CN205753656U - A kind of leakage current Check System - Google Patents

A kind of leakage current Check System Download PDF

Info

Publication number
CN205753656U
CN205753656U CN201620590317.XU CN201620590317U CN205753656U CN 205753656 U CN205753656 U CN 205753656U CN 201620590317 U CN201620590317 U CN 201620590317U CN 205753656 U CN205753656 U CN 205753656U
Authority
CN
China
Prior art keywords
leakage current
harvester
cloud server
check system
mobile terminal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620590317.XU
Other languages
Chinese (zh)
Inventor
张长营
恽瑞金
江苏
崔建胜
尹红成
马驰
王晓红
魏子杰
杨紫涵
孙哲夫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Vocational Skills Training Base Of State Grid Jiangsu Electric Power Co
Original Assignee
Vocational Skills Training Base Of State Grid Jiangsu Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Vocational Skills Training Base Of State Grid Jiangsu Electric Power Co filed Critical Vocational Skills Training Base Of State Grid Jiangsu Electric Power Co
Priority to CN201620590317.XU priority Critical patent/CN205753656U/en
Application granted granted Critical
Publication of CN205753656U publication Critical patent/CN205753656U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/126Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wireless data transmission

Abstract

This utility model relates to investigation of leaking electricity online, it is specifically related to a kind of leakage current Check System, including: main line leakage current harvester, branch road leakage current harvester, cloud server and mobile terminal, described main line leakage current harvester, the data of measurement are reached cloud server by GPRS communication by dry, branch road leakage current harvester, mobile terminal accesses cloud server by network, and having leakage current transfinites, and warning message can be reached mobile terminal and show by cloud server.This utility model provides a kind of leakage current Check System, may be implemented in line installation monitoring, and solution releases more manpower and minimizing goods and materials put into, it becomes possible to investigate out the electrical leakage problems in supply line fast and accurately;Make the on-the-spot investigation to electric leakage more rapid, intelligent.

Description

A kind of leakage current Check System
Technical field
This utility model relates to investigation of leaking electricity online, is specifically related to a kind of leakage current Check System.
Background technology
Along with the intelligent power distribution station district of the construction of China's intelligent grid, resident and rural electricity consumption have also been obtained the biggest sending out Exhibition, current power distribution station is assembled with that intelligence is total protects or earth leakage protective device, by these smart machines can be real-time to platform district Interior residual current is monitored and protects, and is greatly improved the supervision to residual current.But also introduce new asking Topic, if leakage current is excessive, can cause total guarantor or the automatic trip of earth leakage protective device;One so welcome to safe power supply New difficulty and challenge.When community supply lines is laid, easily scratch for electric insulated skin, there is electric leakage hidden danger;Rural Power Distribution Network It is located at outdoor, and cloth line mass is uneven, be particularly in rainy humid area, it is easier to electrical leakage problems occurs;Electric leakage electricity Stream is not only a weakness in power supply, especially a weak link in management.
Intelligent low-pressure is powered leakage current Check System, is to be platform based on Internet of Things, mainly for the leakage of distribution system Electricity current monitoring and investigation and build, the platform district that it is mainly used in transfiniting leakage current is accurately positioned, and finds electric leakage The leakage point of electric current, thus reach to get rid of the fault that leakage current transfinites;Investigate thoroughly from the source of electric leakage, solve electric leakage and ask Topic
Utility model content
This utility model provides a kind of leakage current Check System, the fraud existed for existing conventional earth leakage current detecting End, solution must not meet the problem of growth requirement, and concrete technical scheme is as follows:
A kind of leakage current Check System, including: main line leakage current harvester, branch road leakage current harvester, cloud server And mobile terminal, described main line leakage current harvester, the data measured are passed by dry, branch road leakage current harvester by GPRS communication To cloud server, mobile terminal accesses cloud server by network, and having leakage current transfinites, and cloud server can will be reported Alarming information reaches mobile terminal and shows.
Further, before described main line leakage current harvester and branch road leakage current harvester include body and are arranged on body The hold assembly of end, described hold assembly includes that two semi-circular retaining arms, described semi-circular retaining arms end are rotationally connected also By spring reset, described clamping limb built-in sensitive coil, described body internal processor and GPRS network communication module, described Induction coil gathers leakage current and passes to processor, and data are reached high in the clouds by GPRS network communication module and take by described processor Business device.
Further, the semi-circular retaining arms radian of described main line leakage current harvester is more than branch road leakage current harvester The radian of semi-circular retaining arms.
Further, described body is provided around insulation sleeve.
Further, described insulation sleeve is provided with friction lines.
Operation principle: the data of measurement are reached cloud server by GPRS communication by leakage current harvester;Mobile whole End equipment accesses cloud server by network, reads the data that arrive of harvester measurement, and sends control instruction and pass through server Reach harvester;If there is there being leakage current to transfinite, cloud server has warning message and reaches mobile terminal and show, also may be used To know relevant staff by note square tube.
This utility model provides a kind of leakage current Check System, relative to traditional electric energy meter, Fast Installation: electric leakage occur After stream tripping operation, can deploy troops on garrison duty with Fast Installation;Same scheme supports that the increase of deploying troops on garrison duty of many people scene is deployed troops on garrison duty efficiency, and quantity extends: due to Harvester uses GPRS network communication, and mobile terminal is by cloud server and harvester communication, and quantity is arbitrarily extensible;In time Remind: what is arbitrarily arranged each equipment leakage magnitude of current limit;After occurring reporting to the police, can remind relevant in time by terminal software and note Personnel;Quickly investigation: terminal software can show that main line, each branch line leakage current and main line are to the electric leakage electricity in circuit between branch line Stream size, each node leakage current can from big to small can auto-sequencing, draw leakage current curve chart, facilitate user to search And failure judgement point;Cost-effective: behind region to be checked of deploying troops on garrison duty, it is achieved online monitoring function constantly, solve and release human input;This After secondary monitoring completes, detachable lower to for next onsite application, reduce goods and materials and put into.May be implemented in line and monitoring is installed, solve and release More manpower and minimizing goods and materials put into, it becomes possible to investigate out the electrical leakage problems in supply line fast and accurately;It is on-the-spot right to allow The investigation of electric leakage is more rapid, intelligent.
Accompanying drawing explanation
In order to be illustrated more clearly that this utility model embodiment or technical scheme of the prior art, below will be to embodiment Or the required accompanying drawing used is briefly described in description of the prior art, it should be apparent that, the accompanying drawing in describing below is only It is embodiments more of the present utility model, for those of ordinary skill in the art, in the premise not paying creative work Under, it is also possible to other accompanying drawing is obtained according to these accompanying drawings.
Fig. 1 is this utility model system schematic;
Fig. 2 is leakage current harvester structural representation.
Detailed description of the invention
For making the purpose of this utility model embodiment, technical scheme and advantage clearer, real to this utility model below The technical scheme executed in example is clearly and completely described, it is clear that described embodiment is that this utility model part is implemented Example rather than whole embodiments.Based on the embodiment in this utility model, those of ordinary skill in the art are not making wound The every other embodiment obtained under the property made work premise, broadly falls into the scope of this utility model protection.
Embodiment 1:
A kind of leakage current Check System as shown in Figure 1 and Figure 2, including: main line leakage current harvester, branch road leakage current are adopted Storage, cloud server and mobile terminal, described main line leakage current harvester, dry, branch road leakage current harvester is led to by GPRS The data of measurement are reached cloud server by news, and mobile terminal accesses cloud server by network, and having leakage current transfinites, Warning message can be reached mobile terminal and show by cloud server.
Described main line leakage current harvester and branch road leakage current harvester include body 1 and are arranged on the clamping of body front end Parts 2, described hold assembly includes that two semi-circular retaining arms 3, described semi-circular retaining arms end are rotationally connected and pass through bullet Spring resets, described clamping limb 3 built-in sensitive coil, described body 1 internal processor 4 and GPRS network communication module 5, described sense Answering coil gather leakage current and pass to processor, data are reached cloud service by GPRS network communication module by described processor Device, the semi-circular retaining arms radian of described main line leakage current harvester is more than the semi-circular retaining arms of branch road leakage current harvester Radian, described body is provided around insulation sleeve, and described insulation sleeve is provided with friction lines.
Operation principle: the data of measurement are reached cloud server by GPRS communication by leakage current harvester;Mobile whole End equipment accesses cloud server by network, reads the data that arrive of harvester measurement, and sends control instruction and pass through server Reach harvester;If there is there being leakage current to transfinite, cloud server has warning message and reaches mobile terminal and show, also Relevant staff can be known by note square tube.
This utility model provides a kind of leakage current Check System, relative to traditional electric energy meter, Fast Installation: electric leakage occur After stream tripping operation, can deploy troops on garrison duty with Fast Installation;Same scheme supports that the increase of deploying troops on garrison duty of many people scene is deployed troops on garrison duty efficiency, and quantity extends: due to Harvester uses GPRS network communication, and mobile terminal is by cloud server and harvester communication, and quantity is arbitrarily extensible;In time Remind: what is arbitrarily arranged each equipment leakage magnitude of current limit;After occurring reporting to the police, can remind relevant in time by terminal software and note Personnel;Quickly investigation: terminal software can show that main line, each branch line leakage current and main line are to the electric leakage electricity in circuit between branch line Stream size, each node leakage current can from big to small can auto-sequencing, draw leakage current curve chart, facilitate user to search And failure judgement point;Cost-effective: behind region to be checked of deploying troops on garrison duty, it is achieved online monitoring function constantly, solve and release human input;This After secondary monitoring completes, detachable lower to for next onsite application, reduce goods and materials and put into.
This above example only in order to the technical solution of the utility model to be described, is not intended to limit;Although with reference to aforementioned This utility model has been described in detail by embodiment, it will be understood by those within the art that: it still can be right Technical scheme described in foregoing embodiments is modified, or wherein portion of techniques feature is carried out equivalent;And this A little amendments or replace, do not make the essence of appropriate technical solution depart from this utility model each embodiment technical scheme spirit and Scope.

Claims (5)

1. a leakage current Check System, it is characterised in that including: main line leakage current harvester, branch road leakage current harvester, cloud End server and mobile terminal, described main line leakage current harvester, dry, branch road leakage current harvester will be measured by GPRS communication Data reach cloud server, mobile terminal by network access cloud server, having leakage current transfinites, cloud service Warning message can be reached mobile terminal and show by device.
2. leakage current Check System as claimed in claim 1, it is characterised in that described main line leakage current harvester and branch road leakage Current collector includes body and is arranged on the hold assembly of body front end, and described hold assembly includes two semi-circular clamp Arm, described semi-circular retaining arms end is rotationally connected and passes through spring reset, described clamping limb built-in sensitive coil, described body Internal processor and GPRS network communication module, described induction coil gathers leakage current and passes to processor, and described processor leads to Cross GPRS network communication module and data are reached cloud server.
3. leakage current Check System as claimed in claim 2, it is characterised in that the semicircle of described main line leakage current harvester Clamping limb radian is more than the radian of the semi-circular retaining arms of branch road leakage current harvester.
4. leakage current Check System as claimed in claim 2, it is characterised in that described body is provided around insulation sleeve.
5. leakage current Check System as claimed in claim 4, it is characterised in that described insulation sleeve is provided with friction lines.
CN201620590317.XU 2016-06-16 2016-06-16 A kind of leakage current Check System Expired - Fee Related CN205753656U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620590317.XU CN205753656U (en) 2016-06-16 2016-06-16 A kind of leakage current Check System

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620590317.XU CN205753656U (en) 2016-06-16 2016-06-16 A kind of leakage current Check System

Publications (1)

Publication Number Publication Date
CN205753656U true CN205753656U (en) 2016-11-30

Family

ID=57386731

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620590317.XU Expired - Fee Related CN205753656U (en) 2016-06-16 2016-06-16 A kind of leakage current Check System

Country Status (1)

Country Link
CN (1) CN205753656U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109541375A (en) * 2018-12-20 2019-03-29 杭州华春科技有限公司 A kind of earth detector for concentrated gas meter box
CN115441861A (en) * 2022-11-07 2022-12-06 杭州加速科技有限公司 Switch circuit, method and device for reducing electric leakage of switch circuit and ATE (automatic test equipment)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109541375A (en) * 2018-12-20 2019-03-29 杭州华春科技有限公司 A kind of earth detector for concentrated gas meter box
CN115441861A (en) * 2022-11-07 2022-12-06 杭州加速科技有限公司 Switch circuit, method and device for reducing electric leakage of switch circuit and ATE (automatic test equipment)

Similar Documents

Publication Publication Date Title
CN205647033U (en) Electric leakage electric current investigation system based on thing networking
CN106610319B (en) Passive high voltage cable intermediate joint temperature measuring equipment
CN106296864A (en) A kind of distribution line intelligent inspection system based on vehicle mobile terminals and method
CN205263227U (en) Leakage detection equipment
CN103344885A (en) High-voltage single-core cable protective covering grounding online monitoring device and control method
CN205861815U (en) The detecting system of Simple Low Voltage power distribution network leakage current
CN107329043A (en) Distribution line data acquisition and On-line Fault monitoring system
CN205753656U (en) A kind of leakage current Check System
CN104330686A (en) System for detecting power supply circuit fault
CN103389408A (en) High-voltage single-core cable sheath grounding current on-line monitoring device and control method
CN202870234U (en) Online fault monitoring system for 10KV circuit
CN205038280U (en) Direct current current conversion station earthing pole on -line monitoring system
CN204925314U (en) Distribution network checkout system that fault locating used
CN204228878U (en) A kind of cable sheath grounding circulation detection system
CN203275569U (en) Distributed type distribution circuit short-circuit fault positioning and monitoring system
CN105652098A (en) Ground resistance detection and analysis system adopting solar energy to supply power
CN205581249U (en) Transmission line fault monitoring system
CN205539320U (en) Cable termination arcing ground monitoring devices
CN202814562U (en) Wireless temperature measurement system for distribution network equipment
CN103795052A (en) Data signal line RS-485 intelligent anti-lighting device and method
CN205791802U (en) A kind of electric power apparatus monitoring device
CN103516053B (en) A kind of outdoor lighting power distribution cabinet protection controller
CN204166034U (en) A kind of model plane high voltage testing device
CN204066357U (en) A kind of data transmission set of transmission line long-distance Intelligent line patrolling
CN203396822U (en) On-line monitoring device for grounding currents flowing through sheaths of high-voltage single-core cables

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161130

Termination date: 20170616