CN205742956U - A kind of safe Hanging Basket for work high above the ground - Google Patents
A kind of safe Hanging Basket for work high above the ground Download PDFInfo
- Publication number
- CN205742956U CN205742956U CN201620410059.2U CN201620410059U CN205742956U CN 205742956 U CN205742956 U CN 205742956U CN 201620410059 U CN201620410059 U CN 201620410059U CN 205742956 U CN205742956 U CN 205742956U
- Authority
- CN
- China
- Prior art keywords
- hanging basket
- ground
- sides
- high above
- work high
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a kind of safe Hanging Basket for work high above the ground, including the first Hanging Basket, second Hanging Basket, the port both sides of described first Hanging Basket are connected with described second Hanging Basket port both sides by load bar, the two ends of described load bar are connected with the load rod bush bolt being arranged on described Hanging Basket port both sides respectively, in the middle part of described first Hanging Basket, both sides are connected with both sides in the middle part of described second Hanging Basket by fixing bar, the two ends of described fixing bar are flexibly connected with the fastening mechanism being arranged on inside described Hanging Basket in the middle part of column respectively, this Hanging Basket solves high-altitude girder steel construction difficulty, the technical barrier of personnel safety's difference, ensure that construction quality, raise labour efficiency, promote production development.
Description
Technical field
This utility model belongs to the work platforms in construction operated high-altitude steel structure, makees for high-altitude particularly to one
The safe Hanging Basket of industry.
Background technology
General structural steelwork girder steel construction (includes that welding, bolt connect and adnexa is installed), and traditional method is under work surface
Side sets up full hall frame hand cradle operating platform, and hangs up safety net.Its platform providing workmen's work and protective equipment,
But this method also exists following shortcoming: 1) it is located at the operating platform at the bottom of beam and plain net hinders girder steel and the lifting of beam upper member;
2) the general height of structural steelwork, area relatively greatly, set up full hall scaffold Meteorological big;3) take and tear scaffold open and take in a large number
Duration, it is impossible to meet duration schedule requirement.And for being positioned at tens of rice or even the girder steel in hundred meters of high-altitudes, then can not take from ground
Face to work surface sets up the highest scaffold operating platform, and therefore workmen can only take to be that hanging safety belt is carried out on girder steel
Work high above the ground.Now, workmen just as being on the single-plank bridge of high-altitude, lacks the security on the girder steel that tens of meters of eminences are long narrow,
There is mental pressure, security incident easily occurs;Due to handicapped on girder steel, slow movement, in addition without operating platform
And in the case of reliable protection, it being engaged in work high above the ground, workmen can not accomplish to eliminate distractions, with single-hearted devotion, thus significantly drops
Low work efficiency, engineering construction quality is also had a greatly reduced quality;It is that hanging safety belt can only operate at girder steel end face, beam sides construction pole
Its inconvenience, and cannot be carried out position construction bottom beam.
Utility model content
For prior art, this utility model provides the safe Hanging Basket of a kind of work high above the ground, and this Hanging Basket solves high-altitude girder steel construction
Difficulty, the technical barrier of personnel safety's difference, it is ensured that construction quality, raise labour efficiency, promote production development.
In order to solve to exist in prior art technical problem, this utility model adopts the following technical scheme that and is practiced:
A kind of safe Hanging Basket for work high above the ground, including the first Hanging Basket, the second Hanging Basket, the port both sides of described first Hanging Basket are by load
Bar is connected with described second Hanging Basket port both sides, the two ends of described load bar respectively with the load bar set being arranged on described Hanging Basket port both sides
Pipe bolt connects, and in the middle part of described first Hanging Basket, both sides are connected with both sides in the middle part of described second Hanging Basket by fixing bar, described fixing bar
Two ends be flexibly connected with the fastening mechanism being arranged on inside described Hanging Basket in the middle part of column respectively.
Described fastening mechanism includes the connecting plate of belt bracket, and described connecting plate is connected by bolt hole U bolt, and described bracket activity is even
Connect described fixing bar.
On described Hanging Basket lateral surface and inside top is provided with nonfloating rail, inside described Hanging Basket, column has movable rail by intubating connection.
Described load rod tube wall side has been placed equidistant bolt hole.
Described load rod bush tube wall side has been placed equidistant bolt hole.
The two ends of described fixing bar are provided with vertical hook.
Described bracket and described connecting plate are overall structure.
Described bracket is axe shape.
Described movable rail more than at least 2.
This utility model beneficial effect:
1) this utility model is hung by load bar and is fixed in support beam, utilizes support beam to carry, it is ensured that Hanging Basket is the most steady at height
Qualitative and use safety requirements.
2) this utility model is by arranging fastening mechanism and mounted thereon fixing bar, with Hanging Basket top in the middle part of the column of Hanging Basket
Load bar acts on jointly, is placed in support beam by Hanging Basket securely, ensures that Hanging Basket is in the aerial safety of height fully;Even if hanging
Stablizing of Hanging Basket is also ensured that in the case of basket loading imbalance.
3) in this utility model, Hanging Basket is positioned at support beam both sides, meets and construction steel top surface of the beam, side, bottom surface are carried out comprehensive executing
Work requirement, it is ensured that construction quality.
4) this utility model is carried on a shoulder pole bar and the load rod bush grafting in Hanging Basket, the spacing of telescopically adjustable both sides Hanging Basket, meet various
The construction of width girder steel needs.
5) in this utility model, inside Hanging Basket, construction place is provided with movable guardrail, can be by it during construction girder steel side, position, bottom
Dismounting, meets work surface needs.
6) Hanging Basket design small volume and less weight in this utility model, convenient lifting, separate assembled parts and be readily transported and store.
Accompanying drawing explanation
Fig. 1 is a kind of safe cradle structure schematic diagram for work high above the ground of this utility model.
Fig. 2 is a kind of fastening mechanism structural representation in the safe Hanging Basket of work high above the ground of this utility model.
Fig. 3 is a kind of single cradle structure schematic diagram in the safe Hanging Basket of work high above the ground of this utility model.
Fig. 4 is a kind of safe cradle construction state diagram for work high above the ground of this utility model.
Detailed description of the invention
Below in conjunction with the accompanying drawings this utility model is made and explaining:
As it is shown in figure 1, this utility model provides a kind of safe Hanging Basket for work high above the ground, hang including the first Hanging Basket 11, second
Basket 21, described first Hanging Basket 11 port both sides are connected with described second Hanging Basket 21 port both sides by load bar (12,22), institute
State load bar (12,22) two ends respectively with the load rod bush (13,14,23,24) being arranged on described Hanging Basket (11,21) port both sides
Bolt connects;The tube wall side of described load bar (12,22) has been placed equidistant bolt hole.Described load rod bush (13,14,23,24)
Tube wall side be placed equidistant bolt hole.The bolt hole of described load rod bush (13,14,23,24) and described load bar (12,
22) bolt hole matches.Described load bar (12,22) quantity is 2, is arranged on Hanging Basket (11,21) port both sides (two
End inserts in carrying on a shoulder pole rod bush on Hanging Basket and fastens with bolt, connection between Hanging Basket (11,21) and undertake the load on Hanging Basket.
Described load bar (12,22) uses 80 × 80 × 6.3 square steel tube processing, and length determines as required, and square steel tube is relative to tube wall side
Face is pressed 200mm spacing and is bored Φ 18 bolt hole.Described load rod bush (13,14,23,24) uses 90 × 90 × 4 square steel tube processing,
Length is equal to 600mm, and relative tube wall side is pressed 200mm spacing and bored Φ 18 bolt hole.Load rod bush (13,14,23,24) sum
Being 4, each Hanging Basket port both sides respectively set 1.
This utility model use screw rod straight for described load bar (12,22) and the connecting bolt of load rod bush (13,14,23,24)
Footpath is Φ 16, a length of 130mm;Front end mantle fiber, screw thread specification is M14, and thread segment length is no less than 30mm;Afterbody sets solid
Determine nut.
As it is shown in figure 1, both sides are by both sides in the middle part of fixing bar (17,27) and described second Hanging Basket 21 in the middle part of described first Hanging Basket 11
Connect, the two ends of described fixing bar (17,27) respectively be arranged on described Hanging Basket (11,21) inner side column in the middle part of tightening machine
Structure (15,16,25,26) is flexibly connected.As in figure 2 it is shown, described fastening mechanism (15,16,25,26) include belt bracket (151,161,
251,261) connecting plate (152,162,252,262), described connecting plate (152,162,252,262) by bolt hole (153,163,
253,263) connection has U bolt (154,164,254,264), and described bracket (151,161,251,261) is flexibly connected
Fixing bar (17,27).Described bracket (151,161,251,261) and described connecting plate (152,162,252,262) are whole
Body structure.Described bracket (151,161,251,261) is axe shape.Described bracket (151,161,251,261) and described company
Fishplate bar (152,162,252,262) all uses 10mm steel plate to process, on described connecting plate (152,162,252,262)
It is drilled with the bolt hole (153,163,253,263) for installing U bolt (154,164,254,264).Described U-shaped spiral shell
Bolt (154,164,254,264) specification is Φ 14, and clear span is 50mm, a length of 95mm of limb, and end thread segment length is no less than
40mm.The two ends of described fixing bar (17,27) are provided with vertical hook, are used for preventing its unidirectional slip.Described fixing bar (17,27)
Employing >=Φ 25 steel bar meter forms, and is arranged on two lateral brackets (151,161,251,261) at its two ends, passes through during use
Regulating described bracket (151,161,251,261) position makes fixing bar upper surface be close to support beam bottom surface, with the described load on top
Bar (12,22) acts on jointly, it is ensured that described Hanging Basket (11,21) balance is firm.Support beam in this utility model can be selected
Construction girder steel, engineering girder steel.
As it is shown on figure 3, first Hanging Basket the 11, second Hanging Basket 21 is by underframe (111,211), base plate described in this utility model
(112,212), guardrail (41,42), baffle plate (113,213), load rod bush (13,14,23,24) assemble.Wherein: underframe
It is made up of frame and middle part web member, uses 40 × 40 square steel tubes to be welded;The size of frame is 1000mm × 600mm.The described end
Plate (112,212) uses 3mm steel plate, lays and is welded on underframe (111,211) above.It is thick that baffle plate (113,213) is also adopted by 3mm
Steel plate, height is 150mm, is arranged on base plate (112,212) surrounding, and heel post outer with base plate and Hanging Basket welds.Such as Fig. 1 institute
Showing, described Hanging Basket (11,21) lateral surface is provided with nonfloating rail 41, and described Hanging Basket (11,21) inner side column is by intubating 43
Connect and have movable rail 42.As it is shown on figure 3, guardrail (41,42) all uses 40 × 40 square steel tubes in this utility model.Its
In, nonfloating rail 41 height is 1200mm, and movable rail 42 is arranged on described Hanging Basket (11,21) middle inside, if 2,
Employing >=Φ 25 steel bar meter forms, its two ends crotch assign into described in intubate 43 in.
As shown in Figure 4, in order to solve to exist in prior art technical problem, this utility model can also adopt the following technical scheme that
It is practiced:
Step one, assembles in the face of first Hanging Basket the 11, second Hanging Basket 21 on ground, 2 load bars (12,22) is inserted respectively
In the load rod bush (13,14,23,24) of described first Hanging Basket 11 and the second Hanging Basket 21 port both sides, wanting according to construction simultaneously
Ask the spacing inside regulation first Hanging Basket the 11, second Hanging Basket 21 to the bolt hole carried on a shoulder pole on bar (12,22) and load rod bush
(13,14,23,24) the bolt hole alignment on;Penetrate connecting bolt, nut is fastened;
Step 2, will be connected by the U bolt (154,164,254,264) of (15,16,25,26) in fastening mechanism respectively
Plate (152,162,252,262) is connected with the inner side column of first Hanging Basket the 11, second Hanging Basket 21, fixes temporarily;And
Movable rail 42 is separately mounted to hollow part inside first Hanging Basket the 11, second Hanging Basket 21, and its two ends crotch assigns into first
Inside Hanging Basket, the second Hanging Basket column intubate 43 in;
Step 3, starting crane will be hung by the first Hanging Basket (11), the second Hanging Basket (21) that load bar (12,22) links together
It is transported to support beam (19) construction location, makes load bar (12,22) be seated in support beam 19, it is ensured that the first Hanging Basket 11,
Two Hanging Baskets 21 are positioned at the both sides of support beam 19, are placed in support beam in riding shape;
Step 4, aligns first Hanging Basket the 11, second Hanging Basket 21 position, is passed by fixing bar (17,27) below support beam 19,
Its two ends are arranged on bracket (151,161,251,261), then regulate connecting plate (152,162,252,262) position and make
Fixing bar (17,27) upper surface is adjacent to support beam 19 bottom surface, and the nut tightening U bolt (154,164,254,264) will
The inner side column of connecting plate (152,162,252,262) and first Hanging Basket the 11, second Hanging Basket 21 is fixed;
Step 5, workmen system hanging safety belt enters Hanging Basket (11,21) interior operation, the tool transport of crane batch;According to construction
Requirement remove movable rail 42 at any time, after the construction of a position to be done, the fixing bar (17,27) of dismounting, by Hanging Basket (11,21)
It is hoisted to next construction part, repeats abovementioned steps.
It is the embodiment of a kind of embodiment of this utility model as follows, i.e. to the processing of this utility model part, choice requirement:
1) Hanging Basket parts fabrication and processing
(1) Hanging Basket fabrication and processing: Hanging Basket is assembled by underframe, base plate, safety barrier, baffle plate, load rod bush.
A, underframe, safety barrier make, assembly welding
Underframe, safety barrier mainly use 40 × 40 square steel tube processing, are welded.Work flow is as follows:
Material purchases (requiring that supplier provides material to prove single) → former material inspection → section steel cutting blanking → underframe assembly welding →
Guardrail erecting and welding → inspection.
Wherein, movable guardrail cross bar employing >=Φ 25 reinforcing bar is processed into U-shaped part by design size.Separately protect inside work platforms
Column side, hurdle welding equipment intubates for the steel pipe of installation activity formula cross bar.
The processing of B, base plate, baffle plate, installation
Base plate, barrier material use 3mm steel plate.
Base plate steel plate is cut out according to underframe size: lays and is welded on above underframe.
Height of baffle plate is 150mm, is arranged on base plate surrounding, welds with base plate and fence upright.
C, load rod bush processing, installation
Load rod bush uses 90 × 90 × 4 square steel tube processing, and by design size blanking, boring, erecting and welding is at work platforms two
Minor face guardrail top outer.Requirement setting height(from bottom) is consistent, level.
(1) load bar processing
Load bar uses 80 × 80 × 6.3 square steel tube processing, measure, boring on request, bolt hole position thereon, spacing
Must mate with load rod bush.
(2) connecting bolt processing
Connecting bolt screw rod uses Φ 16 round steel, front end processing M14 screw thread, afterbody weldering M16 nut.Bolt specification, size should
Meet design requirement
(4) fixing bar processing
Fixing bar use >=Φ 25 reinforcing bar.
(5) fastening mechanism processing
Connecting plate body uses the processing welding of 10mm steel plate.Work flow is:
Steel plate cutting → junction steel plate boring → bracket and junction steel plate assembly welding → inspection.
U bolt uses Φ 14 round steel, by bending by design shape size and processing screw thread.
Examples detailed above is merely to illustrate this utility model, and the structure of the most each parts, material, connected mode are all to have become
Change, every equivalents carried out in this utility model technical foundation and improvement, the most should not get rid of of the present utility model
Outside protection domain.
Claims (9)
1. for a safe Hanging Basket for work high above the ground, including the first Hanging Basket (11), the second Hanging Basket (21), it is characterised in that:
Described first Hanging Basket (11) port both sides are connected with described second Hanging Basket (21) port both sides by load bar (12,22), described
Load bar (12,22) two ends respectively with load rod bush (13,14,23.24) bolt being arranged on described Hanging Basket (11,21) port both sides
Connecting, both sides, described first Hanging Basket (11) middle part are connected with both sides, described second Hanging Basket (21) middle part by fixing bar (17,27), institute
State the two ends of fixing bar (17,27) respectively with the fastening mechanism being arranged in the middle part of the column of described Hanging Basket (11,21) inner side
(15,16,25,26) it is flexibly connected.
A kind of safe Hanging Basket for work high above the ground, it is characterised in that: described fastening mechanism
(15,16,25,26) include the connecting plate (152,162,252,262) of belt bracket (151,161,251,261), described connecting plate
(152,162,252,262) are connected by bolt hole (153,163,253,263) U bolt (154,164,254,264), described
Bracket (151,161,251,261) is flexibly connected with described fixing bar (17,27).
A kind of safe Hanging Basket for work high above the ground, it is characterised in that: described Hanging Basket (11,21)
On lateral surface and inside top is provided with nonfloating rail (41), described Hanging Basket (11,21) inner side column connects have work by intubating (43)
Dynamic guardrail.
A kind of safe Hanging Basket for work high above the ground, it is characterised in that: described load bar (12,22)
Tube wall side be placed equidistant bolt hole.
A kind of safe Hanging Basket for work high above the ground, it is characterised in that: described load rod bush
(13,14,23.24) tube wall side has been placed equidistant bolt hole.
A kind of safe Hanging Basket for work high above the ground, it is characterised in that: described fixing bar (17,27)
Two ends be provided with vertical hook.
A kind of safe Hanging Basket for work high above the ground, it is characterised in that: described bracket
(151,161,251,261) with described connecting plate (152,162,252,262) be overall structure.
A kind of safe Hanging Basket for work high above the ground, it is characterised in that: described bracket
(151,161,251,261) it is axe shape.
A kind of safe Hanging Basket for work high above the ground, it is characterised in that: described movable rail (42)
More than at least 2.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620410059.2U CN205742956U (en) | 2016-05-06 | 2016-05-06 | A kind of safe Hanging Basket for work high above the ground |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620410059.2U CN205742956U (en) | 2016-05-06 | 2016-05-06 | A kind of safe Hanging Basket for work high above the ground |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205742956U true CN205742956U (en) | 2016-11-30 |
Family
ID=57371140
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620410059.2U Expired - Fee Related CN205742956U (en) | 2016-05-06 | 2016-05-06 | A kind of safe Hanging Basket for work high above the ground |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205742956U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105781096A (en) * | 2016-05-06 | 2016-07-20 | 中国建筑第六工程局有限公司 | Safety hanging basket for high-altitude operation and construction method thereof |
CN114182942A (en) * | 2021-12-21 | 2022-03-15 | 北京城建道桥建设集团有限公司 | Steel structure welding operation platform and use method thereof |
-
2016
- 2016-05-06 CN CN201620410059.2U patent/CN205742956U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105781096A (en) * | 2016-05-06 | 2016-07-20 | 中国建筑第六工程局有限公司 | Safety hanging basket for high-altitude operation and construction method thereof |
CN114182942A (en) * | 2021-12-21 | 2022-03-15 | 北京城建道桥建设集团有限公司 | Steel structure welding operation platform and use method thereof |
CN114182942B (en) * | 2021-12-21 | 2023-03-14 | 北京城建道桥建设集团有限公司 | Steel structure welding operation platform and use method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105781096B (en) | A kind of safe Hanging Basket and its construction method for working at height | |
CN100590277C (en) | High-altitude bridge type cantilever scaffold | |
CN102864936B (en) | Combination lifting construction method for large-scale high hollow building roof of steel structure | |
CN112681714A (en) | Construction method of steel wire rope lengthened rear support type hanging basket | |
CN105649314A (en) | Suspension platform for high and long-span corridor construction | |
CN206768611U (en) | Bridge pier hanging basket mounting operation platform | |
CN209066843U (en) | A kind of steel structural overhead construction one-man service's nacelle device | |
CN205742956U (en) | A kind of safe Hanging Basket for work high above the ground | |
CN107217836A (en) | A kind of construction hanging basket suspension arrangement for steel construction shelter bridge | |
CN104153586B (en) | A kind of suspension cable hangs the construction method of mounting purlines | |
CN216076228U (en) | Rail mounted hanging flower basket support device | |
CN111456422A (en) | Belt supporting device and method for conical steel truss on top of sliding-form silo of squat silo wall | |
CN215803108U (en) | Attached beam type hanging basket | |
CN105888227A (en) | Ultrahigh horn-shaped steel structure exterior facing construction platform, equalizing beam for construction and construction method of ultrahigh horn-shaped steel structure exterior facing construction platform | |
CN106144832A (en) | A kind of special extended type wall-attached frame and preparation method thereof | |
CN106320716B (en) | High-building construction adjustable division discharging platform | |
CN208668903U (en) | A kind of fabricated scaffold | |
CN103628692B (en) | A kind of floor beam mounting bracket and use it to install the method for floor beam | |
CN110748139A (en) | Hanging basket support system | |
CN210508317U (en) | Overhanging type assembled floor-stopping device for construction elevator | |
CN207063488U (en) | A kind of construction hanging basket suspension arrangement for steel construction shelter bridge | |
CN204038917U (en) | Dismountable external hanging service platform | |
CN206873494U (en) | A kind of operating platform for narrow space on the outside of barricade | |
CN104389441B (en) | A kind of framework support system | |
CN105113509A (en) | Tool type foundation pit suspended step ladder |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161130 Termination date: 20210506 |