CN205669337U - Climbing tower in a kind of Novel Communication - Google Patents
Climbing tower in a kind of Novel Communication Download PDFInfo
- Publication number
- CN205669337U CN205669337U CN201620440399.XU CN201620440399U CN205669337U CN 205669337 U CN205669337 U CN 205669337U CN 201620440399 U CN201620440399 U CN 201620440399U CN 205669337 U CN205669337 U CN 205669337U
- Authority
- CN
- China
- Prior art keywords
- tower body
- platform
- tower
- downside
- cat ladder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000009194 climbing Effects 0.000 title claims abstract description 23
- 241000282326 Felis catus Species 0.000 claims abstract description 16
- 229910000831 Steel Inorganic materials 0.000 description 9
- 239000010959 steel Substances 0.000 description 9
- 238000009434 installation Methods 0.000 description 6
- 238000005516 engineering process Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000002596 correlated effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000002045 lasting effect Effects 0.000 description 1
Landscapes
- Ladders (AREA)
Abstract
This utility model relates to climbing tower in a kind of Novel Communication, belongs to communication engineering technical equipment field.Mainly include tower body and the pole mounting platform being positioned on tower body, there is in tower body interior cat ladder, tower body has parallel channels;On described pole mounting platform, there is down going channel, have below down going channel and fix the outer cat ladder being connected with tower body;Have bottom described outer cat ladder and fix the anchor ear being connected with tower body, fix with transverse support bar outside anchor ear and be connected.Interior climbing tower structure provided by the utility model is crossed downside platform without technical staff and increases pole under vacant state.
Description
Technical field
This utility model relates to communication engineering technical equipment field, specifically, relating in a kind of Novel Communication
Climbing tower.
Background technology
Each common carrier of China at present, is required on steel tower install pole, to improve signal coverage strength and model
Enclose.
According to different types, steel tower substantially can be divided into outer climbing tower and interior climbing tower.The two it is identical in that, the most permissible
Steel tower is installed pole.The difference of the two is, outer climbing tower is to climb on tower body lateral, and steel tower company is correlated with skill
Art personnel I&M pole outside tower body.Outer climbing tower is that the cavity inside tower body is upwards climbed, steel tower company phase
Close technical staff's I&M pole outside tower body.
But, along with the innovation of Communication in China technology, each common carrier the most quickly increases for the demand of pole.Cause
This, steel tower company person skilled needs lasting increase pole on different steel towers.For outer climbing tower and interior climbing tower
Speech, both has pole mounting platform, and when pole mounting platform does not has pole installation site, technical staff can be at tower body
Anchor ear is enclosed in upper increase by, and installs transverse support bar on anchor ear, finally installs the pole newly increased outside transverse support bar.
But for interior climbing tower, outside its tower body, there is no cat ladder.Therefore, technical staff is in the face of needing to newly increase pole
Interior climbing tower for, oneself can only be tied up safety rope, then downward across pole mounting platform, unsettled installation anchor ear, laterally
Support bar and newly-increased pole, extremely dangerous.Again because human body is in hanging operation, there is no impetus, therefore increase pole newly and install
Speed is the slowest.
For these reasons, how to make the steel tower company related personnel newly-increased pole of installation on interior climbing tower fast and safely,
It is those skilled in the art's problems of needing solution badly.
Utility model content
The purpose of this utility model is for overcoming above-mentioned the deficiencies in the prior art, it is provided that climbing tower in a kind of Novel Communication.This
Utility model, by designing brand-new structure, makes the technical staff of steel tower company be easily installed newly-increased pole.
In order to reach above-mentioned purpose, this utility model adopts the following technical scheme that
Climbing tower in a kind of Novel Communication, including tower body and the pole mounting platform that is positioned on tower body, climbs in having in tower body
Ladder, tower body has parallel channels;
On described pole mounting platform, there is down going channel, have below down going channel and fix be connected outer with tower body and climb
Ladder;
Have bottom described outer cat ladder and fix the anchor ear being connected with tower body, fix with transverse support bar outside anchor ear and be connected.
Preferably, described pole mounting platform includes upside platform and downside platform, and upside platform is positioned at tower body top, under
Side platform is positioned on tower body.
Preferably, described parallel channels is positioned at above the platform of downside.
Preferably, the sectional area of described downside platform is more than the sectional area of upside platform.
Preferably, described transverse support bar is fixing with pedal to be connected, and pedal is fixing with anchor ear to be connected.
Preferably, described pedal is triangle, circular or square.
Preferably, described transverse support bar is multiple.
Preferably, described outer cat ladder is insulating ladder.
The beneficial effects of the utility model are:
(1) down going channel and outer cat ladder it are provided with so that anchor ear is installed on technical staff's tower body below the platform of downside
Time can be the most descending.
(2) transverse support bar is fixing with pedal is connected so that technical staff has during newly-increased pole on tower body anchor ear
Impetus, it is not necessary to hanging operation.
(3) newly increased upside platform, more pole can be installed.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
The assembling schematic diagram of pedal in Fig. 2 this utility model;
Wherein: 1, upside platform, 2, tower body, 3, downside platform, 4, anchor ear, 5, parallel channels, 6, down going channel, 7, climb outward
Ladder, 8, pedal, 9, transverse support bar.
Detailed description of the invention
Below in conjunction with accompanying drawing, this utility model is described in detail.
Embodiment: climbing tower in a kind of Novel Communication, its structure as depicted in figs. 1 and 2, including within tower body 2 and tower body
Interior climbing tower.The top of tower body 2 is fixedly connected with upside platform 1, and tower body 2 is fixedly connected with downside platform 3.At upside platform 1
And there is on the tower body between downside platform 3 parallel channels 5 so that technical staff can be entered by parallel channels 5 in tower body 2
Enter on downside platform 3.
There is on described downside platform 3 down going channel 6, for fix the outer cat ladder 7 being connected with tower body below down going channel 6,
Outer cat ladder 7 is insulating ladder.
Preferably, the sectional area of described downside platform 3 is more than the sectional area of upside platform 1, in order to technical staff stands in
The pole on the platform 1 of upside it is positioned on the platform 3 of downside.
The lower section of lower outer cat ladder 7, has the anchor ear 4 that be connected fixing with tower body 2, and anchor ear 4 is fixing with transverse support bar 9 even
Connect, and anchor ear 4 and transverse support bar 9 are all fixed with same pedal 8 and be connected.
The quantity of transverse support bar 9, can increase and decrease according to actual needs.
Pedal 8, can be to have two straight lines and the polymorphic structure of an arc-shaped side, it is also possible to be triangle, circle
Shape or square structure.
Under normal construction state, technical staff can from parallel channels 5 enter on the downside of platform 3, then stand in downside platform 3
On to upside platform 1, pole is installed, it is also possible to stand in downside platform 3 on for downside platform 3 outward flange install pole.Work as upside
After platform 1 and downside platform 3 do not have anchor ear installation site, technical staff can climb outer cat ladder 7 through down going channel 6, then
Step down on pedal 8, carry out the increase of pole with anchor ear 4 for installation position.
After installation, return to ground along outer cat ladder 7, down going channel 6, parallel channels 5 with the order of interior cat ladder.
After have employed said structure, interior climbing tower structure provided by the utility model crosses downside platform without technical staff
And under vacant state, increase pole.
Described above to the disclosed embodiments, makes professional and technical personnel in the field be capable of or uses this practicality new
Type.Multiple amendment to these embodiments will be apparent from for those skilled in the art, is determined herein
The General Principle of justice can realize in the case of without departing from spirit or scope of the present utility model in other embodiments.Cause
This, this utility model is not intended to be limited to the embodiments shown herein, and is to fit to and principles disclosed herein
The widest scope consistent with features of novelty.
Claims (4)
1. a climbing tower in Novel Communication, including tower body and the pole mounting platform that is positioned on tower body, has interior cat ladder in tower body,
There is on tower body parallel channels;
It is characterized in that, on described pole mounting platform, there is down going channel, there is below down going channel be connected fixing with tower body
Outer cat ladder;
Have bottom described outer cat ladder and fix the anchor ear being connected with tower body, fix with transverse support bar outside anchor ear and be connected;
Described pole mounting platform includes upside platform and downside platform, and upside platform is positioned at tower body top, and downside platform is positioned at
On tower body;
Described parallel channels is positioned at above the platform of downside.
Climbing tower in Novel Communication the most according to claim 1, it is characterised in that the sectional area of described downside platform is more than upper
The sectional area of side platform.
Climbing tower in Novel Communication the most according to claim 1, it is characterised in that described transverse support bar is fixed with pedal
Connecting, pedal is fixing with anchor ear to be connected.
Climbing tower in Novel Communication the most according to claim 3, it is characterised in that described pedal be triangle, circle or
Square.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620440399.XU CN205669337U (en) | 2016-05-12 | 2016-05-12 | Climbing tower in a kind of Novel Communication |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620440399.XU CN205669337U (en) | 2016-05-12 | 2016-05-12 | Climbing tower in a kind of Novel Communication |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205669337U true CN205669337U (en) | 2016-11-02 |
Family
ID=57193144
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620440399.XU Expired - Fee Related CN205669337U (en) | 2016-05-12 | 2016-05-12 | Climbing tower in a kind of Novel Communication |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205669337U (en) |
-
2016
- 2016-05-12 CN CN201620440399.XU patent/CN205669337U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208319739U (en) | Transmission line pole tower ascent personal safety protector based on unmanned plane | |
CN208918231U (en) | A kind of safe and stable type welding operating platform for steel column top | |
CN214379737U (en) | Distribution lines steps on pole operation auxiliary platform | |
CN204418629U (en) | Integrated form climbs frame | |
CN205669337U (en) | Climbing tower in a kind of Novel Communication | |
CN212002458U (en) | Climb tower crane pedestrian passageway on frame | |
CN205840468U (en) | The three pipe towers that a kind of stability is high | |
CN201067590Y (en) | Transmission line pole tower ascent protecting device | |
CN205892416U (en) | Communication tower with operating system | |
CN105239804B (en) | Assembly and lift-erecting method of indirect air-cooling system stretching platforms | |
CN203462997U (en) | Wrong climbing prevention type climbing ladder | |
CN203361737U (en) | Electric power tower facilitating overhauling | |
CN206753087U (en) | A kind of lighting roof operating platform structure | |
CN211294282U (en) | Novel transmission tower high altitude training device | |
CN201007102Y (en) | Single-tube tower | |
CN205472406U (en) | Light -duty fast -assembling freight transportation cableway lifting frame | |
CN203359846U (en) | Tower crane standard knot and tower crane | |
CN206397097U (en) | A kind of interior decoration scaffold | |
CN203802994U (en) | Combined type safety belt with double protection functions | |
CN203783449U (en) | Safe cave crawling ladder | |
CN208749208U (en) | Communicate shaft tower | |
CN203321304U (en) | Auxiliary ladder of steel tube tower | |
CN206091857U (en) | Wind power generation tower section of thick bamboo flange plane measurement auxiliary fixtures | |
CN208918239U (en) | Safeguard hanger | |
CN202602173U (en) | Overhead line supporting tower line-releasing/tightening operation platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161102 |
|
CF01 | Termination of patent right due to non-payment of annual fee |