CN205776135U CN201620472787.6U CN201620472787U CN205776135U CN 205776135 U CN205776135 U CN 205776135U CN 201620472787 U CN201620472787 U CN 201620472787U CN 205776135 U CN205776135 U CN 205776135U
Authority
CN
China
Prior art keywords
pipe pile
steel pipe
large diameter
diameter steel
big
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620472787.6U
Other languages
Chinese (zh)
Inventor
张鸿
李宗哲
何超然
唐衡
翟建国
陈小龙
曾健
杨武
邓松涛
秦宗平
鲁力
程多云
黄修平
袁灿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
CCCC Wuhan Harbour Engineering Design and Research Institute Co Ltd
Original Assignee
CCCC Second Harbor Engineering Co
CCCC Wuhan Harbour Engineering Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co, CCCC Wuhan Harbour Engineering Design and Research Institute Co Ltd filed Critical CCCC Second Harbor Engineering Co
Priority to CN201620472787.6U priority Critical patent/CN205776135U/en
Application granted granted Critical
Publication of CN205776135U publication Critical patent/CN205776135U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of based on deep water platform constructing device under the big wave condition of big flow velocity, including large diameter steel pipe pile and platform upper structural system, described large diameter steel pipe pile is internally provided with lateral partitions, and the sidewall of described lateral partitions is fixed on the inwall of described large diameter steel pipe pile;It is interior until being against in described lateral partitions that the supporting leg stake bottom of described platform upper structural system extend into described large diameter steel pipe pile, the external diameter of described supporting leg stake is less than the internal diameter of described large diameter steel pipe pile, and extend into the supporting leg stake position described large diameter steel pipe pile within and be connected with described large diameter steel pipe pile inwall by pouring into a mould concrete.Use large diameter steel pipe pile, relatively mass-flow power and wave force can be resisted;Note concrete connects, and reduces weld job waterborne, it is ensured that weldquality, reduces construction risk, and can adapt to the on-the-spot actual situation with certain off normal.

Description

Based on deep water platform constructing device under the big wave condition of big flow velocity
Technical field
This utility model belongs to the construction field of aquatic pile foundation plinth steel platform, is specifically related to one Based on deep water platform constructing device under the big wave condition of big flow velocity.
Background technology
At present, the construction method of aquatic pile foundation plinth steel platform has leveled off to maturation, but selects Appropriate arrangement and method for construction, correct construction technology are to working security, difficulty, progress and one-tenth This etc. play vital effect.
There is universal the asking of three below in the deep water platform construction under big flow velocity and big wave condition Topic: 1, under deep water, big flow velocity and big wave condition, platform is very big by horizontal loading, tradition Small Diameter Pile basis strength and stiffness under horizontal loads are all difficult to meet requirement;2, big Flow velocity and big wave cause that construction condition is severe, difficulty of construction big, welding for steel structure matter Amount is difficult to ensure;3, operation at sea is more, speed is slow, construction risk is bigger.
Summary of the invention
The purpose of this utility model is aiming at the deficiency of above-mentioned technology, to solve above-mentioned existence Problem, it is provided that a kind of use that overall assembled connects based under the big wave condition of big flow velocity Deep water platform constructing device, work progress is simple, construction risk is little and reliability is high.
For achieving the above object, designed by this utility model based on the big wave condition of big flow velocity Lower deep water platform constructing device, including large diameter steel pipe pile and platform upper structural system, institute Stating large diameter steel pipe pile and be internally provided with lateral partitions, the sidewall of described lateral partitions is fixed on On the inwall of described large diameter steel pipe pile;The supporting leg stake bottom of described platform upper structural system It extend into described large diameter steel pipe pile interior until being against in described lateral partitions, described supporting leg stake External diameter less than the internal diameter of described large diameter steel pipe pile, and extend into described large diameter steel pipe pile Internal supporting leg stake position is connected with described large diameter steel pipe pile inwall by cast concrete.
Further, the bottom of described supporting leg stake connects guider, described lateral partitions Middle part have the pilot hole through described guider.
Further, the position that described supporting leg stake outer wall is connected with concrete is disposed with enhancing Some outer lug of bonding strength, the portion that described large diameter steel pipe pile inwall is connected with concrete The some internal projection strengthening bonding strength it are disposed with at Wei.
Further, the mouth of pipe of height and the described large diameter steel pipe pile of the cast of described concrete Concordant.
Further, exposed at the outside and close nozzle position of described large diameter steel pipe pile Supporting leg stake outer peripheral wall is circumferentially fixed with reinforcing plate, is provided with and is stuck in bottom described reinforcing plate The draw-in groove of described large diameter steel pipe pile mouth of pipe edge.
Further, the diameter of described large diameter steel pipe pile is more than 2m.
Compared with prior art, this utility model has the advantage that base of the present utility model Under the big wave condition of big flow velocity, deep water platform constructing device uses large diameter steel pipe pile, can support Anti-relatively mass-flow power and wave force;Note concrete connects, and reduces weld job waterborne, it is ensured that Weldquality, reduces construction risk, and can adapt to have certain off normal to scene is actual Situation.
Accompanying drawing explanation
Fig. 1 is that this utility model is based on deep water platform constructing device under the big wave condition of big flow velocity Schematic front view;
Fig. 2 is the schematic top plan view in Fig. 1.
In figure, each part numbers is as follows:
Large diameter steel pipe pile 1, platform upper structural system 2, supporting leg stake 3, concrete 4, lead To device 5, reinforcing plate 6, draw-in groove 7, internal projection 8, outer lug 9, pilot hole 10, horizontal stroke To dividing plate 11.
Detailed description of the invention
With specific embodiment, this utility model is made the most below in conjunction with the accompanying drawings Bright.
As shown in Figure 1 and Figure 2 based on deep water platform constructing device under the big wave condition of big flow velocity, Including large diameter steel pipe pile 1 and platform upper structural system 2, large diameter steel pipe in the present embodiment Stake 1 uses the diameter steel-pipe pile more than 2m.Large diameter steel pipe pile 1 is internally provided with horizontal stroke To dividing plate 11, the sidewall of lateral partitions 11 is fixed on the inwall of large diameter steel pipe pile 1, horizontal Pilot hole 10 is had to the middle part of dividing plate 11;The supporting leg stake of platform upper structural system 2 3 bottom weldings have guider 5, and supporting leg stake 3 bottom of platform upper structural system 2 is stretched into In large diameter steel pipe pile 1, guider 5 is through the guiding of lateral partitions 11 middle part Hole 10, until supporting leg stake 3 bottom is against in lateral partitions 11, and the external diameter of supporting leg stake 3 Internal diameter less than large diameter steel pipe pile 1 so that extend into propping up within large diameter steel pipe pile 1 There is gap between lower limb stake 3 position and large diameter steel pipe pile 1 inwall, in gap, note concrete 4, The height of concrete 4 cast is concordant with the mouth of pipe of large diameter steel pipe pile 1, i.e. extend into big straight Supporting leg stake 3 position within footpath steel-pipe pile 1 is by cast concrete 4 and large diameter steel pipe pile 1 Inwall connects.It addition, it is exposed at the outside and close nozzle position of large diameter steel pipe pile 1 Supporting leg stake 3 outer peripheral wall is circumferentially fixed with some reinforcing plates 6, sets bottom some reinforcing plates 6 Being equipped with the draw-in groove 7 being stuck in large diameter steel pipe pile 1 mouth of pipe edge, the side plate of draw-in groove 7 is straight with big Footpath steel-pipe pile 1 welds, and makes supporting leg stake 3 be connected more firm with large diameter steel pipe pile 1.
Again as it is shown in figure 1, the position that supporting leg stake 3 outer wall is connected with concrete 4 is arranged Having the some outer lug 9 strengthening bonding strength, large diameter steel pipe pile 1 inwall is with concrete 4 even The position connect is disposed with the some internal projection 8 strengthening bonding strength, increases further and connects by force Degree.
Based on the construction method of deep water platform constructing device under the big wave condition of big flow velocity, including Following steps:
1) with special pile driving barge injection large diameter steel pipe pile 1 to default absolute altitude;
2) by prefabricated platform upper structural system 2 transportation by driving to job site, crane barge is utilized to rise Hang platform upper structural system 2 to transfer, utilize the guider 5 of supporting leg stake 3 lower end to transfer, Make guider 5 through the pilot hole 10 of lateral partitions 11 until supporting leg stake 3 lower end is against In lateral partitions 11, in supporting leg stake 3 outer peripheral wall, the draw-in groove 7 of some reinforcing plates 6 is stuck in greatly Diameter steel pile tube 1 mouth of pipe edge, draw-in groove 7 sidewall and large diameter steel pipe pile 1 firm welding;
3) by the most mounted conduit supporting leg to extending within large diameter steel pipe pile 1 Concrete 4 is poured into a mould, according to reality between stake 3 position outer walls and large diameter steel pipe pile 1 inwall Site operation requirement, uses the concrete meeting strength and stiffness.
In sum, large diameter steel pipe pile can resist relatively mass-flow power and wave force;Note coagulation Soil connects, and reduces weld job waterborne, it is ensured that weldquality, reduces construction risk, and energy Enough adaptations are to the on-the-spot actual situation with certain off normal.

Claims (6)

1. based on a deep water platform constructing device under the big wave condition of big flow velocity, including big straight Footpath steel-pipe pile (1) and platform upper structural system (2), it is characterised in that: described major diameter Steel-pipe pile (1) is internally provided with lateral partitions (11), the side of described lateral partitions (11) Wall is fixed on the inwall of described large diameter steel pipe pile (1);Described platform upper structural system (2) it is interior until being against that supporting leg stake (3) bottom extend into described large diameter steel pipe pile (1) In described lateral partitions (11), the external diameter of described supporting leg stake (3) is less than described Large-diameter Steel The internal diameter of pile tube (1), and it extend into the supporting leg stake that described large diameter steel pipe pile (1) is internal (3) position is connected with described large diameter steel pipe pile (1) inwall by cast concrete (4).
The most according to claim 1 execute based on deep water platform under the big wave condition of big flow velocity Frock is put, it is characterised in that: the bottom of described supporting leg stake (3) connects guider (5), The middle part of described lateral partitions (11) has the guiding through described guider (5) Hole (10).
The most according to claim 1 execute based on deep water platform under the big wave condition of big flow velocity Frock is put, it is characterised in that: described supporting leg stake (3) outer wall is connected with concrete (4) Position is disposed with the some outer lug (9) strengthening bonding strength, described large diameter steel pipe pile (1) position that inwall is connected with concrete (4) is disposed with and strengthens the some of bonding strength Internal projection (8).
4. according to described in claim 1 or 2 or 3 based on deep under the big wave condition of big flow velocity Horizontal stand constructing device, it is characterised in that: the height that described concrete (4) is poured into a mould is with described The mouth of pipe of large diameter steel pipe pile (1) is concordant.
5. according to described in claim 1 or 2 or 3 based on deep under the big wave condition of big flow velocity Horizontal stand constructing device, it is characterised in that: exposed outside at described large diameter steel pipe pile (1) And supporting leg stake (3) outer peripheral wall at nozzle position is circumferentially fixed with reinforcing plate (6), Described reinforcing plate (6) bottom is provided with and is stuck in described large diameter steel pipe pile (1) mouth of pipe edge The draw-in groove (7) at place.
6. according to described in claim 1 or 2 or 3 based on deep under the big wave condition of big flow velocity Horizontal stand constructing device, it is characterised in that: the diameter of described large diameter steel pipe pile (1) is more than 2m。
CN201620472787.6U 2016-05-23 2016-05-23 Based on deep water platform constructing device under the big wave condition of big flow velocity Expired - Fee Related CN205776135U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620472787.6U CN205776135U (en) 2016-05-23 2016-05-23 Based on deep water platform constructing device under the big wave condition of big flow velocity

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620472787.6U CN205776135U (en) 2016-05-23 2016-05-23 Based on deep water platform constructing device under the big wave condition of big flow velocity

Publications (1)

Publication Number Publication Date
CN205776135U true CN205776135U (en) 2016-12-07

Family

ID=58115699

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620472787.6U Expired - Fee Related CN205776135U (en) 2016-05-23 2016-05-23 Based on deep water platform constructing device under the big wave condition of big flow velocity

Country Status (1)

Country Link
CN (1) CN205776135U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105887786A (en) * 2016-05-23 2016-08-24 中交武汉港湾工程设计研究院有限公司 Deepwater platform construction device and construction method based on high flow speed and large waves

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105887786A (en) * 2016-05-23 2016-08-24 中交武汉港湾工程设计研究院有限公司 Deepwater platform construction device and construction method based on high flow speed and large waves

Similar Documents

Publication Publication Date Title
CN107299643B (en) Steel lattice column combined type tower crane foundation structure in foundation pit and construction method
CN207436373U (en) A kind of assembled is bolted steel core concrete column entirely
CN206971259U (en) Blower foundation concrete pouring structure
CN106930313B (en) Offshore wind power engineering pile barrel combined foundation and construction method thereof
CN207193983U (en) A kind of cast-in-place pile concrete pours pipe guide
CN201809961U (en) Triangular diagonal bracing operation platform for elevator shaft
CN205776135U (en) Based on deep water platform constructing device under the big wave condition of big flow velocity
CN206467667U (en) Suspended net shotcrete building enclosure between a kind of stake of use expansion type fixation reinforced mesh
CN206971251U (en) A kind of coastal waters wind energy project stake bucket combination foundation
CN204000905U (en) A kind of Double-Wall Steel Boxed Cofferdam with binder deep water bearing platform construction
CN206769047U (en) A kind of steel lattice column and bored concrete pile attachment structure
CN202830936U (en) Supporting structure of foundation pit
CN105887786A (en) Deepwater platform construction device and construction method based on high flow speed and large waves
CN208363078U (en) A kind of assembled steel pile cover
CN204151805U (en) A kind of combination steel cofferdam
CN206158226U (en) Quick reinforced concrete column structure of steel pipe slip casting
CN105735338B (en) Prestressing force assembly type blower foundation
CN204125957U (en) Flange transition interconnection system single-pile foundation structure
CN211596769U (en) Novel pile stabilizing platform structure
CN206736950U (en) A kind of special-shaped anchor ear applied to glass steel formwork
CN210013222U (en) Section steel inner support system node
CN205616260U (en) Landing stage frame bracket and whole structure of watering of support girder
CN103726505B (en) Offshore wind plant wind turbine foundation
CN110397064A (en) A kind of separable ring cylinder jacket frame foundation structure and its construction method
CN207073145U (en) The plug-in steel reinforced concrete combination foundation of Super High construction elevator wall

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161207

Termination date: 20210523