CN205742956U - A kind of safe Hanging Basket for work high above the ground - Google Patents

A kind of safe Hanging Basket for work high above the ground Download PDF

Info

Publication number
CN205742956U
CN205742956U CN201620410059.2U CN201620410059U CN205742956U CN 205742956 U CN205742956 U CN 205742956U CN 201620410059 U CN201620410059 U CN 201620410059U CN 205742956 U CN205742956 U CN 205742956U
Authority
CN
China
Prior art keywords
hanging basket
sides
ground
high above
work high
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620410059.2U
Other languages
Chinese (zh)
Inventor
杨兴超
张恩泽
赵诚
许洪元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201620410059.2U priority Critical patent/CN205742956U/en
Application granted granted Critical
Publication of CN205742956U publication Critical patent/CN205742956U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a kind of safe Hanging Basket for work high above the ground, including the first Hanging Basket, second Hanging Basket, the port both sides of described first Hanging Basket are connected with described second Hanging Basket port both sides by load bar, the two ends of described load bar are connected with the load rod bush bolt being arranged on described Hanging Basket port both sides respectively, in the middle part of described first Hanging Basket, both sides are connected with both sides in the middle part of described second Hanging Basket by fixing bar, the two ends of described fixing bar are flexibly connected with the fastening mechanism being arranged on inside described Hanging Basket in the middle part of column respectively, this Hanging Basket solves high-altitude girder steel construction difficulty, the technical barrier of personnel safety's difference, ensure that construction quality, raise labour efficiency, promote production development.

Description

一种用于高空作业的安全挂篮A safety hanging basket for high-altitude operation

技术领域technical field

本实用新型属于建筑施工中对高空钢结构进行操作的工作平台,特别涉及一种用于高空作业的安全挂篮。The utility model belongs to a working platform for operating high-altitude steel structures in building construction, in particular to a safety hanging basket for high-altitude operations.

背景技术Background technique

一般钢结构工程钢梁施工(包括焊接、螺栓连接及附件安装),传统做法是在工作面下方搭设满堂架手架操作平台,并张挂安全平网。其提供了施工人员工作的平台和防护设施,但这种方法存在着以下缺点:1)设在梁底的操作平台和平网阻碍了钢梁及梁上构件的吊装;2)钢结构工程一般高度、面积较大,搭设满堂脚手架投入费用大;3)搭拆脚手架占用大量工期,不能满足工期进度要求。而对于位于数十米乃至百米高空的钢梁,则不可能采取自地面至工作面搭设如此高的脚手架操作平台,因此施工人员只能采取系挂安全带在钢梁上进行高空作业。此时,施工人员在数十米高处窄长的钢梁上犹如处于高空独木桥上,缺乏安全感,存在心理压力,极易发生安全事故;由于在钢梁上行动不便,动作迟缓,加之在无操作平台及可靠防护的情况下从事高空作业,施工人员不可能做到心无旁骛,专心致志,因而大大降低了工作效率,工程施工质量亦大打折扣;系挂安全带只能在钢梁顶面操作,梁侧面施工极其不便,且无法进行梁底部位施工。For the construction of steel beams in general steel structure engineering (including welding, bolt connection and attachment installation), the traditional method is to set up a full-handle scaffolding operating platform under the working surface and hang a safety flat net. It provides a platform and protective facilities for construction personnel to work, but this method has the following disadvantages: 1) The operating platform and flat net at the bottom of the beam hinder the hoisting of the steel beam and the components on the beam; 2) The general height of steel structure engineering , The area is large, and the investment cost of erecting a full house of scaffolding is large; 3) The erection and dismantling of scaffolding takes up a lot of construction time, which cannot meet the progress requirements of the construction period. For steel beams located at a height of tens of meters or even hundreds of meters, it is impossible to set up such a high scaffolding operation platform from the ground to the working surface, so construction workers can only use safety belts to carry out high-altitude operations on the steel beams. At this time, the construction workers are on the narrow and long steel beams tens of meters high, as if they are on a high-altitude single-plank bridge. They lack a sense of security, have psychological pressure, and are prone to safety accidents; Without an operating platform and reliable protection, it is impossible for construction workers to work at heights without distraction, which greatly reduces work efficiency and construction quality; the safety belt can only be operated on the top of the steel beam. The construction on the side of the beam is extremely inconvenient, and the construction at the bottom of the beam cannot be carried out.

实用新型内容Utility model content

针对现有技术,本实用新型提供一种高空作业的安全挂篮,该挂篮解决了高空钢梁施工难,人员安全性差的技术难题,保证了工程质量,提高劳动效率,促进生产发展。Aiming at the prior art, the utility model provides a safety hanging basket for high-altitude operations, which solves the technical problems of difficult construction of high-altitude steel beams and poor safety of personnel, ensures project quality, improves labor efficiency, and promotes production development.

为了解决现有技术中存在技术问题,本实用新型采用如下技术方案予以实施:In order to solve the technical problems in the prior art, the utility model adopts the following technical solutions to implement:

一种用于高空作业的安全挂篮,包括第一挂篮、第二挂篮,所述第一挂篮的端口两侧通过担杆与所述第二挂篮端口两侧连接,所述担杆的两端分别与设置在所述挂篮端口两侧的担杆套管螺栓连接,所述第一挂篮中部两侧通过固定杆与所述第二挂篮中部两侧连接,所述固定杆的两端分别与设置在所述挂篮内侧立柱中部的固紧机构活动连接。A safety hanging basket for working at heights, comprising a first hanging basket and a second hanging basket, both sides of the port of the first hanging basket are connected to both sides of the port of the second hanging basket through poles, and the two sides of the port of the first hanging basket The two ends of the rod are respectively connected with the rod casing bolts arranged on both sides of the port of the hanging basket, and the two sides of the middle part of the first hanging basket are connected with the two sides of the middle part of the second hanging basket through fixing rods. The two ends of the rod are respectively movably connected with the fastening mechanism arranged in the middle of the column inside the hanging basket.

所述固紧机构包括带托架的连接板,所述连接板通过螺栓孔连接有U形螺栓,所述托架活动连接所述固定杆。The fastening mechanism includes a connecting plate with a bracket, the connecting plate is connected with U-shaped bolts through bolt holes, and the bracket is movably connected with the fixing rod.

所述挂篮外侧面上及内侧顶部设置有固定护栏,所述挂篮内侧立柱通过插管连接有活动护栏。所述担杆管壁侧面等距设置有螺栓孔。The outer surface and inner top of the hanging basket are provided with fixed guardrails, and the inner column of the hanging basket is connected with movable guardrails through intubation tubes. Bolt holes are equidistantly arranged on the side of the pipe wall of the pole.

所述担杆套管管壁侧面等距设置有螺栓孔。Bolt holes are equidistantly arranged on the side of the tube wall of the pole casing.

所述固定杆的两端设置有竖直钩。Two ends of the fixed rod are provided with vertical hooks.

所述托架与所述连接板为整体结构。The bracket and the connecting plate are of integral structure.

所述托架为斧形。The bracket is ax-shaped.

所述活动护栏至少2根以上。There are at least two movable guardrails.

本实用新型有益效果:Beneficial effects of the utility model:

1)本实用新型通过担杆悬挂固定在支撑梁上,利用支撑梁承载,保证了挂篮在高空中稳定性和使用安全要求。1) The utility model is suspended and fixed on the supporting beam by a pole, and the supporting beam is used for bearing, which ensures the stability and safety requirements of the hanging basket in high altitude.

2)本实用新型通过在挂篮的立柱中部设置固紧机构及在其上安装固定杆,与挂篮上部的担杆共同作用,牢固地将挂篮安放在支撑梁上,充分地保证挂篮在高空中安全性;即使在挂篮载荷不平衡的情况下也能确保挂篮的稳定。2) The utility model sets the fastening mechanism in the middle of the upright column of the hanging basket and installs the fixing rod on it, and cooperates with the supporting rod on the upper part of the hanging basket to firmly place the hanging basket on the support beam, fully ensuring the stability of the hanging basket Safety at high altitudes; ensures the stability of the hanging basket even when the hanging basket load is unbalanced.

3)本实用新型中挂篮位于支撑梁两侧,满足对施工钢梁顶面、侧面、底面进行全方位施工要求,保证工程质量。3) In the utility model, the hanging baskets are located on both sides of the support beam, which meets the requirements for all-round construction on the top, side and bottom surfaces of the construction steel beam, and ensures the quality of the project.

4)本实用新型中担杆与挂篮中的担杆套管插接,可伸缩调节两侧挂篮的间距,满足各种宽度钢梁施工需要。4) In the utility model, the pole and the pole sleeve in the hanging basket are plugged in, and the distance between the hanging baskets on both sides can be telescopically adjusted to meet the construction needs of steel beams of various widths.

5)本实用新型中在挂篮内侧施工地方设置有活动式护栏,施工钢梁侧、底部位时可将其拆卸,满足工作面需要。5) In the utility model, a movable guardrail is provided at the construction place inside the hanging basket, which can be disassembled when constructing the side and bottom of the steel beam to meet the needs of the working surface.

6)本实用新型中挂篮设计小巧轻便,方便吊装,分离组装式部件便于运输和储存。6) The design of the hanging basket in the utility model is compact and light, which is convenient for hoisting, and the separated and assembled parts are convenient for transportation and storage.

附图说明Description of drawings

图1是本实用新型一种用于高空作业的安全挂篮结构示意图。Fig. 1 is a schematic structural diagram of a safety hanging basket for high-altitude operations of the present invention.

图2是本实用新型一种用于高空作业的安全挂篮中固紧机构结构示意图。Fig. 2 is a structural schematic diagram of a fastening mechanism in a safety hanging basket for working at heights according to the present invention.

图3是本实用新型一种用于高空作业的安全挂篮中单个挂篮结构示意图。Fig. 3 is a structural schematic diagram of a single hanging basket in a safety hanging basket for working at heights according to the utility model.

图4是本实用新型一种用于高空作业的安全挂篮施工状态图。Fig. 4 is a construction status diagram of a safety hanging basket for high-altitude operations of the present invention.

具体实施方式detailed description

下面结合附图对本实用新型做出详细地说明:Below in conjunction with accompanying drawing, the utility model is described in detail:

如图1所示,本实用新型提供一种用于高空作业的安全挂篮,包括第一挂篮11、第二挂篮21,所述第一挂篮11端口两侧通过担杆(12,22)与所述第二挂篮21端口两侧连接,所述担杆(12,22)的两端分别与设置在所述挂篮(11,21)端口两侧的担杆套管(13,14,23,24)螺栓连接;所述担杆(12,22)的管壁侧面等距设置有螺栓孔。所述担杆套管(13,14,23,24)的管壁侧面等距设置有螺栓孔。所述担杆套管(13,14,23,24)的螺栓孔与所述担杆的(12,22)的螺栓孔相匹配。所述担杆(12,22)数量为2根,安装在挂篮(11,21)端口两侧(两端插入挂篮上担杆套管内并用螺栓紧固,用于挂篮(11,21)之间的连接及承担挂篮上的荷载。所述担杆(12,22)采用80×80×6.3方钢管加工,长度根据需要确定,方钢管相对管壁侧面按200mm间距钻Φ18螺栓孔。所述担杆套管(13,14,23,24)采用90×90×4方钢管加工,长度等于600mm,相对管壁侧面按200mm间距钻Φ18螺栓孔。担杆套管(13,14,23,24)总数为4个,每个挂篮端口两侧各设1个。As shown in Figure 1, the utility model provides a safety hanging basket for high-altitude operations, including a first hanging basket 11 and a second hanging basket 21, and the two sides of the first hanging basket 11 are connected by poles (12, 22) Connect to both sides of the port of the second hanging basket 21, and the two ends of the pole (12, 22) are respectively connected to the pole sleeves (13) arranged on both sides of the port of the hanging basket (11, 21). , 14, 23, 24) bolted connection; the pipe wall side of the pole (12, 22) is equidistantly provided with bolt holes. Bolt holes are equidistantly arranged on the pipe wall sides of the pole sleeves (13, 14, 23, 24). The bolt holes of the pole sleeves (13, 14, 23, 24) match the bolt holes of the poles (12, 22). The number of the poles (12, 22) is 2, which are installed on both sides of the port of the hanging basket (11, 21) (both ends are inserted into the sleeves of the poles on the hanging basket and fastened with bolts, and are used for hanging baskets (11, 21). ) and bear the load on the hanging basket. The poles (12, 22) are processed with 80×80×6.3 square steel pipes, the length is determined according to needs, and the square steel pipes are drilled with Φ18 bolt holes at 200mm intervals relative to the side of the pipe wall The pole sleeves (13,14,23,24) are processed with 90×90×4 square steel pipes, the length is equal to 600mm, and Φ18 bolt holes are drilled at a distance of 200mm from the side of the pipe wall. The pole sleeves (13,14 , 23, 24) There are 4 in total, 1 on both sides of each hanging basket port.

本实用新型中用于所述担杆(12,22)与担杆套管(13,14,23,24)的连接螺栓采用螺杆直径为Φ16,长度为130mm;前端套丝,螺纹规格为M14,螺纹段长度不少于30mm;尾部设固定螺母。In the utility model, the connecting bolts used for the poles (12, 22) and the pole sleeves (13, 14, 23, 24) adopt a screw diameter of Φ16 and a length of 130mm; the front end is threaded, and the thread specification is M14 , the length of the threaded section is not less than 30mm; the tail is provided with a fixed nut.

如图1所示,所述第一挂篮11中部两侧通过固定杆(17,27)与所述第二挂篮21中部两侧连接,所述固定杆(17,27)的两端分别与设置在所述挂篮(11,21)内侧立柱中部的固紧机构(15,16,25,26)活动连接。如图2所示,所述固紧机构(15,16,25,26)包括带托架(151,161,251,261)的连接板(152,162,252,262),所述连接板(152,162,252,262)通过螺栓孔(153,163,253,263)连接有U形螺栓(154,164,254,264),所述托架(151,161,251,261)活动连接固定杆(17,27)。所述托架(151,161,251,261)与所述连接板(152,162,252,262)为整体结构。所述托架(151,161,251,261)为斧形。所述托架(151,161,251,261)与所述连接板(152,162,252,262)均采用10mm厚钢板加工,在所述连接板(152,162,252,262)上钻有用于安装U形螺栓(154,164,254,264)的螺栓孔(153,163,253,263)。所述U形螺栓(154,164,254,264)规格为Φ14,净宽为50mm,肢长为95mm,端部螺纹段长度不少于40mm。所述固定杆(17,27)的两端设置有竖直钩,用于防止其单向滑动。所述固定杆(17,27)采用≥Φ25钢筋加工而成,使用时将其两端安装在两侧托架(151,161,251,261)上,通过调节所述托架(151,161,251,261)位置使固定杆上表面紧贴支撑梁底面,与上部的所述担杆(12,22)共同作用,保证所述挂篮(11,21)平衡稳固。本实用新型中的支撑梁可以选用施工钢梁、工程钢梁。As shown in Figure 1, both sides of the middle part of the first hanging basket 11 are connected to both sides of the middle part of the second hanging basket 21 through fixing rods (17, 27), and the two ends of the fixing rods (17, 27) are respectively It is movably connected with the fastening mechanism (15, 16, 25, 26) arranged in the middle of the inner column of the hanging basket (11, 21). As shown in Figure 2, the fastening mechanism (15, 16, 25, 26) includes a connecting plate (152, 162, 252, 262) with a bracket (151, 161, 251, 261), and the connecting plate (152, 162, 252, 262) passes through a bolt hole (153, 163, 253, 263) are connected with U-shaped bolts (154, 164, 254, 264), and the brackets (151, 161, 251, 261) are movably connected with the fixing rods (17, 27). The brackets (151, 161, 251, 261) and the connecting plates (152, 162, 252, 262) are integrally structured. The brackets (151, 161, 251, 261) are ax-shaped. Both the brackets (151, 161, 251, 261) and the connecting plates (152, 162, 252, 262) are processed by 10 mm thick steel plates, and holes for installing U-shaped bolts (154, 164, 254, 264) are drilled on the connecting plates (152, 162, 252, 262). Bolt holes (153, 163, 253, 263). The specification of the U-shaped bolts (154, 164, 254, 264) is Φ14, the clear width is 50mm, the leg length is 95mm, and the length of the threaded section at the end is not less than 40mm. The two ends of the fixed rods (17, 27) are provided with vertical hooks for preventing them from sliding in one direction. The fixed rods (17, 27) are processed by ≥Φ25 steel bars, and their two ends are installed on the brackets (151, 161, 251, 261) on both sides when in use, and fixed by adjusting the positions of the brackets (151, 161, 251, 261). The upper surface of the rod is close to the bottom surface of the support beam, and cooperates with the upper pole (12, 22) to ensure the balance and stability of the hanging basket (11, 21). The support girder in the utility model can select construction steel girder, engineering steel girder for use.

如图3所示,本实用新型中所述第一挂篮11、第二挂篮21均由底框(111,211)、底板(112,212)、护栏(41,42)、挡板(113,213)、担杆套管(13,14,23,24)组装而成。其中:底框是由边框和中部腹杆组成,采用40×40方钢管焊制;边框的尺寸为1000mm×600mm。所述底板(112,212)采用3mm厚钢板,铺设焊接在底框(111,211)上面。挡板(113,213)也采用3mm厚钢板,高度为150mm,安装在底板(112,212)四周,与底板和挂篮外侧立柱焊接。如图1所示,所述挂篮(11,21)外侧面上设置有固定护栏41,所述挂篮(11,21)内侧立柱通过插管43连接有活动护栏42。如图3所示,本实用新型中护栏(41,42)均采用40×40方钢管。其中,固定护栏41高度为1200mm,活动护栏42安装在所述挂篮(11,21)内侧中部,设2根,采用≥Φ25钢筋加工而成,其两端弯钩安插在所述插管43内。As shown in Figure 3, the first hanging basket 11 and the second hanging basket 21 described in the utility model are all composed of a bottom frame (111,211), a bottom plate (112,212), a guardrail (41,42), a baffle plate (113,213), Rod sleeves (13,14,23,24) are assembled. Among them: the bottom frame is composed of a frame and a central web bar, which is welded with 40×40 square steel pipes; the size of the frame is 1000mm×600mm. The bottom plate (112,212) adopts 3mm thick steel plate, which is laid and welded on the bottom frame (111,211). Baffle plate (113,213) also adopts 3mm thick steel plate, and height is 150mm, is installed around base plate (112,212), welds with base plate and hanging basket outer column. As shown in FIG. 1 , a fixed guardrail 41 is provided on the outer surface of the hanging basket ( 11 , 21 ), and a movable guardrail 42 is connected to the inner column of the hanging basket ( 11 , 21 ) through a tube 43 . As shown in Figure 3, guardrail (41,42) all adopts 40 * 40 square steel pipes in the utility model. Among them, the height of the fixed guardrail 41 is 1200mm, and the movable guardrail 42 is installed in the middle part of the inner side of the hanging basket (11, 21). Inside.

如图4所示,为了解决现有技术中存在技术问题,本实用新型还可以采用如下技术方案予以实施:As shown in Figure 4, in order to solve the technical problems in the prior art, the utility model can also be implemented by adopting the following technical solutions:

步骤一,在地面对第一挂篮11、第二挂篮21进行组装,将2根担杆(12,22)分别插入所述第一挂篮11和第二挂篮21端口两侧的担杆套管(13,14,23,24)中,同时按照施工的要求调节第一挂篮11、第二挂篮21内侧的间距至担杆(12,22)上的螺栓孔与担杆套管(13,14,23,24)上的螺栓孔对齐;穿入连接螺栓、螺母予以紧固;Step 1: Assemble the first hanging basket 11 and the second hanging basket 21 on the ground, and insert two poles (12, 22) into the ports on both sides of the first hanging basket 11 and the second hanging basket 21 respectively. In the pole sleeves (13, 14, 23, 24), at the same time adjust the distance between the inside of the first hanging basket 11 and the second hanging basket 21 to the bolt holes on the poles (12, 22) and the poles according to the construction requirements. The bolt holes on the sleeves (13, 14, 23, 24) are aligned; penetrate the connecting bolts and nuts to tighten them;

步骤二,分别通过固紧机构中(15,16,25,26)的U形螺栓(154,164,254,264)将连接板(152,162,252,262)与第一挂篮11、第二挂篮21的内侧立柱连接,予以临时固定;并将活动护栏42分别安装在第一挂篮11、第二挂篮21内侧中空部位,其两端弯钩安插在第一挂篮、第二挂篮内侧立柱的插管43内;Step 2, through the U-shaped bolts (154,164,254,264) in the fastening mechanism (15,16,25,26), connect the connecting plate (152,162,252,262) with the inner column of the first hanging basket 11 and the second hanging basket 21 Connect and be temporarily fixed; and the movable guardrail 42 is respectively installed in the first hanging basket 11, the hollow part inside the second hanging basket 21, and the hooks at both ends are inserted into the intubation tubes of the first hanging basket and the inner column of the second hanging basket within 43;

步骤三,启动吊车将通过担杆(12,22)连接在一起的第一挂篮(11)、第二挂篮(21)吊运至支撑梁(19)施工位置,使担杆(12,22)坐落在支撑梁19上,保证第一挂篮11、第二挂篮21位于支撑梁19的两侧,呈骑跨状安放在支撑梁上;Step 3, start the crane to hoist the first hanging basket (11) and the second hanging basket (21) connected together by the poles (12, 22) to the construction position of the support beam (19), so that the poles (12, 22) 22) Be located on the support beam 19, ensure that the first hanging basket 11 and the second hanging basket 21 are located on both sides of the support beam 19, and are placed on the support beam in a straddle shape;

步骤四,调正第一挂篮11、第二挂篮21位置,将固定杆(17,27)穿过支撑梁19下方,其两端安装在托架(151,161,251,261)上,然后调节连接板(152,162,252,262)位置使固定杆(17,27)上表面贴紧支撑梁19底面,拧紧U形螺栓(154,164,254,264)的螺母将连接板(152,162,252,262)与第一挂篮11、第二挂篮21的内侧立柱固定;Step 4, adjust the positions of the first hanging basket 11 and the second hanging basket 21, pass the fixing rods (17, 27) under the support beam 19, install the two ends on the brackets (151, 161, 251, 261), and then adjust the connection The position of the plate (152,162,252,262) makes the upper surface of the fixed rod (17,27) close to the bottom surface of the support beam 19, and the nuts of the U-shaped bolts (154,164,254,264) are tightened to connect the connecting plate (152,162,252,262) with the first hanging basket 11, The inner column of the second hanging basket 21 is fixed;

步骤五,施工人员系挂安全带进入挂篮(11,21)内作业,吊车配合料具运输;根据施工的要求随时拆除活动护栏42,待完成一个部位施工后,拆卸固定杆(17,27),将挂篮(11,21)吊运至下一施工部位,重复前述步骤。Step 5, the construction personnel fasten the safety belt and enter the hanging basket (11, 21) to work, and the crane transports it with materials; according to the construction requirements, the movable guardrail 42 is removed at any time, and after the construction of a part is completed, the fixed rod (17, 27 ), lift the hanging basket (11, 21) to the next construction site, and repeat the preceding steps.

如下是本实用新型一种实施例的体现,即对本实用新型零件加工、选材要求:The following is the embodiment of a kind of embodiment of the utility model, promptly to the utility model parts processing, material selection requirement:

1)挂篮零部件制作加工1) Manufacturing and processing of hanging basket parts

(1)挂篮制作加工:挂篮由底框、底板、安全护栏、挡板、担杆套管组装而成。(1) Manufacture and processing of the hanging basket: the hanging basket is assembled by the bottom frame, the bottom plate, the safety guardrail, the baffle, and the pole casing.

A、底框、安全护栏制作、组焊A. Bottom frame, safety guardrail production, assembly welding

底框、安全护栏主要采用40×40方钢管加工、焊制。加工流程如下:The bottom frame and safety guardrail are mainly processed and welded with 40×40 square steel pipes. The processing flow is as follows:

材料采购(要求供应商提供材质证明单)→原材检验→型材切割下料→底框拼装焊接→护栏安装焊接→检验。Material procurement (supplier is required to provide a material certificate) → raw material inspection → profile cutting and blanking → bottom frame assembly and welding → guardrail installation and welding → inspection.

其中,活动式护栏横杆采用≥Φ25钢筋按设计尺寸加工成U形件。另在工作平台内侧护栏立柱侧面装焊用于安装活动式横杆的钢管插管。Among them, the movable guardrail cross bar is processed into U-shaped parts according to the design size with ≥Φ25 steel bars. In addition, the steel pipe intubation pipe for installing the movable cross bar is installed and welded on the side of the guardrail column inside the working platform.

B、底板、挡板加工、安装B. Bottom plate and baffle processing and installation

底板、挡板材料采用3mm厚钢板。Base plate and baffle are made of 3mm thick steel plate.

底板钢板按照底框尺寸剪裁:铺设焊接在底框上面。The bottom plate steel plate is cut according to the size of the bottom frame: it is laid and welded on the bottom frame.

挡板高度为150mm,安装在底板四周,与底板和护栏立柱焊接。The height of the baffle is 150mm, installed around the base plate, and welded with the base plate and the guardrail column.

C、担杆套管加工、安装C. Processing and installation of pole casing

担杆套管采用90×90×4方钢管加工,按设计尺寸下料、钻孔,安装焊接在工作平台两短边护栏顶部外侧。要求安装高度一致、水平。The pole casing is processed with 90×90×4 square steel pipes, cut and drilled according to the design size, and installed and welded on the top of the two short side guardrails of the working platform. The installation height is required to be consistent and level.

(1)担杆加工(1) pole processing

担杆采用80×80×6.3方钢管加工,按要求尺寸下料、钻孔,其上的螺栓孔位置、间距须与担杆套管匹配。The pole is processed by 80×80×6.3 square steel pipe, cut and drilled according to the required size, and the position and spacing of the bolt holes on it must match the bushing of the pole.

(2)连接螺栓加工(2) Connection bolt processing

连接螺栓螺杆采用Φ16圆钢,前端加工M14螺纹,尾部焊M16螺母。螺栓规格、尺寸应符合设计要求The connecting bolts and screws are made of Φ16 round steel, the front end is processed with M14 threads, and the tail is welded with M16 nuts. Bolt specifications and dimensions should meet the design requirements

(4)固定杆加工(4) Fixing rod processing

固定杆使用≥Φ25钢筋。The fixed rod uses ≥Φ25 steel bars.

(5)固紧机构加工(5) Fastening mechanism processing

连接板本体采用10mm厚钢板加工焊接。加工流程为:The connecting plate body is processed and welded with 10mm thick steel plate. The processing flow is:

钢板下料→连接钢板钻孔→托架与连接钢板组装焊接→检验。Steel plate blanking → connecting steel plate drilling → bracket and connecting steel plate assembly and welding → inspection.

U形螺栓采用Φ14圆钢,按按设计形状尺寸弯制及加工螺纹。The U-shaped bolts are made of Φ14 round steel, and the threads are bent and processed according to the designed shape and size.

上述实例仅用于说明本实用新型,其中各部件的结构、材料、连接方式都是可以有所变化的,凡是在本实用新型技术基础上进行的等同变换和改进,均不应该排除在本实用新型的保护范围之外。The above examples are only used to illustrate the utility model, wherein the structures, materials and connection methods of each component can be changed, and any equivalent transformation and improvement carried out on the technical basis of the utility model should not be excluded from the scope of the utility model. outside the scope of protection of the new type.

Claims (9)

1. for a safe Hanging Basket for work high above the ground, including the first Hanging Basket (11), the second Hanging Basket (21), it is characterised in that: Described first Hanging Basket (11) port both sides are connected with described second Hanging Basket (21) port both sides by load bar (12,22), described Load bar (12,22) two ends respectively with load rod bush (13,14,23.24) bolt being arranged on described Hanging Basket (11,21) port both sides Connecting, both sides, described first Hanging Basket (11) middle part are connected with both sides, described second Hanging Basket (21) middle part by fixing bar (17,27), institute State the two ends of fixing bar (17,27) respectively with the fastening mechanism being arranged in the middle part of the column of described Hanging Basket (11,21) inner side (15,16,25,26) it is flexibly connected.
A kind of safe Hanging Basket for work high above the ground, it is characterised in that: described fastening mechanism (15,16,25,26) include the connecting plate (152,162,252,262) of belt bracket (151,161,251,261), described connecting plate (152,162,252,262) are connected by bolt hole (153,163,253,263) U bolt (154,164,254,264), described Bracket (151,161,251,261) is flexibly connected with described fixing bar (17,27).
A kind of safe Hanging Basket for work high above the ground, it is characterised in that: described Hanging Basket (11,21) On lateral surface and inside top is provided with nonfloating rail (41), described Hanging Basket (11,21) inner side column connects have work by intubating (43) Dynamic guardrail.
A kind of safe Hanging Basket for work high above the ground, it is characterised in that: described load bar (12,22) Tube wall side be placed equidistant bolt hole.
A kind of safe Hanging Basket for work high above the ground, it is characterised in that: described load rod bush (13,14,23.24) tube wall side has been placed equidistant bolt hole.
A kind of safe Hanging Basket for work high above the ground, it is characterised in that: described fixing bar (17,27) Two ends be provided with vertical hook.
A kind of safe Hanging Basket for work high above the ground, it is characterised in that: described bracket (151,161,251,261) with described connecting plate (152,162,252,262) be overall structure.
A kind of safe Hanging Basket for work high above the ground, it is characterised in that: described bracket (151,161,251,261) it is axe shape.
A kind of safe Hanging Basket for work high above the ground, it is characterised in that: described movable rail (42) More than at least 2.
CN201620410059.2U 2016-05-06 2016-05-06 A kind of safe Hanging Basket for work high above the ground Expired - Fee Related CN205742956U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620410059.2U CN205742956U (en) 2016-05-06 2016-05-06 A kind of safe Hanging Basket for work high above the ground

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620410059.2U CN205742956U (en) 2016-05-06 2016-05-06 A kind of safe Hanging Basket for work high above the ground

Publications (1)

Publication Number Publication Date
CN205742956U true CN205742956U (en) 2016-11-30

Family

ID=57371140

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620410059.2U Expired - Fee Related CN205742956U (en) 2016-05-06 2016-05-06 A kind of safe Hanging Basket for work high above the ground

Country Status (1)

Country Link
CN (1) CN205742956U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105781096A (en) * 2016-05-06 2016-07-20 中国建筑第六工程局有限公司 Safety hanging basket for high-altitude operation and construction method thereof
CN112609953A (en) * 2020-12-21 2021-04-06 中建科工集团有限公司 A operation platform for managing truss
CN114182942A (en) * 2021-12-21 2022-03-15 北京城建道桥建设集团有限公司 Steel structure welding operation platform and use method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105781096A (en) * 2016-05-06 2016-07-20 中国建筑第六工程局有限公司 Safety hanging basket for high-altitude operation and construction method thereof
CN112609953A (en) * 2020-12-21 2021-04-06 中建科工集团有限公司 A operation platform for managing truss
CN114182942A (en) * 2021-12-21 2022-03-15 北京城建道桥建设集团有限公司 Steel structure welding operation platform and use method thereof
CN114182942B (en) * 2021-12-21 2023-03-14 北京城建道桥建设集团有限公司 Steel structure welding operation platform and use method thereof

Similar Documents

Publication Publication Date Title
CN105781096B (en) A kind of safe Hanging Basket and its construction method for working at height
CN102864936B (en) Combination lifting construction method for large-scale high hollow building roof of steel structure
CN211622528U (en) Basket type outer vertical surface scaffold inclined-pulling type I-steel cantilever beam
CN211736298U (en) Double-rod diagonal cantilever scaffold
CN104847102A (en) Wall attaching method and device of attached self-lifting scaffold on retraction section of building outer wall
CN107217836A (en) A kind of construction hanging basket suspension arrangement for steel construction shelter bridge
CN205742956U (en) A kind of safe Hanging Basket for work high above the ground
CN110185247A (en) Mobile outrigger platform
CN104775606A (en) Operation platform for prefabricated assembled residential building wall plate construction and construction method thereof
CN104343234A (en) Simple steel operation platform for civil residential elevator shaft and manufacturing method
CN211689948U (en) A suspension operation platform device for the construction of a cable-stayed bridge tower
CN206376507U (en) Prefabrication outrigger
CN210738053U (en) A turnable operating platform suitable for elevator counterweight installation
CN104389415B (en) scaffold
CN112854719A (en) Cantilever operating platform
CN104278830A (en) Integral combined scaffold
CN208668903U (en) An assembled scaffold
CN216690350U (en) Concrete circular silo slip form construction equipment
CN216921297U (en) A fixed support structure for a hanging basket
CN205000618U (en) Novel scaffold
CN213297074U (en) A convenient outer wall cantilever operation frame
CN115788033A (en) Construction method of large-span slab-free frame beam
CN207348447U (en) A kind of scaffold lifting is early to tear system open
CN210369895U (en) A kind of indoor super-large formwork Bailey beam support system
CN114856154A (en) Novel unsettled cage platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161130

Termination date: 20210506

CF01 Termination of patent right due to non-payment of annual fee