CN106760891A - A kind of steel tube tower cross-arm installs equipment - Google Patents

A kind of steel tube tower cross-arm installs equipment Download PDF

Info

Publication number
CN106760891A
CN106760891A CN201611026440.XA CN201611026440A CN106760891A CN 106760891 A CN106760891 A CN 106760891A CN 201611026440 A CN201611026440 A CN 201611026440A CN 106760891 A CN106760891 A CN 106760891A
Authority
CN
China
Prior art keywords
arm
cross
wheel
cam
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611026440.XA
Other languages
Chinese (zh)
Other versions
CN106760891B (en
Inventor
董亚伦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangmen Electric Power Transmission And Transformation Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201611026440.XA priority Critical patent/CN106760891B/en
Publication of CN106760891A publication Critical patent/CN106760891A/en
Application granted granted Critical
Publication of CN106760891B publication Critical patent/CN106760891B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/24Cross arms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Types And Forms Of Lifts (AREA)
  • Movable Scaffolding (AREA)

Abstract

A kind of steel tube tower cross-arm installs equipment, belongs to electric power tower technical field, and steel tower construction work in the wild, lacks the auxiliary of traditional hanging device, or exhales title height in tens meters of height, and common crane at all cannot operation.In order to overcome disadvantages described above, devise a kind of cross-arm including hoisting mechanism and anti-falling mechanism and equipment is installed, during installation, on the basis of elevator motor output shaft elevator line wheel is bolted on, then steel wire rope is pulled out from elevator line wheel by workmen, bypass the reverse wheel at the top of tower body, steel wire rope is put down again, ground construction personnel are by the threading hole of the second fall arrest cam on steel wire penetrating mounting surface, it is installed to support arm is installed in the second fall arrest by bolt again, cross-arm is mounted on installation support arm finally by hanger.Start elevator motor, installing support arm can rise with cross-arm, until running to the position of cross-arm seat, cross-arm and cross-arm seat can be now installed together by cross-arm mounting hole.

Description

A kind of steel tube tower cross-arm installs equipment
Technical field
The present invention relates to electric power tower technical field, specifically a kind of steel tube tower cross-arm installs equipment.
Background technology
In recent years, with the tremendous development of China's electric utility, electric power pylon industry is increasingly prosperous, and steel tube tower is exactly to transmit electricity An important part in steel tower, at present, when carrying out steel tube tower and building, it is a job for unusual challenge that cross-arm is installed, by In most steel tower construction work in the wild, lack the auxiliary of traditional hanging device, or exhale title height in tens meters of height When, common crane at all cannot operation, run into such case, cross-arm can only be lifted using helicopter and be installed, this Requirement very high is proposed for the technical merit of installation personnel, mounting cost is also very huge..
Meanwhile, transmission line high-altitude operation, be primarily referred to as iron tower of power transmission line and the enterprising pedestrian's displacement body of cement pole, on Capable or descending activity.For steel tower, the pin nail or cat ladder generally relied on setting steel tower steel pipe carry out displacement, are being moved through Safety belt can not realize real-time, whole protective effect in journey, therefore operating personnel carries out high-altitude mobile operational process on steel tower, must Must accomplish spiritual high concentration, foot-operated real, hand grab surely, climbing coordination and prevent the burst hidden danger being likely to occur.
The content of the invention
Technical assignment of the invention is to solve the deficiencies in the prior art, there is provided a kind of steel tube tower cross-arm installs equipment.
The technical solution adopted for the present invention to solve the technical problems is:
The core of the design is to constitute a set of cross-arm by demountable parts to be lifted and erecting device, the skill for mainly solving Art problem includes:
1)The ensuring method of cross-arm its track grazing in uphill process.
2)After cross-arm reaches cross-arm seat installation site, its ensuring method for installing morphological stability.
In order to solve two above technical barrier, a kind of steel tube tower cross-arm of design installs equipment includes hoisting mechanism And anti-falling mechanism, anti-falling mechanism includes main body, there is cam mounting groove, pinhole of camshaft and pulley mounting groove in main body, convex Cam is installed in wheel mounting groove, cam there are two through holes, axis is inserted into pinhole of camshaft by cam and convex through through hole Wheel mounting groove connection, another through hole is connected through steel wire rope with the cross-arm for being lifted;Trailing wheel and preceding is installed in pulley mounting groove Wheel, trailing wheel and front-wheel are fixed by pulley pin;Main body has dovetail groove.
Preferably, pinhole of camshaft constitutes gap and coordinates with axis.
Preferably, trailing wheel and front-wheel are fixed on body by pulley pin, and the pulley pin constitutes interference fit with body.
Preferably, insertion before and after dovetail groove in main body.
Preferably, wheel face is fitted in T-shaped rail after the diameter dimension of trailing wheel and front-wheel should ensure that installation during fabrication On road.
Front-wheel is installed, front-wheel is fixed by pinch roller pin, and torsion spring is installed on pinch roller pin in anti-falling mechanism main body.
Preferably, the resilient both sides of torsion spring tool are separately fixed in main body dovetail groove on upper groove surface the medial surface with pinch roller On, torsion spring center passes through axis.
Preferably, during cross-arm rises, cam remains the state for upwarping.
Hoisting mechanism includes T-shaped guide rail, and dovetail guide is fixed on tower body by angle steel fixed seat, and tower body top passes through Bolt fixes the first reverse wheel and the second reverse wheel, and the first reverse wheel and the second reverse wheel can be rotated around commutation wheel shaft.
Preferably, T-shaped track is to be spliced, and is provided with splicing hole on the track of stitching portion, adjacent track by connecting plate and Bolt is fixed.
The installation site of T-shaped guide rail is located at the underface of cross-arm seat, and the first fall arrest and the are respectively mounted on two side rails Two fall arrests.
Preferably, there is support arm mounting hole in the first fall arrest and the second fall arrest main body.
Hoisting mechanism includes elevator motor, and elevator motor output shaft elevator line wheel, elevator line wheel is fixed by support On concrete pedestal, elevator line wheel lay winding wire ropes, steel wire rope bypasses the first reverse wheel and the second reverse wheel is connected to second and prevents On falling.
Preferably, only steel wire rope, the falling proof device of the non-scope of operation is passed through not to use on the falling proof device of the scope of operation.
Preferably, fluted on elevator wheel, the steel wire rope for folding and unfolding is stored in groove.
Second fall arrest is bolted installation support arm, and installation support arm is round steel, there is hanger on round steel, and cross-arm is by hanging Ear realizes hanging.
A kind of steel tube tower cross-arm of the invention installs equipment beneficial effect produced compared with prior art:
(1)By the way that Lift-on/Lift-off System can be assembled into the assembly of artificial unloading, realize in such as high mountain, the severe installation of water beach lamp Under the conditions of installation exercise, save the expensive expense using helicopter, be also convenient for the repair and maintenance in later stage.
(2)Falling proof device can also be used as the safety prevention measure of workmen, it is ensured that the personal safety of workmen, It is truly realized a set of equipment multiple use.
(3)Complete equipment simple structure, easy for installation, cost is relatively low, detachably, is convenient for carrying, and is adapted to field work.
Brief description of the drawings
Fig. 1 is structure three-dimensional figure of the present invention;
Fig. 2 is structural front view of the present invention and partial enlarged drawing;
Fig. 3 is structure cross-arm partial enlarged drawing of the present invention;
Fig. 4 is structure anti-falling mechanism front view of the present invention;
Fig. 5 is structure anti-falling mechanism top view of the present invention;
Fig. 6 is structure anti-falling mechanism sectional view of the present invention;
Fig. 7 is main structure body front view of the present invention.
In figure:
1st, main body, 2, cam, 3, trailing wheel, 4, pulley pin, 5, front-wheel, 6, pinch roller, 7, pinch roller pin, 8, axis, 9, torsion spring, 10th, dovetail groove, 11, cross-arm seat, 12, gusset, 13, cross-arm, 14, dovetail guide, 15, elevator motor, 16, elevator line wheel, 17, First fall arrest, 18, steel wire rope, 19, commutation wheel shaft, the 20, first reverse wheel, the 21, second reverse wheel, 22, cam clamping position, 23rd, the normal position of cam, the 24, second fall arrest, 25, support arm is installed, 26, hanger, 27, cross-arm mounting hole, 28, cam mounting groove, 29th, pinhole of camshaft, 30, pulley mounting groove, 31, tower body.
Specific embodiment
Core technology thought of the invention is that the constraint of cross-arm rising trace is realized by T-shaped guide rail, when lifting rope Fracture or when installing by cam with T-shaped guide rail inverted running when friction realize the locking of cross-arm position.
With reference to Fig. 4 and Fig. 5, the first embodiment of the present invention is described in detail below.
A kind of steel tube tower cross-arm installs equipment, including hoisting mechanism and anti-falling mechanism, and anti-falling mechanism includes master Body 1, has in main body 1 and cam 2 is installed in cam mounting groove 28, pinhole of camshaft 29 and pulley mounting groove 30, cam mounting groove 28, Cam 2 has two through holes, and axis 8 is inserted into pinhole of camshaft 29 and connects cam 2 and cam mounting groove 28 through a through hole, Another through hole is connected through steel wire rope with the cross-arm 13 for being lifted;Trailing wheel 3 and front-wheel 5, trailing wheel 3 are installed in pulley mounting groove 30 Fixed by pulley pin with front-wheel 5;There is dovetail groove 10 in main body 1.
Further, pinhole of camshaft constitutes gap and coordinates with axis.
Further, trailing wheel and front-wheel are fixed on body by pulley pin, and the pulley pin constitutes interference fit with body.
Further, insertion before and after dovetail groove in main body.
Further, wheel face is fitted in T-shaped rail after the diameter dimension of trailing wheel and front-wheel should ensure that installation during fabrication On road.
With reference to Fig. 6 and Fig. 7, the second embodiment of the present invention is described in detail below.
Front-wheel 5 is installed, front-wheel 5 is fixed by pinch roller pin 7 in main body 1, torsion spring 9 is installed on pinch roller pin 7.
Further, the resilient both sides of torsion spring tool are separately fixed in main body dovetail groove on upper groove surface the medial surface with pinch roller On, torsion spring center passes through axis.
Further, during cross-arm rises, cam remains the state for upwarping.
Further, then cam should be loaded so that torsion spring in the dovetail conduit first by torsion spring as main body during installation Side is stuck in dovetail groove upper surface, and side is withstood on cam, then passes through axis, so under the elastic force effect of torsion spring, cam Remain the state for upwarping.
With reference to Fig. 1, Fig. 2 and Fig. 3, the third embodiment of the present invention is described in detail below.
Hoisting mechanism includes T-shaped guide rail 14, and T-shaped guide rail 14 is fixed on tower body 31, tower body 31 by angle steel fixed seat Top is bolted the first reverse wheel 20 and the second reverse wheel 21, and the first reverse wheel 20 and the second reverse wheel 21 can be around Commutation wheel shaft 19 is rotated.
Further, T-shaped track is to be spliced, and is provided with splicing hole on the track of stitching portion, adjacent track by connecting plate and Bolt is fixed.
The installation site of T-shaped guide rail 14 is located at the underface of cross-arm seat 11, and the first fall arrest is respectively mounted on two side rails 17 and second fall arrest 24.
Further, there is support arm mounting hole in the first fall arrest and the second fall arrest main body.
Hoisting mechanism include elevator motor 15, the output shaft elevator line wheel 16 of elevator motor 15, elevator line wheel 16 passes through Support is fixed on concrete pedestal, the lay winding wire ropes 18 of elevator line wheel 16, and steel wire rope bypasses the first reverse wheel 20 and the second commutation Wheel 21 is connected in the second fall arrest 24.
Second fall arrest 24 is bolted installation support arm 25, and installation support arm 25 is round steel, there is hanger 26 on round steel, is weighed Profit requires that 1 cross-arm 13 is realized hanging by hanger.
Further, only steel wire rope, the falling proof device of the non-scope of operation is passed through not to use on the falling proof device of the scope of operation.
Further, fluted on elevator wheel, the steel wire rope for folding and unfolding is stored in groove.
For the first reverse wheel 20 and the second reverse wheel 21, when steel tube tower dispatches from the factory, the top of tower body has been welded on.
When cross-arm installation is carried out, the output shaft elevator line wheel 16 of elevator motor 15 is bolted on cement base first On plinth, steel wire rope is pulled out from elevator line wheel 16 by workmen then, bypass the first reverse wheel 20 and second at the top of tower body Reverse wheel 21, then steel wire rope is put down, by ground construction personnel by the second fall arrest cam on steel wire penetrating mounting surface Threading hole.
Now, ground staff is installed in the second fall arrest 24 by bolt by support arm 25 is installed first, then by hanging Be mounted to cross-arm 13 on installation support arm 25 by ear 26.
Finally, elevator motor 15 is started, under the drive of motor, installing support arm 25 can rise with cross-arm 13, until fortune Can be installed together for cross-arm 13 and cross-arm seat 11 by cross-arm mounting hole 27 now to the position of cross-arm seat 11 by row.
The operation mechanism of anti-falling mechanism is, is not stressed when cam 2 or during stress very little, in the twisting force of torsion spring 9 Under, anti-falling mechanism can be stuck on T-shaped track and remain stationary as, after carry cross-arm, anti-falling mechanism is applied on T-shaped guide rail Downward active force it is very big, because cam 2 is a kind of ellipsoidal structure, can be rotated during stress so that oval longitudinal end card Tight downward stress is bigger on T-shaped track, and it is more firm that anti-falling mechanism mechanism locks, it is ensured that cross-arm 13 is to cross-arm When seat 1 is installed, the reliability of punching, it is also possible to prevent the danger fallen during workmen's operation.
To sum up, present disclosure is not limited in the above embodiments, and those skilled in the art can be in the present invention Guiding theory within propose other embodiments, but these embodiments are included within the scope of the present invention.

Claims (6)

1. a kind of steel tube tower cross-arm installs equipment, including hoisting mechanism and anti-falling mechanism, it is characterised in that described anti-fall Mechanism fall including main body(1), the main body(1)On have cam mounting groove(28), pinhole of camshaft(29)With pulley mounting groove (30), the cam mounting groove(28)Interior installation cam(2), the cam(2)There are two through holes, axis(8)It is logical through one Hole is inserted into the pinhole of camshaft(29)By cam(2)With cam mounting groove(28)Connection, another through hole passes through steel wire rope With the cross-arm for being lifted(13)Connection;The pulley mounting groove(30)Interior installation trailing wheel(3)And front-wheel(5), the trailing wheel(3)With Front-wheel(5)Fixed by pulley pin;The main body(1)On have dovetail groove(10).
2. anti-falling mechanism according to claim 1, it is characterised in that the main body(1)Upper installation front-wheel(5), it is described before Wheel(5)By pinch roller pin(7)It is fixed, the pinch roller pin(7)Upper installation torsion spring(9).
3. a kind of steel tube tower cross-arm according to claim 1 installs equipment, it is characterised in that the hoisting mechanism bag Include T-shaped guide rail(14), the T-shaped guide rail(14)Tower body is fixed on by angle steel fixed seat(31), the tower body(31)Top leads to Cross bolt and fix the first reverse wheel(20)With the second reverse wheel(21), first reverse wheel(20)With the second reverse wheel(21)Energy Enough around commutation wheel shaft(19)Rotate.
4. a kind of steel tube tower cross-arm according to claim 1 installs equipment, it is characterised in that T-shaped described in claim 3 to lead Rail(14)Installation site be located at cross-arm seat(11)Underface, the first fall arrest is respectively mounted on two side rails(17)With second Fall arrest(24).
5. a kind of steel tube tower cross-arm according to claim 1 installs equipment, it is characterised in that the hoisting mechanism bag Include elevator motor(15), the elevator motor(15)Output shaft elevator line wheel(16), the elevator line wheel(16)It is solid by support It is scheduled on concrete pedestal, the elevator line wheel(16)Lay winding wire ropes(18), the steel wire rope bypasses the first reverse wheel(20)With Second reverse wheel(21)It is connected to the second fall arrest(24)On.
6. a kind of steel tube tower cross-arm according to claim 1 installs equipment, it is characterised in that claim 5 second is anti-fall Fall(24)It is bolted installation support arm(25), the installation support arm(25)It is round steel, there is hanger on round steel(26), right will Seek cross-arm described in 1(13)Realize hanging by the hanger.
CN201611026440.XA 2016-11-22 2016-11-22 A kind of steel tube tower cross-arm installation equipment Active CN106760891B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611026440.XA CN106760891B (en) 2016-11-22 2016-11-22 A kind of steel tube tower cross-arm installation equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611026440.XA CN106760891B (en) 2016-11-22 2016-11-22 A kind of steel tube tower cross-arm installation equipment

Publications (2)

Publication Number Publication Date
CN106760891A true CN106760891A (en) 2017-05-31
CN106760891B CN106760891B (en) 2019-11-15

Family

ID=58970593

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611026440.XA Active CN106760891B (en) 2016-11-22 2016-11-22 A kind of steel tube tower cross-arm installation equipment

Country Status (1)

Country Link
CN (1) CN106760891B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107448053A (en) * 2017-08-04 2017-12-08 国网江苏省电力公司盐城供电公司 A kind of tower bar tilts monitoring bracing means
CN107476634A (en) * 2017-08-04 2017-12-15 国网江苏省电力公司盐城供电公司 A kind of adjustable for height tower bar of cross-arm
CN110998681A (en) * 2017-08-10 2020-04-10 3M创新有限公司 Generation and monitoring of fall arrest device events
CN114934711A (en) * 2022-05-26 2022-08-23 国网山东省电力公司郓城县供电公司 Electric power cross arm

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4312087A1 (en) * 1992-04-10 1993-10-14 Guy Galtier Safety system for use when climbing structures - has user-wear harness with loop connections to safety line run along length of tower and readily repositioned.
FR2820641A1 (en) * 2001-02-14 2002-08-16 Sk MOBILE FALL PROTECTION FOR LOCKING SUPPORT
CN2853103Y (en) * 2005-12-28 2007-01-03 张敏 Self locking device of tower rail
CN201404612Y (en) * 2009-02-19 2010-02-17 长沙亿阳信息科技有限公司 T-shaped guide track fall protection device
CN201578775U (en) * 2010-01-22 2010-09-15 国网电力科学研究院武汉南瑞有限责任公司 Intelligent tower operation fall prevention device
CN201862169U (en) * 2010-11-19 2011-06-15 西安电力机械厂检修安装分厂 T-track type follow-up anti-falling device
CN103269036A (en) * 2013-05-17 2013-08-28 国家电网公司 Tensioning resistant cross arm lifting machine
CN204848091U (en) * 2015-08-03 2015-12-09 国家电网公司 Steel sheet cross arm hoisting accessory
CN205681012U (en) * 2016-06-13 2016-11-09 江西电力职业技术学院 Live working platform for overhead transmission line

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4312087A1 (en) * 1992-04-10 1993-10-14 Guy Galtier Safety system for use when climbing structures - has user-wear harness with loop connections to safety line run along length of tower and readily repositioned.
FR2820641A1 (en) * 2001-02-14 2002-08-16 Sk MOBILE FALL PROTECTION FOR LOCKING SUPPORT
CN2853103Y (en) * 2005-12-28 2007-01-03 张敏 Self locking device of tower rail
CN201404612Y (en) * 2009-02-19 2010-02-17 长沙亿阳信息科技有限公司 T-shaped guide track fall protection device
CN201578775U (en) * 2010-01-22 2010-09-15 国网电力科学研究院武汉南瑞有限责任公司 Intelligent tower operation fall prevention device
CN201862169U (en) * 2010-11-19 2011-06-15 西安电力机械厂检修安装分厂 T-track type follow-up anti-falling device
CN103269036A (en) * 2013-05-17 2013-08-28 国家电网公司 Tensioning resistant cross arm lifting machine
CN204848091U (en) * 2015-08-03 2015-12-09 国家电网公司 Steel sheet cross arm hoisting accessory
CN205681012U (en) * 2016-06-13 2016-11-09 江西电力职业技术学院 Live working platform for overhead transmission line

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107448053A (en) * 2017-08-04 2017-12-08 国网江苏省电力公司盐城供电公司 A kind of tower bar tilts monitoring bracing means
CN107476634A (en) * 2017-08-04 2017-12-15 国网江苏省电力公司盐城供电公司 A kind of adjustable for height tower bar of cross-arm
CN110998681A (en) * 2017-08-10 2020-04-10 3M创新有限公司 Generation and monitoring of fall arrest device events
CN114934711A (en) * 2022-05-26 2022-08-23 国网山东省电力公司郓城县供电公司 Electric power cross arm
CN114934711B (en) * 2022-05-26 2023-06-23 国网山东省电力公司郓城县供电公司 An electric crossarm

Also Published As

Publication number Publication date
CN106760891B (en) 2019-11-15

Similar Documents

Publication Publication Date Title
CN101537976B (en) Dual-tower-mast giant self-lifting crane and following-carrying lifting method thereof
CN106760891A (en) A kind of steel tube tower cross-arm installs equipment
CN106586846B (en) The hanging device and its construction method of a kind of wind power generating set
CN208413709U (en) Unit type glass curtain wall double-ring track hoisting system
CN201376848Y (en) Large-scale double-tower automatic-elevation hoisting equipment
CN205575409U (en) Unpowered self-propelled cable bearing device of large-span cable crane
CN205873594U (en) Special construction elevator of cooling tower section of thick bamboo wall
CN118545649B (en) Portable power transmission line maintenance operation device and method
CN201176567Y (en) Mobile angular adjustment frame hanging at end of staying cable beam
CN205472406U (en) Light -duty fast -assembling freight transportation cableway lifting frame
CN101693501B (en) Deck unit erection gantry for hoisting by large deflection angle
CN201144634Y (en) Assisting device for climbing derrick ladder
CN102926329A (en) Device dedicated for lifting steel box beam of small and medium-sized long-span suspension bridge and lifting method
CN209779465U (en) main tower erects cable-stay bridge's string cable construction system that changes
CN201737611U (en) Lifting device for power capacitor tower
CN110485292A (en) A kind of examination and repair system and repair method of the cable-stayed bridge king-post of falling Y shape
CN206917390U (en) Vertical device is hung in tower section segmentation
CN205275061U (en) Semi -portal crane
CN110165600B (en) Device and method for entering and exiting electric field of double-loop same-tower power transmission line
CN103072903B (en) Method for mounting high-rise pylon by using self-stable double-rocker elevating device
CN203065046U (en) Self-stabilizing double-rocker-arm lifting device for installation of high-rise tower
CN208869123U (en) A kind of novel villa ladder steel structure derrick
CN221877770U (en) Stay cable hanging construction device
CN202414930U (en) Flexible guide rail cable sliding trolley
CN222908564U (en) An overhead man-carrying device in the catwalk portal of an ultra-long span suspension bridge

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20191022

Address after: 529000 Building 2, No. 13, Yongda first road, Pengjiang district, Jiangmen City, Guangdong Province

Applicant after: Jiangmen electric power transmission and transformation Co., Ltd.

Address before: 430065 Hubei Province, Wuhan city Hongshan District HUANGJIAHU Road No. 3

Applicant before: Dong Ya Lun

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant