CN204342323U - A kind of novel tower crane attached wall internal overarm support - Google Patents
A kind of novel tower crane attached wall internal overarm support Download PDFInfo
- Publication number
- CN204342323U CN204342323U CN201420742223.0U CN201420742223U CN204342323U CN 204342323 U CN204342323 U CN 204342323U CN 201420742223 U CN201420742223 U CN 201420742223U CN 204342323 U CN204342323 U CN 204342323U
- Authority
- CN
- China
- Prior art keywords
- cross
- wall
- tower crane
- attached
- threaded sleeve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000010276 construction Methods 0.000 abstract description 2
- 238000012423 maintenance Methods 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Landscapes
- Jib Cranes (AREA)
Abstract
本案公开了一种新型的塔式起重机附墙内撑杆,所述附墙内撑杆整体呈十字形,该十字形的附墙内撑杆由两根呈十字形交叉分布的半梁部件构成,两根半梁部件之间通过销轴固定连接,半梁部件的一端设有螺纹套管,螺纹套管与半梁部件之间设有调节螺栓,螺纹套管的另一端形成直角状顶紧端,半梁部件的另一端设亦形成直角状顶紧端。其采用分体式装配结构,利用两根单体半梁部件装配成十字形的附墙内撑杆,并利用螺纹套管机构实现与塔机标准节主枝的连结。整套内撑杆的结构设计合理,具有很好的实用性,通用性强,日常使用和维护成本低廉,部件紧固效果稳定,施工的安全系数高,产品的装配结构设计合理,拆卸和装配较为简便,易于推广应用。
This case discloses a new type of wall-attached strut for a tower crane. The entire wall-attached strut is in the shape of a cross, and the cross-shaped wall-attached strut is composed of two cross-shaped half-beam components , the two half-beam parts are fixedly connected by pin shafts, one end of the half-beam part is provided with a threaded sleeve, and an adjusting bolt is provided between the threaded sleeve and the half-beam part, and the other end of the threaded sleeve forms a right-angled top tight end, and the other end of the half-beam component also forms a right-angled top tight end. It adopts a split assembly structure, using two single half-beam parts to assemble a cross-shaped wall-attached inner strut, and uses a threaded casing mechanism to realize the connection with the main branch of the tower crane standard section. The structural design of the whole set of inner struts is reasonable, with good practicability, strong versatility, low daily use and maintenance costs, stable fastening effect of parts, high safety factor of construction, reasonable assembly structure design of products, and relatively easy disassembly and assembly. Simple and easy to promote and apply.
Description
技术领域 technical field
本实用新型涉及塔式起重机塔身配件的技术领域,具体地说是一种新型的塔式起重机附墙内撑杆,特别涉及其内撑杆的机械连接结构。 The utility model relates to the technical field of tower crane accessories, in particular to a novel tower crane attached to a wall inner strut, in particular to the mechanical connection structure of the inner strut.
背景技术 Background technique
安装塔式起重机附墙时,为保证塔机标准节局部受力的稳定性需要安装附墙框内撑杆,现有内撑杆为标准定制尺寸,使用的灵活性差,装配、拆卸、运输工序均十分不便。 When installing the wall attached to the tower crane, in order to ensure the stability of the local stress on the standard section of the tower crane, it is necessary to install the inner struts of the attached wall frame. The existing inner struts are standard custom-made sizes, and the flexibility of use is poor. Both are very inconvenient.
实用新型内容 Utility model content
本实用新型的目的在于提供一种新型的塔式起重机附墙内撑杆,其采用单体半梁部件装配结构,配合可调节长度的螺纹套管,最终实现内撑杆与塔机标准节主枝的连结。 The purpose of this utility model is to provide a new type of tower crane attached to the wall inner strut, which adopts the assembly structure of a single half-beam part, cooperates with an adjustable length threaded sleeve, and finally realizes that the inner strut and the tower crane standard section are mainly connected. connection of branches.
为了实现上述目的,本实用新型的技术方案是:一种新型的塔式起重机附墙内撑杆,其特征在于:所述附墙内撑杆整体呈十字形,该十字形的附墙内撑杆由两根呈十字形交叉分布的半梁部件构成,两根半梁部件之间通过销轴固定连接,半梁部件的一端设有螺纹套管,螺纹套管与半梁部件之间设有调节螺栓,螺纹套管的另一端形成直角状顶紧端,半梁部件的另一端设亦形成直角状顶紧端。 In order to achieve the above object, the technical solution of the utility model is: a new type of wall-attached inner brace for a tower crane, which is characterized in that: the overall attached wall inner brace is in the shape of a cross, and the cross-shaped wall-attached inner brace The rod is composed of two half-beam parts distributed in a cross shape, and the two half-beam parts are fixedly connected by pin shafts. One end of the half-beam part is provided with a threaded sleeve, and there is a threaded sleeve between the half-beam parts. Adjusting the bolt, the other end of the threaded casing forms a right-angled tight end, and the other end of the half-beam component also forms a right-angled tight end.
本案公开了一种新型的塔式起重机附墙内撑杆,其采用分体式装配结构,利用两根单体半梁部件装配成十字形的附墙内撑杆,并利用螺纹套管机构实现与塔机标准节主枝的连结。整套内撑杆的结构设计合理,具有很好的实用性,通用性强,日常使用和维护成本低廉,部件紧固效果稳定,施工的安全系数高,产品的装配结构设计合理,拆卸和装配较为简便,易于推广应用。 This case discloses a new type of wall-attached strut for a tower crane, which adopts a split assembly structure, uses two single half-beam components to assemble a cross-shaped wall-attached strut, and utilizes a threaded sleeve mechanism to realize the connection with the wall. The connection of the main branch of the tower crane standard section. The structural design of the whole set of inner struts is reasonable, with good practicability, strong versatility, low daily use and maintenance costs, stable fastening effect of parts, high safety factor of construction, reasonable assembly structure design of products, and relatively easy disassembly and assembly. Simple and easy to promote and apply.
附图说明 Description of drawings
图1为本实用新型结构示意图。 Fig. 1 is the structural representation of the utility model.
图2为半梁部件结构示意图。 Figure 2 is a schematic diagram of the structure of the half-beam components.
其中: in:
1、附墙内撑杆; 1. With support rod inside the wall;
2、半梁部件; 2. Half beam parts;
3、销轴; 3. Pin shaft;
4、螺纹套管; 4. Threaded casing;
5、直角状顶紧端; 5. Right-angled top tight end;
6、左半梁; 6. Left half beam;
7、销轴固定筋板;、 7. The pin shaft fixes the rib plate;
8、右半梁; 8. Right half beam;
9、调节螺栓。 9. Adjust the bolt.
具体实施方式 Detailed ways
下面结合附图和实施例对本实用新型作进一步的描述。 Below in conjunction with accompanying drawing and embodiment the utility model is further described.
本实用新型公开了一种新型的塔式起重机附墙内撑杆,它包括附墙内撑杆1整体呈十字形,该十字形的附墙内撑杆由两根呈十字形交叉分布的半梁部件2构成,两根半梁部件2之间通过销轴3固定连接,半梁部件2的一端设有螺纹套管4,螺纹套管4与半梁部件2之间设有调节螺栓9,螺纹套管4的另一端形成直角状顶紧端5,半梁部件2的另一端设亦形成直角状顶紧端5。 The utility model discloses a novel wall-attached strut for a tower crane, which includes a wall-attached strut 1 as a whole in the shape of a cross, and the cross-shaped wall-attached strut consists of two cross-shaped half The beam part 2 is composed of two half-beam parts 2 fixedly connected by a pin shaft 3, one end of the half-beam part 2 is provided with a threaded sleeve 4, and an adjusting bolt 9 is provided between the threaded sleeve 4 and the half-beam part 2, The other end of the threaded sleeve 4 forms a right-angled tightening end 5 , and the other end of the half-beam component 2 also forms a right-angled tightening end 5 .
在具体实施时,所述半梁部件2由左半梁6、销轴固定筋板7、右半梁8依次固定连接构成,销轴固定筋板7处开设有销轴孔。 In specific implementation, the half-beam part 2 is composed of a left half-beam 6 , a pin-fixed rib 7 , and a right half-beam 8 , which are sequentially fixedly connected, and the pin-fixed rib 7 is provided with a pin hole.
在具体实施时,两根十字交叉分布的半梁部件2通过销轴部件对两块销轴重叠的固定筋板7处形成固定点,再通过调节螺栓实现顶紧端的松紧调节,螺纹套管4向外部顶出,最终实现与塔机标准节主枝的连结。 In the specific implementation, the two half-beam parts 2 distributed in a cross form a fixed point at the fixed rib plate 7 where the two pin shafts overlap through the pin shaft part, and then the tightness adjustment of the top tight end is realized by adjusting the bolt, and the threaded sleeve 4 Push out to the outside, and finally realize the connection with the main branch of the standard section of the tower crane.
以上内容是结合具体的优选实施方式对本实用新型所作的进一步详细说明,不能认定本实用新型具体实施只局限于上述这些说明。对于本实用新型所属技术领域的普通技术人员来说,在不脱离本实用新型构思的前提下,还可以做出若干简单推演或替换,都应当视为属于本实用新型的保护范围。 The above content is a further detailed description of the utility model in combination with specific preferred embodiments, and it cannot be assumed that the specific implementation of the utility model is limited to the above descriptions. For a person of ordinary skill in the technical field to which the utility model belongs, without departing from the concept of the utility model, some simple deduction or substitutions can also be made, which should be regarded as belonging to the protection scope of the utility model.
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420742223.0U CN204342323U (en) | 2014-12-02 | 2014-12-02 | A kind of novel tower crane attached wall internal overarm support |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420742223.0U CN204342323U (en) | 2014-12-02 | 2014-12-02 | A kind of novel tower crane attached wall internal overarm support |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204342323U true CN204342323U (en) | 2015-05-20 |
Family
ID=53225609
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201420742223.0U Expired - Lifetime CN204342323U (en) | 2014-12-02 | 2014-12-02 | A kind of novel tower crane attached wall internal overarm support |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204342323U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110747884A (en) * | 2019-10-12 | 2020-02-04 | 上海建工二建集团有限公司 | Tower crane foundation of internal climbing tower crane and installation method thereof |
-
2014
- 2014-12-02 CN CN201420742223.0U patent/CN204342323U/en not_active Expired - Lifetime
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110747884A (en) * | 2019-10-12 | 2020-02-04 | 上海建工二建集团有限公司 | Tower crane foundation of internal climbing tower crane and installation method thereof |
| CN110747884B (en) * | 2019-10-12 | 2024-11-15 | 上海建工二建集团有限公司 | Tower crane foundation and installation method of internal climbing tower crane |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| MX341135B (en) | Structural module with stop, collapsible structure, and method of erecting a collapsible structure. | |
| CN205116715U (en) | Cast -in -situ box girder template bracing device | |
| CN204342323U (en) | A kind of novel tower crane attached wall internal overarm support | |
| CN205079982U (en) | Atmospheric sampling appearance support | |
| CN103730863A (en) | Adjusting support for electric power circuit pole and tower cross arm | |
| CN203188676U (en) | Electric transmission line tower principal material replacing support component | |
| CN203475697U (en) | Archaized suspended column | |
| CN202513517U (en) | Bracket arm hoop | |
| CN206956996U (en) | A kind of adaptor applied to curtain wall installation | |
| CN203324315U (en) | Electric meter box fixation rack | |
| CN204194505U (en) | Natural gas aerating machine pipeline special manual pipe bender | |
| CN203883339U (en) | Installation pedestal for distribution box | |
| CN204216452U (en) | Maintaining high-voltage isolation switch support | |
| CN203967265U (en) | Portable steel tower Special grounding wire | |
| CN202977079U (en) | Transformer hanging ring hoop | |
| CN206123507U (en) | Contact net cantilever pre -prepared device | |
| CN207004140U (en) | A kind of anchor ear pole | |
| CN206865076U (en) | A kind of multi-faceted adjustable electric hold hoop | |
| CN205073005U (en) | Rib bone fracture plate | |
| CN203796684U (en) | Combined hoop | |
| CN204992849U (en) | Generator glass steel end hoop structure | |
| CN103213893A (en) | Enclosure frame supporting structure | |
| CN201814209U (en) | Easy-to-dismount mosquito net stand | |
| CN103233965A (en) | Fastening bolt component | |
| CN204279208U (en) | A kind of vehicle-mounted folding shelf |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C56 | Change in the name or address of the patentee | ||
| CP01 | Change in the name or title of a patent holder |
Address after: Room sixth, No. 1838 A District Huaxin Town Qingpu District Shanghai City Huateng road 201708 -120 Patentee after: SHANGHAI PANGYUAN MACHINERY RENTAL Co.,Ltd. Address before: Room sixth, No. 1838 A District Huaxin Town Qingpu District Shanghai City Huateng road 201708 -120 Patentee before: SHANGHAI PANGYUAN MACHINERY RENTAL Co.,Ltd. |
|
| CX01 | Expiry of patent term |
Granted publication date: 20150520 |
|
| CX01 | Expiry of patent term |