CN205778909U - The pipe-plate lining structure of sluicing blood pressure lowering - Google Patents

The pipe-plate lining structure of sluicing blood pressure lowering Download PDF

Info

Publication number
CN205778909U
CN205778909U CN201620655449.6U CN201620655449U CN205778909U CN 205778909 U CN205778909 U CN 205778909U CN 201620655449 U CN201620655449 U CN 201620655449U CN 205778909 U CN205778909 U CN 205778909U
Authority
CN
China
Prior art keywords
pipe
plate lining
sluicing
ring
blood pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620655449.6U
Other languages
Chinese (zh)
Inventor
肖明清
邓朝辉
龙凡
游龙飞
姚捷
蒋超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201620655449.6U priority Critical patent/CN205778909U/en
Application granted granted Critical
Publication of CN205778909U publication Critical patent/CN205778909U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

This utility model provides the pipe-plate lining structure of a kind of blood pressure lowering that sluices, including pipe-plate lining ring, it is characterized in that: pipe-plate lining ring includes multiple sluicing decompression tube sheet built rings of coaxially splicing and fixing pipe-plate lining ring, is at least provided with fixing pipe-plate lining ring between one group of adjacent sluicing decompression tube sheet built ring;At least it is provided with sluicing decompression tube sheet built ring between one group of adjacent fixing pipe-plate lining ring;Sluicing decompression hole through after oriented pipe-plate lining ring wall is set on sluicing decompression tube sheet built ring;It is provided with air relief valve on the inwall of sluicing decompression hole;It is filled with the water guide layer with hole after sluicing decompression tube sheet built ring wall and between country rock.This utility model is effectively reduced ground water pressure, and ensures the stability of pipe-plate lining structure.

Description

The pipe-plate lining structure of sluicing blood pressure lowering
Technical field
This utility model belongs to shield tunnel class field, is specifically related to the pipe-plate lining structure of a kind of blood pressure lowering that sluices.
Background technology
Pipe-plate lining ring is the structural shape that one is widely used in shield (TBM) tunnel, is that a kind of waterproof effect is preferable Tunnel structure pattern, typically before tunnel piercing, be prefabricated into pipe-plate lining block by batch production, assembled cyclization in shield machine, pipe Waterproof elastic rubber gasket is set between tile and block, between ring and ring.Then release shield tail, bear the various of tunnel Load.Owing to shield tunnel digs driving, it is therefore desirable to space after pipe-plate lining wall is carried out grouting and reinforcing, it is ensured that shield tunnel Stability.
When pipe-plate lining tunnel structure is applied to high hydraulic condition, on the one hand use as made structure bear water pressure completely Thicker tunnel segment structure, uneconomical;On the other hand, elastic sealing gasket is easy seepage under long-term high hydraulic pressure effect, affects tunnel Safe operation.It is to open relief hole reserved on the ring of section of jurisdiction to high penstock sheet built existing sluicing reduction technology, will lining Build the subsoil water after wall by relief hole pressure limiting draining.In actual application, there is following asking in existing sluicing buck configuration Topic:
(1) relatively low due to the grouting layer infiltration coefficient after pipe-plate lining wall, subsoil water is not smooth toward the path of spilled water hole seepage flow, Cause water discharging structure can only reduce the hydraulic pressure near spilled water hole, and the water pressure at other position of pipe-plate lining ring away from spilled water hole The biggest, it is difficult to reach the purpose of tunnel all-round sluicing blood pressure lowering.
(2) spilled water hole needs to carry out slip casting, during serosity easily blocks in spilled water hole, and grouting layer during slip casting behind The fine graineds such as fine sand easily move under long-term high hydraulic pressure effect, thus block sluicing decompression hole, after causing runing a period of time Spilled water hole occurs cannot the problem of draining.
Utility model content
The purpose of this utility model is aiming at the defect of prior art, it is provided that the pipe-plate lining knot of a kind of blood pressure lowering that sluices Structure, is effectively reduced ground water pressure, and ensures the stability of pipe-plate lining structure.
This utility model provides the pipe-plate lining structure of a kind of blood pressure lowering that sluices, including pipe-plate lining ring, it is characterised in that Pipe-plate lining ring includes the fixing pipe-plate lining ring longitudinally disposed along tunnel, and sluicing blood pressure lowering central spacer is arranged at adjacent fixing pipe Between sheet built ring;Sluicing decompression hole through after oriented pipe-plate lining ring wall is set on sluicing decompression tube sheet built ring;Sluice It is provided with air relief valve on the inwall of decompression hole;It is filled with leading with hole after sluicing decompression tube sheet built ring wall and between country rock Water layer.
The position of described sluicing decompression hole should be arranged in conjunction with pipe-plate lining tunnel internal structure, and the inside being arranged on tunnel is indulged At drainage channel, Quick drainage after facilitating spilled water hole to start, and do not affect the use function in tunnel.
Described water guide layer thickness should be able to meet and forms good drainage path in pipe-plate lining ring periphery, once starts blood pressure lowering Sluice, it is possible to quickly reduce the water pressure in tunnel.
It is connected by grouting layer and country rock are fixing after the wall of described fixing pipe-plate lining ring, pipe-plate lining ring wall grouting behind shaft or drift lining layer Thickness the fixing connection of fixing pipe-plate lining ring and tunnel surrounding should be able to be effectively ensured, limit the deformation of pipe-plate lining ring.
Described water guide layer uses beans stone.The particle size range of described beans stone is 5-10mm, and described beans stone serves as a contrast from section of jurisdiction Building injected hole reserved on ring to be blown into, its bean footpath size should be easy to construction.
The plurality of sluicing decompression tube sheet built ring and the alternately arranged assembled connection of fixing pipe-plate lining ring.
Described water guide layer is evenly arranged every loopful or interval continuously along the outer wall contour line of sluicing decompression tube sheet built ring.
Sluicing decompression tube sheet built ring of the present utility model and fixing pipe-plate lining central spacer are arranged.Sluicing blood pressure lowering section of jurisdiction serves as a contrast Being provided with water guide layer after building the wall of ring, water guide layer uses the materials such as permeability preferable beans stone to fill and is formed, and reaches effectively to drop The purpose of the hydraulic pressure of low tunnel perimeter all sites.Pressure release decompression hole is connected with water guide layer, can more have compared to existing technology Effect ground reduces the water pressure of tunnel perimeter, avoids spilled water hole to block simultaneously.Fixed by slip casting after fixing pipe-plate lining ring wall, protect The stability of card card shield tunnel, and sluice decompression tube sheet built ring and fixing pipe-plate lining ring staggered joint erection, assisted by deformation Adjust the stability ensureing shield tunnel.This utility model is applicable to subway tunnel, railway tunnel and vcehicular tunnel.
Accompanying drawing explanation
Fig. 1 is this utility model structure longitudinal direction schematic diagram;
Fig. 2 is this utility model sluicing decompression tube sheet built ring structure cross-sectional view;
Fig. 3 is that this utility model fixes pipe-plate lining ring structure cross-sectional view;
Wherein, 1 country rock;2 grouting layers;3 sluicing decompression holes;4 air relief valve;5 sluicing decompression tube sheet built rings; 6 fix pipe-plate lining ring;7 water guide layers
Detailed description of the invention
The utility model is described in further detail with specific embodiment below in conjunction with the accompanying drawings, it is simple to is well understood to This utility model, but they do not constitute restriction to this utility model.
As it is shown in figure 1, this utility model provides the pipe-plate lining structure of a kind of blood pressure lowering that sluices, including pipe-plate lining ring, It is characterized in that: pipe-plate lining ring is included coaxially being spliced by the fissure of displacement and multiple lets out according to what certain intervals was longitudinally arranged along tunnel Water decompression tube sheet built ring 5 and fixing pipe-plate lining ring 6, at least set between one group of adjacent sluicing decompression tube sheet built ring 5 It is equipped with fixing pipe-plate lining ring 6;At least it is provided with sluicing decompression tube sheet built between one group of adjacent fixing pipe-plate lining ring 6 Ring 5;Sluicing decompression hole 3 through after oriented pipe-plate lining ring wall is set on sluicing decompression tube sheet built ring 5;Sluicing decompression hole 3 Inwall on be provided with air relief valve 4;It is filled with the water guide with hole after sluicing decompression tube sheet built ring 5 wall and between country rock 1 Layer 7.Sluicing decompression hole is arranged at the drainage channel of tunnel longitudinal direction, it is simple to Quick drainage after spilled water hole startup, and does not affects The use function in tunnel.Described water guide layer thickness meets it and forms good drainage path in pipe-plate lining ring periphery, once opens Dynamic blood pressure lowering sluices, it is possible to quickly reduce the water pressure in tunnel.
It is connected by grouting layer 2 is fixing with country rock 1 after the wall of described fixing pipe-plate lining ring 6, fixing pipe-plate lining ring 6 wall The modes such as rear employing slip casting backfill closely knit with country rock 1.The thickness of pipe-plate lining ring 6 grouting behind shaft or drift lining layer ensures pipe-plate lining ring and tunnel Effectively fixing of road country rock, limits the deformation of pipe-plate lining ring.
Described water guide layer 7 uses the material that the infiltration coefficients such as beans stone are higher to fill and is formed.The particle diameter model of described beans stone Enclosing for 5-10mm, the injected hole reserved from pipe-plate lining ring of described beans stone is blown into, and its bean footpath size should be easy to construction.
The plurality of sluicing decompression tube sheet built ring 5 and the alternately arranged assembled connection of fixing pipe-plate lining ring 6, by deformation Coordinate to keep the Stability Analysis of Structures of sluicing blood pressure lowering ring.Water guide layer 7 along sluicing decompression tube sheet built ring 5 outer wall contour line loopful or Every being evenly arranged, determine according to permeability, groundwater condition and the Operational requirements on stratum residing for tunnel.
When hydraulic pressure is close to when bearing the limit of seam elastic sealing gasket, pipe-plate lining and construction equipment, open air relief valve 4, Sluicing decompression hole 3 starts to sluice, and owing to water guide layer 7 infiltration coefficient is high, the water pressure of tunnel perimeter can be reduced rapidly to and sluice At decompression hole 3 mouthfuls basically identical.Owing to sluicing decompression tube sheet built ring 5 does not the most carry out the filtration work of slip casting and beans stone With, it is possible to prevent spilled water hole blocked.The water guide layer 7 material hole filled behind due to sluicing decompression tube sheet built ring 5 is relatively big, More weak to tunnel structure effect of contraction, easily produce tunnel structure deformation bigger.But use note after fixing pipe-plate lining ring 6 wall Slurry mode forms stable structure, and sluicing decompression tube sheet built ring 5 and fixing pipe-plate lining ring 6 use the side of staggered joint erection simultaneously Formula reaches compatibility of deformation, and the deformation of sluicing decompression tube sheet built ring 5 and stress are transferred to stable fixing pipe-plate lining ring 6, thus it is collectively forming stable overall structure.
The content that this specification is not described in detail belongs to prior art known to professional and technical personnel in the field.

Claims (9)

1. sluice the pipe-plate lining structure of blood pressure lowering, including pipe-plate lining ring, it is characterised in that pipe-plate lining ring includes along tunnel The fixing pipe-plate lining ring (6) that road is longitudinally disposed, sluicing decompression tube sheet built ring (5) is arranged at intervals at adjacent fixing section of jurisdiction lining Build between ring;It is filled with the water guide layer (7) with hole after sluicing decompression tube sheet built ring (5) wall and between country rock (1);Sluice Be provided with on decompression tube sheet built ring (5) with pipe-plate lining ring wall after the through sluicing decompression hole (3) of water guide layer (7);Sluice fall It is provided with air relief valve (4) on the inwall of pressure hole (3).
The pipe-plate lining structure of sluicing blood pressure lowering the most according to claim 1, it is characterised in that sluicing decompression hole is arranged at edge At the drainage channel that tunnel is longitudinal, it is simple to Quick drainage after spilled water hole startup, and do not affect the use function in tunnel.
The pipe-plate lining structure of sluicing blood pressure lowering the most according to claim 1, it is characterised in that the thickness of water guide layer (7) meets It forms good drainage path in pipe-plate lining ring periphery, once starts blood pressure lowering and sluices, it is possible to quickly reduces the water in tunnel Pressure.
The pipe-plate lining structure of sluicing blood pressure lowering the most according to claim 1, it is characterised in that fixing pipe-plate lining ring (6) It is connected by grouting layer (2) and country rock (1) are fixing after wall.
The pipe-plate lining structure of sluicing blood pressure lowering the most according to claim 4, it is characterised in that pipe-plate lining ring wall grouting behind shaft or drift lining The thickness of layer (2) ensures that pipe-plate lining ring and the effective of tunnel surrounding fix, and limits the deformation of pipe-plate lining ring.
The pipe-plate lining structure of sluicing blood pressure lowering the most according to claim 1, it is characterised in that water guide layer (7) uses beans Stone.
The pipe-plate lining structure of sluicing blood pressure lowering the most according to claim 1, it is characterised in that multiple sluicing blood pressure lowering sections of jurisdiction serve as a contrast Build ring (5) and fixing pipe-plate lining ring (6) replaces fissure of displacement arrangement assembly and connects.
The pipe-plate lining structure of sluicing blood pressure lowering the most according to claim 1, it is characterised in that water guide layer (7) is along sluicing blood pressure lowering The outer wall contour line of pipe-plate lining ring (5) is evenly arranged every loopful or interval continuously.
The pipe-plate lining structure of sluicing blood pressure lowering the most according to claim 6, it is characterised in that the particle diameter model of described beans stone Enclose for 5-10mm.
CN201620655449.6U 2016-06-27 2016-06-27 The pipe-plate lining structure of sluicing blood pressure lowering Active CN205778909U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620655449.6U CN205778909U (en) 2016-06-27 2016-06-27 The pipe-plate lining structure of sluicing blood pressure lowering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620655449.6U CN205778909U (en) 2016-06-27 2016-06-27 The pipe-plate lining structure of sluicing blood pressure lowering

Publications (1)

Publication Number Publication Date
CN205778909U true CN205778909U (en) 2016-12-07

Family

ID=58127949

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620655449.6U Active CN205778909U (en) 2016-06-27 2016-06-27 The pipe-plate lining structure of sluicing blood pressure lowering

Country Status (1)

Country Link
CN (1) CN205778909U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105952473A (en) * 2016-06-27 2016-09-21 中铁第四勘察设计院集团有限公司 Segment lining structure capable of draining and reducing pressure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105952473A (en) * 2016-06-27 2016-09-21 中铁第四勘察设计院集团有限公司 Segment lining structure capable of draining and reducing pressure
CN105952473B (en) * 2016-06-27 2019-07-16 中铁第四勘察设计院集团有限公司 Sluice the pipe-plate lining structure being depressured

Similar Documents

Publication Publication Date Title
CN105952473B (en) Sluice the pipe-plate lining structure being depressured
JP5163424B2 (en) Groundwater drainage structure and tunnel construction method having the drainage structure
CN105821830B (en) A kind of anatonosis siphon drainge system for hypotonicity slight slope
CN209145612U (en) A kind of anti-floating type section of jurisdiction for shield tunnel
CN105927231B (en) Inclined shaft passes through rich water densification drifting sand layer circulation-induced curtain-grouting method
CN206386134U (en) A kind of Underground Subway Station guarded drainage construction
CN109505634B (en) Emergency type anti-seepage water-air bag device in tunnel and application method thereof
CN101270582B (en) Method for setting bracing column in underground cavity
CN104499479B (en) It is a kind of to pass through the dug pile construction method that sand gravel backfills layer
CN104612696B (en) Overpass column hole method construction method is passed through in big cross section tunneling subway station in fine sand layer
CN105040775B (en) Deep layer pressure-bearing artesian well plugging system and method
CN103866762A (en) Pile body longitudinal multipoint grouting device
CN206916753U (en) A kind of water sealing structure of diaphram wall and its seam crossing
CN106703010B (en) A kind of no sheath body bed of material sleeve valve barrel grouting rapid constructing method
CN109139059A (en) A kind of osmotic grouting suitable for shield tunnel integrates stick and construction method
CN209430219U (en) Emergency type water-impervious airbag apparatus in tunnel
CN105781575A (en) Water-rich stratum pipe piece combination structure and construction method thereof
CN106522252A (en) Seepage-proofing blocking mechanism and method for deep foundation pit raft dewatering well
CN102002950A (en) Liquid division slip casting reinforcing method for subsurface structure construction joints
CN205714215U (en) Tunnel-liner decompression section of jurisdiction and pipe-plate lining structure
CN107653872A (en) The rigid joint of ultra-deep ground-connecting-wall integrates water-stopping system and its construction method
CN205778909U (en) The pipe-plate lining structure of sluicing blood pressure lowering
CN102747722B (en) Underground continuous wall joint close grouting and covering construction method and expansion rubber plug
CN105178342B (en) Precipitation well casing and method for blocking reserved hole of foundation pit through precipitation well casing
CN206385557U (en) The water-impervious plugging mechanism of dewatering well on deep basal pit raft plate

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant