CN205663125U - Modular hand rail - Google Patents

Modular hand rail Download PDF

Info

Publication number
CN205663125U
CN205663125U CN201620454155.7U CN201620454155U CN205663125U CN 205663125 U CN205663125 U CN 205663125U CN 201620454155 U CN201620454155 U CN 201620454155U CN 205663125 U CN205663125 U CN 205663125U
Authority
CN
China
Prior art keywords
handrail
screw
column
hole
limit bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620454155.7U
Other languages
Chinese (zh)
Inventor
黎志盛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Jihua Aluminum Co Ltd
Original Assignee
Guangdong Jihua Aluminum Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Jihua Aluminum Co Ltd filed Critical Guangdong Jihua Aluminum Co Ltd
Priority to CN201620454155.7U priority Critical patent/CN205663125U/en
Application granted granted Critical
Publication of CN205663125U publication Critical patent/CN205663125U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Steps, Ramps, And Handrails (AREA)

Abstract

The utility model relates to a modular hand rail, a modular hand rail, it includes the handrail, two piece at least stands of support handrail, lie in the last gag lever post between two stands, ornamental strip and lower gag lever post, the handrail includes interconnect's handrail facial canal and handrail base each other, the last through -hole that sets up of handrail base, set up the screw on the inner wall of stand, wherein the handrail facial canal passes through the joint structure with handrail base and can be connected with dismantling, the last through -hole of handrail base is corresponding one by one with the screw on the stand, utilize the connecting piece to connect handrail base and stand. The utility model discloses a modular hand rail utilizes split type structure, and is fixed with the inside screw interconnect who sets up of the lateral wall of stand through the bolt through punching a hole on the handrail base of handrail, reduces welding point problem troublesome with the fixed processing of angle sign indicating number and indisputable railing, swift more convenient and firm in the aspect of the installation.

Description

A kind of combining handrail railing
Technical field
This utility model relates to the hand banisters field of building trade, especially a kind of combining handrail railing.
Background technology
Railing in early days is all based on ferrum and rustless steel, decorates by being welded to form armrest surface, vertical columns and interval Bar, manufacturing procedure bothers, and pad affects overall appearance.Along with the development of materials industry, aluminium alloy extrusions is gradually adopted to make Hand banisters, the Chinese utility model patent if notification number is CN201671260U discloses a kind of Combined type aluminum alloy guardrail, It uses and includes column, the handrail being supported on column, the cross bar being connected between adjacent upright posts and be connected to handrail with horizontal Cornical between bar, the connection between column, handrail and cross bar is all to be that groove type aluminium section bar is connected by corner brace by cross section, And be tightened on the slot in groove by key screw corner brace, the inwall that cornical is relative is equipped with slotted eye, slotted eye and groove type aluminium profiles The bottom thread of material base plate connects.
But, above-mentioned employing corner brace connects the assembling structure of handrail and column, and processing trouble is time-consuming, and corner brace is exposed to Outside, the most unsightly, is also vulnerable to destroy.
Utility model content
For above-mentioned technical problem, the purpose of this utility model is to provide a kind of assembling structure and is arranged in hand banisters Portion, the combining handrail railing of compact conformation.For achieving the above object, this utility model takes techniques below scheme:
A kind of combining handrail railing, comprising: at least two root posts of handrail, supporting armrests, be positioned at two root posts it Between upper limit bar, ornamental strip and lower limit bar, handrail includes handrail paste pipes and the armrest base being interconnected with one another, railing bottom Arranging through hole on Zuo, the inwall of column arranges screw, wherein handrail paste pipes is with armrest base by interface arrangment removedly Connecting, the through hole on armrest base is the most corresponding with the screw on column, utilizes connector to connect armrest base and column.
It may be preferred that the inside of relative two sidewalls of column is respectively provided with screw, the through hole of armrest base with on column Screw quantity equal, and position one_to_one corresponding.
It may be preferred that described interface arrangment includes the claw on the draw-in groove that is positioned on handrail paste pipes and armrest base.
It may be preferred that described handrail paste pipes has arc section shape.
It may be preferred that upper limit bar includes cover and bottom, bottom is provided with the through hole for connecting ornamental strip.
It may be preferred that cover is connected by interface arrangment with bottom.
It may be preferred that arrange screw on the inwall of ornamental strip, the through hole on bottom and the screw quantity phase on ornamental strip Deng, and position one_to_one corresponding.
It may be preferred that the two ends of upper limit bar and lower limit bar are inserted on column.
It may be preferred that the sidewall of column arranges slot, for connecting upper limit bar and the left and right end portions of lower limit bar.
Combining handrail railing of the present utility model, utilizes split-type structural, by punching on the armrest base of handrail, The screw arranged by the interior of bolt with column is interconnected and fixed, reduction corner brace fixing processing trouble and ferrum hurdle The pad problem of bar, more efficient and convenient in installation, attractive in appearance.
Accompanying drawing explanation
Fig. 1 is the structural representation of this utility model combining handrail railing;
Fig. 2 is that the A-A of Fig. 1 is to sectional view;
Fig. 3 is that the B-B of Fig. 1 is to sectional view;
Fig. 4 is that the C-C of Fig. 1 is to sectional view;And
Fig. 5 is that the D-D of Fig. 1 is to sectional view.
Detailed description of the invention
As it is shown in figure 1, this utility model relates to a kind of combining handrail railing, comprising: handrail 1, supporting armrests are extremely Few two root posts 3, upper limit bar 2, ornamental strip 4 and lower limit bar 5 between two root posts 3, handrail 1 includes each other The handrail paste pipes 11 being flexibly connected and armrest base 12, this combining handrail railing is made by aluminium alloy extrusions or bar section of stainless steel etc. Become.
As in figure 2 it is shown, its line A-A sectional view along Fig. 1, it is the sectional view of handrail 1 and column 3 link position, handrail 1 For hollow-core construction, including the handrail paste pipes 11 being connected with each other and armrest base 12, handrail paste pipes 11 is arc section structure, it is to avoid Horn structure occurs, it is simple to user is helped.Arranging through hole 13 on armrest base 12, in installation process, this through hole 13 is with vertical The screw 31 of post 3 is corresponding, and this through hole 13 is for through bolt, and this bolt is connected with screw 31, to realize handrail 1 and column 3 Connection, handrail paste pipes 11 and armrest base 12, by snap-fit engagement, such as, arrange claw 121 on armrest base 12, are holding up Gesture and facial expression pipe 11 position corresponding with claw 121 arranges draw-in groove 111, is realized by the snap-fit engagement of claw 121 with draw-in groove 111 Handrail paste pipes 11 and the connection of armrest base 12.
The bottom of column 3 is connected with stationary plane, such as, can be connected with ground cement pedestal, or be inserted into ground On, the top of column 3 is connected with handrail 1, and column 3 provides support force for hand banisters, as shown in Figure 4, for C-C to sectional view, Column 3 is the hollow-core construction of general square shape, arranges screw 31 in the inside of its sidewall, in installation process, and this screw 31 and handrail 1 On through hole 13 align, be connected with screw by bolt, handrail 1 be connected fixing with column 3.In order to make handrail 1 and column 3 Connect more firm, be respectively provided with screw 31, in one embodiment, each side in the inside of relative two sidewall of column 3 Arranging two screws 31 on wall, now, position corresponding with screw 31 on the armrest base 12 of handrail 1 arranges same number Through hole 13.
Upper limit bar 2, the two ends of lower limit bar 5 are inserted on column 3, arrange for upper limit bar on the sidewall of column 3 2, the slot that the two ends of lower limit bar 5 are inserted, upper limit bar 2, lower limit bar 5 are for limiting the position of ornamental strip 4, ornamental strip 4 Top is connected with upper limit bar 2, and the bottom of ornamental strip 4 is connected with lower limit bar 5, as it is shown on figure 3, its be B-B to sectional view, Being the sectional view of upper limit bar 2 and ornamental strip 4 link position, upper limit bar 2 is hollow-core construction, including cover 21, bottom 22, Arranging through hole 23 on bottom 22, in installation process, this through hole 23 is corresponding with the screw 41 on ornamental strip 4, and this through hole 23 is used In through bolt, bolt is connected with the screw 41 of ornamental strip 4, is connected with the fixing of ornamental strip 4 realizing upper limit bar 2, cover 21 pass through snap-fit engagement with bottom 22, such as, arrange claw on bottom 22, and the position corresponding with claw at cover 21 sets Put draw-in groove, realized the connection of bottom 22 and cover 21 by the snap-fit engagement of claw Yu draw-in groove.Lower limit bar 5 uses and upper limit The similar structure of bar 2, is attached with ornamental strip 4.
See accompanying drawing 5, its be D-D to sectional view, for the sectional view of ornamental strip 4, ornamental strip 4 is the hollow knot of general square shape Structure, arranges screw 41 in the inside of its sidewall, and in installation process, this screw 41 aligns with the through hole 23 on upper limit bar 2, logical Cross bolt to be connected with screw 41, upper limit bar 2 is connected fixing with ornamental strip 4.In order to make upper limit bar 2 be connected with ornamental strip 4 More firm, it is respectively provided with screw 41 in the inside of relative two sidewall of ornamental strip, now, at the bottom 22 of upper limit bar 2 The upper position corresponding with screw 41 arranges the through hole 23 of quantity.In the position that ornamental strip 4 is connected with lower limit bar 5, have equally There is above-mentioned similar structure, do not repeat them here.
Combining handrail railing of the present utility model, utilizes split-type structural, by punching on the armrest base of handrail, The screw arranged by the interior of bolt with column is interconnected and fixed, and, upper and lower gag lever post is connected with ornamental strip Time, the above-mentioned similar structures of same employing, the attachment structure between each parts is arranged on the inside of hand banisters, by handrail paste pipes It is connected with armrest base clamping, blocks the bolt that handrail is connected with column, reduction corner brace fixing processing trouble and ferrum hurdle The pad problem of bar, more efficient and convenient in installation, attractive in appearance.
Last it is noted that above-described each embodiment is merely to illustrate the technical solution of the utility model, rather than It is limited;Although this utility model being described in detail with reference to previous embodiment, those of ordinary skill in the art It is understood that the technical scheme described in previous embodiment still can be modified by it, or to the most part or all of Technical characteristic carries out equivalent;And these amendments or replacement, do not make the essence of appropriate technical solution depart from this utility model The scope of each embodiment technical scheme.

Claims (6)

1. a combining handrail railing, comprising: at least two root posts (3) of handrail (1), supporting armrests, be positioned at two stand Upper limit bar (2), ornamental strip (4) and lower limit bar (5) between post (3), handrail (1) includes the armrest surface being interconnected with one another Pipe (11) and armrest base (12), armrest base (12) arranges through hole (13), the inwall of column (3) arranges screw (31), It is characterized in that: handrail paste pipes (11) is connected, on armrest base (12) by interface arrangment removedly with armrest base (12) Through hole (13) the most corresponding with the screw (31) on column (3), utilize connector to connect armrest base (12) and column (3), upper limit bar (2) includes cover (21) and bottom (22), is provided with for connecting the logical of ornamental strip (4) on bottom (22) Hole (23), the inwall of ornamental strip (4) arranges screw (41), the through hole (23) on bottom (22) and the screw on ornamental strip (4) (41) quantity is equal, and position one_to_one corresponding, and the two ends of upper limit bar (2) and lower limit bar (5) are inserted on column (3), The sidewall of column (3) arranges slot, is used for connecting upper limit bar (2) and the left and right end portions of lower limit bar (5).
2. combining handrail railing as claimed in claim 1, it is characterised in that: the inside of two sidewalls that column (3) is relative Being respectively provided with screw (31), the through hole (13) of armrest base (12) is equal with screw (31) quantity on column (3), and position one One is corresponding.
3. combining handrail railing as claimed in claim 1 or 2, it is characterised in that: described interface arrangment includes being positioned at handrail Draw-in groove on facial canal (11) and the claw on armrest base (12).
4. combining handrail railing as claimed in claim 3, it is characterised in that: described handrail paste pipes (11) has arc section Shape.
5. combining handrail railing as claimed in claim 1, it is characterised in that: cover (21) and bottom (22) are by card access node Structure connects.
6. combining handrail railing as claimed in claim 5, it is characterised in that: described interface arrangment includes being positioned at cover (21) On draw-in groove and claw on bottom (22).
CN201620454155.7U 2016-05-17 2016-05-17 Modular hand rail Expired - Fee Related CN205663125U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620454155.7U CN205663125U (en) 2016-05-17 2016-05-17 Modular hand rail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620454155.7U CN205663125U (en) 2016-05-17 2016-05-17 Modular hand rail

Publications (1)

Publication Number Publication Date
CN205663125U true CN205663125U (en) 2016-10-26

Family

ID=57160661

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620454155.7U Expired - Fee Related CN205663125U (en) 2016-05-17 2016-05-17 Modular hand rail

Country Status (1)

Country Link
CN (1) CN205663125U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112323685A (en) * 2020-11-03 2021-02-05 美图(福建)铝业有限公司 Assembled aluminum alloy railing and assembling method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112323685A (en) * 2020-11-03 2021-02-05 美图(福建)铝业有限公司 Assembled aluminum alloy railing and assembling method thereof

Similar Documents

Publication Publication Date Title
CN110700538A (en) Building scaffold convenient to dismouting
CN205663125U (en) Modular hand rail
CN210947477U (en) High strength guardrail modelled after an antique
CN211448052U (en) Detachable support for constructional engineering construction
CN210659407U (en) Tool type protective shed for machining of reinforcing steel bars
KR20080029981A (en) The double standing bed with some brackets
CN110748001A (en) Steel structure net rack
CN210748293U (en) Multifunctional bed with corner protector
CN209760742U (en) Simple scaffold for house construction
CN108978487B (en) A easily set up quick detachable protection rack for bridge construction
CN207686266U (en) A kind of means for fastening scaffolding of fast demountable
CN215483942U (en) Steel bar truss building carrier plate convenient to construction
CN217299773U (en) Embedded sleeve can be dismantled rotatory fixed wall spare even
CN217681033U (en) Fence is enclosed in municipal administration
CN217998897U (en) Detachable outer frame steel plate net connecting device
CN2238871Y (en) Support device for framing
CN209620536U (en) A kind of combined type installing engineering special frame
CN205530828U (en) Modular aluminium wall
CN201042284Y (en) Combined table support mechanism of
CN104032977A (en) Wood-plastic four-corner pavilion
CN213626037U (en) Steel framework is pour to building engineering service pillar
CN106284669B (en) A kind of column for fast construction steel structure room
CN201581552U (en) Steel structure supporting column
CN205046938U (en) Covering or awning on a car, boat, etc. room
CN215329580U (en) Flower box guardrail convenient to fix and replace

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161026

Termination date: 20210517