CN102733520B - Rubber-sandwiched glass rib for full glass curtain wall - Google Patents

Rubber-sandwiched glass rib for full glass curtain wall Download PDF

Info

Publication number
CN102733520B
CN102733520B CN201210191127.7A CN201210191127A CN102733520B CN 102733520 B CN102733520 B CN 102733520B CN 201210191127 A CN201210191127 A CN 201210191127A CN 102733520 B CN102733520 B CN 102733520B
Authority
CN
China
Prior art keywords
glass
hole
steel pin
curtain wall
holes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210191127.7A
Other languages
Chinese (zh)
Other versions
CN102733520A (en
Inventor
任民
王勤
李小乐
孙连弟
杨欢军
欧阳本文
竺陈冬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Yasha Curtain Wall Co Ltd
Original Assignee
Zhejiang Yasha Curtain Wall Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Yasha Curtain Wall Co Ltd filed Critical Zhejiang Yasha Curtain Wall Co Ltd
Priority to CN201210191127.7A priority Critical patent/CN102733520B/en
Publication of CN102733520A publication Critical patent/CN102733520A/en
Application granted granted Critical
Publication of CN102733520B publication Critical patent/CN102733520B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The invention discloses a rubber-sandwiched glass rib for a full glass curtain wall, which comprises more than two parallel single glass sheets and fixing parts, wherein an adhesive layer is arranged between every two single glass sheets, and the more than two single glass sheets are provided with fixing holes in corresponding positions; the fixing parts comprise a connecting steel pin, a fixing steel plate, a spacer sleeve, a rubber gasket, an end cover and a fastening screw; both ends of the connecting steel pin are respectively provided with an axial shaft hole; the end cover is provided with through holes in the positions corresponding to the shaft holes; the connecting steel pin is also provided with at least two radial holes; the radial holes are respectively communicated with the shaft holes; the spacer sleeve in the positions corresponding to the axial holes is provided with rubber holes; and the adhesive layer is arranged between the spacer sleeve and the fixing holes of the more than two single glass sheets. The invention can ensure that the glass sheets are stressed at the same time and hinged connection is formed between the steel pin and the glass, thereby improving the stress condition; and the glass curtain wall can be demounted for maintenance. The invention ensures the glass curtain wall to be mounted and used safely, and satisfies the demands for ultrahigh full glass curtain walls.

Description

A kind of doubling glass rib of full glass curtain wall
Technical field
The present invention relates to full glass curtain wall, is more specifically a kind of doubling glass rib of full glass curtain wall, belongs to building decoration technology field.
Background technology
In some heavy constructions; usually can use full glass curtain wall; fixing of full glass curtain wall generally adopts point supporting type now; the junction between two panels of curtain wall is provided with the Glass Rib vertical with curtain wall; by hardware, curtain wall panel is fixed on Glass Rib, resists the blast that curtain wall bears.Existing Glass Rib is generally two doubling glass, and the fastening employing bonding film between two sheet glass is bonding, then by fixture, completes the connection of curtain wall slab glass and Glass Rib.Wherein the fixing structure of fixture is: the correspondence position at two sheet glass is drilled with fixing hole, and screw rod and nylon jacket are through fixing hole, then screw flight end attaching nut.
The Glass Rib of the full glass curtain wall of said structure, generally can bear height at the full glass curtain wall below 20 meters, but for surpassing the high-rise full glass curtain wall of 20 meters, because the effect of wind load is larger, add the weight of curtain wall slab, the Glass Rib of its supporting construction need to adopt four or more monolithic glass doubling simultaneously.And for the connection of more than two doubling compound glass rib of monolithic glass, make and also there is no ripe technology at present.This is mainly in the processing and fabricating of glass, and the size of its connecting hole, pitch-row are difficult to be consistent, and make like this screw rod pass each monolithic glass discontinuity after fixing hole, and glass is fragile material, very easily broken.Meanwhile, curtain wall intensitometer at last using all Glass Ribs simultaneously uniform stresseds as fringe conditions, as long as all, have a sheet glass to damage, other glass are also followed damage, thereby cause collapsing of whole curtain wall.
Summary of the invention
The object of the present invention is to provide a kind of rational in infrastructurely, can guarantee two above monolithic glass doubling glass ribs of uniform stresseds simultaneously, to guarantee that curtain wall installs safely and use, meet the needs of superelevation full glass curtain wall.
For achieving the above object, the present invention has adopted following technical scheme: a kind of doubling glass rib of full glass curtain wall, it comprises more than two that are parallel to each other monolithic glass and fixture, described two above monolithic glass form glass group, between described two above monolithic glass, be provided with adhesive linkage, the correspondence position of described two above monolithic glass is provided with fixing hole; Described fixture comprises connection steel pin, fixation steel plate, separation sleeve, glue gasket, end cap and trip bolt, and one end of described connection steel pin has head, the other end is provided with screw, and described end cap is fixed on the end face that connects steel pin by trip bolt; Described connection steel pin passes respectively the fixing hole of fixation steel plate, glue gasket, two above monolithic glass, described separation sleeve is arranged on and connects between steel pin and the fixing hole of two above monolithic glass, described fixation steel plate is in two sides of glass group, and described glue gasket is between glass group and fixation steel plate; Two ends of described connection steel pin are provided with axial axis hole, on described end cap, at axis hole correspondence position, are also provided with through hole, be also provided with and be at least provided with two holes, footpath radially on described connection steel pin, and hole, described footpath is communicated with axis hole respectively; The separation sleeve of corresponding position, hole, described footpath is provided with glue hole; Between the fixing hole of described separation sleeve and two above monolithic glass, be also provided with adhesive-layer.
Improvement as the doubling glass rib of full glass curtain wall of the present invention, is provided with a circle groove at axial location corresponding to hole, footpath on described connection steel pin.
Adopt such scheme, the doubling glass rib of invention full glass curtain wall compared with prior art, owing to being provided with adhesive-layer at separation sleeve and more than two between the fixing hole of monolithic glass, guarantee that like this multi-disc glass while is stressed and make to form and be articulated and connected between steel pin and glass, improving force-bearing situation detachable maintenance.Simultaneously, because the fixing hole of multi-disc glass is made respectively, even if the size of each sheet glass fixing hole, pitch-row have suitable deviation, after still making screw rod pass fixing hole by the adhesive-layer between separation sleeve and the fixing hole of glass, each monolithic glass is stressed evenly, assurance curtain wall is installed safely and uses, and meets the needs of superelevation full glass curtain wall.
Accompanying drawing explanation
Fig. 1 is the structural representation of the doubling glass rib of full glass curtain wall of the present invention;
Fig. 2 is the structural representation that connects steel pin;
Fig. 3 is the structural representation of separation sleeve;
Fig. 4 is the structural representation of end cap.
In figure: 1-monolithic glass, 2-adhesive linkage, 3-fixing hole, 4-connects steel pin, 5-fixation steel plate, 6-separation sleeve, 7-glue gasket, 8-end cap, 9-trip bolt, 10-head, 11-screw, 12-axis hole, hole, 13-footpath, 14-glue hole, 15-adhesive-layer, 16-groove, 17-through hole.
The specific embodiment
As shown in Figure 1, the doubling glass rib of full glass curtain wall of the present invention, it comprises more than two that are parallel to each other monolithic glass 1 and fixture, it is example that the present embodiment be take four monolithic glass, described four monolithic glass 1 form glass group, between described four monolithic glass 1, be provided with adhesive linkage 2, the correspondence position of described four above monolithic glass 1 is provided with fixing hole 3.Certainly, on the doubling glass rib of a full glass curtain wall, can be provided with several fixing holes 3, same, also there is the fixture equating with fixing hole 3 quantity, for sake of convenience, only with a fixing hole 3 and a fixture, described below.
Described fixture comprises connection steel pin 4, fixation steel plate 5, separation sleeve 6, glue gasket 7, end cap 8 and trip bolt 9, one end of described connection steel pin 4 has head 10, the other end is provided with screw 11, and described end cap 8 is fixed on the end face that connects steel pin 4 by trip bolt 9.Described connection steel pin 4 is respectively through the fixing hole 3 of fixation steel plate 5, glue gasket 7, four monolithic glass 1, described separation sleeve 6 is arranged on and connects between steel pin 4 and the fixing hole 3 of two above monolithic glass 1, described fixation steel plate 5 is in two sides of glass group, and described glue gasket 7 is between glass group and fixation steel plate 5.
Structure and the prior art of the described full glass curtain wall of the first two paragraph do not have this qualitative difference, are not therefore launched.
Referring to Fig. 1, Fig. 2, the feature of the doubling glass rib of full glass curtain wall of the present invention is: 4 two ends of described connection steel pin are provided with axial axis hole 12, on described end cap 8, at axis hole 12 correspondence positions, are also provided with through hole 17.The axis hole 12 that connects 4 two ends of steel pin in figure is respectively two, on end cap 8 through hole 17 be also two.Certainly according to the axis hole 12 of actual conditions connection 4 two ends of steel pin, can be to be also respectively 1.On described connection steel pin 4, be also provided with and be at least provided with two holes, footpath 13 radially, because the axis hole 12 of the present embodiment is altogether four, so the quantity in hole, footpath 13 is also set as four.Hole, described footpath 13 is communicated with axis hole 12 respectively.The separation sleeve 6 of 13 corresponding positions, hole, described footpath is provided with glue hole 14(referring to Fig. 3).Between described separation sleeve 6 and the fixing hole 3 of four monolithic glass 1, be also provided with adhesive-layer 15.
Here need should be mentioned that adhesive-layer 15 is that (axis hole 12 that can connect steel pin 4 heads 10 injects by connecting axis hole 12 injections of steel pin 4 ends, also can be to inject from the through hole 17 of end cap 8), flow through hole, footpath 13, glue hole 14, arrive between separation sleeve 6 and the fixing hole 3 of four monolithic glass 1, the axis hole 12 of an end of wherein said connection steel pin 4 is as inlet, and the axis hole 12 of another end of connection steel pin 4 is as gas outlet.Viscose glue can adopt some conventional glass cements, as epoxy glue.
As the improvement of the doubling glass rib of full glass curtain wall of the present invention, the axial location in hole, footpath 13 correspondences on described connection steel pin 4 is provided with a circle groove 16.Even so when mounted, the hole, footpath 13 connecting on steel pin 4 has deviation with 14 positions, glue hole on separation sleeve 6, the viscose glue injecting from connecting the axis hole 12 of steel pin 4 ends, the hole, footpath 13 of still flowing through, by groove 16, to glue hole 14, finally arrive between separation sleeve 6 and the fixing hole 3 of four monolithic glass 1.

Claims (2)

1. the doubling glass rib of a full glass curtain wall, it comprises more than two that are parallel to each other monolithic glass (1) and fixture, described two above monolithic glass (1) form glass group, between described two above monolithic glass (1), be provided with adhesive linkage (2), the correspondence position of described two above monolithic glass (1) is provided with fixing hole (3); Described fixture comprises connection steel pin (4), fixation steel plate (5), separation sleeve (6), glue gasket (7), end cap (8) and trip bolt (9), one end of described connection steel pin (4) has head (10), the other end is provided with screw (11), and described end cap (8) is fixed on the end face that connects steel pin (4) by trip bolt (9); Described connection steel pin (4) passes respectively the fixing hole (3) of fixation steel plate (5), glue gasket (7), two above monolithic glass (1), described separation sleeve (6) is arranged on and connects between steel pin (4) and the fixing hole (3) of two above monolithic glass (1), described fixation steel plate (5) is in two sides of glass group, and described glue gasket (7) is between glass group and fixation steel plate (5); It is characterized in that (4) two ends of described connection steel pin are provided with axial axis hole (12), described end cap (8) is upper is also provided with through hole (17) at axis hole (12) correspondence position, on described connection steel pin (4), be also provided with and be at least provided with two holes, footpath (13) radially, hole, described footpath (13) is communicated with axis hole (12) respectively; The separation sleeve (6) of corresponding position, hole, described footpath (13) is provided with glue hole (14); Between the fixing hole (3) of described separation sleeve (6) and two above monolithic glass (1), be also provided with adhesive-layer (15).
2. the doubling glass rib of full glass curtain wall according to claim 1, is characterized in that the upper axial location in hole, footpath (13) correspondence of described connection steel pin (4) is provided with a circle groove (16).
CN201210191127.7A 2012-06-12 2012-06-12 Rubber-sandwiched glass rib for full glass curtain wall Active CN102733520B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210191127.7A CN102733520B (en) 2012-06-12 2012-06-12 Rubber-sandwiched glass rib for full glass curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210191127.7A CN102733520B (en) 2012-06-12 2012-06-12 Rubber-sandwiched glass rib for full glass curtain wall

Publications (2)

Publication Number Publication Date
CN102733520A CN102733520A (en) 2012-10-17
CN102733520B true CN102733520B (en) 2014-04-02

Family

ID=46989769

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210191127.7A Active CN102733520B (en) 2012-06-12 2012-06-12 Rubber-sandwiched glass rib for full glass curtain wall

Country Status (1)

Country Link
CN (1) CN102733520B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104805939B (en) * 2015-03-24 2017-06-06 广东坚朗五金制品股份有限公司 Glass Rib splicing construction and its construction method
CN105089186B (en) * 2015-08-12 2017-11-24 苏州柯利达光电幕墙有限公司 A kind of full glass curtain wall supporting construction and full glass curtain wall installation method
CN106988456A (en) * 2017-03-23 2017-07-28 合肥协耀玻璃制品有限公司 A kind of full glass curtain wall
CN108204063A (en) * 2017-12-15 2018-06-26 广州全正建筑工程有限公司 A kind of novel full glass curtain wall structure
CN113431233B (en) * 2021-07-13 2022-02-18 浙江国飞幕墙建筑装饰工程有限公司 Steel structure curtain wall

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3282969B2 (en) * 1996-06-04 2002-05-20 ワイケイケイアーキテクチュラルプロダクツ株式会社 Curtain wall support
JP2003328484A (en) * 2002-05-15 2003-11-19 Nippon Sheet Glass Co Ltd Panel wall-body supporting structure
CN2719965Y (en) * 2004-07-16 2005-08-24 方大集团股份有限公司 Glass rib connecting structure
CN102345335A (en) * 2011-07-13 2012-02-08 沈阳远大铝业工程有限公司 Glass curtain wall
CN202214881U (en) * 2011-09-08 2012-05-09 深圳中航幕墙工程有限公司 Unit curtain-wall supporting structure for building
CN202627277U (en) * 2012-06-12 2012-12-26 浙江亚厦幕墙有限公司 Laminated glass rib of full glass curtain wall

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3282969B2 (en) * 1996-06-04 2002-05-20 ワイケイケイアーキテクチュラルプロダクツ株式会社 Curtain wall support
JP2003328484A (en) * 2002-05-15 2003-11-19 Nippon Sheet Glass Co Ltd Panel wall-body supporting structure
CN2719965Y (en) * 2004-07-16 2005-08-24 方大集团股份有限公司 Glass rib connecting structure
CN102345335A (en) * 2011-07-13 2012-02-08 沈阳远大铝业工程有限公司 Glass curtain wall
CN202214881U (en) * 2011-09-08 2012-05-09 深圳中航幕墙工程有限公司 Unit curtain-wall supporting structure for building
CN202627277U (en) * 2012-06-12 2012-12-26 浙江亚厦幕墙有限公司 Laminated glass rib of full glass curtain wall

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李小乐.浅谈大跨度玻璃肋点式幕墙系统设计及应用.《门窗》.2012,幕墙专栏第1-4页.
浅谈大跨度玻璃肋点式幕墙系统设计及应用;李小乐;《门窗》;20121020;第3页6.2 系统节点设计 *

Also Published As

Publication number Publication date
CN102733520A (en) 2012-10-17

Similar Documents

Publication Publication Date Title
CN102733520B (en) Rubber-sandwiched glass rib for full glass curtain wall
CN205316525U (en) Novel outer quick -witted suspension support structure of air conditioner
CN209538430U (en) A kind of exterior-wall heat insulation device
CN102767250A (en) Assembled-type externally-restricted buckling-restrained supporting component
CN102535830B (en) Machine position adhesion device for monolithic climbing scaffold for constructing prefabricated building
CN202627277U (en) Laminated glass rib of full glass curtain wall
CN206233500U (en) Heat-preserving wall balustrade exterior panelling mounting structure
CN103982079A (en) Construction method for anticorrosion device of thermal power chimney
CN206956996U (en) A kind of adaptor applied to curtain wall installation
CN201691385U (en) Combined frame
CN215214293U (en) Stud combined structure
CN205400115U (en) Reinforced structure of steel structural net framework piece
CN205822663U (en) A kind of building wall board conveniently removed and installed
CN214329869U (en) Bracket device for truss support of silo wall
CN204212531U (en) Limit maintenance tool is faced at a kind of hole
CN203201015U (en) Combined type I-shaped steel component
CN203418972U (en) Suspended type postprocessing supporting assembly
CN208137410U (en) Buckle-type double duct connection member
CN207484265U (en) Spelling fills implicit low-pylon cable-stayed bridge
CN205843378U (en) The slip-off preventing mounting structure of fibre module
CN205633077U (en) Wing anti -icing system flute venturi tube strutting arrangement
CN203961313U (en) A kind of adjustable apparatus
CN215211885U (en) Novel material-saving and environment-friendly I-beam
CN212176063U (en) Connection structure of prefabricated building
CN208891833U (en) It is a kind of using lithotome as the hutch table structure of plate face

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
OL01 Intention to license declared
OL01 Intention to license declared