Light -duty fast -assembling freight transportation cableway lifting frame Download PDFInfo
- Publication number
- CN205472406U CN205472406U CN201620179276.5U CN201620179276U CN205472406U CN 205472406 U CN205472406 U CN 205472406U CN 201620179276 U CN201620179276 U CN 201620179276U CN 205472406 U CN205472406 U CN 205472406U
- Authority
- CN
- China
- Prior art keywords
- guide
- rod fixing
- fixing part
- support
- guide rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
本实用新型提供了一种轻型快装货运索道起升架,包括支撑机构和导向提升机构,所述支撑机构包括倾斜设置的多根支撑杆及位于支撑上端的上连接盘和位于支撑杆下端的底盘;所述支撑杆上还设置有刻度;所述导向提升机构包括竖直位于上连接盘和底盘之间的导向杆,所述导向杆上设置有导向套,所述导向套上设置用于起吊的吊攀,所述导向套上水平设置有用于固定索道架支腿腿节的连接轴;还包括固定在上连接盘并位于吊攀正上方的U型连接件,所述U型连接件上连接有手拉葫芦。本实用新型结构设计简单合理,能够在无外部设备的条件下,通过人力快速的进行安装塔架。底盘的设计结构、支撑杆上的刻度能够有效控制整个塔架的稳定性与安全性。
The utility model provides a lifting frame for a light-duty fast-loading freight cableway, which includes a support mechanism and a guide lifting mechanism. Chassis; the support rod is also provided with a scale; the guide lifting mechanism includes a guide rod vertically positioned between the upper connecting plate and the chassis, the guide rod is provided with a guide sleeve, and the guide sleeve is provided for The hoisting crane, the guide sleeve is horizontally provided with a connecting shaft for fixing the legs of the cableway frame; it also includes a U-shaped connector fixed on the upper connecting plate and located directly above the crane, and the U-shaped connector A hand chain hoist is connected to it. The structure design of the utility model is simple and reasonable, and the tower frame can be quickly installed by manpower under the condition of no external equipment. The design structure of the chassis and the scale on the support rod can effectively control the stability and safety of the entire tower.
Description
技术领域technical field
本实用新型涉及索道运输技术领域,特别涉及一种轻型快装货运索道起升架。The utility model relates to the technical field of cableway transportation, in particular to a lifting frame for a light fast-loading freight cableway.
背景技术Background technique
随着国家对基础建设力度的加大,在丘陵、山区进行油气输送管道、输配电线路与设施等基础建设项目越来越多,这些设施在使用过程中将面临各种事故情况下的应急抢修、维修等工作,其中山地陡坡地段抢维修装备的运载问题,是影响抢维修工作效率的关键环节。另外,我国是地质灾害最多和危害最严重的国家之一,灾害事故发生后特别是处于山地、陡坡等地区各种救援装备的运载问题也是迫切需要解决的现实问题。As the country strengthens infrastructure construction, more and more infrastructure projects such as oil and gas transmission pipelines, power transmission and distribution lines and facilities are being carried out in hills and mountainous areas. These facilities will face emergencies in various accidents during their use. Emergency repairs, maintenance and other work, among which the problem of carrying emergency maintenance equipment in steep mountainous areas is a key link that affects the efficiency of emergency maintenance work. In addition, my country is one of the countries with the most geological disasters and the most serious hazards. The transportation of various rescue equipment after disasters and accidents, especially in areas such as mountains and steep slopes, is also a practical problem that needs to be solved urgently.
目前,在突发灾害事故情况下各类救援装备货物的运输,在交通便利的平原地区或可通行公路的山区,可采用公路、铁路等运输手段;在陡坡(坡度30度以上)、沟壑等特殊地区,主要依靠人力、畜力等搬运,效率低、劳动强度大。At present, in the case of sudden disasters and accidents, the transportation of various rescue equipment and goods can be carried out in plain areas with convenient transportation or mountainous areas where roads can be passed, such as roads and railways; In special areas, it mainly relies on manpower, animal power, etc. for transportation, which is inefficient and labor-intensive.
索道作为一种特殊的,适应山区集材及客运运输工具,在我国应用已经有几百年历史。索道发展到今天,随着融入许多现代元素,应用也越来越广泛。而作为索道最重要的一个组成部分——索道塔架,也在随着索道应用的需求,悄悄地发生着各种变化,索道塔架,已经在新的时期,发展出多种形式,具有多种构想,而不再是单一的水泥钢结构。但是,到目前为止,索道本身也始终保留了基础制作,机械安装等工程特点,尤其是索道塔架由于存在安装周期长,施工复杂,需要机械化操作等技术问题始终阻挠其在快速安装。如何在不依靠大型工程机械,在没有电力等环境下,以及在山区等交通非常不便的环境下,实现快速组装索道塔架则成为亟待解决的问题。Cableway, as a special tool suitable for skidding and passenger transport in mountainous areas, has been used in my country for hundreds of years. With the development of the cableway to this day, with the integration of many modern elements, the application is becoming more and more extensive. As the most important part of the cableway, the cableway tower is also undergoing various changes quietly with the needs of the cableway application. The cableway tower has developed various forms in the new era, and has many This concept is no longer a single cement and steel structure. However, so far, the cableway itself has always retained engineering features such as basic fabrication and mechanical installation, especially technical problems such as long installation period, complicated construction, and need for mechanized operation of the cableway tower have always hindered its rapid installation. How to quickly assemble the cableway tower without relying on large-scale construction machinery, in an environment without electricity, and in an environment with very inconvenient traffic such as mountainous areas has become an urgent problem to be solved.
实用新型内容Utility model content
针对现有技术中所存在的不足,本实用新型提供了一种轻型快装货运索道起升架,其结构设计合理、便捷安装的索道塔架的快装起升之架。Aiming at the deficiencies in the prior art, the utility model provides a light-duty fast-loading freight cableway lifting frame, which has a reasonable structural design and a fast-loading lifting frame for a cableway tower that is conveniently installed.
为实现上述目的,本实用新型采用了如下的技术方案:In order to achieve the above object, the utility model adopts the following technical solutions:
一种轻型快装货运索道起升架,包括支撑机构和导向提升机构,所述支撑机构包括倾斜设置的多根支撑杆及位于支撑上端的上连接盘和位于支撑杆下端的底盘;所述支撑杆上还设置有刻度;A light-duty fast-loading freight cableway hoisting frame, including a support mechanism and a guide lifting mechanism, the support mechanism includes a plurality of support rods arranged obliquely, an upper connecting plate located at the upper end of the support and a chassis located at the lower end of the support rod; There is also a scale on the rod;
所述导向提升机构包括竖直位于上连接盘和底盘之间的导向杆,所述导向杆上设置有导向套,所述导向套上设置用于起吊的吊攀,所述导向套上水平设置有用于固定索道塔架支腿腿节的连接轴;还包括固定在上连接盘上并位于吊攀正上方的U型连接件,所述U型连接件上连接有手拉葫芦。The guide lifting mechanism includes a guide rod vertically located between the upper connection plate and the chassis, a guide sleeve is arranged on the guide rod, a hanging climber for lifting is arranged on the guide sleeve, and a horizontal There are connecting shafts for fixing the outrigger leg joints of the cableway tower; it also includes a U-shaped connecting piece fixed on the upper connecting plate and located directly above the hanging climb, and a chain hoist is connected to the U-shaped connecting piece.
其中,所述底盘包括一体成型的用于固定导向杆的导向杆固定部及设置在导向杆固定部外围的用于固定支撑杆的支撑杆固定部;所述导向杆固定部为一带弧形凹陷部的圆型结构,所述支撑杆固定部为端部圆弧过渡的条形结构。Wherein, the chassis includes an integrally formed guide rod fixing part for fixing the guide rod and a support rod fixing part arranged on the periphery of the guide rod fixing part for fixing the support rod; the guide rod fixing part is an arc-shaped depression The circular structure of the part, the support rod fixing part is a bar-shaped structure with a circular arc transition at the end.
具体地,所述支撑杆固定部为三个,其中两个与导向杆固定部的弧形凹陷部的口部圆弧过渡连接,另一个固定在导向杆固定部上与凹陷部对应的位置处;另外,每相邻两支撑杆固定部之间的夹具均等。Specifically, there are three support rod fixing parts, two of which are transitionally connected with the mouth of the arc-shaped concave part of the guide rod fixing part, and the other is fixed on the guide rod fixing part at a position corresponding to the concave part ; In addition, the clamps between each adjacent two support rod fixing parts are equal.
再有,所述导向杆为一组,每两个形成一组,所述两导向杆上对应设置有导向套,所述导向套之间连接有吊攀;且其中一导向套上水平设置有连接轴,另一导向套上与连接轴对应的位置设置有开口销。Furthermore, the guide rods are in one group, and every two guide rods form a group, and guide sleeves are correspondingly arranged on the two guide rods, and a hanging climb is connected between the guide sleeves; and one of the guide sleeves is horizontally provided with For the connecting shaft, cotter pins are arranged at positions corresponding to the connecting shaft on the other guide sleeve.
相比于现有技术,本实用新型具有如下有益效果:结构设计简单合理,能够在无外部设备的条件下,通过人力快速的进行安装塔架,拆装方便,轻巧便携,非常适合在山区等交通、电力非常不方便的环境下,实现安装。底盘的设计结构及支撑杆上的刻度能够有效控制整个起升架的稳定性与安全性。Compared with the prior art, the utility model has the following beneficial effects: the structural design is simple and reasonable, and the tower can be quickly installed by manpower without external equipment. It can be installed in an environment where transportation and electricity are very inconvenient. The design structure of the chassis and the scale on the support rod can effectively control the stability and safety of the entire lifting frame.
附图说明Description of drawings
图1为本实用新型结构示意图;Fig. 1 is the structural representation of the utility model;
图2为图1的左视图;Fig. 2 is the left view of Fig. 1;
图3为本实用新型的俯视图。Fig. 3 is a top view of the utility model.
具体实施方式detailed description
下面结合附图及实施例对本实用新型中的技术方案进一步说明。Below in conjunction with accompanying drawing and embodiment the technical solution in the utility model is further described.
如图1和图2所示,本实用新型提出了一种轻型快装货运索道起升架,包括支撑机构和导向提升机构,所述支撑机构包括倾斜设置的多根支撑杆3及位于支撑上端的上连接盘1和位于支撑杆3下端的底盘2;所述上连接盘1为圆型结构,上连接盘1的面积小于底盘2的面积,支撑杆3与上连接盘1和底盘2之间均通过相互匹配的连耳11和连接座10固定连接。所述支撑杆3上还设置有刻度,在安装塔架支腿腿节时,每一次起升,所有的吊攀8必须在同一刻度内,同时,工作人员要相互沟通,保证所有起升高度误差不大于一个小格。As shown in Fig. 1 and Fig. 2, the utility model proposes a light-duty fast-loading freight cableway lifting frame, including a support mechanism and a guide lifting mechanism, and the support mechanism includes a plurality of support rods 3 arranged obliquely and located at the upper end of the support. The upper connection plate 1 and the chassis 2 located at the lower end of the support rod 3; the upper connection plate 1 is a circular structure, the area of the upper connection plate 1 is smaller than the area of the chassis 2, and the connection between the support rod 3 and the upper connection plate 1 and the chassis 2 They are fixedly connected by matching lugs 11 and connecting bases 10 . The support rod 3 is also provided with a scale. When installing the leg joints of the tower legs, all the hoisting climbs 8 must be within the same scale every time they are lifted. At the same time, the staff must communicate with each other to ensure that all lifting heights The error is not greater than one small division.
所述导向提升机构包括竖直位于上连接盘1和底盘2之间的导向杆4,所述导向杆4上设置有导向套7,所述导向套7上设置用于起吊的吊攀8,所述导向套7上水平设置有用于固定索道架支腿腿节的连接轴9;还包括固定在上连接盘1上并位于吊攀8正上方的U型连接件5,所述U型连接件5上连接有手拉葫芦6。在起升架安装塔架支腿腿节时,将起升架安装在塔架的每个支腿上,调整平整,将连接轴9穿入支腿腿节管口上的紧固孔内,连接轴9与开口销配合固定,不使其滑下,手动葫芦上的吊钩勾起吊攀8,然后缓缓拉动手拉葫芦6,吊攀8带动导向套7在导向杆4上滑动,使所有支腿一致上升,当上升到顶点时,各安装一节腿节,用螺钉紧固牢固,当腿节装配完成后,缓缓将起升架放下,打开吊攀8,放下手拉葫芦6上的吊钩,再次重复以上动作,将起升架再升起一节,直至完成需要。The guide lifting mechanism includes a guide rod 4 vertically positioned between the upper connection plate 1 and the chassis 2, the guide rod 4 is provided with a guide sleeve 7, and the guide sleeve 7 is provided with a hanging climber 8 for lifting, The guide sleeve 7 is horizontally provided with a connecting shaft 9 for fixing the leg joints of the legs of the cableway frame; it also includes a U-shaped connector 5 fixed on the upper connecting plate 1 and located directly above the suspension 8, and the U-shaped connection A chain hoist 6 is connected to the piece 5 . When the lifting frame is installed on the leg joints of the tower legs, the lifting frame is installed on each leg of the tower, adjusted to be flat, and the connecting shaft 9 is inserted into the fastening hole on the nozzle of the leg joints, and the connection The shaft 9 is fixed with the cotter pin to prevent it from sliding down. The hook on the manual hoist hooks up the chain hoist 8, and then slowly pulls the chain hoist 6. The suspension rope 8 drives the guide sleeve 7 to slide on the guide rod 4, so that The outriggers rise in unison. When they rise to the top, install a leg section each and fasten them firmly with screws. After the leg sections are assembled, slowly lower the hoisting frame, open the hoist 8, and put down the chain block 6. hook, repeat the above action again, and raise the lifting frame by another section until the completion of the needs.
如图3所示,所述底盘2包括一体成型的用于固定导向杆4的导向杆固定部2-2及设置在导向杆固定部2-2外围的用于固定支撑杆3的支撑杆固定部2-1;所述导向杆固定部2-2为一带弧形凹陷部的圆型结构,所述支撑杆固定部2-1为端部圆弧过渡的条形结构。所述支撑杆固定部2-1为三个,其中两个与导向杆固定部2-2的弧形凹陷部的口部圆弧过渡连接,另一个固定在导向杆固定部2-2上与凹陷部对应的位置处;另外,每相邻两支撑杆固定部2-1之间的夹具均等。结构新颖,设计合理,受力均匀,平稳。As shown in Figure 3, the chassis 2 includes an integrally formed guide rod fixing part 2-2 for fixing the guide rod 4 and a support rod fixing part for fixing the support rod 3 arranged on the periphery of the guide rod fixing part 2-2. Part 2-1; the guide rod fixing part 2-2 is a circular structure with an arc-shaped concave part, and the support rod fixing part 2-1 is a bar-shaped structure with an arc transition at the end. There are three support rod fixing parts 2-1, two of which are connected with the mouth arc transition of the arc-shaped recessed part of the guide rod fixing part 2-2, and the other is fixed on the guide rod fixing part 2-2 and The position corresponding to the concave part; in addition, the clamps between every two adjacent support rod fixing parts 2-1 are equal. The structure is novel, the design is reasonable, the force is uniform and stable.
再有,所述导向杆4为一组,每两个形成一组,所述两导向杆4上对应设置有导向套7,所述导向套7之间连接有吊攀8;且其中一导向套7上水平设置有连接轴9,另一导向套7上与连接轴9对应的位置设置有开口销。在安装支腿腿节时,连接轴9套入支腿腿节口部的紧固孔内并与开口销配合,防止支腿腿节滑下。吊攀8在导向杆4上保证起升架子在安装的过程不会晃动。Furthermore, the guide rods 4 are in one group, and every two form a group, and the two guide rods 4 are correspondingly provided with guide sleeves 7, and a hanging climb 8 is connected between the guide sleeves 7; A connecting shaft 9 is arranged horizontally on the sleeve 7 , and cotter pins are arranged at positions corresponding to the connecting shaft 9 on the other guide sleeve 7 . When the leg joints of the supporting legs are installed, the connecting shaft 9 is inserted into the fastening hole of the mouth of the leg joints of the supporting legs and cooperates with the cotter pins to prevent the leg joints from sliding down. Hanging climb 8 guarantees that lifting frame can not rock in the process of installing on guide bar 4.
起升支架的上升速度要保持一致,不能使支架歪斜,以免发生危险。The rising speed of the lifting bracket must be consistent, and the bracket cannot be skewed to avoid danger.
最后说明的是,以上实施例仅用以说明本实用新型的技术方案而非限制,尽管参照较佳实施例对本实用新型进行了详细说明,本领域的普通技术人员应当理解,可以对本实用新型的技术方案进行修改或者等同替换,而不脱离本实用新型技术方案的宗旨和范围,其均应涵盖在本实用新型的权利要求范围当中。Finally, it is noted that the above embodiments are only used to illustrate the technical solutions of the present utility model without limitation. Although the utility model has been described in detail with reference to the preferred embodiments, those of ordinary skill in the art should understand that the utility model can be Modifications or equivalent replacements of the technical solutions without departing from the purpose and scope of the technical solutions of the utility model shall be covered by the claims of the utility model.
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620179276.5U CN205472406U (en) | 2016-03-09 | 2016-03-09 | Light -duty fast -assembling freight transportation cableway lifting frame |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620179276.5U CN205472406U (en) | 2016-03-09 | 2016-03-09 | Light -duty fast -assembling freight transportation cableway lifting frame |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205472406U true CN205472406U (en) | 2016-08-17 |
Family
ID=56656531
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201620179276.5U Expired - Fee Related CN205472406U (en) | 2016-03-09 | 2016-03-09 | Light -duty fast -assembling freight transportation cableway lifting frame |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205472406U (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106115529A (en) * | 2016-08-19 | 2016-11-16 | 江苏亚华救生装备有限公司 | Small space lifting device |
| CN106314448A (en) * | 2016-09-20 | 2017-01-11 | 巨力索具股份有限公司 | Ropeway supporting frame and inverted installation method thereof |
| CN110985492A (en) * | 2019-12-09 | 2020-04-10 | 金华送变电工程有限公司 | Convenient hoist and mount threading action bars of height-adjusting |
| CN117023430A (en) * | 2023-08-09 | 2023-11-10 | 国网四川电力送变电建设有限公司 | A new type of cargo ropeway mast and its erection tooling and erection method |
-
2016
- 2016-03-09 CN CN201620179276.5U patent/CN205472406U/en not_active Expired - Fee Related
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106115529A (en) * | 2016-08-19 | 2016-11-16 | 江苏亚华救生装备有限公司 | Small space lifting device |
| CN106314448A (en) * | 2016-09-20 | 2017-01-11 | 巨力索具股份有限公司 | Ropeway supporting frame and inverted installation method thereof |
| CN110985492A (en) * | 2019-12-09 | 2020-04-10 | 金华送变电工程有限公司 | Convenient hoist and mount threading action bars of height-adjusting |
| CN117023430A (en) * | 2023-08-09 | 2023-11-10 | 国网四川电力送变电建设有限公司 | A new type of cargo ropeway mast and its erection tooling and erection method |
| CN117023430B (en) * | 2023-08-09 | 2026-07-14 | 国网四川电力送变电建设有限公司 | Freight cableway portal frame and erecting tool and method thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN203967625U (en) | A kind of overhead facility crossing frame | |
| CN103545751B (en) | Overhead transmission line ground wire optical fiber cable fitting changes support | |
| CN105113803B (en) | A high-altitude sliding hoisting device and its implementation method for a mountain corridor truss | |
| CN105905815A (en) | Work method of seating-type self-balance holding pole | |
| CN208454342U (en) | A kind of safety of tower crane platform and standard knot install conjoined device | |
| CN201323398Y (en) | Small-sized electric power equipment landing gear | |
| CN104695848B (en) | A kind of novel silo emergency staircase | |
| CN204999517U (en) | Coal transporting trestle steel truss hoist device in power plant's chimney | |
| CN106760891A (en) | A kind of steel tube tower cross-arm installs equipment | |
| CN101402436A (en) | Method and apparatus for disassembling cargo boom of climbing tower crane | |
| CN208516784U (en) | Suspended electric hoist test bench hoisting device | |
| CN202405695U (en) | Lifting tool for overhead ground wire of steel pipe pole | |
| CN202729645U (en) | Tower crane with elevator | |
| CN204983693U (en) | Hoist device slides in mountain area corridor truss high altitude | |
| CN201758253U (en) | Overhaul frame | |
| CN203345999U (en) | Special multifunctional lifting frame for busbar bridge | |
| CN103896153A (en) | Zig-zag derrick for replacing disconnecting link | |
| CN110697585A (en) | A mechanism for self-detaching attachment device | |
| CN205442452U (en) | Convenient hoisting accessory of substation equipment safety | |
| CN205590182U (en) | Tower crane dismantles part and puts from hoist and mount | |
| CN214003869U (en) | Attached lifting tower crane runway | |
| CN203065046U (en) | Self-stabilizing double-rocker-arm lifting device for installation of high-rise tower | |
| CN203835250U (en) | Safety support for well mouth | |
| CN211255049U (en) | An indoor overhead pipeline lifting mechanism | |
| CN203794469U (en) | Inversed-v-shaped holding pole for replacing disconnecting link |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160817 Termination date: 20170309 |