CN201991292U - High-power prestressing four-piece type concrete tower - Google Patents

High-power prestressing four-piece type concrete tower Download PDF

Info

Publication number
CN201991292U
CN201991292U CN2011200493138U CN201120049313U CN201991292U CN 201991292 U CN201991292 U CN 201991292U CN 2011200493138 U CN2011200493138 U CN 2011200493138U CN 201120049313 U CN201120049313 U CN 201120049313U CN 201991292 U CN201991292 U CN 201991292U
Authority
CN
China
Prior art keywords
cast
tower
rebar
tower sheet
place concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011200493138U
Other languages
Chinese (zh)
Inventor
崔志忠
金鑫
吴世宇
付波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LIAONING DAJIN HEAVY INDUSTRY Co Ltd
Original Assignee
LIAONING DAJIN HEAVY INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LIAONING DAJIN HEAVY INDUSTRY Co Ltd filed Critical LIAONING DAJIN HEAVY INDUSTRY Co Ltd
Priority to CN2011200493138U priority Critical patent/CN201991292U/en
Application granted granted Critical
Publication of CN201991292U publication Critical patent/CN201991292U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model belongs to wind power generator equipment, and particularly relates to a high-power prestressing four-piece type concrete tower which comprises a cast-in-place concrete foundation (11); the circumference of the middle of the upper surface of the cast-in-place concrete foundation (11), having an equal circle with a tower piece, is provided with a plurality of cast-in-place concrete foundation reserved rebar implanting holes (1) at equal intervals; after the periphery of the cast-in-place concrete foundation reserved rebar implanting holes (1) is respectively provided with the rebar implanting holes, pouring basins (12) are correspondingly communicated with the cast-in-place concrete foundation reserved rebar implanting holes (1); circular arc tower pieces with any angle and equal diameters are respectively arranged in the middle of the upper surface of the cast-in-place concrete foundation (11), the lower end surface of each tower piece is provided with a guide rebar (2) and a prestressing anchoring rebar (3) respectively at equal intervals, the guide rebasr (2) and the prestressing anchoring rebars (3) are respectively arranged in the cast-in-place concrete foundation reserved rebar implanting holes (1) in a penetrating way, and the upper end surfaces of the tower pieces are provided with reserved rebar implanting holes (5) at the upper part of the tower pieces respectively at equal intervals, thus being convenient for transportation and installation, and reducing the manufacturing cost; and transportation problem does not exist for the tower, thus being convenient for factory production.

Description

High-power prestressing force four-piece type concrete pylon
Technical field
The utility model belongs to wind power plant, particularly a kind of high-power prestressing force four-piece type concrete pylon.
Background technology
The wind-power electricity generation pylon is the important component part of wind power plant, along with wind power generating set power constantly increases, height, intensity to the wind-power electricity generation pylon are had higher requirement, owing to be subjected to the restriction of traffic condition, the diameter that infinitely enlarges pylon is difficult to finish for transportation and lifting.Simultaneously, the application of prestressed concrete wind power tower with low cost, easy for installation is restricted because of its bulky heaviness.
Summary of the invention
The purpose of this utility model is to overcome above-mentioned technical deficiency, and a kind of transportation, installation, high-power prestressing force four-piece type concrete pylon with low cost be convenient to is provided.
The technical scheme that the utility model technical solution problem adopts is: high-power prestressing force four-piece type concrete pylon comprises the cast-in-situ concrete basis, be characterized in middle and tower sheet one above the cast-in-situ concrete basis, two, three, equidistantly be provided with several cast-in-situ concrete bases on the circumference of fourth class circle and reserve the bar planting hole, the cast-in-situ concrete basis is reserved periphery, bar planting hole and is respectively equipped with the corresponding connection with it of pouring basin behind the bar planting hole, be respectively equipped with arbitrarily angled isometrical circular arc tower sheet one in the middle of above the cast-in-situ concrete basis, two, three, four, tower sheet one, two, three, equidistantly be provided with guiding reinforcing bar and prestress anchoraging muscle on four lower surfaces respectively, guiding reinforcing bar and prestress anchoraging muscle are installed on the cast-in-situ concrete basis respectively and reserve in the bar planting hole, tower sheet one, two, three, equidistantly be provided with tower sheet top on four upper surfaces respectively and reserve the bar planting hole, tower sheet one, two, three, be respectively equipped with horizontal butt joint pouring basin on two sides of four, laterally be respectively equipped with several layers of steel hoop on the butt joint pouring basin, tower sheet one, two, three, butt joint back steel hoop is staggered with one heart between four the horizontal butt joint pouring basin, vertically install shear reinforcement in the looping pit of staggered with one heart steel hoop, the joint both sides of laterally docking between the pouring basin are respectively equipped with vertical inner formword and vertical exterior sheathing.
The beneficial effects of the utility model are: high-power prestressing force four-piece type concrete pylon has made things convenient for transportation and installation owing to take the four-piece type structure, has reduced fabricating cost, and tower diameter can be done and have transportation problem greatly and not, is convenient to batch production production.
Description of drawings
Specify with embodiment below in conjunction with accompanying drawing.
Fig. 1 is high-power prestressing force four-piece type concrete towers shelf structure figure.
Fig. 2 is tower sheet and a cast-in-situ concrete basis assembling relationship figure among Fig. 1.
Fig. 3 is the enlarged drawing of I among Fig. 2.
Fig. 4 is that the P of Fig. 3 is to view.
Among the figure, the bar planting hole is reserved on 1-cast-in-situ concrete basis; The 2-reinforcing bar that leads; 3-prestress anchoraging muscle; 4-tower sheet one; The bar planting hole is reserved on 5-tower sheet top; 6-upper segment anchor rib; 7-upper segment guiding rib; 8-tower sheet two; 9-tower sheet three; 10-tower sheet four; 11-cast-in-situ concrete basis; Pouring basin behind the 12-bar planting hole; The 13-steel hoop; The 14-shear reinforcement; 15-laterally docks pouring basin; The vertical inner formword of 16-; The vertical exterior sheathing of 17-; The 18-upper segment;
The specific embodiment
Embodiment, with reference to accompanying drawing 1~4, equidistantly be provided with several cast-in-situ concretes bases and reserve bar planting hole 1 in the middle of above the cast-in-situ concrete of the high-power prestressing force four-piece type concrete pylon basis 11 with on the circumference of isometrical circular arc tower sheet one, two, three, circles such as 44,8,9,10, pouring basin 12 was communicated with it after reservation 1 periphery, bar planting hole, cast-in-situ concrete basis was respectively equipped with the bar planting hole.Be respectively equipped with arbitrarily angled isometrical circular arc tower sheet one, two, three, 44,8,9,10 in the middle of above the cast-in-place notes concrete foundation 11, equidistantly be provided with several guiding reinforcing bar 2 and prestress anchoraging muscle 3 on tower sheet one, two, three, 44,8,9,10 lower surfaces respectively, guiding reinforcing bar 2 and prestress anchoraging muscle 3 are installed on the cast-in-situ concrete basis respectively and reserve in the bar planting hole 1, by pouring basin 12 concrete perfusions behind the bar planting hole on the cast-in-situ concrete basis 11, make tower sheet one, two, three, 44,8,9,10 and cast-in-situ concrete basis 11 connect as one.Tower sheet one, two, three, 44,8,9,10 upper surfaces equidistantly are provided with tower sheet top respectively and reserve bar planting hole 5, tower sheet one, two, three, 44,8,9, be respectively equipped with horizontal butt joint pouring basin 15 on 10 the side end face, laterally be respectively equipped with several layers of steel hoop 13 on the butt joint pouring basin 15, tower sheet one, two, three, 44,8,9, butt joint back steel hoop 13 is staggered with one heart between 10 the horizontal butt joint pouring basin 15, in the looping pit of staggered with one heart steel hoop 13, vertically install shear reinforcement 14, form the load bar construction, laterally the joint both sides between the butt joint pouring basin 15 are respectively equipped with vertical inner formword 17 and vertical exterior sheathing 16, laterally dock pouring basin 15, vertical inner formword 17, vertically the filling concrete makes tower sheet one between the exterior sheathing 16, two, three, 44,8,9,10 laterally connect as one.Tower sheet one, two, three after the butt joint, 44,8,9,10 upper surface are provided with the upper segment 18 that four tower sheets butt joints are formed, equidistantly be provided with tower sheet top on the upper surface of upper segment 18 and reserve bar planting hole 5, equidistantly be provided with upper segment anchor rib 6 and upper segment guiding rib 7 on the lower surface respectively, with same technology upper segment 18 is installed in the top of first segment tower section, follow-up tower section by that analogy.

Claims (1)

1. high-power prestressing force four-piece type concrete pylon, comprise cast-in-situ concrete basis (11), it is characterized in that middle and tower sheet one above the cast-in-situ concrete basis (11), two, three, four (4,8,9,10) etc. equidistantly be provided with several cast-in-situ concretes bases on the circumference of circle and reserve bar planting hole (1), the cast-in-situ concrete basis is reserved periphery, bar planting hole (1) and is respectively equipped with the corresponding connection with it of pouring basin (12) behind the bar planting hole, be respectively equipped with arbitrarily angled isometrical circular arc tower sheet one in the middle of above the cast-in-situ concrete basis (11), two, three, four (4,8,9,10), tower sheet one, two, three, four (4,8,9,10) equidistantly be provided with guiding reinforcing bar (2) and prestress anchoraging muscle (3) on the lower surface respectively, guiding reinforcing bar (2) and prestress anchoraging muscle (3) are installed on the cast-in-situ concrete basis respectively and reserve in the bar planting hole (1), tower sheet one, two, three, four (4,8,9,10) equidistantly be provided with tower sheet top on the upper surface respectively and reserve bar planting hole (5), tower sheet one, two, three, four (4,8,9,10) be respectively equipped with horizontal butt joint pouring basin (15) on two sides, laterally be respectively equipped with several layers of steel hoop (13) on the butt joint pouring basin (15), tower sheet one, two, three, four (4,8,9,10) butt joint back steel hoop (13) is staggered with one heart between the horizontal butt joint pouring basin (15), vertically install shear reinforcement (14) in the looping pit of staggered with one heart steel hoop (13), the joint both sides of laterally docking between the pouring basin (15) are respectively equipped with vertical inner formword (16) and vertical exterior sheathing (17).
CN2011200493138U 2011-02-24 2011-02-24 High-power prestressing four-piece type concrete tower Expired - Fee Related CN201991292U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200493138U CN201991292U (en) 2011-02-24 2011-02-24 High-power prestressing four-piece type concrete tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200493138U CN201991292U (en) 2011-02-24 2011-02-24 High-power prestressing four-piece type concrete tower

Publications (1)

Publication Number Publication Date
CN201991292U true CN201991292U (en) 2011-09-28

Family

ID=44667781

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200493138U Expired - Fee Related CN201991292U (en) 2011-02-24 2011-02-24 High-power prestressing four-piece type concrete tower

Country Status (1)

Country Link
CN (1) CN201991292U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103291562A (en) * 2013-05-16 2013-09-11 上海交通大学 Maritime wind power tower structure
CN103883482A (en) * 2014-03-28 2014-06-25 北京金风科创风电设备有限公司 Precast concrete shell ring, manufacturing method thereof and fan tower barrel
CN104314776A (en) * 2014-10-13 2015-01-28 天津大学前沿技术研究院有限公司 Assembled prestressed tower drum for offshore and onshore wind turbine generators
CN106438215A (en) * 2016-10-08 2017-02-22 霍尔果斯新国金新能源科技有限公司 Tower drum used for wind driven generator
CN106640538A (en) * 2016-10-08 2017-05-10 霍尔果斯新国金新能源科技有限公司 Tower tube component and grouting method thereof
CN111946556A (en) * 2020-07-29 2020-11-17 上海市机电设计研究院有限公司 Construction positioning method for precast concrete shell ring

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103291562A (en) * 2013-05-16 2013-09-11 上海交通大学 Maritime wind power tower structure
CN103291562B (en) * 2013-05-16 2016-05-04 上海交通大学 Offshore wind farm pylon structure
CN103883482A (en) * 2014-03-28 2014-06-25 北京金风科创风电设备有限公司 Precast concrete shell ring, manufacturing method thereof and fan tower barrel
CN104314776A (en) * 2014-10-13 2015-01-28 天津大学前沿技术研究院有限公司 Assembled prestressed tower drum for offshore and onshore wind turbine generators
CN104314776B (en) * 2014-10-13 2017-05-24 天津大学前沿技术研究院有限公司 Assembled prestressed tower drum for offshore and onshore wind turbine generators
CN106438215A (en) * 2016-10-08 2017-02-22 霍尔果斯新国金新能源科技有限公司 Tower drum used for wind driven generator
CN106640538A (en) * 2016-10-08 2017-05-10 霍尔果斯新国金新能源科技有限公司 Tower tube component and grouting method thereof
CN111946556A (en) * 2020-07-29 2020-11-17 上海市机电设计研究院有限公司 Construction positioning method for precast concrete shell ring
CN111946556B (en) * 2020-07-29 2021-07-23 上海市机电设计研究院有限公司 Construction positioning method for precast concrete shell ring

Similar Documents

Publication Publication Date Title
CN201991292U (en) High-power prestressing four-piece type concrete tower
CN201933825U (en) High-power prestressed five-piece type concrete tower
CN112096573B (en) Grouting-free dry-type prestressed bolt splicing and slicing prefabricated assembly type mixed tower
CN102767303B (en) Precast concrete tower and construction method thereof
CN204024928U (en) One can assemble self-erecting type wind power generating set prestressed concrete steel combination pylon
CN105179183A (en) Prestressed concrete wind power tower system and construction method thereof
CN103867019A (en) Assembly type external prestressing active powder concrete wind power tower
CN201943080U (en) Six-piece type high-power prestress concrete tower
CN205779491U (en) Sectional prefabricating type concrete tower
JP2006299631A (en) Tower structure having non-uniform cross section, constructed by precast construction method
CN109295994B (en) Full-assembly type wind power tower cylinder foundation with combined structure
CN201991293U (en) High-power prestressed three-piece type concrete tower
CN215367377U (en) Fully-assembled wind generating set foundation and wind generating set
CN202545137U (en) Internally-prestressed planted bar connection type concrete wind power tower
CN202039377U (en) Prestressed steel stranded wire-combined anchor bolt
CN213392499U (en) Grouting-free dry-type prestressed bolt splicing and slicing prefabricated assembly type mixed tower
CN201933505U (en) High-power prestressed two-piece type concrete tower
CN202064276U (en) Cable-girder anchorage structure of railway steel truss cable stayed bridge
CN201981549U (en) Precast electric pole pile
CN201963020U (en) Prestress sheet-separating type square concrete wind-powered electricity generation tower
CN102182343A (en) Hollow steel tube concrete tower drum for wind generating set
CN205036512U (en) Prestressed concrete wind -powered electricity generation pylon system
CN210917329U (en) Movable connection anchor disc of prefabricated single tubular pile of overhead transmission line shaft tower
CN103291562A (en) Maritime wind power tower structure
CN202645885U (en) Tower of wind-driven generator set

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110928

Termination date: 20180224

CF01 Termination of patent right due to non-payment of annual fee