CN205747483U - Wall-hung boiler - Google Patents
Wall-hung boiler Download PDFInfo
- Publication number
- CN205747483U CN205747483U CN201620562446.8U CN201620562446U CN205747483U CN 205747483 U CN205747483 U CN 205747483U CN 201620562446 U CN201620562446 U CN 201620562446U CN 205747483 U CN205747483 U CN 205747483U
- Authority
- CN
- China
- Prior art keywords
- water supply
- supply conduit
- wall
- combustor
- water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Heat-Pump Type And Storage Water Heaters (AREA)
Abstract
This utility model provides a kind of wall-hung boiler, including: combustor;Heater, is arranged in combustor;Water supply conduit, at least part of water supply conduit is arranged on combustor, and water supply conduit and heater carry out heat exchange, and when combustion chamber operational, the water in water supply conduit and combustor carry out heat exchange to improve the temperature of the water in water supply conduit.By at least part of water supply conduit is arranged on combustor, make heat and water supply conduit generation heat exchange that the sidewall of combustor during combustion chamber operational produces, play the effect that the water in water supply conduit is heated, efficiently utilize the high temperature that sidewall of combustion chamber produces, add the utilization rate of the combustion gas of wall-hung boiler.
Description
Technical field
This utility model relates to firing equipment technical field, in particular to a kind of wall-hung boiler.
Background technology
At some cold districts of the north, wall-mounted gas heating stove is as important heating system, and get more and more subscriber households
Wall-hung boiler is used to meet the demand of floor heating and domestic water.Water owing to water temperature is relatively low in the environment of cold, to lower temperature
Heating institute calorific requirement increases, and wall-hung boiler maximum combustion generation heat and cold water direct heat transfer have been unable to reach the temperature of user's request
Degree, though controlling discharge by regulating water inlet valve can meet required water temperature, but reduces water rate and can directly affect heating demands.
Utility model content
Main purpose of the present utility model is to provide a kind of wall-hung boiler, to solve wall-hung boiler supply water temperature in prior art
Low problem.
To achieve these goals, according to an aspect of the present utility model, it is provided that a kind of wall-hung boiler, including: burning
Room;Heater, is arranged in combustor;Water supply conduit, at least part of water supply conduit is arranged on combustor, water supply conduit with
Heater carries out heat exchange, and when combustion chamber operational, the water in water supply conduit and combustor carry out heat exchange to improve water supply conduit
The temperature of interior water.
Further, at least part of water supply conduit is arranged on the outer wall of combustor.
Further, water supply conduit is located in heater, and one end of water supply conduit is water inlet end, another of water supply conduit
End is user side.
Further, water supply conduit includes: microchannel tubing, and microchannel tubing is coiled on the outer wall of combustor.
Further, water supply conduit includes: the first water supply conduit, and one end of the first water supply conduit is connected with heater,
The other end of the first water supply conduit is water inlet end, and heater is positioned at the downstream sending water direction of the first water supply conduit, at least partly
The first water supply conduit be arranged on the outer wall of combustor.
Further, water supply conduit also includes: the second water supply conduit, and one end of the second water supply conduit is connected with heater
Logical, the other end of the second water supply conduit is user side.
Further, the first water supply conduit includes: microchannel tubing, and microchannel tubing is coiled on the outer wall of combustor.
Further, microchannel tubing is flat pipeline.
Further, wall-hung boiler includes: the first temperature sensor, is arranged in water supply conduit to enter in order to monitoring water supply conduit
The temperature of water.
Further, wall-hung boiler includes: water pump, is arranged in water supply conduit.
Further, wall-hung boiler includes: housing, and combustor is arranged in housing;Second temperature sensor, is arranged at housing
On in order to monitor the temperature of hull outside environment.
Application the technical solution of the utility model, wall-hung boiler includes combustor, heater and water supply conduit.Heater is arranged
In combustor.At least part of water supply conduit of water supply conduit is arranged on combustor, and water supply conduit and heater carry out heat friendship
Changing, when combustion chamber operational, the water in water supply conduit and combustor carry out heat exchange to improve the temperature of the water in water supply conduit.
By at least part of water supply conduit is arranged on combustor so that the heat that during combustion chamber operational, the sidewall of combustor produces
With water supply conduit generation heat exchange, play the effect that the water in water supply conduit is heated, efficiently utilize sidewall of combustion chamber and produce
Raw high temperature, adds the utilization rate of the combustion gas of wall-hung boiler.
Accompanying drawing explanation
The Figure of description of the part constituting the application is used for providing being further appreciated by of the present utility model, this practicality
Novel schematic description and description is used for explaining this utility model, is not intended that improper restriction of the present utility model.
In the accompanying drawings:
Fig. 1 shows the structural representation of the embodiment according to wall-hung boiler of the present utility model.
Wherein, above-mentioned accompanying drawing includes the following drawings labelling:
10, combustor;20, heater;30, water supply conduit;31, the first water supply conduit;311, inlet pipeline;312, micro-logical
Road pipeline;32, the second water supply conduit;40, the first temperature sensor;50, water pump;60, housing;70, the second temperature sensor.
Detailed description of the invention
It should be noted that in the case of not conflicting, the embodiment in the application and the feature in embodiment can phases
Combination mutually.Describe this utility model below with reference to the accompanying drawings and in conjunction with the embodiments in detail.
It should be noted that term used herein above merely to describe detailed description of the invention, and be not intended to restricted root
Illustrative embodiments according to the application.As used herein, unless the context clearly indicates otherwise, otherwise singulative
It is also intended to include plural form, additionally, it should be understood that, when using term " to comprise " in this manual and/or " bag
Include " time, it indicates existing characteristics, step, operation, device, assembly and/or combinations thereof.
It should be noted that term " first " in the description and claims of this application and above-mentioned accompanying drawing, "
Two " it is etc. for distinguishing similar object, without being used for describing specific order or precedence.Should be appreciated that so use
Term can exchange in the appropriate case, in order to presently filed embodiment described herein such as can be with except here
Order beyond those of diagram or description is implemented.Additionally, term " includes " and " having " and their any deformation, it is intended that
It is to cover non-exclusive comprising, such as, contains series of steps or the process of unit, method, system, product or equipment not
Be necessarily limited to those steps or the unit clearly listed, but can include the most clearly listing or for these processes, side
Other step that method, product or equipment are intrinsic or unit.
For the ease of describing, space relative terms here can be used, as " ... on ", " ... top ",
" at ... upper surface ", " above " etc., be used for describing such as a device shown in the figure or feature and other devices or spy
The spatial relation levied.It should be appreciated that space relative terms is intended to comprise except the described in the drawings orientation of device
Outside different azimuth in use or operation.Such as, if the device in accompanying drawing is squeezed, then it is described as " at other devices
Part or structure above " or " other devices or structure on " device after will be positioned as " other devices or construct under
Side " or " under other devices or structure ".Thus, exemplary term " ... top " can include " ... top " and
" in ... lower section " two kinds of orientation.This device can also other different modes location (90-degree rotation or be in other orientation), and
And space used herein above described relatively make respective explanations.
Now, the illustrative embodiments according to the application it is more fully described with reference to the accompanying drawings.But, these are exemplary
Embodiment can be implemented by multiple different form, and should not be construed to be limited solely to embodiment party set forth herein
Formula.It should be appreciated that these embodiments are provided so that disclosure herein is thorough and complete, and these are shown
The design of example embodiment is fully conveyed to those of ordinary skill in the art, in the accompanying drawings, for the sake of clarity, it is possible to expand
The big thickness of layer and region, and make to be presented with like reference characters identical device, thus by omitting, they are retouched
State.
As it is shown in figure 1, according to an embodiment of the present utility model, this wall-hung boiler includes combustor 10, heater 20 and
Water supply conduit 30.Heater 20 is arranged in combustor 10.At least part of water supply conduit of water supply conduit 30 30 is arranged at burning
On room 10, water supply conduit 30 and heater 20 carry out heat exchange, the water in water supply conduit 30 and burning when combustor 10 works
Room 10 carries out heat exchange to improve the temperature of the water in water supply conduit 30.
In the present embodiment, by least part of water supply conduit 30 is arranged on combustor 10 so that combustor 10
There is heat exchange in the heat that during work, the sidewall of combustor 10 produces and water supply conduit 30, plays and add the water in water supply conduit 30
The effect of heat, efficiently utilizes the high temperature that sidewall of combustion chamber produces, adds the utilization rate of the combustion gas of wall-hung boiler.Utilize wall hanging
The combustor waste heat preheating cold water of stove provides constant leaving water temperature, adds the comfortableness of wall-hung boiler.
Wherein, at least part of water supply conduit 30 is arranged on the outer wall of combustor 10.Water supply conduit 30 is arranged at combustion
Burning makes water supply conduit 30 can be good at the outer wall generation heat exchange with combustor 10 on the outer wall of room 10, thus effectively transports
With the preheating on outer wall of combustion chamber, it is achieved wall-hung boiler heat recovery, improve and heat efficiency and comfortableness.
In the present embodiment, water supply conduit 30 is located in heater 20, and one end of water supply conduit 30 is water inlet end, send water
The other end of pipeline 30 is user side.Being heated heater 20 by combustion gas in combustor 10, heater 20 is again
The water supply conduit 30 being located in heater 20 is carried out heat exchange to improve the temperature of water in water supply conduit 30, be effectively improved
Heater 20 and the heat exchange efficiency of water supply conduit 30.
Preferably, water supply conduit 30 includes microchannel tubing 312.Microchannel tubing 312 is coiled in the outer wall of combustor 10
On.The contact area that can effectively increase microchannel tubing 312 with the outer wall of combustor 10 is so set, by increasing capacitance it is possible to increase micro-logical
The outer wall of road pipeline 312 and combustor 10 carries out the contact area of heat exchange.
In second embodiment of the present utility model, this wall-hung boiler includes combustor 10, heater 20 and water supply conduit
30.Heater 20 is arranged in combustor 10.At least part of water supply conduit of water supply conduit 30 30 is arranged on combustor 10, send
Water lines 30 and heater 20 carry out heat exchange, and when combustor 10 works, the water in water supply conduit 30 and combustor 10 carry out heat
Exchange to improve the temperature of the water in water supply conduit 30.Wherein, water supply conduit 30 includes the first water supply conduit 31.First flow pipe
The one end on road 31 is connected with heater 20, and the other end of the first water supply conduit 31 is water inlet end, and heater 20 is positioned at first and send
The downstream sending water direction of water lines 31, at least part of first water supply conduit 31 is arranged on the outer wall of combustor 10.So
Arrange and make the first outer wall generation heat exchange with combustor 10 before being heated by heater 20 of the water within water supply conduit 30
I.e. the water within water supply conduit 30 is carried out the pre-heat treatment, significantly reduce the amount of the internal fuel gas buring of combustor 10, reduce
The use cost of this wall-hung boiler.
In the present embodiment, the first water supply conduit 31 includes microchannel tubing 312.Microchannel tubing 312 is coiled in burning
On the outer wall of room 10.The outer wall so arranging water and the combustor 10 effectively increasing in microchannel tubing 312 carries out heat friendship
The efficiency changed.
Wherein, water supply conduit 30 also includes the second water supply conduit 32.One end of second water supply conduit 32 and heater 20 phase
Connection, the other end of the second water supply conduit 32 is user side.Heat after can effectively being heated by heater via 20 is so set
Water is delivered to user side and uses.
Preferably, in order to increase the pre-heat effect of water supply conduit 30 further, microchannel tubing 312 is arranged to flat
Pipeline.
Wall-hung boiler includes the first temperature sensor 40.First temperature sensor 40 is arranged in water supply conduit 30 in order to monitor
The temperature of water supply conduit 30 water inlet.So arrange and make user can regulate wall-hung boiler according to the temperature of water in water supply conduit 30
The opening degree of gas valve, so that the water temperature after combustor 10 heats disclosure satisfy that life is required.
In order to supplement water continuously in water supply conduit 30, water supply conduit is provided with water pump 50.
In the 3rd embodiment of the present utility model, wall-hung boiler includes the first temperature sensor 40, housing the 60, second temperature
Sensor 70, combustor 10, heater 20 and water supply conduit 30.Combustor 10 is arranged in housing 60.Heater 20 is arranged at
In combustor 10.At least part of water supply conduit of water supply conduit 30 30 is arranged on combustor 10, water supply conduit 30 and heater
20 carry out heat exchange, and when combustor 10 works, the water in water supply conduit 30 and combustor 10 carry out heat exchange to improve flow pipe
The temperature of the water in road 30.Second temperature sensor 70 is arranged on housing 60 in order to monitor the temperature of housing 60 external environment condition.
First temperature sensor 40 is arranged in water supply conduit 30 temperature in order to monitor water supply conduit 30 water inlet.So arrange and make
User can be by the opening and closing degree of the gas valve of the temperature regulation wall-hung boiler of the temperature of external environment and water inlet, and regulating gas fires
Burn ratio value so that the water temperature after combustor 10 heats disclosure satisfy that life is required.
In the present embodiment, the entrance point of water supply conduit 30 is provided with inlet valve, and the user side of water supply conduit 30 is arranged
Flowing water Valve, inlet valve and flowing water Valve is had to be respectively intended to control the flow of water inlet and water outlet.Waste heat by combustor 10
Reclaiming preheating cold water, after cold water heat absorption, water temperature suitably raises, then is heated to design temperature by combustor 10, keeps constant going out
Coolant-temperature gage, that improves wall-hung boiler heats efficiency.
Attaching Flat waterpipe on the outer wall of combustor 10, Flat waterpipe uses microchannel design, micro-on the downside of water inlet pipe connection
Passage water pipe, water route is collected in the heater 20 in entrance combustor by microchannel combustor outside again and is heated.?
Rear connection outlet pipe is for user's water demand.When wall-hung boiler is properly functioning, combustion chamber burning produces heat of high temperature heating and send
Water in water lines 30, outer wall of combustion chamber is due to heat conduction temperature equally up to more than 100 DEG C simultaneously, and water supply conduit 30 is by burning
The high-temperature conduit heat exchange of outdoor microchannel first preheats, and water temperature now rises a lot by heat exchange preheating temperature, then entrance of confluxing
Adding in pipe line i.e. heater 20 within combustor 10, directly heats, and reaches user's design temperature.According to preset environment temperature
When sensor (the second temperature sensor 70) and inflow temperature sensor (the first temperature sensor 40) can determine whether combustion chamber operational
The recovery utilization rate of outer wall high-temperature residual heat, the outer wall waste heat preheating water temperature rise situation of combustor 10, and then regulating gas ratio
Valve controls firepower, it is ensured that constant output water temperature, improves the efficiency of wall-hung boiler.Summer mainly utilizes heat recovery energy-saving, and winter can carry
Front preheating cold water, it is ensured that constant leaving water temperature.Water route, microchannel simultaneously as the outer wall heat-exchanging water cooling system of combustor 10,
Avoid the impact components and parts insulation ag(e)ing around of combustor localized hyperthermia impaired, and wall-hung boiler shell heat transfer high temperature hidden danger.Effectively
Improve service life of wall-hung boiler.
As can be seen from the above description, this utility model the above embodiments achieve following technique effect:
By at least part of water supply conduit is arranged on combustor so that during combustion chamber operational, the sidewall of combustor produces
Raw heat and water supply conduit generation heat exchange, play the effect heating the water in water supply conduit, efficiently utilize burning
The high temperature that room sidewall produces, adds the utilization rate of the combustion gas of wall-hung boiler.The combustor waste heat preheating cold water utilizing wall-hung boiler carries
For constant leaving water temperature, add the comfortableness of wall-hung boiler.
The foregoing is only preferred embodiment of the present utility model, be not limited to this utility model, for this
For the technical staff in field, this utility model can have various modifications and variations.All in spirit of the present utility model and principle
Within, any modification, equivalent substitution and improvement etc. made, within should be included in protection domain of the present utility model.
Claims (11)
1. a wall-hung boiler, it is characterised in that including:
Combustor (10);
Heater (20), is arranged in described combustor (10);
Water supply conduit (30), at least part of described water supply conduit (30) is arranged on described combustor (10), described flow pipe
Road (30) and described heater (20) carry out heat exchange, the water in described water supply conduit (30) when described combustor (10) works
Heat exchange is carried out to improve the temperature of the water in described water supply conduit (30) with described combustor (10).
Wall-hung boiler the most according to claim 1, it is characterised in that at least part of described water supply conduit (30) is arranged at institute
State on the outer wall of combustor (10).
Wall-hung boiler the most according to claim 1 and 2, it is characterised in that described water supply conduit (30) is located in described heating
In device (20), one end of described water supply conduit (30) is water inlet end, and the other end of described water supply conduit (30) is user side.
Wall-hung boiler the most according to claim 3, it is characterised in that described water supply conduit (30) including:
Microchannel tubing (312), described microchannel tubing (312) is coiled on the outer wall of described combustor (10).
Wall-hung boiler the most according to claim 1 and 2, it is characterised in that described water supply conduit (30) including:
First water supply conduit (31), one end of described first water supply conduit (31) is connected with described heater (20), and described
The other end of one water supply conduit (31) is water inlet end, and what described heater (20) was positioned at described first water supply conduit (31) send water side
To downstream, at least part of described first water supply conduit (31) is arranged on the outer wall of described combustor (10).
Wall-hung boiler the most according to claim 5, it is characterised in that described water supply conduit (30) also includes:
Second water supply conduit (32), one end of described second water supply conduit (32) is connected with described heater (20), and described
The other end of two water supply conduits (32) is user side.
Wall-hung boiler the most according to claim 5, it is characterised in that described first water supply conduit (31) including:
Microchannel tubing (312), described microchannel tubing (312) is coiled on the outer wall of described combustor (10).
Wall-hung boiler the most according to claim 7, it is characterised in that described microchannel tubing (312) is flat pipeline.
Wall-hung boiler the most according to claim 1, it is characterised in that described wall-hung boiler includes:
First temperature sensor (40), is arranged in described water supply conduit (30) in order to monitor what described water supply conduit (30) was intake
Temperature.
Wall-hung boiler the most according to claim 1, it is characterised in that described wall-hung boiler includes:
Water pump (50), is arranged in described water supply conduit (30).
11. wall-hung boilers according to claim 1, it is characterised in that described wall-hung boiler includes:
Housing (60), described combustor (10) is arranged in described housing (60);
Second temperature sensor (70), is arranged on described housing (60) in order to monitor the temperature of described housing (60) external environment condition
Degree.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620562446.8U CN205747483U (en) | 2016-06-08 | 2016-06-08 | Wall-hung boiler |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620562446.8U CN205747483U (en) | 2016-06-08 | 2016-06-08 | Wall-hung boiler |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205747483U true CN205747483U (en) | 2016-11-30 |
Family
ID=57361123
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620562446.8U Active CN205747483U (en) | 2016-06-08 | 2016-06-08 | Wall-hung boiler |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205747483U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105890160A (en) * | 2016-06-08 | 2016-08-24 | 珠海格力电器股份有限公司 | Wall-mounted furnace |
-
2016
- 2016-06-08 CN CN201620562446.8U patent/CN205747483U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105890160A (en) * | 2016-06-08 | 2016-08-24 | 珠海格力电器股份有限公司 | Wall-mounted furnace |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106403274A (en) | Gas water heater with heat supply function | |
CN104791893A (en) | PTC ceramic electric heating device and integrated heating system | |
CN104180425B (en) | A kind of high-power central hot radiator of family expenses Dual-energy source | |
CN107726428A (en) | The heating system of domestic solar heat collector condensing gas wall hanging stove | |
CN201662211U (en) | Dual-water-pump gas-fired heating and hot water boiler | |
CN101900366A (en) | Double-tank hot-water system with double thermal effects | |
CN205825411U (en) | A kind of gas heater of band heating function | |
CN102679410A (en) | Novel efficient gas cooking appliance integrated with heat pipe, heat-insulation bushing and temperature-difference power generation | |
CN205747483U (en) | Wall-hung boiler | |
CN108088070A (en) | A kind of Intelligent preheating gas heater and its subsystem and implementation method | |
CN202125993U (en) | Comprehensive heating system for gas instant-heating type water heater of air source heat pump | |
CN207515033U (en) | The heating system of domestic solar heat collector-condensing gas wall hanging stove | |
CN202613513U (en) | Novel efficient gas cooking appliance integrating heat pipe, heat insulation bushing with temperature difference generating sheets | |
CN206001583U (en) | A kind of condensed type combustion gas warm up bath dual-purpose stove | |
CN204006282U (en) | The hot radiator of a kind of high-power central authorities of family expenses Dual-energy source | |
CN210624878U (en) | Sleeve type wall-mounted furnace | |
CN209726498U (en) | A kind of efficient frequency conversion multimode wall-hung boiler | |
CN208794532U (en) | A kind of air source heat pump system trilogy supply multipurpose water tank | |
CN203052807U (en) | Hybrid-energy remote-intelligent-control heating system | |
CN203052808U (en) | Hybrid-energy remote-intelligent-control heating system | |
CN107560147B (en) | Household air source heat pump hot water system assisted by gas wall-mounted boiler and control method thereof | |
CN102506455B (en) | A kind of energy-efficient formula electric heater | |
CN206648283U (en) | A kind of new forced exhaust gas water heater | |
CN201425390Y (en) | Double energy source ground heating air conditioner and hot water supply system | |
CN105890160A (en) | Wall-mounted furnace |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |