CN205742795U - A kind of security civilization standardized construction balustrade - Google Patents

A kind of security civilization standardized construction balustrade Download PDF

Info

Publication number
CN205742795U
CN205742795U CN201620689794.1U CN201620689794U CN205742795U CN 205742795 U CN205742795 U CN 205742795U CN 201620689794 U CN201620689794 U CN 201620689794U CN 205742795 U CN205742795 U CN 205742795U
Authority
CN
China
Prior art keywords
connecting rod
sleeve
balustrade
skirt
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620689794.1U
Other languages
Chinese (zh)
Inventor
孙春旺
王新年
李咏梅
邓忠华
邓如才
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction And Installation Engineering Co Ltd Of Xinjiang Production And Construction Corps Construction Engineering Group
Original Assignee
First Construction And Installation Engineering Co Ltd Of Xinjiang Production And Construction Corps Construction Engineering Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction And Installation Engineering Co Ltd Of Xinjiang Production And Construction Corps Construction Engineering Group filed Critical First Construction And Installation Engineering Co Ltd Of Xinjiang Production And Construction Corps Construction Engineering Group
Priority to CN201620689794.1U priority Critical patent/CN205742795U/en
Application granted granted Critical
Publication of CN205742795U publication Critical patent/CN205742795U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of security civilization standardized construction balustrade, including draw-in groove, skirt card and sleeve base, the lower end of described draw-in groove is fixed with vertical rod, and two side positions of vertical rod are provided with connecting rod, the right side of described connecting rod is provided with handrail, the lower end of described connecting rod connects has connecting rod to fix bolt, the inner side of described sleeve base is fixed with vertical rod, the lower section of described skirt card is fixed with skirting board, the outside of described skirt card is provided with skirt sleeve, and the internally installed of described skirt sleeve has fixing iron.This security civilization standardized construction balustrade, standardized size, set up specification, overall structure is simple, setting up firmly, practical, L-type connecting rod does not results in damages, and uses safety, easy installation and removal improves efficiency of construction, and tool part management is convenient, cost-effective.

Description

A kind of security civilization standardized construction balustrade
Technical field
This utility model relates to construction engineering technical field, is specially a kind of security civilization standardized construction stair and holds up Hands.
Background technology
Along with the development of society of China architectural engineering industry, Architectural Equipment, in the middle of constantly improving, with safety is wherein Topmost purpose, provides a relieved working environment to workmen.When engineering construction, it is essentially all building multilamellar Building, be accomplished by this time building engineering construction balustrade, workload is big when, people ignore work The importance of journey construction balustrade.
The engineering construction overwhelming majority uses steel tube fastener to build Simple engineering construction balustrade at present, in the mistake used There is many drawbacks in journey, such as using steel tube fastener to take construction balustrade does not has respective standard specification, and each is executed Work scene is arbitrarily set up, management inconvenience;The construction balustrade that fastener type steel pipe is set up, sets up the most not safety and protects Card, overall structure is complex, removes and installs inconvenience;Use fastener type steel pipe still to make stair corner to connect with steel tube or Do not process;The construction balustrade that steel tube fastener formula is set up does not designs special foot guard plate device.
Utility model content
The purpose of this utility model is to provide a kind of security civilization standardized construction balustrade, to solve the above-mentioned back of the body Setting up of proposing in scape technology is lack of standardization, and management inconvenience, overall structure is complex, and the safety of use is low, not reproducible The problems such as use.
For achieving the above object, the following technical scheme of this utility model offer: a kind of security civilization standardized construction building Ladder rail, including draw-in groove, skirt card and sleeve base, the lower end of described draw-in groove is fixed with vertical rod, and two side position peaces of vertical rod Equipped with connecting rod, the right side of described connecting rod is provided with handrail, and the lower end of described connecting rod connects has connecting rod to fix bolt, institute The inner side stating sleeve base is fixed with vertical rod, and the left side of described sleeve base is provided with sleeve level and fixes bolt, described sleeve Level is fixed the lower section of bolt and is provided with sleeve vertical anchor bolt, and the lower section of described skirt card is fixed with skirting board, described in play The outside of foot card is provided with skirt sleeve, and the internally installed of described skirt sleeve has fixing iron.
Preferably, a length of 1.2m of described vertical rod 2.
Preferably, described connecting rod 3 is L-type connecting rod.
Preferably, described connecting rod is fixed bolt 10 and is provided with 3.
Preferably, described fixing iron 11 is U-shaped iron, and A/F is 7cm.
Compared with prior art, the beneficial effects of the utility model are: this security civilization standardized construction balustrade, Standardized size, sets up specification, and overall structure is simple, and vertical, level is fixed bolt and securely fixed by sleeve base, 3 companies Extension bar fix bolt guarantee connecting rod do not have rock, obscission, set up firmly, practical, L-type connecting rod will not be made One-tenth is damaged, and uses safety, and easy installation and removal improves efficiency of construction, and tool part management is convenient, cost-effective.
Accompanying drawing explanation
Fig. 1 is this utility model structure overall schematic;
Fig. 2 is this utility model structural sleeve base schematic diagram;
Fig. 3 is this utility model structure connecting rod schematic diagram;
Fig. 4 is this utility model structure skirt card schematic diagram.
In figure: 1, draw-in groove, 2, vertical rod, 3, connecting rod, 4, skirt card, 5, sleeve base, 6, handrail, 7, skirting board, 8, set Cylinder level fixes bolt, 9, sleeve vertical anchor bolt, 10, connecting rod fix bolt, 11, fixing iron, 12, skirt sleeve.
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of this utility model rather than whole Embodiment.Based on the embodiment in this utility model, those of ordinary skill in the art are not under making creative work premise The every other embodiment obtained, broadly falls into the scope of this utility model protection.
Referring to Fig. 1-4, this utility model provides a kind of technical scheme: a kind of security civilization standardized construction stair are held up Hands, including draw-in groove 1, vertical rod 2, connecting rod 3, skirt card 4, sleeve base 5, handrail 6, skirting board 7, sleeve level fix bolt 8, Sleeve vertical anchor bolt 9, connecting rod fix bolt 10, fixing iron 11 and skirt sleeve 12, and the lower end of draw-in groove 1 is fixed with vertical Bar 2, a length of 1.2m of vertical rod 2, and two side positions of vertical rod 2 are provided with connecting rod 3, and the right side of connecting rod 3 is provided with handrail 6, connecting rod 3 is L-type connecting rod, and the lower end of connecting rod 3 connects has connecting rod to fix bolt 10, and connecting rod is fixed bolt 10 and arranged Having 3, the inner side of sleeve base 5 is fixed with vertical rod 2, and the left side of sleeve base 5 is provided with sleeve level and fixes bolt 8, sleeve Level is fixed the lower section of bolt 8 and is provided with sleeve vertical anchor bolt 9, and the lower section of skirt card 4 is fixed with skirting board 7, skirt card 4 Outside be provided with skirt sleeve 12, the internally installed of skirt sleeve 12 has fixing iron 11, and fixing iron 11 is U-shaped iron, And A/F is 7cm.
Operation principle: when using this security civilization standardized construction balustrade, overall work principle is easier Understand, first carry out the installation of construction balustrade, at the draw-in groove 1 that vertical rod 2 is embedded in connecting rod 3, then connecting rod 3 Fixing bolt 10 by connecting rod and connect handrail 6, skirting board 7 is placed on vertical rod the latter half, is fixed by skirt card 4, Before rear, mounted part is fixed on stair, when people holds up handrail 6 to walk stair, through corner by sleeve base 5 The connecting rod 6 of L-type, directly take advantage of a situation and turn round, skirting board 7 does not haves foot when protecting people on foot and skids off, and overall structure is simple, steady Fixed, here it is the operation principle of security civilization standardized construction balustrade.
Embodiment the most of the present utility model, for the ordinary skill in the art, It is appreciated that in the case of without departing from principle of the present utility model and spirit and these embodiments can be carried out multiple change, repair Changing, replace and modification, scope of the present utility model is defined by the appended claims and the equivalents thereof.

Claims (5)

1. a security civilization standardized construction balustrade, including draw-in groove (1), skirt card (4) and sleeve base (5), its It is characterised by: the lower end of described draw-in groove (1) is fixed with vertical rod (2), and two side positions of vertical rod (2) are provided with connecting rod (3), institute The right side stating connecting rod (3) is provided with handrail (6), and the lower end of described connecting rod (3) connects has connecting rod to fix bolt (10), institute The inner side stating sleeve base (5) is fixed with vertical rod (2), and the left side of described sleeve base (5) is provided with sleeve level and fixes bolt (8), described sleeve level is fixed the lower section of bolt (8) and is provided with sleeve vertical anchor bolt (9), under described skirt card (4) Side is fixed with skirting board (7), and the outside of described skirt card (4) is provided with skirt sleeve (12), described skirt sleeve (12) interior Portion is provided with fixing iron (11).
A kind of security civilization standardized construction balustrade the most according to claim 1, it is characterised in that: described vertical rod (2) a length of 1.2m.
A kind of security civilization standardized construction balustrade the most according to claim 1, it is characterised in that: described connection Bar (3) is L-type connecting rod.
A kind of security civilization standardized construction balustrade the most according to claim 1, it is characterised in that: described connection Bar is fixed bolt (10) and is provided with 3.
A kind of security civilization standardized construction balustrade the most according to claim 1, it is characterised in that: described fixing Iron (11) is U-shaped iron, and A/F is 7cm.
CN201620689794.1U 2016-07-04 2016-07-04 A kind of security civilization standardized construction balustrade Expired - Fee Related CN205742795U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620689794.1U CN205742795U (en) 2016-07-04 2016-07-04 A kind of security civilization standardized construction balustrade

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620689794.1U CN205742795U (en) 2016-07-04 2016-07-04 A kind of security civilization standardized construction balustrade

Publications (1)

Publication Number Publication Date
CN205742795U true CN205742795U (en) 2016-11-30

Family

ID=57380048

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620689794.1U Expired - Fee Related CN205742795U (en) 2016-07-04 2016-07-04 A kind of security civilization standardized construction balustrade

Country Status (1)

Country Link
CN (1) CN205742795U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111379430A (en) * 2018-12-29 2020-07-07 广西建工集团第五建筑工程有限责任公司 Angle-adjustable limb safety protection railing for construction site and installation and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111379430A (en) * 2018-12-29 2020-07-07 广西建工集团第五建筑工程有限责任公司 Angle-adjustable limb safety protection railing for construction site and installation and construction method thereof

Similar Documents

Publication Publication Date Title
CN203808484U (en) Integrated cantilevered and attached external scaffolding
CN205096590U (en) Simple and easy auxiliary device of ceiling punching operation
CN204001731U (en) A kind of shuttering supporting vertical rod base fixing device
CN205742795U (en) A kind of security civilization standardized construction balustrade
CN205713450U (en) A kind of construction ground enclosing
CN202596150U (en) Scaffold pedal
CN204159929U (en) Mobile adjustable drilling sectional shelf-unit
CN204621973U (en) Surface pipe screw thread helmet extracting tool
CN203654716U (en) Tool type scaffold cross bridging connecting device
CN204663371U (en) A kind of safe and convenient type staircase
CN202689514U (en) Pull rod of external scaffold
CN202622700U (en) Hanger rod installation tool
CN201152014Y (en) Scaffolding connector
CN203939226U (en) A kind of wall-connecting piece device for scaffold
CN205742969U (en) A kind of construction site scaffold clasp
CN206245714U (en) A kind of floating junction
CN203977857U (en) Concrete plate surface reserved holes of pipes capping tools formula erecting device
CN204059933U (en) A kind of civil engineering means for fastening scaffolding
CN205713060U (en) Scaffold is stood plate
CN203271104U (en) Dual-fixing type cantilever beam fixing piece
CN205343008U (en) Hammer that can dismantle and change arm of force length
CN104120875B (en) A kind of civil engineering means for fastening scaffolding
CN203373955U (en) Inner blocking protection device for outer wall scaffold
CN203821820U (en) Steel tube buckle
CN203905455U (en) Scaffold for constructional engineering

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161130

Termination date: 20170704

CF01 Termination of patent right due to non-payment of annual fee