CN205669258U - A kind of connection precast beam of pre-buried shear key - Google Patents

A kind of connection precast beam of pre-buried shear key Download PDF

Info

Publication number
CN205669258U
CN205669258U CN201620571913.3U CN201620571913U CN205669258U CN 205669258 U CN205669258 U CN 205669258U CN 201620571913 U CN201620571913 U CN 201620571913U CN 205669258 U CN205669258 U CN 205669258U
Authority
CN
China
Prior art keywords
precast beam
shear key
joint face
precast
connection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620571913.3U
Other languages
Chinese (zh)
Inventor
李鹏
郑七振
曾晓晓
让梦
乐利清
罗恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
University of Shanghai for Science and Technology
Original Assignee
University of Shanghai for Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by University of Shanghai for Science and Technology filed Critical University of Shanghai for Science and Technology
Priority to CN201620571913.3U priority Critical patent/CN205669258U/en
Application granted granted Critical
Publication of CN205669258U publication Critical patent/CN205669258U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The connection precast beam of pre-buried shear key provided by the utility model, have: two precast beams, precast beam has joint face and Liang Zong muscle, two precast beams are the most linearly arranged with joint face, and there are between joint face gap, at least two pieces of shear keies, it is separately positioned on precast beam, one end of shear key is arranged in precast beam, and the other end protrudes from joint face;A plurality of stirrups, stirrup is converted into precast beam shape of cross section by reinforcing bar and beam is indulged muscle and tied up and be disposed between gap;Ultra-high performance concrete LIFT, indulges muscle with shear key, stirrup, beam in being filled in gap and pours integral.Because pre-buried shear key at the joint face of precast beam, so the precast beam that connects of the pre-buried shear key that provides of this utility model has the shear resistance improved at precast beam and Cast-in-Situ Segment joint face, and increase the beneficial effect connecting precast beam globality.

Description

A kind of connection precast beam of pre-buried shear key
Technical field
This utility model relates to a kind of precast beam, is specifically related to the connection precast beam of a kind of pre-buried shear key.
Background technology
Prefabricated assembled frame structure is one of version the most frequently used in assembled architecture, and connects skill between precast beam Art is one of key technology of prefabricated assembled frame structure.
At present, component domestic project used connects to be generally at bean column node and connects or moment of flexure smaller part on beam Connect, sometimes for reaching the shockproof requirements of structure, need on precast beam, artificially arrange plastic hinge.When on beam, moment of flexure is less When place connects, it is typically employed in precast beam and connects end and the mode of groove bristle and linkage section cast-in-place concrete is set carries out even Connect, in this case precast beam with belong to the weak link being connected at the joint face of Cast-in-Situ Segment, show as shear resistance especially Not enough.
Utility model content
This utility model is carried out to solve the problems referred to above, it is therefore intended that provide the connection of a kind of pre-buried shear key Precast beam.
This utility model provides the connection precast beam of a kind of pre-buried shear key, has the feature that, including: two are pre- Beam processed, precast beam has joint face, and two precast beams are linearly arranged, correspondingly relative with joint face, and has between joint face Having gap, be respectively arranged with beam at the top of precast beam and bottom and indulge muscle, beam is indulged muscle and is protruded from joint face;At least two pieces of shearing resistances Key, is separately positioned on precast beam, and one end of shear key is arranged in precast beam, and one end protrudes from joint face;A plurality of stirrups, Stirrup is converted into precast beam shape of cross section by reinforcing bar and beam is indulged muscle and tied up and be disposed between gap;And very-high performance Concrete lift, indulges muscle with shear key, stirrup, beam in being filled in gap and pours integral.
In the connection precast beam of the pre-buried shear key of this utility model offer, it is also possible to have a feature in that wherein, The joint face of precast beam is provided with the pit of indent, is used for increasing connection contact surface, and joint face is coarse.
It addition, in the connection precast beam of the pre-buried shear key of this utility model offer, it is also possible to have a feature in that Wherein, two sides of the through precast beam of pit.
It addition, in the connection precast beam of the pre-buried shear key of this utility model offer, it is also possible to have a feature in that Wherein, pit depth is not less than 30mm.
It addition, in the connection precast beam of the pre-buried shear key of this utility model offer, it is also possible to have a feature in that Wherein, being arranged on the roof beam of two precast beams and indulge muscle and overlap connection each other, bottom beam is indulged muscle and is overlapped connection each other.
It addition, in the connection precast beam of the pre-buried shear key of this utility model offer, it is also possible to have a feature in that Wherein, shear key is arranged on the center of joint face.
It addition, in the connection precast beam of the pre-buried shear key of this utility model offer, it is also possible to have a feature in that Wherein, shear key is one section of I-steel or one section of square bar.
The effect of utility model and effect
The connection precast beam of pre-buried shear key provided by the utility model, has: two precast beams, and precast beam has even Junction and Liang Zong muscle, two precast beams are the most linearly arranged with joint face, and have gap between joint face, and at least two pieces resist Cutting key, be separately positioned on precast beam, one end of shear key is arranged in precast beam, and the other end protrudes from joint face;A plurality of Stirrup, stirrup is converted into precast beam shape of cross section by reinforcing bar and beam is indulged muscle and tied up and be disposed between gap;Superelevation Energy concrete lift, indulges muscle with shear key, stirrup, beam in being filled in gap and pours integral.Because the connection at precast beam Pre-buried shear key at face, so the connection precast beam of pre-buried shear key that this utility model provides has raising precast beam with existing Shear resistance at the section of watering joint face, and increase the beneficial effect connecting precast beam globality.
Accompanying drawing explanation
Fig. 1 is schematic diagram at the connection precast beam joint face of pre-buried shear key in embodiment of the present utility model.
Detailed description of the invention
For the technological means making this utility model realize, creation characteristic, reach purpose and be easy to understand with effect, with Lower embodiment combines the connection precast beam of the pre-buried shear key that this utility model is related to by accompanying drawing and is specifically addressed.
Fig. 1 is the connection precast beam junction schematic diagram of pre-buried shear key in embodiment of the present utility model.
As it is shown in figure 1, the connection precast beam 100 of pre-buried shear key has: precast beam 10, shear key 20, stirrup 30 and Ultra-high performance concrete LIFT 40.
Two precast beams 10, precast beam 10 has joint face 11, and joint face 11 is provided with the pit of indent, the degree of depth of pit It is coarse for 50mm, two sides of the through precast beam of pit 10, and the surface of joint face 11.
Two precast beams 10 are linearly arranged relatively with joint face 11, and leave gap 300mm between joint face 11.
Being respectively arranged with at the top of precast beam 10 and bottom that roof beam indulges muscle 12, bottom beam indulges muscle 13, roof beam indulges muscle 12, bottom beam is indulged muscle 13 and is protruded from joint face 11, and the roof beam of two precast beams 10 is indulged muscle 12 and overlapped connection each other, two The bottom beam of precast beam 10 is indulged muscle 13 and is overlapped connection each other.
Two pieces of shear keies 20, are separately positioned on precast beam 10, and are positioned at the center of joint face 11, one end of shear key 20 Being arranged in precast beam 10, one end protrudes from joint face 11, and shear key 20 is one section of I-steel.
3 stirrups 30, stirrup 30 is converted into precast beam 10 shape of cross section by reinforcing bar and indulges at muscle 12 and the end with roof beam respectively Portion's beam is indulged muscle 13 and is tied up and be disposed between gap.
Ultra-high performance concrete LIFT 40, be filled in gap with shear key 20, stirrup 30, roof beam indulge muscle 12 and Bottom beam is indulged muscle 13 and is poured integral.
The effect of embodiment and effect
According to the connection precast beam of pre-buried shear key provided by the utility model, having: two precast beams, precast beam has There are joint face and Liang Zong muscle, two precast beams the most linearly to arrange with joint face, and there is between joint face gap, at least two Block shear key, is separately positioned on precast beam, and one end of shear key is arranged in precast beam, and the other end protrudes from joint face;Multiple Several stirrups, stirrup is converted into precast beam shape of cross section by reinforcing bar and beam is indulged muscle and tied up and be disposed between gap;Super High performance concrete LIFT, indulges muscle with shear key, stirrup, beam in being filled in gap and pours integral.Because at precast beam Pre-buried shear key at joint face, so the connection precast beam of pre-buried shear key that this utility model provides has raising precast beam With the shear resistance at Cast-in-Situ Segment joint face, and increase connect precast beam globality beneficial effect.
It addition, the joint face of precast beam is provided with the pit of indent in embodiment, the degree of depth of pit is 50mm, and connects The surface in face is coarse, arranges pit and rough surface can increase precast beam and the switching performance of cast-in-place UHPC.
Further, shear key is the center that one section of I-steel is arranged on joint face, and one section is positioned at prefabricated, one section It is positioned at cast-in-place UHPC, the globality of precast beam can be increased.
Above-mentioned embodiment is preferred case of the present utility model, is not intended to limit protection domain of the present utility model.

Claims (7)

1. the connection precast beam of a pre-buried shear key, it is characterised in that including:
Two precast beams, described precast beam has joint face, and two precast beams are linearly arranged, correspondingly with described joint face phase Right, and between described joint face, there is gap, it being respectively arranged with beam at the top of described precast beam and bottom and indulge muscle, described beam is indulged Muscle protrudes from described joint face;
At least two pieces of shear keies, are separately positioned on described precast beam, and one end of described shear key is arranged in described precast beam, One end protrudes from described joint face;
A plurality of stirrups, described stirrup is converted into described precast beam shape of cross section by reinforcing bar and described beam is indulged muscle and tied up and be spaced It is arranged between described gap;And
Ultra-high performance concrete LIFT, indulges muscle pour with described shear key, described stirrup, described beam in being filled in described gap Integral.
The connection precast beam of pre-buried shear key the most according to claim 1, it is characterised in that:
Wherein, the described joint face of described precast beam is provided with the pit of indent, is used for increasing connection contact surface, and described connection Face is coarse.
The connection precast beam of pre-buried shear key the most according to claim 2, it is characterised in that:
Wherein, two sides of the through described precast beam of described pit.
The connection precast beam of pre-buried shear key the most according to claim 2, it is characterised in that:
Wherein, described pit depth is not less than 30mm.
The connection precast beam of pre-buried shear key the most according to claim 1, it is characterised in that:
Wherein, being arranged on beam described in the top of two described precast beams and indulge muscle and overlap connection each other, the described beam in bottom indulges muscle Overlap connection each other.
The connection precast beam of pre-buried shear key the most according to claim 1, it is characterised in that:
Wherein, described shear key is arranged on the center of described joint face.
The connection precast beam of pre-buried shear key the most according to claim 1, it is characterised in that:
Wherein, described shear key is one section of I-steel or one section of square bar.
CN201620571913.3U 2016-06-15 2016-06-15 A kind of connection precast beam of pre-buried shear key Expired - Fee Related CN205669258U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620571913.3U CN205669258U (en) 2016-06-15 2016-06-15 A kind of connection precast beam of pre-buried shear key

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620571913.3U CN205669258U (en) 2016-06-15 2016-06-15 A kind of connection precast beam of pre-buried shear key

Publications (1)

Publication Number Publication Date
CN205669258U true CN205669258U (en) 2016-11-02

Family

ID=57192209

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620571913.3U Expired - Fee Related CN205669258U (en) 2016-06-15 2016-06-15 A kind of connection precast beam of pre-buried shear key

Country Status (1)

Country Link
CN (1) CN205669258U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759878A (en) * 2016-11-30 2017-05-31 上海建工二建集团有限公司 Assembled beam-column node structure and its building method
CN112900620A (en) * 2021-01-22 2021-06-04 清华大学 UHPC-based assembled combined beam-column joint and construction method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759878A (en) * 2016-11-30 2017-05-31 上海建工二建集团有限公司 Assembled beam-column node structure and its building method
CN112900620A (en) * 2021-01-22 2021-06-04 清华大学 UHPC-based assembled combined beam-column joint and construction method thereof
CN112900620B (en) * 2021-01-22 2022-04-29 清华大学 UHPC-based assembled combined beam-column joint and construction method thereof

Similar Documents

Publication Publication Date Title
CN106677049B (en) Assembled steel-concrete combined structure bridge and construction method
CN105040829B (en) A kind of precast concrete primary-secondary beam attachment structure and its construction method
CN104674660B (en) A kind of cored slab hinge crack structure and construction method thereof
CN204676609U (en) The reinforced waterproof construction of a kind of basement bottom plate rear pouring tape
CN109339230A (en) A kind of prefabricated assembling type reinforced concrete column splicing node structure and its construction method
CN104060781A (en) Cast-in-situ cranked slab stair without seams at stair sections and construction method
CN205669258U (en) A kind of connection precast beam of pre-buried shear key
CN206174120U (en) Prefabricated constructional column and structure thereof
CN106948548A (en) A kind of precast concrete frame beam structure
CN107130715A (en) Teeth groove is poured after a kind of to be linked and packed the construction method of formula building roof system
CN204491412U (en) A kind of hollow sheet hinge crack structure
CN207812307U (en) The construction system of Cable stayed Bridge Main Tower and steel anchor beam
CN103614974A (en) Prestress sectional steel reinforcing system of reinforced concrete arch shell bridge body
KR101668295B1 (en) Steel-concrete composite box girder
CN105735470A (en) Precast concrete frame system using high-performance materials differentially
CN206769438U (en) The ruggedized construction of the existing prefabricated ledger beam of multilayer Box linear programming
CN103216085B (en) A kind of removable lining self-bearing type reinforcement bar truss mould plate
CN103276663B (en) Method for manufacturing assembled integral plate for reinforced concrete slab bridge
CN206408543U (en) Suitable for being hinged the T-shaped transversely strengthening system cut section bar
CN205502058U (en) Pin -connected panel tower crane foundation
CN206053124U (en) A kind of combination type prestressed beam slab system
CN104265005A (en) Steel plate and steel bar combined beam top reinforced structure
CN204126295U (en) Outsourcing reinforcing bar ruggedized construction at the bottom of a kind of beam
CN209369177U (en) Reinforcement structure based on H profile steel support column
CN104328793B (en) Raft plated construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161102

Termination date: 20170615

CF01 Termination of patent right due to non-payment of annual fee