CN205779491U - Sectional prefabricating type concrete tower - Google Patents
Sectional prefabricating type concrete tower Download PDFInfo
- Publication number
- CN205779491U CN205779491U CN201620301334.7U CN201620301334U CN205779491U CN 205779491 U CN205779491 U CN 205779491U CN 201620301334 U CN201620301334 U CN 201620301334U CN 205779491 U CN205779491 U CN 205779491U
- Authority
- CN
- China
- Prior art keywords
- tower
- prefabricated
- concrete tower
- section
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/728—Onshore wind turbines
Landscapes
- Wind Motors (AREA)
Abstract
本实用新型涉及一种用于风力发电机的混凝土塔筒,特别是用于上部是常规钢制塔筒、下部是混凝土塔筒类型的分段预制式混凝土塔筒。本实用新型的目的是提供一种施工工艺简单、运输和安装方便、造价低廉的分段预制式混凝土塔筒。本实用新型的技术方案是:一种分段预制式混凝土塔筒,包括底部基础和整体呈圆台锥型的混凝土塔筒,混凝土塔筒上端接有与其直径相匹配的钢制塔筒,其特征在于:所述混凝土塔筒由若干个水平分段的预制塔筒段拼接而成,各预制塔筒段内及底部基础内均预设有上下相互对齐并呈圆形分布的预应力钢绞线穿管,穿管内通长穿设预应力钢绞线并在混凝土塔筒的最上端和底部基础内张拉后锚固。本实用新型适用于风力发电领域。
The utility model relates to a concrete tower used for wind power generators, in particular to a segmented prefabricated concrete tower whose upper part is a conventional steel tower and whose lower part is a concrete tower. The purpose of the utility model is to provide a segmented prefabricated concrete tower with simple construction technology, convenient transportation and installation, and low cost. The technical scheme of the utility model is: a segmented prefabricated concrete tower tube, including a bottom foundation and a concrete tower tube in the shape of a conical cone as a whole, and a steel tower tube matching its diameter is connected to the concrete tower tube. It is: the concrete tower is spliced by several horizontally segmented prefabricated tower sections, and prestressed steel strands aligned up and down and distributed in a circle are preset in each prefabricated tower section and in the bottom foundation Through the pipe, the prestressed steel strand is threaded throughout the length of the pipe and anchored after being tensioned in the uppermost end and the bottom foundation of the concrete tower. The utility model is suitable for the field of wind power generation.
Description
技术领域 technical field
本实用新型涉及一种用于风力发电机的混凝土塔筒,特别是用于上部是常规钢制塔筒、下部是混凝土塔筒类型的分段预制式混凝土塔筒。适用于风力发电领域。 The utility model relates to a concrete tower used for a wind power generator, in particular to a segmented prefabricated concrete tower whose upper part is a conventional steel tower and whose lower part is a concrete tower. Applicable to the field of wind power generation.
背景技术 Background technique
随着我国风力发电行业得到快速发展,风电机组单机容量越来越大、转轮直径越来越大、轮毂高度也越来越高。传统的风电机组的支撑结构为钢制圆锥形塔筒,分段制作,用螺栓连接,钢制塔筒具有外形美观、安装方便的特点,但随着风电机组大型化的发展,为满足受力及刚度需要,钢制塔筒的直径越来越大,当轮毂高度超过100m时,其底段塔筒的直径已远远超过了常规公路运输的限制尺寸,从而限制了风电机组大型化的发展。 With the rapid development of my country's wind power industry, the capacity of wind turbine units is increasing, the diameter of the runner is increasing, and the height of the hub is also increasing. The support structure of the traditional wind turbine is a steel conical tower, which is made in sections and connected by bolts. The steel tower has the characteristics of beautiful appearance and convenient installation. However, with the development of large-scale wind turbines, in order to meet the force and rigidity requirements, the diameter of the steel tower is getting larger and larger. When the height of the hub exceeds 100m, the diameter of the tower at the bottom section has far exceeded the limit size of conventional road transportation, thus limiting the development of large-scale wind turbines .
为解决大型风电机组钢制塔筒直径过大而运输困难的问题,需要减小钢制塔筒的高度,即将下部塔筒由钢制塔筒改为混凝土塔筒,而上部塔筒仍采用常规的钢制塔筒,上部的钢制塔筒由于高度减小、受力减小,其直径就可以满足常规公路运输的要求。下部的混凝土塔筒由于直径大、重量大,施工工艺复杂,混凝土塔筒除了需要满足结构强度和刚度要求外,还需要能够方便的运输和安装,并节省投资。 In order to solve the problem that the diameter of the steel tower of large wind turbines is too large and the transportation is difficult, it is necessary to reduce the height of the steel tower, that is, the lower tower is changed from a steel tower to a concrete tower, while the upper tower still adopts the conventional Due to the reduced height and reduced stress of the upper steel tower, its diameter can meet the requirements of conventional road transportation. Due to the large diameter and heavy weight of the lower concrete tower, the construction process is complicated. In addition to meeting the structural strength and rigidity requirements, the concrete tower needs to be able to be transported and installed conveniently and save investment.
发明内容 Contents of the invention
本实用新型要解决的技术问题是:针对上述存在的问题,提供一种施工工艺简单、运输和安装方便、造价低廉的分段预制式混凝土塔筒。 The technical problem to be solved by the utility model is to provide a segmented prefabricated concrete tower with simple construction technology, convenient transportation and installation, and low cost in view of the above-mentioned existing problems.
本实用新型所采用的技术方案是:一种分段预制式混凝土塔筒,包括底部基础和整体呈圆台锥型的混凝土塔筒,混凝土塔筒上端接有与其直径相匹配的 钢制塔筒,其特征在于所述混凝土塔筒由若干个水平分段的预制塔筒段拼接而成,各预制塔筒段内及底部基础内均预设有上下相互对齐并呈圆形分布的预应力钢绞线穿管,穿管内通长穿设预应力钢绞线并在混凝土塔筒的最上端和底部基础内张拉后锚固。 The technical solution adopted by the utility model is: a segmented prefabricated concrete tower tube, including a bottom foundation and a concrete tower tube in the shape of a conical cone as a whole, and a steel tower tube matching its diameter is connected to the concrete tower tube. It is characterized in that the concrete tower is spliced by several horizontally segmented prefabricated tower sections, each prefabricated tower section and the bottom foundation are preset with prestressed steel strands aligned up and down and distributed in a circle The wire goes through the pipe, and the prestressed steel strand is threaded through the pipe and anchored after being stretched in the uppermost end and the bottom foundation of the concrete tower.
所述各预制塔筒段的壁厚为300~500mm,除顶段与底段的预制塔筒段外的中间各段均为圆台形;顶段的预制塔筒段的侧面形状为圆弧形,顶部设有预应力钢绞线的锚固装置,顶部外侧设有检修和安装平台;底段的预制塔筒段与底部基础相连接,并设有进入塔筒内部的门。 The wall thickness of each prefabricated tower section is 300-500mm, and the middle sections except the prefabricated tower sections of the top section and the bottom section are all in the shape of a cone; the side shape of the prefabricated tower section of the top section is arc-shaped , the top is equipped with an anchoring device for prestressed steel strands, and an inspection and installation platform is provided on the outside of the top; the prefabricated tower section at the bottom section is connected to the bottom foundation, and a door to enter the interior of the tower is provided.
所述底部基础下部设有与预应力钢绞线穿管相对应的预应力钢绞线的锚固操作坑。 The lower part of the bottom foundation is provided with an anchor operation pit for the prestressed steel strand corresponding to the prestressed steel strand through the pipe.
所述混凝土塔筒的单侧锥度在0.1~0.2之间,其混凝土强度等级在C40~C70之间。 The one-side taper of the concrete tower is between 0.1 and 0.2, and its concrete strength grade is between C40 and C70.
所述预应力钢绞线穿管为PE管或PVC管。 The said prestressed steel strand threading pipe is a PE pipe or a PVC pipe.
本实用新型的有益效果是: The beneficial effects of the utility model are:
1、本实用新型采用分段预制式的混凝土塔筒,预制混凝土的施工质量较好、强度可以得到保证,每一个分段的尺寸、重量较小,可以方便的运输和安装,并且造价较低。 1. The utility model adopts a segmented prefabricated concrete tower, the construction quality of the precast concrete is better, and the strength can be guaranteed. The size and weight of each segment are small, which can be conveniently transported and installed, and the cost is low .
2、本实用新型的分段方式为水平分段,不进行竖向分段,这样分段方式形成的预制塔筒段数量较少,每一段是整体的圆台结构,便于吊装和拼接。 2. The segmentation method of the utility model is horizontal segmentation, without vertical segmentation, so that the number of prefabricated tower tube sections formed by the segmentation method is small, and each section is an integral circular platform structure, which is convenient for hoisting and splicing.
3、本实用新型的预制塔筒段内预设预应力钢绞线穿管,使得整个混凝土塔筒的强度和刚度可以得到有效的保证。 3. The preset prestressed steel strands in the prefabricated tower section of the utility model pass through the pipe, so that the strength and rigidity of the entire concrete tower can be effectively guaranteed.
4、本实用新型在顶段预制塔筒段的顶部设置预应力钢绞线的锚固装置,在基础底部设置预应力钢绞线的锚固操作坑,便于预应力钢绞线的张拉和锚固操 作。 4. The utility model sets the anchoring device of the prestressed steel strand on the top of the prefabricated tower section, and sets the anchoring operation pit of the prestressed steel strand at the bottom of the foundation, so as to facilitate the tensioning and anchoring operation of the prestressed steel strand .
附图说明 Description of drawings
图1是本实施例的剖面图。 Fig. 1 is a sectional view of this embodiment.
图2是本实施例中分段预制式混凝土塔筒底部的平面图。 Fig. 2 is a plan view of the bottom of the sectioned prefabricated concrete tower in this embodiment.
图3是本实施例中分段预制式混凝土塔筒中间典型段的透视图。 Fig. 3 is a perspective view of a typical middle section of the segmented prefabricated concrete tower in this embodiment.
图4是本实施例的局部放大图。 Fig. 4 is a partial enlarged view of this embodiment.
具体实施方式 detailed description
如图1~4所示,本实施例为一座30m高的分段预制式混凝土塔筒,包括底部基础2和整体呈圆台锥型的混凝土塔筒1,混凝土塔筒上端接有与其直径相区配的钢制塔筒,混凝土塔筒1由6个水平分段的预制塔筒段1-1拼接而成,各预制塔筒段1-1及底部基础2内均预设有上下相互对齐并呈圆形分布的预应力钢绞线穿管3,该穿管内通长穿设预应力钢绞线4并在混凝土塔筒1的最上端和底部基础2内张拉后锚固。 As shown in Figures 1 to 4, this embodiment is a 30m-high segmented prefabricated concrete tower, including a bottom foundation 2 and a concrete tower 1 in the shape of a conical cone as a whole. The matching steel tower, the concrete tower 1 is spliced by 6 horizontally segmented prefabricated tower sections 1-1, each prefabricated tower section 1-1 and the bottom foundation 2 are preset with vertical alignment and The circularly distributed prestressed steel strands pass through the pipe 3, and the prestressed steel strands 4 are passed through the pipe through the length, and are anchored after tensioning in the uppermost end of the concrete tower 1 and the bottom foundation 2.
本实施例中,混凝土塔筒1由6个水平分段的预制塔筒段1-1拼接而成,拼接后整体呈圆台形,单侧锥度在0.1~0.2之间,本例为0.1;该塔筒上端的直径为4.0m,接有与其直径相匹配的钢制塔筒,下端的直径(根据受力需要确定)为10.0m,与底部基础2相连。预制塔筒段1-1除顶段与底段外的中间各段为圆台形,其壁厚在300mm~500mm之间,本例为400mm;顶段的预制塔筒段为适应预应力钢绞线的弯曲,其侧面形状为圆弧形,圆弧半径为60m,顶段的预制塔筒段的顶部设有预应力钢绞线的锚固装置5,外侧设有检修和安装平台6;底段的预制塔筒段与底部基础2相连接,并设有进入塔筒内部的门。 In this embodiment, the concrete tower tube 1 is spliced by six horizontally segmented prefabricated tower tube sections 1-1. After splicing, the whole is in the shape of a truncated cone, and the taper on one side is between 0.1 and 0.2, which is 0.1 in this example; The diameter of the upper end of the tower is 4.0m, which is connected with a steel tower matching its diameter; The middle sections of prefabricated tower section 1-1 except the top section and the bottom section are truncated circular, and their wall thickness is between 300mm and 500mm, which is 400mm in this example; the prefabricated tower section at the top section is suitable for prestressed steel The bending of the line, its side shape is arc-shaped, and the radius of the arc is 60m. The top section of the prefabricated tower section is equipped with an anchor device 5 for prestressed steel strands, and an inspection and installation platform 6 is provided on the outside; the bottom section The prefabricated tower tube section is connected to the bottom foundation 2, and is provided with a door to enter the inside of the tower tube.
各预制塔筒段1-1均在地面预制,其混凝土强度等级在C40~C70之间,本例为C60;预制时,筒身设置常规非预应力钢筋。各段预制塔筒段1-1和底部基 础2内预设有上下相互对齐的预应力钢绞线穿管3,该预应力钢绞线穿管为PE管或PVC管,本例为PE管。在底部基础2下端设置预应力钢绞线4的锚固操作坑2-1,预应力钢绞线的下端在锚固操作坑内锚固。 Each prefabricated tower tube section 1-1 is prefabricated on the ground, and its concrete strength grade is between C40 and C70, in this case C60; during prefabrication, conventional non-prestressed steel bars are arranged on the cylinder body. Each prefabricated tower section 1-1 and the bottom foundation 2 are preset with prestressed steel strand threading pipes 3 that are aligned up and down. The prestressing steel strand threading pipes are PE pipes or PVC pipes. In this example, they are PE pipes. . An anchor operation pit 2-1 for the prestressed steel strand 4 is arranged at the lower end of the bottom foundation 2, and the lower end of the prestressed steel strand is anchored in the anchor operation pit.
本实施例将所有的预制塔筒段1-1预制完成后,采用吊装的方式逐段安装,全部安装后在预应力钢绞线穿管3内穿预应力钢绞线4,预应力钢绞线穿管之前外侧需涂油,预应力钢绞线4穿管后张拉,并将其上、下端锚固于锚固装置5和锚固操作坑2-1内。 In this embodiment, after all the prefabricated tower tube sections 1-1 are prefabricated, they are installed section by section by hoisting. The outside of the wire needs to be oiled before passing through the pipe, and the prestressed steel strand 4 is stretched after passing through the pipe, and its upper and lower ends are anchored in the anchoring device 5 and the anchoring operation pit 2-1.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620301334.7U CN205779491U (en) | 2016-04-12 | 2016-04-12 | Sectional prefabricating type concrete tower |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620301334.7U CN205779491U (en) | 2016-04-12 | 2016-04-12 | Sectional prefabricating type concrete tower |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205779491U true CN205779491U (en) | 2016-12-07 |
Family
ID=57413315
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201620301334.7U Expired - Lifetime CN205779491U (en) | 2016-04-12 | 2016-04-12 | Sectional prefabricating type concrete tower |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205779491U (en) |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106768960A (en) * | 2016-12-29 | 2017-05-31 | 北京金风科创风电设备有限公司 | Load loading device and load loading method |
| CN108266330A (en) * | 2018-03-06 | 2018-07-10 | 中国电建集团华东勘测设计研究院有限公司 | A kind of Wind turbines prestressing force steel reinforced concrete tower |
| CN108301983A (en) * | 2018-03-06 | 2018-07-20 | 中国电建集团华东勘测设计研究院有限公司 | A kind of fragment prefabricated Wind turbines prestressed concrete tower cylinder |
| CN109356797A (en) * | 2018-12-28 | 2019-02-19 | 北京天杉高科风电科技有限责任公司 | Tower structure, offshore wind turbine and installation method thereof |
| CN110863953A (en) * | 2018-08-28 | 2020-03-06 | 中国电建集团华东勘测设计研究院有限公司 | Annular steel pipe concrete combined wind turbine generator tower structure |
| WO2022037219A1 (en) * | 2020-08-21 | 2022-02-24 | 中国电建集团华东勘测设计研究院有限公司 | Grouting-free dry-type prestressed bolt segment-assembled prefabricated concrete tower |
| CN116292126A (en) * | 2023-04-12 | 2023-06-23 | 湖南大学 | Offshore wind turbine prestressed assembled UHPC support structure and its construction method |
-
2016
- 2016-04-12 CN CN201620301334.7U patent/CN205779491U/en not_active Expired - Lifetime
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106768960A (en) * | 2016-12-29 | 2017-05-31 | 北京金风科创风电设备有限公司 | Load loading device and load loading method |
| CN108266330A (en) * | 2018-03-06 | 2018-07-10 | 中国电建集团华东勘测设计研究院有限公司 | A kind of Wind turbines prestressing force steel reinforced concrete tower |
| CN108301983A (en) * | 2018-03-06 | 2018-07-20 | 中国电建集团华东勘测设计研究院有限公司 | A kind of fragment prefabricated Wind turbines prestressed concrete tower cylinder |
| CN110863953A (en) * | 2018-08-28 | 2020-03-06 | 中国电建集团华东勘测设计研究院有限公司 | Annular steel pipe concrete combined wind turbine generator tower structure |
| CN110863953B (en) * | 2018-08-28 | 2025-03-18 | 中国电建集团华东勘测设计研究院有限公司 | Circular steel tube concrete composite wind turbine tower structure |
| CN109356797A (en) * | 2018-12-28 | 2019-02-19 | 北京天杉高科风电科技有限责任公司 | Tower structure, offshore wind turbine and installation method thereof |
| WO2022037219A1 (en) * | 2020-08-21 | 2022-02-24 | 中国电建集团华东勘测设计研究院有限公司 | Grouting-free dry-type prestressed bolt segment-assembled prefabricated concrete tower |
| CN116292126A (en) * | 2023-04-12 | 2023-06-23 | 湖南大学 | Offshore wind turbine prestressed assembled UHPC support structure and its construction method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103821677B (en) | Prefabricated PC RPC wind power tower | |
| CN104121155B (en) | One kind can be assembled from vertical wind driven generator group prestressed concrete steel combination pylon and its anchoring process | |
| CN103088750B (en) | Especial-big span suspension bridge of uniparted hyperboloid space rope net main cable and construction method thereof | |
| CN104328740A (en) | Large-span steel tubular arched bridge vertical rotation construction and linear control method | |
| CN109930892A (en) | A kind of pre-tensioning system fragment prefabricated prestressing concrete tower structure | |
| CN102418315A (en) | Construction method for concrete-filled steel tube arched bridge with large low-buckle tower erection bridge width | |
| CN110042767B (en) | Cable buckling and anchoring method of cable hoisting system | |
| CN112412707A (en) | Assembled wind turbine generator system circle cross section concrete bearing structure | |
| CN205712748U (en) | A kind of sphere prestressed anchor | |
| CN103950100B (en) | The production technology of high strength post tensioned steel concurrent and electric pole | |
| CN208763818U (en) | A kind of Wind turbines prestressing force stay-supported pylon heightening structure | |
| CN204139694U (en) | Inner wall belt strengthens the steel pipe king-post of structure | |
| CN105673354B (en) | Connecting structure between concrete tower barrel and steel tower barrel | |
| CN103291562B (en) | Offshore wind farm pylon structure | |
| CN203769405U (en) | Large-bending moment high-intensity post-tensioning reinforced concrete pole | |
| CN103909574B (en) | The production technology of large moment of flexure high strength post tensioned steel concurrent and electric pole | |
| CN203769404U (en) | High-intensity post-tensioning reinforced concrete pole | |
| CN102286929A (en) | Hinged arch springing of arch center | |
| CN110657071A (en) | Prefabricated concrete fan tower drum, tower drum component and connecting method | |
| CN205955922U (en) | A wind turbine concrete tower section structure | |
| CN209469534U (en) | Concrete tower | |
| CN211116420U (en) | A precast concrete fan tower and tower components | |
| CN102277999B (en) | Large-section portal steel structure holding pole | |
| CN116356720B (en) | Cable-stayed bridge steel strand stay cable replacement method | |
| CN206800226U (en) | A kind of T-shaped rigid frame bridge oblique pull ruggedized construction |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CX01 | Expiry of patent term | ||
| CX01 | Expiry of patent term |
Granted publication date: 20161207 |