CN205699788U - Job site sewage disposal system - Google Patents

Job site sewage disposal system Download PDF

Info

Publication number
CN205699788U
CN205699788U CN201620286080.6U CN201620286080U CN205699788U CN 205699788 U CN205699788 U CN 205699788U CN 201620286080 U CN201620286080 U CN 201620286080U CN 205699788 U CN205699788 U CN 205699788U
Authority
CN
China
Prior art keywords
water
sidewall
sedimentation basin
job site
filtering pond
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620286080.6U
Other languages
Chinese (zh)
Inventor
周康
徐克松
应高梁
虞功平
杜德明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Construction Group Co Ltd
Original Assignee
Zhongtian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Construction Group Co Ltd filed Critical Zhongtian Construction Group Co Ltd
Priority to CN201620286080.6U priority Critical patent/CN205699788U/en
Application granted granted Critical
Publication of CN205699788U publication Critical patent/CN205699788U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a kind of job site sewage disposal system, including Water-collecting filtering pond and two sedimentation basins, connected by water-supply-pipe between described Water-collecting filtering pond and sedimentation basin, described water-supply-pipe is connected with sewage pump at Water-collecting filtering pond end, described sedimentation basin includes basis and sidewall, sidewall surrounds multi stage precipitation chamber on basis, it is provided with discharge outlet connection between described multi stage precipitation chamber, described basis uses armored concrete to water and smashes, described sidewall is with solid concrete brick masonry, described sidewall inwall is coated with waterproof mortar, steel pipe has been gone along with sb. to guard him in the outside of described sidewall, the both sides in described Water-collecting filtering pond are provided with filter structure, described sewage pump is placed in bamboo basket.Job site sewage is precipitated by the utility model by sedimentation basin, it is to avoid job site sewage carries too much mud and causes municipal wastewater pipe network to result in blockage.

Description

Job site sewage disposal system
Technical field
The utility model building construction technology, is specifically related to sewage disposal system of constructing.
Background technology
At present, the sewage that the earthwork evacuation of engineering produces is directly discharged in municipal wastewater pipe network, easily causes sewage network and blocks because mud is too much.The blocking main cause causing city planting ductwork is that on-the-spot sewage is not directly discharged to municipal wastewater mouth through precipitation.Through the sampling detection to on-the-spot sewage, wherein the concentration of suspension in sewage has reached 70mg/L, and < therefore 50mg/L easilys lead to the blocking of municipal wastewater pipe network to have exceeded the permission discharge maximum of second level standard in Equations of The Second Kind pollutant.
Utility model content
Technical problem to be solved in the utility model is just to provide a kind of job site sewage disposal system, it is to avoid be directly discharged to job site sewage result in blockage in municipal wastewater pipe network.
For solving above-mentioned technical problem, the utility model adopts the following technical scheme that job site sewage disposal system, including Water-collecting filtering pond and two sedimentation basins, connected by water-supply-pipe between described Water-collecting filtering pond and sedimentation basin, described water-supply-pipe is connected with sewage pump at Water-collecting filtering pond end, described sedimentation basin includes basis and sidewall, sidewall surrounds multi stage precipitation chamber on basis, it is provided with discharge outlet connection between described multi stage precipitation chamber, described basis uses armored concrete to water and smashes, described sidewall is with solid concrete brick masonry, described sidewall inwall is coated with waterproof mortar, steel pipe has been gone along with sb. to guard him in the outside of described sidewall, the both sides in described Water-collecting filtering pond are provided with filter structure, described sewage pump is placed in bamboo basket.
As preferably, the inwall of described sedimentation basin is coated with the thick JS water-repellent paint of 2mm.
As preferably, described filter structure includes that the thickness laid by diameter 20mm~40mm cobble is the boulder bed of 500mm and the drainage sandbag being placed on boulder bed.
As preferably, setting up temporary drainage frame, the added drainpipe that is provided with of described temporary drainage frame between said two sedimentation basin, described drainpipe connects two sedimentation basins, and described drainpipe tilts to the sedimentation basin near municipal wastewater mouth side.
The technical solution adopted in the utility model, sedimentation basin is made in more than ground, basis C20 concrete waters to be smash, sidewall is with solid concrete brick masonry, the cement sand plaster of metope 1:3 simultaneously mixes 5% waterproofing agent, the thick JS water-repellent paint of inwall brush 2mm, owing to the intensity of sidewall is insufficiently resistant to the lateral pressure of water, needs to be reinforced by one steel pipe of@500mm.So, by sedimentation basin, job site sewage is precipitated, it is to avoid job site sewage is carried too much mud and causes municipal wastewater pipe network to result in blockage.
Additionally, for the present situation that the mud of foundation ditch catchment is too much, collection water spot at foundation ditch makes filter, diameter 20mm~40mm the boulder bed and the drainage sandbag that integrate water spot both sides thickness as 500mm do two-layer drainage, again sewage pump is placed in the bamboo basket of filter, it is ensured that sewage pump is not blocked by mud.
Brief description
With detailed description of the invention, the utility model is further described below in conjunction with the accompanying drawings:
Fig. 1 is the structural representation in Water-collecting filtering pond;
Fig. 2 is the structural representation of sedimentation basin.
Detailed description of the invention
As depicted in figs. 1 and 2, job site sewage disposal system, including Water-collecting filtering pond 1 and two sedimentation basins 2, described Water-collecting filtering pond 1 is connected by water-supply-pipe between sedimentation basin 2, and the Water-collecting filtering pond end of described water-supply-pipe is connected with sewage pump 13.
Wherein, described sedimentation basin 2 includes basis 21 and sidewall 22, the cooperation of multiple sidewalls surrounds multi stage precipitation chamber on basis, it is provided with discharge outlet 23 between described multi stage precipitation chamber to connect, described basis uses armored concrete to water and smashes, described sidewall is coated with waterproof mortar with solid concrete brick masonry, the outer described sidewall inwall of described sidewall.This brick sedimentation basin either construction technology in ground, there are bigger advantage cost, making duration etc., both satisfied compared with casual labourer's phase, can solve again on-the-spot sewage discharge problem.
In order to ensure sedimentation basin construction quality, preventing sidewall from seeping water, full degree of mortar at bed joint is seepage control of wall very the key link, and the quality of masonry quality directly affects last result.It is thus determined that ACCEPTABLE QUALITY LEVEL be: horizontal mortar joint full degree of mortar at bed joint cannot be less than 90%;Vertical mortar seam uses and adds slurry processes cooperation shove method, makes full degree of mortar at bed joint cannot be less than 80%, it is ensured that self packing of body of wall.Waterproofing work needs each link to accomplish the percolation ratio keeping on improving could to reduce metope to the full extent, therefore in painting mortar, mix the waterproofing agent of 5%, after wall plastering completes, on the inwall of sedimentation basin, do 2 thick JS water-repellent paint together again, it is ensured that the water resistance of sidewall reaches expected requirement.
Owing to the side wall strength of solid concrete brick masonry is insufficiently resistant to the lateral pressure of water, need to be reinforced by one steel pipe of@500mm.
Set up temporary steel pipe support and do drainage channel, drainpipe uses PVC sleeve pipe, and the passage limit of job site is set up temporary drainage frame, connection north and south sedimentation basin, because municipal wastewater mouth is in southern side, therefore the water of north side is caused southern side, support body will be set up into high south, north when building a framework low, because distance is longer, therefore use the slope downstream of 1%, drainpipe uses the PVC sleeve pipe of diameter 200mm, and pipeline connects closely knit, does not leaks in midway.
How ensureing that sewage pump is not blocked by mud under foundation ditch is also highly important link in sewage disposal process.The collection water spot proposing at foundation ditch for the too much present situation of the mud of foundation ditch catchment makes the scheme in Water-collecting filtering pond 1, brick fetal membrane 10 based on collection water spot side, integrate water spot opposite side as foundation pit slope protection, diameter 20mm~40mm the boulder bed 12 and the drainage sandbag 11 that integrate water spot other both sides thickness as 500mm do two-layer drainage, then are placed on sewage pump 13 in bamboo basket 14.Ensure that sewage pump is not blocked by mud.

Claims (4)

1. job site sewage disposal system, it is characterized in that: include Water-collecting filtering pond and two sedimentation basins, connected by water-supply-pipe between described Water-collecting filtering pond and sedimentation basin, described water-supply-pipe is connected with sewage pump at Water-collecting filtering pond end, described sedimentation basin includes basis and sidewall, sidewall surrounds multi stage precipitation chamber on basis, it is provided with discharge outlet connection between described multi stage precipitation chamber, described basis uses armored concrete to water and smashes, described sidewall is with solid concrete brick masonry, described sidewall inwall is coated with waterproof mortar, steel pipe has been gone along with sb. to guard him in the outside of described sidewall, the both sides in described Water-collecting filtering pond are provided with filter structure, described sewage pump is placed in bamboo basket.
2. job site according to claim 1 sewage disposal system, it is characterised in that: it is coated with the thick JS water-repellent paint of 2mm on the inwall of described sedimentation basin.
3. job site according to claim 1 sewage disposal system, it is characterised in that: described filter structure includes that the thickness laid by diameter 20mm~40mm cobble is the boulder bed of 500mm and the drainage sandbag being placed on boulder bed.
4. job site according to claim 1 sewage disposal system, it is characterized in that: between said two sedimentation basin, set up temporary drainage frame, described temporary drainage frame is added is provided with drainpipe, described drainpipe connects two sedimentation basins, and described drainpipe tilts to the sedimentation basin near municipal wastewater mouth side.
CN201620286080.6U 2016-04-07 2016-04-07 Job site sewage disposal system Expired - Fee Related CN205699788U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620286080.6U CN205699788U (en) 2016-04-07 2016-04-07 Job site sewage disposal system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620286080.6U CN205699788U (en) 2016-04-07 2016-04-07 Job site sewage disposal system

Publications (1)

Publication Number Publication Date
CN205699788U true CN205699788U (en) 2016-11-23

Family

ID=57309151

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620286080.6U Expired - Fee Related CN205699788U (en) 2016-04-07 2016-04-07 Job site sewage disposal system

Country Status (1)

Country Link
CN (1) CN205699788U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106880966A (en) * 2017-03-29 2017-06-23 广西顺帆投资有限公司 Filtering apparatus for drinking water
CN108543377A (en) * 2018-05-03 2018-09-18 宿州冬宇环保科技有限公司 A kind of purifying dust-removing device for power plant
CN111676970A (en) * 2020-07-27 2020-09-18 中建八局第三建设有限公司 Basement outer wall backfilling system and method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106880966A (en) * 2017-03-29 2017-06-23 广西顺帆投资有限公司 Filtering apparatus for drinking water
CN108543377A (en) * 2018-05-03 2018-09-18 宿州冬宇环保科技有限公司 A kind of purifying dust-removing device for power plant
CN111676970A (en) * 2020-07-27 2020-09-18 中建八局第三建设有限公司 Basement outer wall backfilling system and method

Similar Documents

Publication Publication Date Title
CN103046565B (en) Draining method for ultra-deep batholith deep foundation pit
CN205699788U (en) Job site sewage disposal system
CN105002973B (en) A kind of urban rainwater pipeline system of effective compensation underground water
CN104234089A (en) Construction method for waterproof and water-draining combination of basement
CN206591743U (en) A kind of big depth large scale concrete roof building looks for pitched roof drain structure
CN104328836B (en) A kind of environment-friendly type prefabricated pair of case deep hole type catch pit and construction method thereof
CN110093965A (en) A kind of water discharge method of construction site
CN206477382U (en) Rainwater recycle comprehensively utilizes structure
CN108166516B (en) Sponge city based dewatering well comprehensive utilization system and method
CN106703157B (en) Construction method of rainwater recycling and comprehensive utilizing structure
CN107366348A (en) A kind of anti-alluvial pipeline
CN201644490U (en) Concrete pouring waste treatment and recovery system
CN210409826U (en) Building site waste water cyclic utilization system
CN114045880A (en) Basement post-cast strip treatment process
CN107338700A (en) For strengthening the permeable structure of permeable pavement fastness
CN108589796B (en) Substrate water-dispersing treatment method
CN106430907A (en) Bottom mud dredging treatment system
CN103882918B (en) The water discharge method of floor hydrops and device during construction of super highrise building
CN207469420U (en) A kind of anti-siltation pipeline
CN204225257U (en) A kind of environment-friendly type prefabricated pair of case deep hole type catch pit
CN111608171A (en) Sandbar underground soft base pipe, well precipitation anti-floating pipe pile structure and construction method
CN209411947U (en) Building site rainwater and waste water recycle system
CN218508504U (en) Composite impervious wall adapted to solid waste landfill
CN221072962U (en) Building overflow well structure
CN207419667U (en) Road inlet for stom water prevents blockking up and cuts dirty sediment device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161123

Termination date: 20170407

CF01 Termination of patent right due to non-payment of annual fee