CN106284669B - A column for quickly building a steel structure house - Google Patents
A column for quickly building a steel structure house Download PDFInfo
- Publication number
- CN106284669B CN106284669B CN201510268389.2A CN201510268389A CN106284669B CN 106284669 B CN106284669 B CN 106284669B CN 201510268389 A CN201510268389 A CN 201510268389A CN 106284669 B CN106284669 B CN 106284669B
- Authority
- CN
- China
- Prior art keywords
- frame
- column
- seat
- seat frame
- base
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Working Measures On Existing Buildindgs (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
本发明公开了一种用于快速搭建钢构房的立柱,包括:基座;固定安装在所述基座上的立柱柱架组件;其中,所述立柱柱架组件包括:至少两个立柱柱架;以及安装在相邻两个立柱柱架之间用于将所述两个相邻立柱柱架连接在一起的中间六面咬合座框架。所述两个立柱柱架包括:固定在所述基座上的底层立柱柱架;以及经由所述中间六面咬合座框架连接在所述底层立柱柱架上的上层立柱柱架。本发明由易拆装的钢构件连接而成,结构简单,可重复利用,节约成本。
The invention discloses a column for quickly building a steel structure house, comprising: a base; a column and column frame assembly fixedly installed on the base; wherein, the column and column frame assembly includes: at least two column columns a frame; and a middle six-sided snap seat frame installed between two adjacent upright post frames for connecting the two adjacent upright post frames together. The two upright post brackets include: a bottom layer upright post bracket fixed on the base; and an upper layer upright post bracket connected to the bottom layer upright post bracket via the middle six-sided snap seat frame. The invention is formed by connecting easily disassembled steel components, has a simple structure, can be reused, and saves costs.
Description
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510268389.2A CN106284669B (en) | 2015-05-23 | 2015-05-23 | A column for quickly building a steel structure house |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510268389.2A CN106284669B (en) | 2015-05-23 | 2015-05-23 | A column for quickly building a steel structure house |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN106284669A CN106284669A (en) | 2017-01-04 |
| CN106284669B true CN106284669B (en) | 2019-02-12 |
Family
ID=57633296
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201510268389.2A Active CN106284669B (en) | 2015-05-23 | 2015-05-23 | A column for quickly building a steel structure house |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106284669B (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108018942B (en) * | 2017-12-15 | 2024-01-30 | 茅金声 | Thin-wall steel integrated house frame and construction method thereof |
| CN114790774A (en) * | 2021-01-26 | 2022-07-26 | 茅金声 | A method for realizing the main frame of a house |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN202128184U (en) * | 2011-06-20 | 2012-02-01 | 常州灵特尔广告器材有限公司 | Quick insertion type upright post |
| CN102454293A (en) * | 2010-10-18 | 2012-05-16 | 上海洪铺钢结构工程有限公司 | Steel structural concrete-based pre-cast bolt positioning device |
| CN104278798A (en) * | 2014-09-01 | 2015-01-14 | 湖北源盛钢构有限公司 | Fastening process of steel structure column foot concrete and fixed connection device of steel structure column foot concrete |
| CN204826201U (en) * | 2015-05-23 | 2015-12-02 | 茅金声 | A stand that is used for buildding fast steel and constructs room |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US8468775B2 (en) * | 2006-03-10 | 2013-06-25 | Willaim B. Vaughn | Moment resistant building column insert system and method |
-
2015
- 2015-05-23 CN CN201510268389.2A patent/CN106284669B/en active Active
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102454293A (en) * | 2010-10-18 | 2012-05-16 | 上海洪铺钢结构工程有限公司 | Steel structural concrete-based pre-cast bolt positioning device |
| CN202128184U (en) * | 2011-06-20 | 2012-02-01 | 常州灵特尔广告器材有限公司 | Quick insertion type upright post |
| CN104278798A (en) * | 2014-09-01 | 2015-01-14 | 湖北源盛钢构有限公司 | Fastening process of steel structure column foot concrete and fixed connection device of steel structure column foot concrete |
| CN204826201U (en) * | 2015-05-23 | 2015-12-02 | 茅金声 | A stand that is used for buildding fast steel and constructs room |
Also Published As
| Publication number | Publication date |
|---|---|
| CN106284669A (en) | 2017-01-04 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR101459082B1 (en) | Seismic reinforcement device using steel frame and concrete, and method for constructing the same | |
| KR101310844B1 (en) | Concrete Mold assembly and Method of constructing Beam by using the same | |
| CN103104092A (en) | Support composite structure of beam and slab | |
| CN204126230U (en) | Assembly scaffold unit | |
| CN111519894A (en) | Concrete placement encloses fender support steel form | |
| JP5961778B1 (en) | Anchor bolt installation base | |
| CN215055197U (en) | Outer scaffold drawknot reinforced structure of large-span high-rise building system | |
| CN108018942A (en) | A kind of light-gauge steel section integrated house frame and its building method | |
| CN206616854U (en) | A kind of concrete blinding assembled lattice post support system | |
| KR101572245B1 (en) | Support for a upper reinforcing bar of footings | |
| CN106284669A (en) | A kind of column for fast construction steel structure room | |
| CN204826201U (en) | A stand that is used for buildding fast steel and constructs room | |
| JP6127325B2 (en) | Support frame for anchor ring installation of windmill tower and manufacturing method thereof | |
| CN201924284U (en) | Screw rod seat pipe double-split Bailey bracket | |
| CN206530077U (en) | A kind of support frame | |
| CN105715046B (en) | A kind of Steel-wood forming board component and its construction method | |
| JP3181570U (en) | Anchor bolt support device | |
| JP5931819B2 (en) | Underground beam rebar placement method using separate vertical frame for underground beam rebar and its stand | |
| CN218044462U (en) | Assembling structure of bed upright post and bed guardrail | |
| CN206530054U (en) | A kind of cast-in-situ concrete columns hang mould | |
| JP2009027771A (en) | Frame for distribution panel | |
| JP7280606B2 (en) | Seismic structure | |
| JP3193502U (en) | Formwork support system | |
| CN213174807U (en) | Novel building templates fixed knot constructs | |
| JP3225322U (en) | Reinforcement structure for seismic strength of wooden buildings |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20201117 Address after: No.998, group 5, renbei village, Xinfeng Town, Dafeng City, Yancheng City, Jiangsu Province Patentee after: Jiangsu xinjiayuan building assembly technology Co.,Ltd. Address before: 224141, Yancheng City, Dafeng County, Jiangsu, Nanyang Province, a group of Wang Zhen, Gu Jian Patentee before: Mao Jinsheng |
|
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20240117 Address after: Room 327, 3rd Floor, No. 56 Jinzhai Road, Yangchenghu Town, Xiangcheng District, Suzhou City, Jiangsu Province, 215000 Patentee after: Mao Jinsheng (Suzhou) Ecological Technology Co.,Ltd. Address before: 224141 No. 998, group 5, renbei village, Xinfeng Town, Dafeng City, Yancheng City, Jiangsu Province Patentee before: Jiangsu xinjiayuan building assembly technology Co.,Ltd. |
|
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20240129 Address after: Room 327, 3rd Floor, No. 56 Jinzhai Road, Yangchenghu Town, Xiangcheng District, Suzhou City, Jiangsu Province, 215000 Patentee after: Mao Jinsheng (Suzhou) Ecological Technology Co.,Ltd. Country or region after: China Patentee after: Mao Jinsheng Address before: Room 327, 3rd Floor, No. 56 Jinzhai Road, Yangchenghu Town, Xiangcheng District, Suzhou City, Jiangsu Province, 215000 Patentee before: Mao Jinsheng (Suzhou) Ecological Technology Co.,Ltd. Country or region before: China |
|
| CP03 | Change of name, title or address | ||
| CP03 | Change of name, title or address |
Address after: Room 327, 3rd Floor, No. 56 Jinzhai Road, Yangchenghu Town, Xiangcheng District, Suzhou City, Jiangsu Province, 215000 Patentee after: Green Wisdom Festival (Suzhou) Ecological Technology Co.,Ltd. Country or region after: China Patentee after: Mao Jinsheng Address before: Room 327, 3rd Floor, No. 56 Jinzhai Road, Yangchenghu Town, Xiangcheng District, Suzhou City, Jiangsu Province, 215000 Patentee before: Mao Jinsheng (Suzhou) Ecological Technology Co.,Ltd. Country or region before: China Patentee before: Mao Jinsheng |
|
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20250917 Address after: Room 326, 3rd Floor, No. 56 Jinzhai Road, Yangchenghu Town, Xiangcheng District, Suzhou City, Jiangsu Province 215131 Patentee after: Lvzhijie (Suzhou) Intelligent Technology Co.,Ltd. Country or region after: China Address before: Room 327, 3rd Floor, No. 56 Jinzhai Road, Yangchenghu Town, Xiangcheng District, Suzhou City, Jiangsu Province, 215000 Patentee before: Green Wisdom Festival (Suzhou) Ecological Technology Co.,Ltd. Country or region before: China Patentee before: Mao Jinsheng |