CN205687440U - A kind of removable Undercarriage structure of furnace roof derrick crane - Google Patents
A kind of removable Undercarriage structure of furnace roof derrick crane Download PDFInfo
- Publication number
- CN205687440U CN205687440U CN201620592077.7U CN201620592077U CN205687440U CN 205687440 U CN205687440 U CN 205687440U CN 201620592077 U CN201620592077 U CN 201620592077U CN 205687440 U CN205687440 U CN 205687440U
- Authority
- CN
- China
- Prior art keywords
- girder steel
- main girder
- support leg
- undercarriage
- furnace roof
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The open a kind of removable Undercarriage structure of furnace roof derrick crane of this utility model.It includes the main girder steel being positioned at top, boiler room, by parallel traverse main girder steel facade in the way of two, the left and right longitudinal direction that is arranged on main girder steel time girder steel, it is characterised in that: in the way of parallel with main girder steel, be separately installed with a support leg beam being positioned at about main girder steel facade forward-and-rearward on two longitudinal direction time girder steels;Supporting leg depth of beam is equal to the difference in height of main girder steel upper surface with time girder steel upper surface;On two support leg beams, in the way of riding main girder steel, parallel left and right two foundation that are provided with are set a roof beam in place;Undercarriage bea top flange plate and tower body main chord connect.This utility model solves the problem that common building tower crane " is taken root " nowhere at top, boiler room, and this underframe is demountable structure, reusable;Meanwhile, crawler crane or the work of ultra-large type self-raising tower crane are substituted with a tower crane being arranged on furnace roof, it is possible to save substantial contribution, reduce power construction cost.
Description
Technical field
This utility model relates to a kind of derrick crane underframe being arranged on furnace roof, it particularly relates to one is supported on
Common building derrick crane bottom support basis above power plant boiler room steel construction, i.e. furnace roof derrick crane is removable
Undercarriage structure.
Background technology
Early construction, generally a common building tower with a ultra-large type self-raising tower crane are being installed by thermal power plant
Formula crane carries out Steel Structure Installation, and such two tower crane amplitudes just can cover whole boiler room;And arrived power plant boiler
Room build later stage, i.e. the main girder steel (large girder) of boiler room install in place after, now, the tower lifting of building having reached common
The lifting altitude limit of machine, in order to work normally, at this moment or with a crawler crane coordinates lifting, or installs one again
Platform ultra-large type self-raising tower crane, but the cost of both approaches is the highest, and the input of equipment is the biggest, and at fire
In the later stage that Boiler House is built, the weight of the one piece apparatus of required lifting is all little, and the somewhat the biggest material of both schemes is little
With.
In this case, if it is possible to the building tower crane that a Daepori is logical is installed at the top of main girder steel, can
Meeting job requirement, cost is the highest;And the component that bigger load can be born in top, boiler room has main girder steel and four steel
Beam, four times girder steel is distributed in main girder steel both sides two-by-two, and upper table and the main girder steel upper surface of secondary girder steel have certain difference in height, as
Shown in Fig. 1, main girder steel and time girder steel broadly fall into the internal main stress component of power plant, do not allow external component to weld with it;And it is tower
Crane is when normally working, and tower crane underframe part stress is complicated, i.e. wants to bear the pressure of alternation, also wants to bear alternation
Pulling force.So according to the distinctive operating mode in boiler top, developing one and both need not be welded on main girder steel and time girder steel, the most just
In the furnace roof derrick crane Undercarriage structure of dismounting, there is the biggest practical value and economic worth.
Summary of the invention
The purpose of this utility model provides one to install for the special structure in power plant boiler roof portion just
It is being positioned at main girder steel and the tower lifting of dismountable common building at two, left and right longitudinal direction time girder steel top at top, boiler room
Machine Undercarriage structure.
The purpose of this utility model can be realized by following technique measures:
The removable Undercarriage structure of furnace roof derrick crane of the present utility model includes the main girder steel being positioned at top, boiler room, with
Two, the left and right longitudinal direction that the parallel mode traversing main girder steel facade is arranged on main girder steel time girder steel;Before being positioned at main girder steel facade
In the way of parallel with main girder steel, a support leg beam it is separately installed with on two, the left and right at rear longitudinal direction time girder steel;At two supporting legs
On beam, in the way of riding main girder steel, parallel left and right two foundation that are provided with are set a roof beam in place;Described undercarriage bea top flange plate and tower body main chord
Connect.
Supporting leg depth of beam described in this utility model is equal to the difference in height of main girder steel upper surface with time girder steel upper surface, long
Degree is more than or equal to the distance between two, left and right longitudinal direction time girder steel outer side edges.
This utility model is respectively and fixedly connected with lower end at described support leg beam two ends and is provided with the box-shaped supporting leg of mounting flange, if
Put the box-shaped supporting leg at support leg beam two ends by connecting bolt and backing plate girder steel Joint secondary with two, left and right longitudinal direction respectively;Described
Supporting leg depth of beam is adjusted by connecting bolt and backing plate according to the difference in height of main girder steel and time girder steel.
Support leg beam described in this utility model is I-shaped cross-section, is just being provided with undercarriage bea connecting portion even at support leg beam
Acting flange, is connected by bolt and undercarriage bea, is being provided with reinforcement with corresponding position, adpting flange position;Described undercarriage bea is
Box section, is just welded with cross gusset, undercarriage bea lower flange at link position to tower body main chord inside undercarriage bea
Plate two ends are welded with box-shaped flange seat, for being connected with support leg beam;Undercarriage bea length is more than tower body sectional dimension.
Operation principle of the present utility model is as follows:
When tower crane tower body main chord bears pressure, the pressure of main chord directly passes to main girder steel by undercarriage bea
And support leg beam, that a part of pressure passing to support leg beam passes to time girder steel still further below;When tower crane tower body main chord bears
During pulling force, the pulling force of main chord passes to undercarriage bea, and pulling force is passed to support leg beam by flange bolt by undercarriage bea, and support leg beam is again
By backing plate and stay bolt, pulling force is passed to time girder steel again.Therefore this underframe can either meet tower crane main chord tension operating mode,
Also main chord pressurized operating mode can be met.
Useful benefit of the present utility model is as follows:
This utility model solves the problem that common building tower crane " is taken root " nowhere at top, boiler room, and this underframe is
Demountable structure, reusable;Meanwhile, crawler crane or ultra-large type are substituted from rising tower with a tower crane being arranged on furnace roof
Formula crane works, it is possible to saves substantial amounts of fund, greatly reduces the construction cost of power plant.
Accompanying drawing explanation
Fig. 1 is the main girder steel of furnace roof and the layout schematic diagram of time girder steel.
Fig. 2 is structural representation of the present utility model.
Fig. 3 is the built-in cross gusset layout drawing of undercarriage bea in this utility model.
Part sequence number in figure: 1, longitudinal time girder steel, 2, support leg beam, 3, backing plate, 4, connecting bolt, 5, main girder steel, 6, underframe
Beam, 6-1, cross gusset.
Detailed description of the invention
This utility model is further described below with reference to embodiment (accompanying drawing):
As shown in Figure 2,3, the removable Undercarriage structure of furnace roof derrick crane of the present utility model includes being positioned at boiler roof
The main girder steel 5 in portion, by parallel traverse main girder steel 5 facade in the way of two, the left and right longitudinal direction that is arranged on main girder steel 5 time girder steel 1;
It is separately installed with in the way of parallel with main girder steel 5 on two longitudinal direction time girder steels 1 being positioned at about main girder steel 5 facade forward-and-rearward
A piece support leg beam 2;The height of described support leg beam 2 is equal to the difference in height of main girder steel 5 upper surface with time girder steel 1 upper surface, and length is big
In equal to the distance between two, left and right longitudinal direction time girder steel 1 outer side edges;On two support leg beams 2 in the way of riding main girder steel 5
Parallel left and right two foundation that are provided with set a roof beam in place 6;Described undercarriage bea 6 top flange plate and tower body main chord connect.
This utility model is respectively and fixedly connected with lower end at described support leg beam 2 two ends and is provided with the box-shaped supporting leg of mounting flange,
The box-shaped supporting leg being arranged on support leg beam 2 two ends is solid mutually with two, left and right longitudinal direction time girder steel 1 respectively with backing plate 3 by connecting bolt 4
Connect;Described supporting leg depth of beam is adjusted by connecting bolt 4 and backing plate 3 according to the difference in height of main girder steel and time girder steel.
Support leg beam 2 described in this utility model is I-shaped cross-section, is just provided with undercarriage bea 6 connecting portion at support leg beam
Adpting flange, is connected by bolt and undercarriage bea 6, is being provided with reinforcement with corresponding position, adpting flange position;Described underframe
Beam 6 is box section, is just welded with cross gusset 6-1(such as Fig. 3 at link position to tower body main chord inside undercarriage bea
Shown in), undercarriage bea bottom wing listrium two ends are welded with box-shaped flange seat, for being connected with support leg beam;Undercarriage bea length is more than tower body
Sectional dimension.
Claims (5)
1. the removable Undercarriage structure of furnace roof derrick crane, it includes the main girder steel being positioned at top, boiler room, with parallel horizontal stroke
Pass through two, the left and right longitudinal direction time girder steel that the mode of main girder steel facade is arranged on main girder steel, it is characterised in that: it is being positioned at main girder steel
In the way of parallel with main girder steel, a support leg beam it is separately installed with on two longitudinal direction time girder steels about facade forward-and-rearward;Two
On root support leg beam, in the way of riding main girder steel, parallel left and right two foundation that are provided with are set a roof beam in place;Described undercarriage bea top flange plate and tower body
Main chord connects.
The removable Undercarriage structure of furnace roof derrick crane the most according to claim 1, it is characterised in that: described support leg beam
Highly equal to the difference in height of main girder steel upper surface with time girder steel upper surface, length is more than or equal to outside two, left and right longitudinal direction time girder steel
Distance between limit.
The removable Undercarriage structure of furnace roof derrick crane the most according to claim 1, it is characterised in that: at described support leg beam
Two ends are respectively and fixedly connected with lower end and are provided with the box-shaped supporting leg of mounting flange, are arranged on the box-shaped supporting leg at support leg beam two ends by even
Connecting bolt and backing plate girder steel Joint secondary with two, left and right longitudinal direction respectively.
The removable Undercarriage structure of furnace roof derrick crane the most according to claim 1, it is characterised in that: described support leg beam is
I-shaped cross-section, is just provided with adpting flange to undercarriage bea connecting portion at support leg beam, is connected by bolt and undercarriage bea, with
Corresponding position, adpting flange position is provided with reinforcement.
The removable Undercarriage structure of furnace roof derrick crane the most according to claim 1, it is characterised in that: described undercarriage bea is
Box section, is just welded with cross gusset, undercarriage bea lower flange at link position to tower body main chord inside undercarriage bea
Plate two ends are welded with box-shaped flange seat, for being connected with support leg beam;Undercarriage bea length is more than tower body sectional dimension.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620592077.7U CN205687440U (en) | 2016-06-17 | 2016-06-17 | A kind of removable Undercarriage structure of furnace roof derrick crane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620592077.7U CN205687440U (en) | 2016-06-17 | 2016-06-17 | A kind of removable Undercarriage structure of furnace roof derrick crane |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205687440U true CN205687440U (en) | 2016-11-16 |
Family
ID=57414825
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620592077.7U Expired - Fee Related CN205687440U (en) | 2016-06-17 | 2016-06-17 | A kind of removable Undercarriage structure of furnace roof derrick crane |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205687440U (en) |
-
2016
- 2016-06-17 CN CN201620592077.7U patent/CN205687440U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101886468B (en) | Construction method of suspension type template support in high-position conjoined structure | |
JP5169549B2 (en) | Large beam block lifting method and jack-up stage used for it | |
CN204252286U (en) | A kind of rectangular steel-tube concrete column-steel beam connecting joint | |
EP3564608A1 (en) | Skid-mounted cold box, prefabricated structure thereof, and assembling method therefor | |
CN109231006A (en) | The construction method of hanging hang structure under a kind of steel structure truss | |
JP2020105803A (en) | Cable-stayed bridge and cable-stayed bridge construction method | |
CN102943546A (en) | Main girder for boiler steel structure | |
CN205444975U (en) | Large -scale room lid steel construction construction braced system with view platform | |
CN201865116U (en) | Temporary construction platform of pile leg for self-climbing well drilling platform | |
CN205687440U (en) | A kind of removable Undercarriage structure of furnace roof derrick crane | |
CN108457374A (en) | A kind of box beam and column are linked and packed formula node preparation process and its node | |
CN108412231A (en) | Assembled is bolted reinforcing steel processing shed and its assemble method entirely | |
CN202672353U (en) | Panel constraint type concrete filled steel tube composite column-steel beam joint | |
CN204850048U (en) | Overlap joint structure of quick hoist and mount of supplementary high -rise girder steel | |
CN102589913A (en) | Horizontal tunnel lining model test platform modularization loading machine frame | |
CN207905389U (en) | Assembled is bolted reinforcing steel processing shed entirely | |
CN103601081B (en) | Support system is climbed in tower crane | |
CN102259794B (en) | Method for installing overall combined type crane beam | |
CN205295915U (en) | Wave form steel web nose girder | |
CN208947559U (en) | Assembling displacement bracket in a kind of shipbuilding | |
CN208965579U (en) | A kind of non-console mode lattice tower crane platform | |
CN208137125U (en) | Support construction is used in a kind of construction of superimposed sheet | |
CN202522428U (en) | Horizontal tunnel lining model test platform modularization loading machine frame | |
CN201808660U (en) | Movable scaffold hook | |
CN202447842U (en) | Electro-gas welding assembly bracket of detachable blast furnace shell |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161116 Termination date: 20180617 |
|