CN205711653U - A kind of construction site plash fills up go-cart - Google Patents
A kind of construction site plash fills up go-cart Download PDFInfo
- Publication number
- CN205711653U CN205711653U CN201620356640.0U CN201620356640U CN205711653U CN 205711653 U CN205711653 U CN 205711653U CN 201620356640 U CN201620356640 U CN 201620356640U CN 205711653 U CN205711653 U CN 205711653U
- Authority
- CN
- China
- Prior art keywords
- cylinder
- cart
- plash
- electric pushrod
- fills
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
This utility model relates to a kind of go-cart, particularly relates to a kind of construction site plash and fills up go-cart.The technical problems to be solved in the utility model is to provide a kind of can reduce plash, plash is filled up effective, safety is high construction site plash and filled up go-cart.In order to solve above-mentioned technical problem, this utility model provides such a construction site plash and fills up go-cart, include go-cart, cylinder I, pressuring flat device, support, electric magnet, guide rail, irony casing, elastic component, pendulous device, pole, cylinder II, rake hands, material storing box, funnel, discharge nozzle and electrically-controlled valve, top in go-cart is provided with cylinder I, the lower end of cylinder I connects pressuring flat device, pressuring flat device includes fixed plate, bearing block, motor and cylinder, the bottom left of fixed plate is provided with bearing block, the bottom right of fixed plate is provided with motor.This utility model has reached to reduce plash, plash fills up effect effective, that safety is high.
Description
Technical field
This utility model relates to a kind of go-cart, particularly relates to a kind of construction site plash and fills up go-cart.
Background technology
Building is the general name of building and structures, be people in order to meet social life needs, utilize the material technology means grasped, and use the artificial environment that certain scientific law, edema due to wind pathogen theory and aesthetic principle create.
Fill up, refer to fill in the blanks.Different from replenishing, replenish and refer to increase, fill up and refer to fill in the blanks.
Go-cart is with the carrying vehicle of manpower push and pull.Go-cart has dividing of single wheel, two-wheeled, three-wheel and four-wheel.The car body material of tradition go-cart is the most wooden, and the go-cart car body material of modern production is generally iron sheet.
There is the shortcoming that plash is more, plash is difficult to fill up, easily cause accident in existing construction site, therefore needs that research and development a kind of can reduce plash, plash is filled up effective, safety is high construction site plash and filled up go-cart badly.
Utility model content
(1) to solve the technical problem that
This utility model is in order to overcome the shortcoming that existing construction site plash is more, plash is difficult to fill up, easily cause accident, and the technical problems to be solved in the utility model is to provide a kind of can reduce plash, plash is filled up effective, safety is high construction site plash and filled up go-cart.
(2) technical scheme
nullIn order to solve above-mentioned technical problem,This utility model provides such a construction site plash and fills up go-cart,Include go-cart、Cylinder I、Pressuring flat device、Support、Electric magnet、Guide rail、Irony casing、Elastic component、Pendulous device、Pole、Cylinder II、Rake hands、Material storing box、Funnel、Discharge nozzle and electrically-controlled valve,Top in go-cart is provided with cylinder I,The lower end of cylinder I connects pressuring flat device,Pressuring flat device includes fixed plate、Bearing block、Motor and cylinder,The bottom left of fixed plate is provided with bearing block,The bottom right of fixed plate is provided with motor,Cylinder it is provided with between motor and bearing block,Motor is connected with the front end of cylinder,Support it is disposed with from left to right above go-cart、Electric magnet and guide rail,Top in support is provided with material storing box,The left and right sides, top of material storing box is provided with funnel,Funnel passes cradle top,The lower end, right side of material storing box connects discharge nozzle,Electrically-controlled valve it is provided with on discharge nozzle,Irony casing it is provided with on guide rail,Guide rail coordinates with irony casing,Flexible part it is connected between electric magnet with irony casing,It is provided with pendulous device on irony casing inner left wall,Pendulous device includes slide rail、Slide block、Tooth bar、Electric pushrod I、Connecting rod and gear,It is provided with slide rail on irony casing inner left wall,Slide block it is provided with on slide rail,The right-hand member of slide block connects tooth bar,The rear end of tooth bar connects electric pushrod I,Electric pushrod I is arranged on the roof in irony casing,The right of electric pushrod I is provided with connecting rod,Connecting rod is located at irony casing top,The front end of connecting rod is provided with gear,Wheel and rack engages,Connect on gear and have pole,The right-hand member of pole connects cylinder II,The right-hand member of cylinder II connects rake hands.
Preferably, also including beche, be provided with beche on the right side of the left wall of support, beche is located at below material storing box, and beche is located at above electric magnet.
Preferably, also including electric pushrod II, the right side of pendulous device is provided with electric pushrod II, and electric pushrod II is arranged on gear, and the right-hand member of electric pushrod II is connected with pole.
Preferably, elastic component is spring.
Operation principle: time initial, electric magnet is in "on" position, when the plash in people building site to be filled up, first pass through funnel in material storing box, add appropriate material for repairing, then promote go-cart to suitable position, open electrically-controlled valve, material for repairing in material storing box spills along material storing box inclined-plane from discharge nozzle, fall in plash, after falling into appropriate material for repairing, close electrically-controlled valve.Electric magnet power-off, electric magnet no longer holds irony casing, and irony casing is moved right by the elastic force effect of elastic component.When elastic component no longer stretches, irony casing no longer moves right, start cylinder II to extend, cylinder II drives rake hands to move to the right, when harrowing hands movement to appropriate location, close cylinder II, start pendulous device to swing, i.e. start electric pushrod I expanding-contracting action, band carry-over bar constantly seesaws, make pole constantly swing, pole band dynamic air cylinder II and rake hands constantly swing, rake hands can make material for repairing be evenly distributed in plash, when after rake hands movement a period of time, close electric pushrod I, start cylinder II to shorten, after rake hands resets, close cylinder II, electric magnet is energized, electric magnet holds irony casing, irony casing resets.Then go-cart is promoted, plash is made to be positioned at the underface of pressuring flat device, start cylinder I to extend, cylinder I drives pressuring flat device to move down, and after cylinder contacts with the material for repairing in plash, closes cylinder I, start motor work, driven by motor cylinder rotates, and cylinder can be filled and led up material and be compacted, make to fill and lead up material to fill and lead up effect more preferable.In plash fill and lead up material compacting after, close motor, start cylinder I and shorten, after pressuring flat device resets, close cylinder I, then go-cart is pushed into the next place needing and filling and leading up, repeat aforesaid operations and whole plash can have been filled up.
Because also including beche, it is provided with beche on the right side of the left wall of support, beche is located at below material storing box, and beche is located at above electric magnet, so when material for repairing is when falling in plash, beche can be started, material storing box is beaten by beche, makes the material for repairing in material storing box fall into quickly in plash, improves the efficiency of device, after falling into appropriate material for repairing, close beche.
Because also including electric pushrod II, the right side of pendulous device is provided with electric pushrod II, the right-hand member of electric pushrod II is connected with pole, so when harrowing hands by material for repairing mix homogeneously, starting electric pushrod II to stretch, can increase the range of activity harrowing hands, make that material for repairing mixes is more uniform, when, after material for repairing mix homogeneously, closing electric pushrod II.
Because elastic component is spring, the drawing effect of spring is more preferable.
(3) beneficial effect
This utility model has reached to reduce plash, plash fills up effect effective, that safety is high.
Accompanying drawing explanation
Fig. 1 is the first main TV structure schematic diagram of the present utility model.
Fig. 2 is the left view structural representation of this utility model pressuring flat device.
Fig. 3 is the main TV structure schematic diagram of this utility model pendulous device.
Fig. 4 is the second of the present utility model main TV structure schematic diagram.
Fig. 5 is the third main TV structure schematic diagram of the present utility model.
Being labeled as in accompanying drawing: 1-go-cart, 2-cylinder I, 3-pressuring flat device, 31-fixed plate, 32-bearing block, 33-motor, 34-cylinder, 4-support, 5-electric magnet, 6-guide rail, 7-irony casing, 8-elastic component, 9-pendulous device, 91-slide rail, 92-slide block, 93-tooth bar, 94-electric pushrod I, 95-connecting rod, 96-gear, 10-pole, 11-cylinder II, 12-harrows hands, 13-material storing box, 14-funnel, 15-discharge nozzle, 16-electrically-controlled valve, 17-beche, 18-electric pushrod II.
Detailed description of the invention
With embodiment, this utility model is further described below in conjunction with the accompanying drawings.
Embodiment
1
nullA kind of construction site plash fills up go-cart,As Figure 1-5,Include go-cart 1、Cylinder I 2、Pressuring flat device 3、Support 4、Electric magnet 5、Guide rail 6、Irony casing 7、Elastic component 8、Pendulous device 9、Pole 10、Cylinder II 11、Rake hands 12、Material storing box 13、Funnel 14、Discharge nozzle 15 and electrically-controlled valve 16,Top in go-cart 1 is provided with cylinder I 2,The lower end of cylinder I 2 connects pressuring flat device 3,Pressuring flat device 3 includes fixed plate 31、Bearing block 32、Motor 33 and cylinder 34,The bottom left of fixed plate 31 is provided with bearing block 32,The bottom right of fixed plate 31 is provided with motor 33,Cylinder 34 it is provided with between motor 33 and bearing block 32,Motor 33 is connected with the front end of cylinder 34,Support 4 it is disposed with from left to right above go-cart 1、Electric magnet 5 and guide rail 6,Top in support 4 is provided with material storing box 13,The left and right sides, top of material storing box 13 is provided with funnel 14,Funnel 14 is through support 4 top,The lower end, right side of material storing box 13 connects discharge nozzle 15,Electrically-controlled valve 16 it is provided with on discharge nozzle 15,Irony casing 7 it is provided with on guide rail 6,Guide rail 6 coordinates with irony casing 7,Flexible part 8 it is connected between electric magnet 5 with irony casing 7,It is provided with pendulous device 9 on irony casing 7 inner left wall,Pendulous device 9 includes slide rail 91、Slide block 92、Tooth bar 93、Electric pushrod I 94、Connecting rod 95 and gear 96,It is provided with slide rail 91 on irony casing 7 inner left wall,Slide block 92 it is provided with on slide rail 91,The right-hand member of slide block 92 connects tooth bar 93,The rear end of tooth bar 93 connects electric pushrod I 94,Electric pushrod I 94 is arranged on the roof in irony casing 7,The right of electric pushrod I 94 is provided with connecting rod 95,Connecting rod 95 is located at irony casing 7 top,The front end of connecting rod 95 is provided with gear 96,Gear 96 engages with tooth bar 93,Connect on gear 96 and have pole 10,The right-hand member of pole 10 connects cylinder II 11,The right-hand member of cylinder II 11 connects rake hands 12.
Also including beche 17, be provided with beche 17 on the right side of the left wall of support 4, beche 17 is located at below material storing box 13, and beche 17 is located at above electric magnet 5.
Also including electric pushrod II 18, the right side of pendulous device 9 is provided with electric pushrod II 18, and electric pushrod II 18 is arranged on gear 96, and the right-hand member of electric pushrod II 18 is connected with pole 10.
Elastic component 8 is spring.
Operation principle: time initial, electric magnet 5 is in "on" position, when the plash in people building site to be filled up, first pass through funnel 14 in material storing box 13, add appropriate material for repairing, then promote go-cart 1 to suitable position, open electrically-controlled valve 16, material for repairing in material storing box 13 spills along material storing box 13 inclined-plane from discharge nozzle 15, fall in plash, after falling into appropriate material for repairing, close electrically-controlled valve 16.Electric magnet 5 power-off, electric magnet 5 no longer holds irony casing 7, and irony casing 7 is moved right by the elastic force effect of elastic component 8.When elastic component 8 no longer stretches, irony casing 7 no longer moves right, start cylinder II 11 elongation, cylinder II 11 drives rake hands 12 to move to the right, when harrowing hands 12 and moving to appropriate location, close cylinder II 11, start pendulous device 9 to swing, i.e. start electric pushrod I 94 expanding-contracting action, band carry-over bar 93 constantly seesaws, make pole 10 constantly swing, pole 10 band dynamic air cylinder II 11 and rake hands 12 constantly swing, rake hands 12 can make material for repairing be evenly distributed in plash, after rake hands 12 moves a period of time, close electric pushrod I 94, start cylinder II 11 to shorten, after rake hands 12 resets, close cylinder II 11, electric magnet 5 is energized, electric magnet 5 holds irony casing 7, irony casing 7 resets.Then go-cart 1 is promoted, plash is made to be positioned at the underface of pressuring flat device 3, start cylinder I 2 elongation, cylinder I 2 drives pressuring flat device 3 to move down, and after cylinder 34 contacts with the material for repairing in plash, closes cylinder I 2, start motor 33 to work, motor 33 drives cylinder 34 to rotate, and cylinder 34 can fill and lead up material compacting, make to fill and lead up material to fill and lead up effect more preferable.In plash fill and lead up material compacting after, close motor 33, start cylinder I 2 and shorten, after pressuring flat device 3 resets, close cylinder I 2, then go-cart 1 is pushed into the next place needing and filling and leading up, repeat aforesaid operations and whole plash can have been filled up.
Because also including beche 17, beche 17 it is provided with on the right side of the left wall of support 4, beche 17 is located at below material storing box 13, and beche 17 is located at above electric magnet 5, so when material for repairing is when falling in plash, beche 17 can be started, material storing box 13 is beaten by beche 17, makes the material for repairing in material storing box 13 fall into quickly in plash, improves the efficiency of device, after falling into appropriate material for repairing, close beche 17.
Because also including electric pushrod II 18, the right side of pendulous device 9 is provided with electric pushrod II 18, the right-hand member of electric pushrod II 18 is connected with pole 10, so when harrowing hands 12 by material for repairing mix homogeneously, starting electric pushrod II 18 to stretch, can increase the range of activity harrowing hands 12, make that material for repairing mixes is more uniform, when, after material for repairing mix homogeneously, closing electric pushrod II 18.
Because elastic component 8 is spring, the drawing effect of spring is more preferable.
Embodiment described above only have expressed preferred implementation of the present utility model, and it describes more concrete and detailed, but therefore can not be interpreted as the restriction to this utility model the scope of the claims.It should be pointed out that, for the person of ordinary skill of the art, without departing from the inventive concept of the premise, it is also possible to making some deformation, improve and substitute, these broadly fall into protection domain of the present utility model.Therefore, the protection domain of this utility model patent should be as the criterion with claims.
Claims (4)
- null1. a construction site plash fills up go-cart,It is characterized in that,Include go-cart (1)、Cylinder I (2)、Pressuring flat device (3)、Support (4)、Electric magnet (5)、Guide rail (6)、Irony casing (7)、Elastic component (8)、Pendulous device (9)、Pole (10)、Cylinder II (11)、Rake hands (12)、Material storing box (13)、Funnel (14)、Discharge nozzle (15) and electrically-controlled valve (16),Top in go-cart (1) is provided with cylinder I (2),The lower end of cylinder I (2) connects pressuring flat device (3),Pressuring flat device (3) includes fixed plate (31)、Bearing block (32)、Motor (33) and cylinder (34),The bottom left of fixed plate (31) is provided with bearing block (32),The bottom right of fixed plate (31) is provided with motor (33),Cylinder (34) it is provided with between motor (33) and bearing block (32),Motor (33) is connected with the front end of cylinder (34),Go-cart (1) top is disposed with support (4) from left to right、Electric magnet (5) and guide rail (6),Top in support (4) is provided with material storing box (13),The left and right sides, top of material storing box (13) is provided with funnel (14),Funnel (14) passes support (4) top,The lower end, right side of material storing box (13) connects discharge nozzle (15),Electrically-controlled valve (16) it is provided with on discharge nozzle (15),Irony casing (7) it is provided with on guide rail (6),Guide rail (6) coordinates with irony casing (7),Flexible part (8) it is connected between electric magnet (5) with irony casing (7),Pendulous device (9) it is provided with on irony casing (7) inner left wall,Pendulous device (9) includes slide rail (91)、Slide block (92)、Tooth bar (93)、Electric pushrod I (94)、Connecting rod (95) and gear (96),Slide rail (91) it is provided with on irony casing (7) inner left wall,Slide block (92) it is provided with on slide rail (91),The right-hand member of slide block (92) connects tooth bar (93),The rear end of tooth bar (93) connects electric pushrod I (94),Electric pushrod I (94) is arranged on the roof in irony casing (7),The right of electric pushrod I (94) is provided with connecting rod (95),Connecting rod (95) is located at irony casing (7) top,The front end of connecting rod (95) is provided with gear (96),Gear (96) engages with tooth bar (93),The upper connection of gear (96) has pole (10),The right-hand member of pole (10) connects cylinder II (11),The right-hand member of cylinder II (11) connects rake hands (12).
- A kind of construction site the most according to claim 1 plash fills up go-cart, it is characterized in that, also include beche (17), beche (17) it is provided with on the right side of the left wall of support (4), beche (17) is located at material storing box (13) lower section, and beche (17) is located at electric magnet (5) top.
- A kind of construction site the most according to claim 1 plash fills up go-cart, it is characterized in that, also include electric pushrod II (18), the right side of pendulous device (9) is provided with electric pushrod II (18), electric pushrod II (18) is arranged on gear (96), and the right-hand member of electric pushrod II (18) is connected with pole (10).
- A kind of construction site the most according to claim 1 plash fills up go-cart, it is characterised in that elastic component (8) is spring.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620356640.0U CN205711653U (en) | 2016-04-26 | 2016-04-26 | A kind of construction site plash fills up go-cart |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620356640.0U CN205711653U (en) | 2016-04-26 | 2016-04-26 | A kind of construction site plash fills up go-cart |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205711653U true CN205711653U (en) | 2016-11-23 |
Family
ID=57293278
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620356640.0U Expired - Fee Related CN205711653U (en) | 2016-04-26 | 2016-04-26 | A kind of construction site plash fills up go-cart |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205711653U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106958262A (en) * | 2017-03-29 | 2017-07-18 | 吴剑辉 | A kind of construction site with fill out hole ponding recycle device |
CN112523148A (en) * | 2020-12-21 | 2021-03-19 | 浙江鼎盛交通建设有限公司 | Road construction is with small-size foundation ditch ponding duster |
CN112627533A (en) * | 2020-12-20 | 2021-04-09 | 南京奥帕思汽车用品有限公司 | Can prevent jolting and can carry out cement shallow of landfill to pit |
-
2016
- 2016-04-26 CN CN201620356640.0U patent/CN205711653U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106958262A (en) * | 2017-03-29 | 2017-07-18 | 吴剑辉 | A kind of construction site with fill out hole ponding recycle device |
CN106958262B (en) * | 2017-03-29 | 2019-05-31 | 宜昌领兴建筑工程有限公司 | A kind of construction site is with filling out hole ponding recycle device |
CN112627533A (en) * | 2020-12-20 | 2021-04-09 | 南京奥帕思汽车用品有限公司 | Can prevent jolting and can carry out cement shallow of landfill to pit |
CN112523148A (en) * | 2020-12-21 | 2021-03-19 | 浙江鼎盛交通建设有限公司 | Road construction is with small-size foundation ditch ponding duster |
CN112523148B (en) * | 2020-12-21 | 2024-03-15 | 浙江鼎盛交通建设有限公司 | Small foundation pit ponding remover for road construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205711653U (en) | A kind of construction site plash fills up go-cart | |
CN205700708U (en) | A kind of finishing cullet efficiency crushing device | |
CN107720651A (en) | A kind of municipal well lid tilts device | |
CN206817353U (en) | A kind of theft-proof type solar energy street lamp | |
CN106838804A (en) | A kind of theft-proof type solar energy street lamp | |
CN205474976U (en) | Automobile dead weight switch fence door | |
CN204712688U (en) | A kind of automatic stamping machine | |
CN206261559U (en) | A kind of electrical water jetting is swept the floor moping floor integrated machine | |
CN204426174U (en) | Fixed type two-way film rolling device | |
CN206183850U (en) | Two -way spring assistor has | |
CN206589917U (en) | A kind of water sending device with top bar function | |
CN206768530U (en) | A kind of road maintenance asphalt heating equipment | |
CN204782171U (en) | Turn into pressure intelligent environmental protection parking stall safety lock system of electric energy | |
CN109131241A (en) | A kind of bus window automatic cleaning device for glass | |
CN205621363U (en) | Building site uses high -efficient warning sign | |
CN204148831U (en) | A kind of automatic loading spring equipment of automobile inside door handle | |
CN107972390A (en) | A kind of Language education board of education automatic cleaner | |
CN204133842U (en) | Smoke evacuation moxibustion device | |
CN206428696U (en) | A kind of low spatial drop hammer type automatic hydraulic piling machine | |
CN203920122U (en) | A kind of blackboard that can automatically wipe writing | |
CN206150364U (en) | Chocolate horizontal rod inserting machine constructs | |
CN205711842U (en) | The efficient warning sign in a kind of construction site equipped with electric magnet | |
CN202731357U (en) | Lateral side free-moving parking device with two vehicles parking in one position | |
CN206280908U (en) | A kind of street lamp with body-building device | |
CN205766914U (en) | Glass high-efficiency drilling equipment used by a kind of finishing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161123 Termination date: 20170426 |