CN205778622U - Wheeled tubing string board migration device for driller tube heap field areas - Google Patents
Wheeled tubing string board migration device for driller tube heap field areas Download PDFInfo
- Publication number
- CN205778622U CN205778622U CN201620514929.0U CN201620514929U CN205778622U CN 205778622 U CN205778622 U CN 205778622U CN 201620514929 U CN201620514929 U CN 201620514929U CN 205778622 U CN205778622 U CN 205778622U
- Authority
- CN
- China
- Prior art keywords
- tubing string
- suspension gear
- wheel
- pulley
- main body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model discloses a kind of wheeled tubing string board migration device for driller tube heap field areas, between the stockyard of pipe slacking block and automatization cat road and hydraulic pressure pipe rack, be provided with track, across being provided with movement main body on track;The wheel mount of movement main body both sides is provided with at least two wheel, least one set is installed outside the wheel mount of every side and drives motor;The hydraulic wireline winch of single cylinder left-right rotary double-rope is installed at movement body top crossbeam, pulley one and pulley two it is separately installed with on hydraulic wireline winch both sides, from hydraulic wireline winch draw steel wire rope one walk around pulley one backward be connected with loop chain one, loop chain one is connected with tubing string suspension gear one downwards, from hydraulic wireline winch draw steel wire rope two walk around pulley two backward be connected with loop chain two, loop chain two is connected with tubing string suspension gear two downwards.Simple in construction of the present utility model, reliable operation.
Description
Technical field
This utility model belongs to mechanical equipment technical field, relates to a kind of for driller tube heap field areas
Wheeled tubing string board migration device.
Background technology
Existing land rig is in drilling operation course, and the tubing string for drillng operation is generally emitted on level
Conventional pipe rack on, when needing to be delivered to the tubing string on pipe rack on conventional cat road, need artificial
By on the tubing string V-groove having bad luck conventional cat road one by one, this process at least needs 2 workmans to join together
Close and promote tubing string to complete, more staff may be needed to assist for heavier tubing string (drill collar) and push away
Dynamic just can complete;Otherwise in like manner, the tubing string of this traditional pipe heap field areas at conventional pipe rack with often
Transhipment between Gui Mao road is entirely and manually completes, and labor intensity is very big, poor stability, and effect
Rate is low.
Utility model content
The purpose of this utility model is to provide a kind of wheeled tubing string movement for driller tube heap field areas
Device, solves traditional tubing string when tubing string is stacked and shifted between region and conventional pipe rack, time-consuming,
Arduously, the problem of poor stability.
This utility model be employed technical scheme comprise that, a kind of wheeled pipe for driller tube heap field areas
Post board migration device, is provided with a tracking between the stockyard of pipe slacking block and automatization cat road and hydraulic pressure pipe rack
Road, this on track across being provided with movement main body;
The supporting leg of movement main body both sides is separately installed with wheel mount, is provided with at least two in the wheel mount of every side
Individual wheel, be provided with outside the wheel mount of every side least one set drive motor, drive motor drive shaft with
The wheel shaft of wheel is in transmission connection;The liquid of single cylinder left-right rotary double-rope is installed at movement body top crossbeam
Pressure winch, is separately installed with pulley one and pulley two on hydraulic wireline winch both sides, the steel drawn from hydraulic wireline winch
Cord one is walked around pulley one and is connected with loop chain one for backward time, and loop chain one is downwards with tubing string suspension gear one even
Connect, from hydraulic wireline winch draw steel wire rope two walk around pulley two backward be connected with loop chain two, loop chain two to
It is connected with tubing string suspension gear two down.
Wheeled tubing string board migration device for driller tube heap field areas of the present utility model, its feature also exists
In:
A leg outer side in movement main body both sides is also respectively provided with supporting mechanism one and supporting mechanism two.
Tubing string suspension gear one is identical with tubing string suspension gear two structure, and tubing string suspension gear one hangs with tubing string
Loop wheel machine structure two is connected as one by link;Tubing string suspension gear one and tubing string suspension gear two lower part
Many group switch electromagnets are not installed and multiple V-type groove is set.
The beneficial effects of the utility model are, have once by many endowels from tubing string laydown area horizontal transfer
To the hydraulic pressure pipe rack in automatization cat road, it is possible to will be located in many on automatization cat road hydraulic pressure pipe rack
Integral installation of tubing string is transported to tubing string and stacks region, can realize continual transhipment, only needs 1 people to control pipe
Post board migration device, it is only necessary to operator, safe and reliable, work efficiency is high.
Automatization Mao Dao is arranged in position, rig Yuan Mao road, and needed for drilling well, tubing string (drilling rod, drill collar) is whole
Being arranged in pipe slacking block, pipe slacking block is regular to be sequentially arranged, and is provided with pipe outside pipe slacking block two ends
The simple track of post board migration device, track length is across pipe slacking block region, and tubing string board migration device both sides tire is put
Putting in orbit, it is ensured that tubing string board migration device can cover all pipe slacking blocks, 1 people operates tubing string movement dress
Put above corresponding pipe slacking block, transfer tubing string overhung construction, the same layer tubing string of alignment pipe slacking block arrangement
(many), treat that tubing string suspension apparatus electric magnet is energized, after holding all tubing strings, and upper lifting pipe post suspention machine
Structure all leaves pipe slacking block to tubing string, then operates tubing string board migration device and be moved horizontally to automatization cat road hydraulic pressure
After above pipe rack, transfer tubing string suspension gear until tubing string is complete and plane contact on hydraulic pressure pipe rack
After, by tubing string suspension gear electric magnet power-off, electromagnet suction disappears, by complete for the many endowels suspended in midair
Portion is placed on hydraulic pressure pipe rack, so far completes the work that moves horizontally of many endowels, in repetitive cycling one
Action, thus continual carry out tubing string horizontal movement work;Otherwise, it is possible to will be located in automatization Mao Dao
The horizontal movement of many endowels on hydraulic pressure pipe rack, in pipe slacking block, after whole tubing string movements complete, can be entered
The removal of home work of line pipe post, the realization of everything has all remotely been controlled by 1 people, and system is fully examined
Considered interlocking design, under decompression state still can the current state of maintaining body, operator away from
Dangerous operation region, safe and reliable, efficiency is high.
Accompanying drawing explanation
Fig. 1 is the structural representation of this utility model device;
Fig. 2 is this utility model device and pipe slacking block and automatization cat road movement whole process top view;
Fig. 3 is that this utility model device is positioned on pipe slacking block the schematic diagram carrying out lifting by crane drilling rod;
Fig. 4 is that this utility model device walks close to automatization cat road and the schematic diagram of hydraulic pressure pipe rack;
Fig. 5 is the work process schematic diagram of the tubing string suspension gear absorption drilling rod of this utility model device.
In figure, 1. wheel, 2. tubing string suspension gear one, 3. loop chain one, 4. steel wire rope one, 5. movement main body,
6. pulley one, 7. hydraulic wireline winch, 8. pulley two, 9. link, 10. steel wire rope two, 11. loop chains two, 12.
Tubing string suspension gear two, 13. wheel mounts, 14. driving motors, 15. supporting mechanisms one, 16. switch electromagnets,
17. supporting mechanisms two, 18. pipe slacking blocks, 19. automatization Mao Dao, 20. hydraulic pressure pipe racks, 21. tracks, 22.
Hydraulic Station.
Detailed description of the invention
With detailed description of the invention, this utility model is described in detail below in conjunction with the accompanying drawings.
With reference to Fig. 1, Fig. 2, structure of the present utility model is, (implements in figure in the stockyard of pipe slacking block 18
Example shows the pipe slacking block 18 of tri-groups of specifications of A, B, C) and automatization cat road 19 and hydraulic pressure pipe rack
A pair (two) track 21 of straight line parallel, automatization cat road 19 and hydraulic pressure comb it is provided with between 20
Frame 2 is connected with Hydraulic Station 22 by respective pipeline, this on track 21 across being provided with movement main body
5;
The supporting leg of movement main body 5 both sides is separately installed with wheel mount 13, installs in the wheel mount 13 of every side
There is at least two wheel 1, least one set is installed outside the wheel mount 13 of every side and drives motor 14, drive
The drive shaft of galvanic electricity machine 14 is in transmission connection with the wheel shaft of wheel 1, is driven by the positive and negative rotation controlling motor
The positive and negative rotation of motor car wheel 1, drives movement main body 5 to be moved forward or rearward along track 21;Movement master
Body 5 top cross-bar is provided with the hydraulic wireline winch 7 of single cylinder left-right rotary double-rope structure, at hydraulic wireline winch 7
Both sides are separately installed with pulley 1 and pulley 28, and the wheel shaft of pulley 1 and the wheel shaft of pulley 28 are each
From by one group of hinge on the lug of movement main body 5 crossbeam, from hydraulic wireline winch 7 draw steel wire
One 4 (lower rope stretchings) of restricting walk around that pulley 1 is backward lower to be connected with loop chain 1, and loop chain 1 downwards and is managed
Post suspension gear 1 connects, and pulley walked around by the steel wire rope 2 10 (overlap) drawn from hydraulic wireline winch 7
Being connected with loop chain 2 11 for 28 backward times, loop chain 2 11 is connected with tubing string suspension gear 2 12 downwards;
Tubing string suspension gear 1 is identical with tubing string suspension gear 2 12 structure, tubing string suspension gear 1 and pipe
Post suspension gear 2 12 is connected as one by link 9, and tubing string suspension gear 1 suspends in midair with tubing string
Mechanism 2 12 carries out transferring and promoting operation with putting rope entirety by the rope closing of hydraulic wireline winch 7 together;
A leg outer side in movement main body 5 both sides is also respectively provided with supporting mechanism 1 and supporting mechanism
2 17, when movement main body 5 is in initial position or send brill position, by supporting mechanism 1 and the machine of support
Structure 2 17 ground connection also supports movement main body 5 so that wheel 1 is liftoff, it is to avoid the long-time stress of tire;Move
In fortune main body 5 walking process, by liftoff to supporting mechanism 1 and supporting mechanism 2 17 so that wheel 1
Land, it is simple to wheel 1 has been walked movement tubing string in orbit.
Being provided with single cylinder left-right rotary double-rope hydraulic wireline winch 7 in movement main body 5 in the middle part of top, cylinder rotates
Time, steel wire rope 1 and steel wire rope 2 10 rope stretching in opposite directions or slack rope, thus realize tubing string suspension gear 1
Transfer with tubing string suspension gear 2 12 simultaneously and promote.
Tubing string suspension gear 1 and tubing string suspension gear 2 12 bottom are separately installed with many group switch electromagnetism
Ferrum 16 also arranges multiple V-type groove, and each V-type groove the most accurately docks the same layer in pipe slacking block
Tubing string.Adsorb drilling rod when switch electromagnet 16 is energized, during switch electromagnet 16 power-off, leave drilling rod, can
Realize once holding the many endowels of same layer the function transported.
Work process of the present utility model is,
Preliminary step: automatization cat road 19 is placed at rig Yuan Mao road, and hydraulic pressure pipe rack 20 launches,
Multiple pipe slacking blocks 18 are installed the most in place in side, automatization cat road 19 successively, pipe slacking block 18 region two
Side install pair of tracks 21, movement main body 5 install this on track 21, movement main body 5 can whole process be covered
Lid pipe slacking block region.
Workflow one: by tubing string by being transported to automatization cat road 19 and hydraulic pressure pipe rack in pipe slacking block 18
On 20.
The first step, in conjunction with Fig. 2, Fig. 5, remote control drives motor 14 to drive respective wheel 1 to walk about, from
And drive movement main body 5 to run to rear braking directly over a certain pipe slacking block 18 and stop.
Second step, in conjunction with Fig. 3, Fig. 5, after movement main body 5 is positioned at the surface of pipe slacking block, controls single
Cylinder left-right rotary double-rope hydraulic wireline winch 7 rotates transfers steel wire rope 1 and steel wire rope 2 10, owing to passing through
Tubing string suspension gear 1 is connected as one by link 9 with tubing string suspension gear 2 12, so tubing string
Suspension gear 1 and tubing string suspension gear 2 12 by holistically-lowering until tubing string suspension gear bottom
The V-groove opened is directed at and is pressed in tubular column main body, leads to now to many group switch electromagnets 16 simultaneously
Electricity, the tubing string being pointed to bottom is produced magnetic attraction by all switch electromagnets 16.
3rd step, in conjunction with Fig. 3, Fig. 5, after sucking tubing string, controls single cylinder left-right rotary double-rope hydraulic pressure
Winch 7 rotates and synchronizes to carry steel wire rope 1 and steel wire rope 2 10, and tubing string suspension gear 1 hangs with tubing string
Attraction is firmly grasped many endowels and is risen to certain altitude by loop wheel machine structure 2 12.
4th step, in conjunction with Fig. 2, Fig. 4, remote control drives motor 14 to drive wheel 1 to rotate, thus drives
Whole tubing string board migration device runs to " sending brill position " in front of automatization cat road 19 hydraulic pressure pipe rack 20
Brake stops;Control single cylinder left-right rotary double-rope hydraulic wireline winch 7 rotate synchronization transfer steel wire rope 1 with
Steel wire rope 2 10, tubing string suspension gear 1 and tubing string suspension gear 2 12 by holistically-lowering until
Many endowels front portion that bottom attracts contacts with hydraulic pressure pipe rack 20, now by all of switch electromagnet
16 power-off, the captivation of tubing string will be disappeared by all switch electromagnets 16, and the most endowels all drop
On hydraulic pressure pipe rack 20, then control to carry in single cylinder left-right rotary double-rope hydraulic wireline winch 7 rotation synchronization
Steel wire rope 1 and steel wire rope 2 10, remote control drives motor 14 to drive wheel 1 to rotate, thus drives whole
Individual movement main body 5 runs to the next one needs rear braking directly over the pipe slacking block 18 of movement to stop.
5th step, the repetition first step is to the 4th step everything, until progressively being turned by the tubing string in pipe slacking block
Move on hydraulic pressure pipe rack, for drillng operation.
Workflow two: tubing string is transported to pipe slacking block by automatization cat road 19 and hydraulic pressure pipe rack 20
In 18.
Contrary with workflow one step, principle is identical.
Claims (3)
1. the wheeled tubing string board migration device for driller tube heap field areas, it is characterised in that: boring
It is provided with a pair between the stockyard of bar box (18) and automatization Mao Dao (19) and hydraulic pressure pipe rack (20)
Track (21), this on track (21) across being provided with movement main body (5);
The supporting leg of movement main body (5) both sides is separately installed with wheel mount (13), the wheel mount (13) of every side
In at least two wheel (1) is installed, the wheel mount (13) of every side outside is provided with least one set and drives
Motor (14), drives the drive shaft of motor (14) to be in transmission connection with the wheel shaft of wheel (1);In movement
Main body (5) top cross-bar is provided with the hydraulic wireline winch (7) of single cylinder left-right rotary double-rope, twists at hydraulic pressure
Car (7) both sides are separately installed with pulley one (6) and pulley two (8), draw from hydraulic wireline winch (7)
Steel wire rope one (4) walk around that pulley one (6) is backward lower to be connected with loop chain one (3), loop chain one (3)
It is connected with tubing string suspension gear one (2) downwards, the steel wire rope two (10) drawn from hydraulic wireline winch (7)
Walking around pulley two (8) to be connected with loop chain two (11) for backward time, loop chain two (11) hangs with tubing string downwards
Loop wheel machine structure two (12) connects.
Wheeled tubing string board migration device for driller tube heap field areas the most according to claim 1,
It is characterized in that: the described leg outer side in movement main body (5) both sides is also respectively provided with support machine
Structure one (15) and supporting mechanism two (17).
Wheeled tubing string board migration device for driller tube heap field areas the most according to claim 1,
It is characterized in that: described tubing string suspension gear one (2) and tubing string suspension gear two (12) structure phase
With, tubing string suspension gear one (2) is connected as by link (9) with tubing string suspension gear two (12)
Integrally;Tubing string suspension gear one (2) and tubing string suspension gear two (12) bottom are separately installed with many groups
Switch electromagnet (16) also arranges multiple V-type groove.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620514929.0U CN205778622U (en) | 2016-05-31 | 2016-05-31 | Wheeled tubing string board migration device for driller tube heap field areas |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620514929.0U CN205778622U (en) | 2016-05-31 | 2016-05-31 | Wheeled tubing string board migration device for driller tube heap field areas |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205778622U true CN205778622U (en) | 2016-12-07 |
Family
ID=58139342
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620514929.0U Active CN205778622U (en) | 2016-05-31 | 2016-05-31 | Wheeled tubing string board migration device for driller tube heap field areas |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205778622U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108049828A (en) * | 2017-12-11 | 2018-05-18 | 太原理工大学 | It is a kind of can rod automatically drill pipe storage |
CN109025857A (en) * | 2017-06-08 | 2018-12-18 | 天津市东方先科石油机械有限公司 | A kind of drilling rod and casing storage system |
CN109184594A (en) * | 2018-11-23 | 2019-01-11 | 宝鸡石油机械有限责任公司 | Wheel-track type drilling rod storage device |
CN110700769A (en) * | 2019-11-05 | 2020-01-17 | 中国石油集团川庆钻探工程有限公司长庆钻井总公司 | Electric remote control drilling tool pulling and conveying device and using method thereof |
CN113090205A (en) * | 2021-04-14 | 2021-07-09 | 四川宏华石油设备有限公司 | Power drilling tool box |
-
2016
- 2016-05-31 CN CN201620514929.0U patent/CN205778622U/en active Active
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109025857A (en) * | 2017-06-08 | 2018-12-18 | 天津市东方先科石油机械有限公司 | A kind of drilling rod and casing storage system |
CN109025857B (en) * | 2017-06-08 | 2021-05-04 | 天津市东方先科石油机械有限公司 | Drill rod and casing storage system |
CN108049828A (en) * | 2017-12-11 | 2018-05-18 | 太原理工大学 | It is a kind of can rod automatically drill pipe storage |
CN108049828B (en) * | 2017-12-11 | 2019-07-16 | 太原理工大学 | It is a kind of can automatic rod drill pipe storage |
CN109184594A (en) * | 2018-11-23 | 2019-01-11 | 宝鸡石油机械有限责任公司 | Wheel-track type drilling rod storage device |
CN109184594B (en) * | 2018-11-23 | 2020-04-24 | 宝鸡石油机械有限责任公司 | Wheel-rail type drill rod storage device |
CN110700769A (en) * | 2019-11-05 | 2020-01-17 | 中国石油集团川庆钻探工程有限公司长庆钻井总公司 | Electric remote control drilling tool pulling and conveying device and using method thereof |
CN113090205A (en) * | 2021-04-14 | 2021-07-09 | 四川宏华石油设备有限公司 | Power drilling tool box |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205778622U (en) | Wheeled tubing string board migration device for driller tube heap field areas | |
CN107208464B (en) | Modular racking system for a drilling rig | |
CN104563912B (en) | A kind of well drilling pipe column automation operating system | |
CN108756968A (en) | A kind of coal mine Zuan Mao robots and method for protecting support | |
CN105275415A (en) | Full-automatic continuous drilling rig | |
CN203822194U (en) | Mechanized working device for oil field well repair | |
CN209277832U (en) | A kind of automation catwalk device | |
CN205638216U (en) | Oil -well rig tubular column automated processing system | |
CN107227934A (en) | A kind of oil-well rig tubing string automated programming system | |
CN104405304B (en) | The operatorless workover treatment system and method for a kind of well head | |
CN208416589U (en) | A kind of coal mine drilling anchor robot | |
CN109184594A (en) | Wheel-track type drilling rod storage device | |
CN104712270A (en) | Oil field well workover operation robot | |
CN102518396A (en) | Automatic drilling machine | |
CN107780855A (en) | A kind of oil pipe is remotely controlled drag-over unit | |
CN203684019U (en) | Height and span adjustable track laying machine for subway construction | |
CN203145859U (en) | Elevator transferring device for mechanical workover operation | |
WO2018145327A1 (en) | Vertical lifting equipment and method | |
CN106869827A (en) | A kind of self-travel type dynamic catwalk and its traveling method | |
CN204492292U (en) | A kind of parking apparatus | |
CN208234420U (en) | Construction site Miniature hanging device | |
CN217263814U (en) | Intelligent crawler-type cable conveyor | |
CN105863706A (en) | Circulating type forepoling moving device driven by monorail crane | |
CN105645288B (en) | Winch overhead oil bailing device | |
CN203756073U (en) | Mechanical well repair work system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210108 Address after: 721002 No.2 Dongfeng Road, Jintai District, Baoji City, Shaanxi Province Patentee after: Baoji Oilfield Machinery Co.,Ltd. Patentee after: CHINA NATIONAL PETROLEUM Corp. Patentee after: CNPC national oil and gas drilling equipment Engineering Technology Research Center Co., Ltd Address before: 721002 No. 2 Dongfeng Road, Shaanxi, Baoji Patentee before: Baoji Oilfield Machinery Co.,Ltd. |
|
TR01 | Transfer of patent right |