CN205472406U - Light -duty fast -assembling freight transportation cableway lifting frame - Google Patents
Light -duty fast -assembling freight transportation cableway lifting frame Download PDFInfo
- Publication number
- CN205472406U CN205472406U CN201620179276.5U CN201620179276U CN205472406U CN 205472406 U CN205472406 U CN 205472406U CN 201620179276 U CN201620179276 U CN 201620179276U CN 205472406 U CN205472406 U CN 205472406U
- Authority
- CN
- China
- Prior art keywords
- fixed part
- fairlead
- guide post
- support bar
- chassis
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The utility model provides a light -duty fast -assembling freight transportation cableway lifting frame, including supporting mechanism and direction hoist mechanism, many spinal branchs vaulting pole that the supporting mechanism set up including the slope and be located the last connection pad that supports the upper end and be located the chassis of bracing piece lower extreme, still be provided with the scale on the bracing piece, direction hoist mechanism includes the vertical guide bar that is located between connection pad and the chassis, be provided with the uide bushing on the guide bar, set up on the uide bushing and be used for the joint hinge that lifts by crane, the uide bushing is improved level and is provided with the connecting axle that is used for fixed cableway frame landing leg leg section, still including fixing the U type connecting piece at last connection pad and directly over lieing in the joint hinge, be connected with chain block on the U type connecting piece. The utility model discloses structural design is simple reasonable, can be under no external equipment's condition, and through the quick erection tower that carries on of manpower. The project organization on chassis, the scale on the bracing piece can the whole pylon of effective control stability and security.
Description
Technical field
This utility model relates to technical field of cableway transport, particularly to a kind of Light-duty Quick-installation freight ropeway hoisting rack.
Background technology
Along with country's increasing to capital construction dynamics, on hills, mountain area carries out pipe-line, electric line and sets
The capital construction project such as execute to get more and more, these facilities in use by the emergency first-aid repair faced under various accident conditions,
The work such as maintenance, wherein mountain region steep slope region robs the delivery problem of remedial installation, is the crucial ring affecting and robbing maintenance work efficiency
Joint.It addition, China is geological disaster at most and endangers one of the most serious country, disaster accident is especially in mountain after occurring
The delivery problem of the regional various rescue outfits such as ground, abrupt slope is also realistic problem in the urgent need to address.
At present, the transport of all kinds of rescue outfit goods under burst fire-disaster accident conditions, in the plains region of traffic convenience or can
The mountain area of thoroughfare, can use the transportation means such as highway, railway;Special in abrupt slope (gradient more than 30 degree), gully etc.
Area, relies primarily on the carrying such as manpower, animal power, and efficiency is low, labor intensity is big.
Cableway, as a kind of special, adapts to mountain area logging and passenger transportation instrument, and in China, application has had centuries history.
Cableway develops into today, along with incorporating many Modern Elements, applies more and more extensive.And as cableway most important one
, also in the demand applied along with cableway, there is various change in ingredient cableway pylon, cableway pylon stealthily,
In new period, develop various ways, there is multiple conception, and be no longer single cement steel construction.But,
Up to the present, cableway itself remains basis making the most all the time, the engineering characteristic, especially cableway pylon such as mechanical erection by
Long in there is installation period, construction complexity, need the technical problems such as mechanized operation to obstruct it in Fast Installation all the time.How
Not against large-scale engineering machinery, under there is no the environment such as electric power, and in the environment of the traffic such as mountain area are the most inconvenient, real
The most quickly assemble cableway pylon and then become problem demanding prompt solution.
Utility model content
For the deficiency in the presence of prior art, this utility model provides a kind of Light-duty Quick-installation freight ropeway hoisting rack, its
The frame that reasonable in design, the fast-assembling of cableway pylon of convenient installation hoist.
For achieving the above object, this utility model have employed following technical scheme:
A kind of Light-duty Quick-installation freight ropeway hoisting rack, including supporting mechanism and guiding hoisting mechanism, described supporting mechanism includes inclining
The many support bars tiltedly arranged and the upper connection dish being positioned at support upper end and the chassis being positioned at support bar lower end;On described support bar
It is additionally provided with scale;
Described guiding hoisting mechanism includes the guide post being vertically positioned between connection dish and chassis, and described guide post is provided with
Fairlead, described fairlead is provided for the joint hinge of lifting, described fairlead has been horizontally disposed with for antilift wire road pylon
The connecting shaft of supporting leg leg section;Also include the U-shaped connector being fixed on connection dish and be positioned at directly over joint hinge, described U-shaped company
Connect on fitting and have chain block.
Wherein, described chassis includes the integrated guide post fixed part for fixed guide pole and is arranged on guide post and fixes
The support bar fixed part for fixing support bar that portion is peripheral;Described guide post fixed part is the round knot in a band arc-shaped recess portion
Structure, described support bar fixed part is the strip structure of end arc transition.
Specifically, described support bar fixed part is three, and two of which is round with the oral area in the arc-shaped recess portion of guide post fixed part
Arc transition connects, and another is fixed on position corresponding with depressed part on guide post fixed part;It addition, the most adjacent two support
Fixture between bar fixed part is impartial.
Further, described guide post is one group, each two forms one group, described two guide posts is correspondingly arranged on fairlead, institute
State to connect between fairlead and have joint hinge;And wherein it has been horizontally disposed with connecting shaft, with connecting shaft on another fairlead on a fairlead
Corresponding position is provided with split pin.
Compared to prior art, this utility model has the advantages that structure designs advantages of simple, it is possible to without outside
Under conditions of equipment, it is rapidly performed by erection tower by manpower, easy accessibility, the most portable, it is highly suitable for mountain area etc.
In the environment of traffic, electric power are very inconvenient, it is achieved install.Scale in the design structure on chassis and support bar can be effective
Control stability and the safety of whole hoisting rack.
Accompanying drawing explanation
Fig. 1 is this utility model structural representation;
Fig. 2 is the left view of Fig. 1;
Fig. 3 is top view of the present utility model.
Detailed description of the invention
Below in conjunction with the accompanying drawings and the technical scheme in this utility model is further illustrated by embodiment.
As depicted in figs. 1 and 2, the utility model proposes a kind of Light-duty Quick-installation freight ropeway hoisting rack, including supporting mechanism and
Guiding hoisting mechanism, described supporting mechanism includes the many support bars 3 being obliquely installed and is positioned at upper connection dish 1 He supporting upper end
It is positioned at the chassis 2 of support bar 3 lower end;Described upper connection dish 1 is round structure, and the area of upper connection dish 1 is less than the face on chassis 2
Long-pending, support bar 3 with on be connected between dish 1 and chassis 2 all by the company's ear 11 being mutually matched with connect seat 10 and fix connection.Institute
Stating and be additionally provided with scale on support bar 3, when erection tower supporting leg leg section, hoist each time, all of joint hinge 8 must be same
In one scale, meanwhile, staff to communicate with each other, it is ensured that all lifting altitude errors are not more than little lattice.
Described guiding hoisting mechanism includes the guide post 4 being vertically positioned between connection dish 1 and chassis 2, and described guide post 4 sets
It is equipped with fairlead 7, described fairlead 7 is provided for the joint hinge 8 of lifting, described fairlead 7 has been horizontally disposed with for fixing
The connecting shaft 9 of cableway frame supporting leg leg section;Also include the U-shaped connector 5 being fixed on connection dish 1 and be positioned at directly over joint hinge 8,
Connect on described U-shaped connector 5 and have chain block 6.When hoisting rack erection tower supporting leg leg section, hoisting rack is arranged on tower
On each supporting leg of frame, adjust smooth, connecting shaft 9 is penetrated in the fastener hole on the supporting leg leg section mouth of pipe, connecting shaft 9 and opening
Pin coordinates fixing, does not make it slide, and the suspension hook on bottle gouard moved by hands triggers joint hinge 8, the most slowly pulls chain block 6, joint hinge
8 drive fairlead 7 to slide on guide post 4, make all supporting legs unanimously increase, when rising to summit, and each installation one joint lower limb
Joint, with screw fastening firmly, after leg section has assembled, slowly puts down hoisting rack, opens joint hinge 8, put down and pull calabash
Suspension hook on reed 6, repeats above action again, hoisting rack rises a joint again, until completing needs.
As it is shown on figure 3, described chassis 2 includes the integrated guide post fixed part 2-2 for fixed guide pole 4 and is arranged on
The support bar fixed part 2-1 for fixing support bar 3 that guide post fixed part 2-2 is peripheral;Described guide post fixed part 2-2 is one
With the round structure in arc-shaped recess portion, described support bar fixed part 2-1 is the strip structure of end arc transition.Described support
Bar fixed part 2-1 is three, and two of which is connected, separately with the oral area arc transition in the arc-shaped recess portion of guide post fixed part 2-2
One is fixed on position corresponding with depressed part on guide post fixed part 2-2;It addition, the most adjacent two support bar fixed part 2-1
Between fixture impartial.Novel structure, reasonable in design, uniform force, steadily.
Further, described guide post 4 is one group, each two forms one group, and described two guide posts 4 are correspondingly arranged on fairlead 7,
Connect between described fairlead 7 and have joint hinge 8;And wherein it has been horizontally disposed with connecting shaft 9, on another fairlead 7 on a fairlead 7
The position corresponding with connecting shaft 9 is provided with split pin.When installing supporting leg leg section, connecting shaft 9 is inserted in the tight of supporting leg leg section oral area
Gu coordinate in hole and with split pin, prevent supporting leg leg section from sliding.Joint hinge 8 ensures to hoist shelf in the mistake installed on guide post 4
Cheng Buhui rocks.
The rate of climb of lifting bracket to keep consistent, it is impossible to makes support crooked, to avoid danger.
Finally illustrating, above example is only in order to illustrate the technical solution of the utility model and unrestricted, although with reference to relatively
This utility model has been described in detail by good embodiment, it will be understood by those within the art that, can be to this practicality
Novel technical scheme is modified or equivalent, without deviating from objective and the scope of technical solutions of the utility model, its
All should contain in the middle of right of the present utility model.
Claims (4)
1. a Light-duty Quick-installation freight ropeway hoisting rack, it is characterised in that: include supporting mechanism and guide hoisting mechanism, institute
State many support bars that supporting mechanism includes being obliquely installed and be positioned at and support the upper connection dish of upper end and be positioned at support bar lower end
Chassis;It is additionally provided with scale on described support bar;
Described guiding hoisting mechanism includes the guide post being vertically positioned between connection dish and chassis, and described guide post is provided with
Fairlead, described fairlead is provided for the joint hinge of lifting, described fairlead has been horizontally disposed with and has propped up for antilift wire road frame
The connecting shaft of lower limb leg section;Also include the U-shaped connector being fixed on connection dish and be positioned at directly over joint hinge, described U-shaped connection
Connect on part and have chain block.
2. a kind of Light-duty Quick-installation freight ropeway hoisting rack as claimed in claim 1, it is characterised in that: described chassis includes one
The body formed guide post fixed part for fixed guide pole and be arranged on guide post fixed part peripheral for fixing support bar
Support bar fixed part;Described guide post fixed part is the round structure in a band arc-shaped recess portion, and described support bar fixed part is
The strip structure of end arc transition.
3. Light-duty Quick-installation freight ropeway hoisting rack as claimed in claim 2, it is characterised in that: described support bar fixed part
Being three, two of which is connected with the oral area arc transition in the arc-shaped recess portion of guide post fixed part, and another is fixed on guiding
Position corresponding with depressed part on bar fixed part;It addition, the fixture between the most adjacent two support bar fixed parts is impartial.
4. Light-duty Quick-installation freight ropeway hoisting rack as claimed in claim 3, it is characterised in that: described guide post is one group,
Each two forms one group, and described two guide posts are correspondingly arranged on fairlead, and connecting between described fairlead has joint hinge;And its
In be horizontally disposed with connecting shaft on a fairlead, position corresponding with connecting shaft on another fairlead is provided with split pin.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620179276.5U CN205472406U (en) | 2016-03-09 | 2016-03-09 | Light -duty fast -assembling freight transportation cableway lifting frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620179276.5U CN205472406U (en) | 2016-03-09 | 2016-03-09 | Light -duty fast -assembling freight transportation cableway lifting frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205472406U true CN205472406U (en) | 2016-08-17 |
Family
ID=56656531
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620179276.5U Expired - Fee Related CN205472406U (en) | 2016-03-09 | 2016-03-09 | Light -duty fast -assembling freight transportation cableway lifting frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205472406U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106115529A (en) * | 2016-08-19 | 2016-11-16 | 江苏亚华救生装备有限公司 | Small space lifting device |
CN106314448A (en) * | 2016-09-20 | 2017-01-11 | 巨力索具股份有限公司 | Ropeway supporting frame and inverted installation method thereof |
-
2016
- 2016-03-09 CN CN201620179276.5U patent/CN205472406U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106115529A (en) * | 2016-08-19 | 2016-11-16 | 江苏亚华救生装备有限公司 | Small space lifting device |
CN106314448A (en) * | 2016-09-20 | 2017-01-11 | 巨力索具股份有限公司 | Ropeway supporting frame and inverted installation method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206706584U (en) | Pier arch rib in the asymmetric button lashed cable cable system installation Multi-arch bridge of middle pier | |
CN205558958U (en) | Hoist device of tunnel efflux fan | |
CN203946271U (en) | The dirigible mooring gear that anchors fast | |
CN205472406U (en) | Light -duty fast -assembling freight transportation cableway lifting frame | |
CN106760891A (en) | A kind of steel tube tower cross-arm installs equipment | |
CN205076637U (en) | Derrick material hoist | |
CN206815163U (en) | A kind of suspension cable construction bridge | |
CN205706666U (en) | A kind of Light-duty Quick-installation goods ropeway supporting trestle | |
CN205653063U (en) | Gantry crane of hoist and mount container | |
CN205543980U (en) | Coaster is crossed to air wire | |
CN209907179U (en) | Pedestrian bridge with adjustable height in pit | |
CN209322327U (en) | A kind of anti-deflection device of monorail crane rail | |
CN203065046U (en) | Self-stabilizing double-rocker-arm lifting device for installation of high-rise tower | |
CN206138605U (en) | Horizontal lifeline system of dual -rope | |
CN208966123U (en) | A kind of big section lattice steel tube holding pole formal dress lifting device | |
CN203463556U (en) | Rope locker | |
CN205901172U (en) | Nearly pole of transmission line overhauls corridor hanger device | |
CN206801189U (en) | A kind of Portable wind bar stands up device | |
CN210557193U (en) | Novel track lifting device | |
CN220732207U (en) | Crossing frame for power transmission and transformation engineering | |
CN204098004U (en) | For the guiding device of Miter Lock Gates jacking | |
CN104064984A (en) | Double split wire line maintenance pulley | |
CN109292622A (en) | A kind of anti-deflection device and installation method of monorail crane rail | |
CN204266611U (en) | A kind of building site safety guide rail | |
CN106869769A (en) | It is easy to climb the climbing tool of insulator chain |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160817 Termination date: 20170309 |