CN205742153U - A kind of novel Anti-sliding Pile - Google Patents
A kind of novel Anti-sliding Pile Download PDFInfo
- Publication number
- CN205742153U CN205742153U CN201620786227.8U CN201620786227U CN205742153U CN 205742153 U CN205742153 U CN 205742153U CN 201620786227 U CN201620786227 U CN 201620786227U CN 205742153 U CN205742153 U CN 205742153U
- Authority
- CN
- China
- Prior art keywords
- skid resistant
- resistant plates
- groove
- concrete
- circular
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Piles And Underground Anchors (AREA)
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
This utility model relates to Landslide Hazards Treatment process field, it is specifically related to a kind of novel Anti-sliding Pile, it is characterized in that it includes skid resistant plates, main muscle, stirrup, it is lamellar that described skid resistant plates is vertical cuboid, skid resistant plates is formed by reinforced concrete cast-in-situ, several concrete all it are fixed with protruding on four vertical outer surfaces in long limit of skid resistant plates, and the concrete projection on each outer surface all arranges the most whole surface, it is positioned in skid resistant plates at the medium position of a long limit outer surface and vertically offers one groove, the horizontal cross sectional geometry of groove is circular or square, the end face of groove and bottom surface are all through to outside end face and the bottom surface of skid resistant plates, the embedded circular draining wired hose being equipped with adaptation is fixed in circular groove, the embedded square plastic draining board being equipped with adaptation is fixed in square groove.This utility model compares traditional hollow friction pile, can reduce the consumption of concrete, reduces construction cost, strengthens the shear behavior of friction pile.
Description
[technical field]
This utility model relates to Landslide Hazards Treatment process field, more particularly to a kind of novel side slope antiskid
Stake.
[background technology]
Friction pile is a kind of major measure that geotechnical slope carries out in current engineering practice antiskid process, is landslide geology
A kind of main method in hazard management, its mechanism of action is that through slip mass, friction pile is goed deep into slider bed, with a gear gliding mass
Sliding force, and then stable side slope.Compared with the Anti-slide engineering using the Skid Resistance Measures such as long and short anchor arm, anchor pole, friction pile has
There is the advantage that anti-slide performance is strong, applied widely, be particularly well-suited to administer the major landslip that sliding surface is deeper, and native with antiskid gear
Wall is compared, friction pile have more excavation volume little, to Landslide Stability and geological environment destructiveness is little, be difficult to deteriorate landslide shape
State, can construct with multiple friction piles simultaneously, many outstanding advantages such as construction safety is easy, the duration is short.
In current side slope Anti-slide engineering is put into practice, can be according to thickness, thrust size, waterproof requirement and the construction bar of slip mass
Part, the pilework such as reasonable selection timber, piling bar, concrete-pile or reinforcing bar (rail) concrete-pile, wherein reinforced concrete pile makes
With the most extensive, in order to friction pile can preferably overcome the huge thrust that Rock And Soil in sliding area, top produces, typically can resist
It is very big that the volume of sliding pile does, and filling concrete in the hollow area at friction pile center, although the friction pile of large volume
Can guarantee that self bearing capacity and the requirement of side slope skid resistance, but it be big to make and fill the mixed earth amount needed for large volume friction pile,
Cost is expensive, adds financial burden to engineering, and the deformation performance of large volume friction pile tends not to meet engine request simultaneously, right
In explosion or seismic landslide, owing to gliding mass impulsive force is big, slip time is short, and the friction pile of shear behavior difference can be easy to
Destroyed, and then cause friction pile to lose anti-slippery effect.
[utility model content]
The technical problems to be solved in the utility model is to provide a kind of novel Anti-sliding Pile, and it compares traditional hollow anti-
Sliding pile, can not only reduce the consumption of concrete, reduces construction cost, and can also increase the friction resistance between friction pile and the soil body
Power, strengthens the shear behavior of friction pile, improves the anti-slide performance of friction pile, and it also has certain drainability in addition.
In order to achieve the above object, the technical scheme that this utility model provides is: a kind of novel Anti-sliding Pile, its feature
Being that it includes skid resistant plates, main muscle, stirrup, it is lamellar that described skid resistant plates is vertical cuboid, and skid resistant plates is existing by armored concrete
Water and form, four vertical outer surfaces in long limit of skid resistant plates are all fixed with several concrete protruding, and each outside table
Concrete projection on face is all arranged the most whole surface, skid resistant plates is positioned at the medium position of a long limit outer surface and vertically opens
Being provided with one groove, the horizontal cross sectional geometry of groove is circular or square, and the end face of groove and bottom surface are all through to skid resistant plates
End face and bottom surface outside, fix the embedded circular draining wired hose being equipped with adaptation in circular groove, solid in square groove
The fixed embedded square plastic draining board being equipped with adaptation, the vertical long limit of medial surface of six pieces of skid resistant plates is depended on by the main muscle of the six roots of sensation respectively
Secondary head and the tail be fixedly linked hold formation annular hexa-prism, be connected rear six pieces of skid resistant plates be centrally formed six prism hollow area,
It is and if the level on six medial surface in rear six pieces of skid resistant plates central hollow region that is connected is equipped with arterial highway hexagon stirrup, some
Road stirrup is the most spaced apart, and after being connected, the angle α between the vertical side of adjacent level minor face of adjacent skid resistant plates is 30
~90 degree.
The beneficial effects of the utility model are: this utility model compares traditional hollow friction pile, can not only reduce coagulation
The consumption of soil, reduces construction cost, and can also increase the frictional resistance between friction pile and the soil body, strengthens the shear resistance of friction pile
Can, improve the anti-slide performance of friction pile, it also has certain drainability in addition.
[accompanying drawing explanation]
With embodiment, this utility model is further illustrated below in conjunction with the accompanying drawings.
Fig. 1 is plan structure schematic diagram of the present utility model.
Fig. 2 is this utility model partial internal structure schematic diagram.
Wherein, 1-skid resistant plates, 2-draining wired hose or plastic draining board, the main muscle of 3-, 4-stirrup, 5-sandy and stony soil.
[detailed description of the invention]
In example shown in the drawings, as shown in Figure 1 and Figure 2, a kind of novel Anti-sliding Pile, it is characterised in that it includes
Skid resistant plates, main muscle, stirrup, described skid resistant plates is that vertical cuboid is lamellar, and skid resistant plates is formed by reinforced concrete cast-in-situ, antiskid
Several concrete all it are fixed with protruding on four vertical outer surfaces in long limit of plate, and the concrete on each outer surface
Projection is all arranged the most whole surface, skid resistant plates is positioned at the medium position of a long limit outer surface vertically offer the most recessed
Groove, the horizontal cross sectional geometry of groove is circular or square, and the end face of groove and bottom surface are all through to end face and the end of skid resistant plates
Outside face, fix the embedded circular draining wired hose being equipped with adaptation in circular groove, in square groove, fix embedded laying
Having the square plastic draining board of adaptation, the vertical long limit of medial surface of six pieces of skid resistant plates is fixing by the main muscle of the six roots of sensation successively head and the tail respectively
Be connected and hold formation annular hexa-prism, the rear six pieces of skid resistant plates that are connected be centrally formed six prism hollow area, and after being connected six
If on six medial surface in block skid resistant plates central hollow region, level is equipped with arterial highway hexagon stirrup, if arterial highway stirrup is successively
The most spaced apart, after being connected, the angle α between the vertical side of adjacent level minor face of adjacent skid resistant plates is 30~90 degree.
When using this utility model, construction operation personnel first treat reinforcing side slope excavation stake holes, then by this novel antiskid
Stake is inserted in stake holes, and between the space of friction pile outer surface and stake holes, and the six prism hollow area at friction pile center
Between all insert sandy and stony soil (see Fig. 1), and by the sandy and stony soil compacting inserted closely, compare conventional hollow concrete-pile and insert concrete
For, this utility model decreases the consumption of concrete, and owing to being equipped with concrete on four vertical sides of skid resistant plates
Projection, increases the skin friction resistance of friction pile, improves the anti-slide performance of friction pile, and six prism loop configuration make in addition
There is between adjacent skid resistant plates certain activity space, the level of disruption of certain side slope can be compensated, enhance the shearing resistance of friction pile
Performance, and the hydrops in skid resistant plates can be discharged by the plastic draining board that is provided with of skid resistant plates or draining wired hose in time, has
It is beneficial to the stability of side slope.
Claims (1)
1. a novel Anti-sliding Pile, it is characterised in that it includes skid resistant plates, main muscle, stirrup, described skid resistant plates is in the longest
Cube is lamellar, and skid resistant plates is formed by reinforced concrete cast-in-situ, four vertical outer surfaces in long limit of skid resistant plates is all fixed setting
There are several concrete protruding, and the concrete projection on each outer surface is all arranged the most whole surface, and skid resistant plates is positioned at
Vertically offering one groove at the medium position of one long limit outer surface, the horizontal cross sectional geometry of groove is circular or side
Shape, the end face of groove and bottom surface are all through to outside end face and the bottom surface of skid resistant plates, fix in circular groove embedded be equipped with suitable
The circular draining wired hose joined, fixes the embedded square plastic draining board being equipped with adaptation, six pieces of skid resistant plates in square groove
The vertical long limit of medial surface respectively by the main muscle of the six roots of sensation successively head and the tail be fixedly linked hold formation annular hexa-prism, be connected after six
Six medial surface being centrally formed in six prism hollow area, and connected rear six pieces of skid resistant plates central hollow region of block skid resistant plates
If upper level is equipped with arterial highway hexagon stirrup, if arterial highway stirrup is the most spaced apart, the phase of adjacent skid resistant plates after being connected
Angle α between the adjacent vertical side of horizontal short is 30~90 degree.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620786227.8U CN205742153U (en) | 2016-06-30 | 2016-06-30 | A kind of novel Anti-sliding Pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620786227.8U CN205742153U (en) | 2016-06-30 | 2016-06-30 | A kind of novel Anti-sliding Pile |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205742153U true CN205742153U (en) | 2016-11-30 |
Family
ID=57375776
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620786227.8U Expired - Fee Related CN205742153U (en) | 2016-06-30 | 2016-06-30 | A kind of novel Anti-sliding Pile |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205742153U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110359443A (en) * | 2019-08-01 | 2019-10-22 | 顾青林 | A kind of soft foundation in water conservancy project construction method |
-
2016
- 2016-06-30 CN CN201620786227.8U patent/CN205742153U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110359443A (en) * | 2019-08-01 | 2019-10-22 | 顾青林 | A kind of soft foundation in water conservancy project construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101476466B (en) | Giant heavy laver land slide pre-stress anchor cable antiskid tunnel construction method and novel prevention structure | |
CN202466594U (en) | Horizontal jet grouting soil anchoring and cast-in-place pile compound foundation pit supporting structure | |
CN103774675A (en) | Combined double-row-pile combined vertical prestress anchor rod supporting system and construction method thereof | |
CN205152982U (en) | Barricade and structure of filling suitable for height is filled | |
CN202466620U (en) | Reinforced concrete buttress retaining wall | |
CN102828525A (en) | Foundation structure of power transmission line tower | |
AU2021104441A4 (en) | Method of using anti-slide piles to reinforce large slope and thick layer rock pile at tunnel mouth | |
CN108755731A (en) | A kind of well foundation and construction method | |
CN103334423B (en) | A kind of combined steel pile tube | |
CN203960921U (en) | A kind of existing cut slope stake board wall ruggedized construction | |
CN205742153U (en) | A kind of novel Anti-sliding Pile | |
CN203716156U (en) | Pit-in-pit city gate hole type excavation construction structure in deep foundation pit | |
CN209066454U (en) | Soft soil zone cut slope support structure | |
CN105256811B (en) | Construction method for foundation pit supporting and protecting through sheet pile supporting structure with water stopping function | |
CN202170498U (en) | Reinforced concrete pile dike | |
CN109537588A (en) | A kind of novel practical anchor pile | |
CN109339078A (en) | A kind of rectangular pile is inscribed in the Combined Anti-sliding stake of round stake | |
CN203729309U (en) | Support system with combined double-row piles combined with vertical prestressed anchor bolts | |
CN202492856U (en) | Reinforced concrete pile type buttress retaining wall | |
CN203284795U (en) | Buttressed retaining wall with anchor board | |
CN203559430U (en) | Cantilever type composite retaining wall provided with perpendicular anchor rods | |
CN202989942U (en) | Wall foundation structure for soft soil or high backfill soil area | |
CN203270588U (en) | Mini-pile antiskid structure | |
CN206337566U (en) | Foundation ditch vertical prestressing anchor pole supporting construction | |
CN104895090B (en) | Combined ladder key structure and construction method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161130 Termination date: 20170630 |
|