Fig. 2 is the vertical profile structural representation of the full glass curtain wall supporting construction of the embodiment of the present invention;
Fig. 3 is the connection relationship diagram of the Glass Rib of the embodiment of the present invention, packing ring and fixture.
Reference is expressed as in figure:1- packing rings;2- Glass Ribs;21- holding tanks;22- connecting holes;3- connectors;4- consolidates
Determine part;5- glass cement solidification layers;6- glass panels;7- pull bars;The aperture of R1- through holes;The external diameter of R2- packing rings;L- long lumbar holes
Length.
Embodiment
Technical scheme is described in detail below in conjunction with the accompanying drawings.
Embodiment 1
The present embodiment provides a kind of full glass curtain wall supporting construction, as Figure 1-3,
Including, the pull bar 7 vertically set, connector 3, one end of the connector 3 are provided with the pull bar 7
It is connected with glass panel 6, the other end of the connector 3 is fixed by fixture 4 and Glass Rib 2.
As shown in figure 1, the connecting hole 22 for passing through or fixing for pull bar 7, the pull bar are additionally provided with the connector 3
7 are connected through connecting hole 22 with connector 3.
As shown in figure 1, the receiving for accommodating portion Glass Rib 2 is also formed with along vertical direction on the connector 3
Groove 21, the part that the Glass Rib 2 is located at holding tank 21 have through hole, mounting hole are offered on the cell wall of the holding tank 21,
It is provided with packing ring 1 in the through hole, the packing ring 1 has a long lumbar hole being arranged in a vertical direction, and the fixture 4 is from connector
3 side passes through the installation of mounting hole, the long lumbar hole in packing ring 1, the through hole on the Glass Rib 2, the opposite side of the connector 3
Hole fixes the connector 3 with Glass Rib 2.
The fixture 4 is located at the centre position of long lumbar hole and the top and bottom inwall of long lumbar hole be respectively provided with it is certain between
Gap so that position of the fixture 4 in long lumbar hole can be adjusted.
Fixture 4 makes connector 3 be fixedly connected with Glass Rib 2, as shown in figure 3, by adjusting the fixture 4 in packing ring
The upper-lower position (position of vertical direction) of long lumbar hole in 1, to adjust the height of fixture 4, so as to adjusting connector 3
Highly so that the fixed position between connector 3 and Glass Rib 2 can be done according to the fixed position of glass panel 6 and connector 3
Go out certain regulation, the fixed position between connector 3 and Glass Rib 2 and the fixed position of glass panel 6 and connector 3 are mutually fitted
Should, overcome connector 3 and Glass Rib 2 fixed position and with the height of the fixed position of glass panel 6 because of mismachining tolerance and
Unmatched problem, Glass Rib 2 or the fragmentation of glass panel 6 are prevented, ensure Glass Rib and glass panel safety.It is further, since solid
Determine part 4 to be located in long lumbar hole, thus, the effect of glass curtain wall wind-engaging power produces (the setting angle hair of glass panel after micro-strain
Raw certain change), drag-line or pull bar are stretched or compressed, and fixture is made certain vertical in long lumbar hole or strip hole
Displacement, fixture 4 still will not contact with the top and bottom inwall of packing ring 1, thus the gravity of glass panel would not be along admittedly
To determine part 4 to be delivered on Glass Rib 2, the gravity of glass panel is all born by pull bar 7 all the time, thus also it is prevented that Glass Rib 2
Fragmentation, the safety of protective glass rib 2.Allow the full glass curtain wall supporting construction of the present embodiment make Glass Rib bearing height higher
Full glass curtain wall (can highly reach 10 to 30 meters), pull bar 7 bears the gravity of glass panel, and Glass Rib 2 is solely subjected to glass
Panel transmission because of horizontal loading caused by blast.
As deformation, the long lumbar hole in packing ring 1 in the present embodiment can also be strip hole.
Further, glass cement is filled with the space between the through hole of packing ring 1 and the Glass Rib 2.Glass is filled
Glass cement solidification layer 5 is formed after glue.
Glass cement will be filled with space between the through hole of packing ring 1 and the Glass Rib 2, packing ring 1 can be prevented described
Moved in the through hole of Glass Rib 2, make to form cushion between the through-hole wall of packing ring 1 and Glass Rib 2, prevent packing ring 1 from directly hitting
Hit the through hole of Glass Rib 2 and cause Glass Rib 2 to rupture, further improve the security of Glass Rib 2.
Preferably, the packing ring 1 is made up of 6063 aluminium alloys.
The hardness of 6063 aluminium alloys is moderate, on the one hand makes the hardness of the fixing-stable of fixture 4, on the other hand 6063 aluminium alloys
Packing ring 1 is also prevented to hit the through hole hole wall of Glass Rib 2 under special circumstances and cause the fragmentation of Glass Rib 2.
It is highly preferred that the long lumbar hole is in the length L of vertical direction is 1.5-3 times of the cross-sectional diameter of fixture 4
Arbitrary value, such as 1.5 times, 2 times, 3 times.The length L of the long lumbar hole is arranged to 1.5-3 times of the cross-sectional diameter of fixture 4,
So that the adjustable range of position of the fixture 4 in long lumbar hole is 1.5-3 times of its cross-sectional diameter, glass has been well adapted for
The height error of the position of opening of the connecting hole 22 of rib 2, on the other hand also will not because long lumbar hole is long and cause fixture 4 with
The connection of Glass Rib 2 is unstable.
Further, the aperture R1 of the external diameter R2 of the packing ring and through hole ratio is 1:0.8-1:It is any between 0.95
Value, such as 1:0.8、1:0.85、1:0.9、1:0.95.
The fixture 4 is preferably bolt connection piece, can also be screw etc. as deformation.Bolt connection piece fix tightly
Gu convenient dismounting.
Embodiment 2
The present embodiment provides a kind of full glass curtain wall installation side of the full glass curtain wall supporting construction with described in embodiment 1
Method, comprise the following steps:
Vertically positioned installation Glass Rib 2 and pull bar 7;
Packing ring 1 is inserted in the through hole of Glass Rib 2, using glass cement by between the packing ring 1 and the through hole of the Glass Rib 2
Space in filling glass glue;
Connector 3 is set on pull bar 7, and makes length of the fixture 4 from the side of connector 3 through mounting hole, in packing ring 1
The mounting hole of waist hole or the opposite side of bar hole and connector 3 fixes the connector 3 with Glass Rib 2, and fixture 4 is set
Top and bottom inwall in the centre position of long lumbar hole or bar hole and long lumbar hole or bar hole is respectively provided with certain interval;
After the installation for completing whole connectors 3, glass panel 6 is fixed on connection successively from bottom to up along short transverse
On part 3.
The full glass curtain wall installation method of the present embodiment, there is the full glass curtain wall supporting construction described in embodiment 1, have
The advantages of described in embodiment 1.
It is pointed out that the pull bar 7 in Examples 1 and 2 can also be substituted with drag-line.
Obviously, above-described embodiment is only intended to clearly illustrate example, and is not the restriction to embodiment.It is right
For those of ordinary skill in the art, can also make on the basis of the above description it is other it is various forms of change or
Change.There is no necessity and possibility to exhaust all the enbodiments.And the obvious change thus extended out or
Among changing still in the protection domain of the invention.
Claims (8)
1. a kind of full glass curtain wall supporting construction, it is characterised in that including the pull bar or drag-line vertically set is described
Connector (3) is provided with pull bar or drag-line, one end of the connector (3) is connected with glass panel (6), the connector
(3) storage tank (21), some described storage tank (21) of insertion of the Glass Rib (2) and the connection are set on the other end
Part (3) is connected, and through hole, the groove of the holding tank (21) are provided with the part that the Glass Rib (2) is located in holding tank (21)
Mounting hole is set on wall, packing ring (1) is set in the through hole, the packing ring (1) has the long lumbar hole or bar hole arranged vertically,
Long lumbar hole or bar hole and connector (3) of the fixture (4) from connector (3) side through mounting hole, in packing ring (1) are another
The mounting hole of side is fixed by the connector (3) and Glass Rib (2), and the fixture (4) is located in long lumbar hole or bar hole
Between the top and bottom inwall of position and long lumbar hole or bar hole be respectively provided with certain interval.
2. full glass curtain wall supporting construction according to claim 1, it is characterised in that the packing ring (1) and the glass
Glass cement is filled with space between the through hole of rib (2).
3. full glass curtain wall supporting construction according to claim 1, it is characterised in that the packing ring (1) is closed by 6063 aluminium
Gold is made.
4. according to the full glass curtain wall supporting construction described in claim any one of 1-3, it is characterised in that the long lumbar hole or bar
Shape hole is in 1.5-3 times that the length (L) of vertical direction is fixture (4) cross-sectional diameter.
5. according to the full glass curtain wall supporting construction described in claim any one of 1-3, it is characterised in that the external diameter of the packing ring
(R2) ratio with the aperture (R1) of through hole is 1:0.8-1:Between 0.95.
6. according to the full glass curtain wall supporting construction described in claim any one of 1-3, it is characterised in that the fixture (4)
For bolt connection piece.
A kind of 7. installation side of the full glass curtain wall of the full glass curtain wall supporting construction with as described in claim any one of 1-6
Method, it is characterised in that comprise the following steps:
Vertically positioned installation Glass Rib (2) and pull bar or drag-line;
Packing ring (1) is inserted in the through hole of Glass Rib (2);
Connector (3) is set onto pull bar or drag-line, and fixture (4) is passed through mounting hole, packing ring from connector (3) side
(1) mounting hole of long lumbar hole or bar hole and connector (3) opposite side in is solid by the connector (3) and Glass Rib (2)
It is fixed, fixture (4) is arranged on to centre position and long lumbar hole or the top and bottom inwall of bar hole of long lumbar hole or bar hole
It is respectively provided with certain interval;
After the installation for completing whole connectors (3), glass panel (6) is fixed on connection successively from bottom to up along short transverse
On part (3).
8. full glass curtain wall installation method according to claim 7, it is characterised in that packing ring (1) is being inserted into Glass Rib (2)
Through hole in after, also including the use of glass cement will in the space between the packing ring (1) and the Glass Rib (2) through hole filling
The step of glass cement.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510490964.3A CN105089186B (en) | 2015-08-12 | 2015-08-12 | A kind of full glass curtain wall supporting construction and full glass curtain wall installation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510490964.3A CN105089186B (en) | 2015-08-12 | 2015-08-12 | A kind of full glass curtain wall supporting construction and full glass curtain wall installation method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105089186A CN105089186A (en) | 2015-11-25 |
CN105089186B true CN105089186B (en) | 2017-11-24 |
Family
ID=54570441
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510490964.3A Active CN105089186B (en) | 2015-08-12 | 2015-08-12 | A kind of full glass curtain wall supporting construction and full glass curtain wall installation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105089186B (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106988456A (en) * | 2017-03-23 | 2017-07-28 | 合肥协耀玻璃制品有限公司 | A kind of full glass curtain wall |
CN107905536A (en) * | 2017-12-22 | 2018-04-13 | 中电建建筑集团有限公司 | Glass curtain wall construction method |
CN110344524B (en) * | 2019-07-23 | 2020-12-08 | 宁波建工建乐工程有限公司 | Closed full-glass curtain wall construction process and glass panel installation device |
CN113107121B (en) * | 2021-04-14 | 2022-08-30 | 南通居者安建筑科学研究院有限公司 | Glass curtain wall rib splicing structure and construction method thereof |
CN113899625B (en) * | 2021-09-13 | 2024-05-31 | 苏州市鑫泰建筑装璜有限公司 | Method and device for testing glass ribs of all-glass curtain wall |
CN115162580B (en) * | 2022-06-29 | 2023-10-10 | 重庆市设计院有限公司 | Embedded wood structure glass curtain wall |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN205000504U (en) * | 2015-08-12 | 2016-01-27 | 苏州柯利达光电幕墙有限公司 | Full glass curtain wall bearing structure |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2732142B2 (en) * | 1990-06-21 | 1998-03-25 | 小野田エー・エル・シー株式会社 | Lightweight cellular concrete member, method of manufacturing and mounting method |
CN102733520B (en) * | 2012-06-12 | 2014-04-02 | 浙江亚厦幕墙有限公司 | Rubber-sandwiched glass rib for full glass curtain wall |
CN202658775U (en) * | 2012-07-12 | 2013-01-09 | 浙江亚厦幕墙有限公司 | Supporting device of full-glass curtain wall |
CN202755506U (en) * | 2012-08-16 | 2013-02-27 | 苏州柯利达光电幕墙有限公司 | Longitudinal division full-glass curtain wall supporting structure for buildings |
CN103184777B (en) * | 2012-09-29 | 2016-03-30 | 江河创建集团股份有限公司 | A kind of Glass Rib curtain wall system |
CN103806581B (en) * | 2014-02-19 | 2016-07-06 | 苏州柯利达装饰股份有限公司 | Modular outer Glass Rib of choosing mounts system |
-
2015
- 2015-08-12 CN CN201510490964.3A patent/CN105089186B/en active Active
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN205000504U (en) * | 2015-08-12 | 2016-01-27 | 苏州柯利达光电幕墙有限公司 | Full glass curtain wall bearing structure |
Also Published As
Publication number | Publication date |
---|---|
CN105089186A (en) | 2015-11-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105089186B (en) | A kind of full glass curtain wall supporting construction and full glass curtain wall installation method | |
CN103243813A (en) | Fastening system | |
CN205000504U (en) | Full glass curtain wall bearing structure | |
CN206267385U (en) | One kind is without crossbeam glass curtain wall system | |
CN103233535B (en) | Mounting fixture for point-supported double-layer glass curtain wall | |
CN103287525B (en) | Bicycle saddle anti-theft mechanism | |
IT201600068660A1 (en) | Front carrier for a motorcycle with a load-bearing body | |
CN212926602U (en) | Building curtain wall structure convenient to installation and dismantlement | |
CN204442432U (en) | Mobile phone protecting case | |
CN203891663U (en) | Installation positioning rack | |
CN208870244U (en) | A kind of glass curtain wall bracing structure | |
CN202530608U (en) | Connecting structure at top of glass curtain wall in hole | |
CN205840070U (en) | A kind of mounting structure of top glass curtain wall | |
CN205390891U (en) | Frame bed structure of simple and easy dismouting | |
CN102888920B (en) | Anti-slip stand column component for inversion type glass curtain wall | |
CN205638181U (en) | Burglary -resisting window convenient to installation and dismantlement | |
CN204185984U (en) | One is exempted from weldering all steel and is cut off curtain wall | |
CN103343586B (en) | Wedge of glass auxiliary frame pressing plate | |
CN103334520A (en) | Three-dimensional adjustable connecting piece device | |
CN103343585A (en) | Built-in auxiliary frame installation system of hollow glass | |
CN204337585U (en) | The mounting structure of the non-reservoir pressure fire extinguisher of a kind of suspension type | |
CN204342323U (en) | A kind of novel tower crane attached wall internal overarm support | |
CN102888915B (en) | A kind of outer cover plate of inversion type curtain wall | |
CN103866980B (en) | The wooden bulkhead construction method of body of wall steel form | |
CN214272577U (en) | Crossbeam anti-torsion limiting block system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |