CN205714222U - Tunnel overall steel die bush platform building cart binds device - Google Patents

Tunnel overall steel die bush platform building cart binds device Download PDF

Info

Publication number
CN205714222U
CN205714222U CN201620563220.XU CN201620563220U CN205714222U CN 205714222 U CN205714222 U CN 205714222U CN 201620563220 U CN201620563220 U CN 201620563220U CN 205714222 U CN205714222 U CN 205714222U
Authority
CN
China
Prior art keywords
binds
panel
cover plate
pipe
lift shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620563220.XU
Other languages
Chinese (zh)
Inventor
张济宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201620563220.XU priority Critical patent/CN205714222U/en
Application granted granted Critical
Publication of CN205714222U publication Critical patent/CN205714222U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of tunnel overall steel die bush platform building cart to bind device, solve Tunnel Second Lining concrete surface capping position faulting of slab ends problem.It includes panel, the cover plate that binds, lift shaft, axle bed, stopping means and the pipe that binds, wherein said panel is provided with aperture of binding, the fixing pipe that binds of lower surface at panel, on the panel of described side, aperture of binding jagged, and the side contacted with the described pipe that binds in breach is provided with groove;Described lift shaft upper end is vertically fixed on described ear;Lift shaft is operating side through breach and axle bed posterior end.This utility model uses the cover plate that binds rotatable and realizes the Novel sealing apical organ technology of axially lifting, the cover plate that binds can realize smooth closely connected with steel die, fundamentally solve Tunnel Second Lining concrete surface capping position faulting of slab ends problem, after form removal, capping position concrete surface is without faulting of slab ends, overall smooth-going.

Description

Tunnel overall steel die bush platform building cart binds device
Technical field
This utility model relates to technical field of tunnel construction, and specifically one is applicable to tunnel overall steel die bush block platform The device that binds of car.
Background technology
At present, the length of home and abroad, big tunnel use overall punching block hydraulic lining trolley to construct mostly, use pumping Concrete making technology carries out Tunnel Second Lining Construction.In overall punching block hydraulic lining trolley, there is a functional part and be called envelope Apical organ, as the term suggests, it is simply that during placing of binding, concrete is that the tube pump that binds by the device that binds sends into mould, filling of binding After having built, utilize the device that binds to close hole of binding and reach the purpose that binds.
In existing overall punching block hydraulic lining trolley pump concrete capping technology, the device that binds typically uses inner side plate Formula or outer side rotary bind device structure, as a example by the board plug type of inner side, it is simply that insert a plate at the top of the pipe that binds, due to The existence of plate, after pouring complete and maintenance, will necessarily form a cylindrical faulting of slab ends at this.For another example, outer side rotary, be The bind top of pipe is previously implanted rotation cover, and the existence of rotation cover will necessarily cause depression, and then form reverse cylinder Shape faulting of slab ends.
So, the pump concrete in reality is when binding staged construction, and bound device structure design limit, concrete table Face can leave cylindrical faulting of slab ends (recessed or prominent lining concrete surface) in hole site of binding, it is impossible to fundamentally solves to bind Position concrete surface residual faulting of slab ends problem, have impact on Tunnel Second Lining overall appearance quality to a certain extent.
Utility model content
In order to solve the deficiencies in the prior art, this utility model mainly solves Tunnel Second Lining concrete surface and binds position Put faulting of slab ends problem, reach improve overall punching block hydraulic lining trolley pump concrete capping technology level and improve tunnel secondary The purpose of lining concrete surface overall appearance quality.
This utility model solves the technical scheme that its technical problem used:
Tunnel overall steel die bush platform building cart binds device, it is characterised in that include panel, the cover plate that binds, lift shaft, axle Seat, stopping means and the pipe that binds, wherein said panel is provided with aperture of binding, the fixing pipe that binds of lower surface at panel, described Bind jagged on the panel of side, aperture, and the side contacted with the described pipe that binds in breach is provided with groove;
The cover plate that binds described in diameter is identical with described aperture of binding is provided with chamfering and ear;
Described lift shaft upper end is vertically fixed on described ear;
Outside the described pipe that binds, be provided with the axle bed for installing lift shaft, and described lift shaft through breach and Axle bed posterior end is operating side.
Further, at described lift shaft with bind and be provided with stopping means between tube wall.
Further, at lift shaft with bind and arrange alignment scale between pipe, when both alignment scales overlap, institute State the cover plate upper surface that binds concordant with described panel upper surface.
The beneficial effects of the utility model are:
This utility model have developed novel overall punching block hydraulic lining trolley pump concrete capping technology, and employing is bound Cover plate is rotatable and realizes the Novel sealing apical organ technology axially lifted, and the cover plate that binds can realize smooth closely connected with steel die, Fundamentally solve Tunnel Second Lining concrete surface capping position faulting of slab ends problem, capping position concrete surface after form removal Without faulting of slab ends, overall smooth-going.
Secondary lining concrete surface outward appearance entirety smoothes out, and can effectively promote overall punching block hydraulic lining trolley pumped concrete Grave top technical merit and Tunnel Second Lining concrete surface overall appearance quality.
This utility model very Lay Importance on Practical, is carried out at the overall punching block hydraulic lining trolley pumped concrete earth process of application In the long tunnel of secondary moulded lining construction, overall punching block hydraulic lining trolley pump concrete can be effectively improved and bind Technical merit and the purpose of raising Tunnel Second Lining concrete surface overall appearance quality, have wide in constructing tunnel field Application prospect.
Accompanying drawing explanation
Fig. 1 is the axonometric chart of device of originally binding.
Fig. 2 is the full sectional view of device of originally binding.
Fig. 3 is the state diagram that cover plate opens of binding.
Fig. 4 is the part-structure schematic diagram of device of binding.
Fig. 5 is the axonometric chart of cover plate of binding.
In figure: 1 panel, 11 bind aperture, 12 breach, 13 grooves, and 2 bind cover plate, 21 ears, 22 chamfer design, 3 liftings Rotating shaft, 31 operating sides, 4 axle beds, 41 alignment scales, 5 stopping means, 6 bind pipe.
Detailed description of the invention
As shown in Figures 1 to 5, for existing defect, protection main body of the present utility model is as follows: exploitation is a kind of tunnel Overall steel die bush platform building cart binds device, is made up of following structure.
The novel device structure that binds is mainly by panel 1, the cover plate 2 that binds, lift shaft 3, axle bed 4, stopping means 5 and bind Pipe 6 grade forms, and wherein panel 1 is with a big plate of monoblock, uses steel plate to make, determines a major diameter and bind on panel Aperture 11, such as, the aperture of binding of 20 cm diameters, the diameter in aperture of binding is identical with the internal diameter of the corresponding pipe that binds.Corresponding At the lower surface of panel, weld the pipe 6 that binds, the pipe that binds for pipe, for and concrete conveying pipeline connect.
A breach 12 determined by the panel of above-mentioned side, aperture 11 of binding, is used for rotating shaft is installed.In breach 12 The side contacted with the above-mentioned pipe that binds is provided with a groove 13, is used for discharging slurry.
The cover plate 2 that binds uses chamfer design 22, and the side of the cover plate 2 that binds arranges an ear 21, and ear 21 is used for and rises Fall rotating shaft 3 connects, and connected mode is for being welded to connect, and lift shaft 3 is vertical with the cover plate that binds.
Above-mentioned pipe 6 side of binding is provided with some axle beds 4, and axle bed about 4 orientation is coaxially disposed and lacks with above-mentioned After the lift shaft 3 that mouth 12 positions are the most corresponding, above-mentioned passes breach and axle bed, lower end extends out and is provided with and is easy to The operating side 31 of wrench operated.
The above-mentioned cover plate 2 that binds uses chamfering, band plate ear to design;Lift shaft 3 is fixed with the cover plate 2 that binds and is connected, can edge Axially lift and rotate;The pipe that binds is fixed as one with the panel 1 of lining trolley, and binding, it is corresponding with the ear of the cover plate that binds to manage Indentation, there uses bevel design, and concrete binds to manage and is fixed as one with axle bed.
Above-mentioned each parts use process for machining, assemble and complete carry out outer surface grinding process, it is ensured that the device that binds closes The cover plate that binds under closed state smooths with slab joint.
Seamless closed-top technology process is as follows:
First, pump concrete binds before placing, the cover plate jacking rotating to outside aperture of binding of binding, and avoids binding Orifice position, fits with template, opens the mouth of pipe that binds;
Second step, the device concrete that will bind binds to manage and snaps connection with concrete conveying pipeline, and concrete is pumped by pipeline Enter mould, until filling slurry by mould, end of binding,
3rd step, binds after end, rotates backward rotation and lifting rotating shaft so that the cover plate that binds turns to bind at the mouth of pipe, The cover plate that binds falls under the pressure of concrete slurry and closes the mouth of pipe that binds, it is achieved concrete binds;Bind after cover closure, Cover plate smooths with panel outer surface seam, eliminates the faulting of slab ends phenomenon that binds.During the above-mentioned cover plate that binds falls, bind Chamfering on cover plate is arranged so that the cover plate that binds has automatic capturing function.
4th step, dismantling concrete conveying pipe, and maintenance,
5th step, maintenance removes, after completing, the device that binds.
By the application of said structure, the work of overall punching block hydraulic lining trolley pumped concrete earth process Novel sealing top technology Process flow: axially jacking lift shaft, rotary seal lamina tecti are opened hole → connections of binding and bound and manage and concrete delivery pipe → pump Send concrete → rotation and lifting rotating shaft until cover plate coincide with aperture of binding and close hole of binding → → bound.
Key problem in technology point of the present utility model is the perfect adaptation of covering plate structure, liftable pivot structure and panel of binding, And after closure, the cover plate that binds forms coordinating of a near seamless with panel.Operating process is simple, by simple rotation operation i.e. Can, the structure design that the cover plate that binds axially lifts so that the cover plate that binds can realize smooth closely connected with steel die, and elimination is bound Concrete surface faulting of slab ends phenomenon during placing.
As improving further, a limited block can be welded on lift shaft 3 so that bind cover plate and hole of binding After salty conjunction spacing, do not rotating, preventing from rotating excessively, formed and preferably coordinate, form stopping means 5.
Arranging alignment scale 41 on lift shaft 3 and the pipe 6 that binds, when both scales overlap, expression is bound simultaneously Cover plate upper surface is concordant with panel upper surface, forms a complete plane.
Embodiment described above is only to be described preferred implementation of the present utility model, not to this practicality Novel scope is defined, and on the premise of without departing from this utility model design spirit, relevant technical staff in the field is to this The various deformation of utility model and improvement, all should expand in protection domain as determined by this utility model claims.

Claims (3)

1. tunnel overall steel die bush platform building cart binds device, it is characterised in that include panel (1), the cover plate that binds (2), lift shaft (3), axle bed (4), stopping means (5) and the pipe (6) that binds, wherein said panel is provided with aperture of binding (11), under panel The fixing pipe (6) that binds in surface, described in bind aperture (11) side panel on jagged (12), and with described in breach (12) The side of the pipe that binds contact is provided with groove (13);
The cover plate (2) that binds described in diameter is identical with described aperture of binding is provided with chamfering and ear (21);
Described lift shaft (3) upper end is vertically fixed on described ear (21);
Described pipe (6) outside of binding is provided with the axle bed (4) for installing lift shaft, and described lift shaft (3) passes Breach and axle bed posterior end are operating side (31).
Tunnel the most according to claim 1 overall steel die bush platform building cart binds device, it is characterised in that at described lift shaft And bind and between tube wall, be provided with stopping means (5) (3).
Tunnel the most according to claim 1 overall steel die bush platform building cart binds device, it is characterised in that in lift shaft (3) And bind alignment scale (41) be set between pipe (6), when both alignment scales overlap, described in bind cover plate upper surface and institute State panel upper surface concordant.
CN201620563220.XU 2016-06-08 2016-06-08 Tunnel overall steel die bush platform building cart binds device Expired - Fee Related CN205714222U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620563220.XU CN205714222U (en) 2016-06-08 2016-06-08 Tunnel overall steel die bush platform building cart binds device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620563220.XU CN205714222U (en) 2016-06-08 2016-06-08 Tunnel overall steel die bush platform building cart binds device

Publications (1)

Publication Number Publication Date
CN205714222U true CN205714222U (en) 2016-11-23

Family

ID=57302443

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620563220.XU Expired - Fee Related CN205714222U (en) 2016-06-08 2016-06-08 Tunnel overall steel die bush platform building cart binds device

Country Status (1)

Country Link
CN (1) CN205714222U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105888694A (en) * 2016-06-08 2016-08-24 张济宏 Tunnel integral steel mould lining trolley capping device and seamless capping process

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105888694A (en) * 2016-06-08 2016-08-24 张济宏 Tunnel integral steel mould lining trolley capping device and seamless capping process

Similar Documents

Publication Publication Date Title
CN206829417U (en) Anchor formula connecting structure under a kind of precast shear wall vertical reinforcement bellows
CN204098928U (en) Tunnel vault two serves as a contrast the location pre-embedded device of front Grouting Pipe
CN107326918A (en) A kind of concealed type, which passes through raft plate, can block impervious sump and its construction technology
CN203514333U (en) Basement soleplate precipitation well mouth blocking sleeve
CN205714222U (en) Tunnel overall steel die bush platform building cart binds device
CN202627006U (en) Plugging steel sleeve of dewatering well under basement floor
CN208763204U (en) A kind of vertical connecting structure of low layer assembled architecture prefabricated panel
CN105888694A (en) Tunnel integral steel mould lining trolley capping device and seamless capping process
CN101158163B (en) Pneumatic caisson bottom closing construction process
CN202689039U (en) Grouting tube structure of immersed tube tunnel tube section
CN207348231U (en) A kind of vertical connecting structure of Prefabricated stacking floor
CN105587053B (en) A kind of industrialization house wall bottom grouting construction method
CN202882099U (en) Prefabricated assembly-type round inspection well with integrated base and well room
CN206289873U (en) Spacing oblique pulp cellular type half-connection grout sleeve
CN108049425A (en) A kind of pipe gallery temporary plugging wall construction and construction method
CN206128787U (en) Assembled dregs strorage device
CN205077480U (en) Double cannula bored concrete pile structure
CN203939037U (en) A kind of plugging dewatering well device
CN203113349U (en) Foundation trench shoring lattice type end structure
CN106592635A (en) Integrated inspection shaft and installation method thereof
CN106567415A (en) Drain sleeve for preventing basement floating upward and use method
CN207047903U (en) A kind of automatic hydraulic well lid being flipped open
CN204491643U (en) The constructing structure that on a kind of raft plate, dewatering well is closed
CN206495206U (en) A kind of soil nailing
CN206421878U (en) A kind of fuel tank of transformer

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161123

Termination date: 20210608

CF01 Termination of patent right due to non-payment of annual fee