CN205662851U - Bridge construction fastening is equipped - Google Patents
Bridge construction fastening is equipped Download PDFInfo
- Publication number
- CN205662851U CN205662851U CN201620559161.9U CN201620559161U CN205662851U CN 205662851 U CN205662851 U CN 205662851U CN 201620559161 U CN201620559161 U CN 201620559161U CN 205662851 U CN205662851 U CN 205662851U
- Authority
- CN
- China
- Prior art keywords
- bridge
- bolt
- retainer ring
- fixing
- ring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model provides a bridge construction fastening is equipped, including the pier, the upper end of pier is provided with bridge post, characterized by: the upper portion ring cover of bridge post has solid fixed ring, gu be provided with a set of fixing bolt no. 1 on the fixed ring, gu the fixed ring upside is provided with the articulated slab of symmetry, be connected with the hinge bar on the articulated slab, the hinge bar fits with a contraceptive ring to overlap there is the dead lever, threaded connection has fixing bolt no. 2 on the dead lever, dead lever upper portion is provided with the screw hole, threaded hole is provided with positioning bolt, positioning bolt's end -to -end connection pinch -off blades, the last sign of positioning bolt is scaled. The utility model discloses a bridge post and crossbeam fixed, and the crossbeam is located the middle part of bridge capital face, does not have the horizontal shift.
Description
Technical field
This utility model relates to equipment for bridge construction field, specifically, relating to a kind of bridge construction fastening equipment.
Background technology
During bridge construction, general flow process is first to build up bridge pier, is then poured on bridge pier by bridge post, on two bridge posts again
Placing crossbeam, lay bridge floor the most again, between bridge post and crossbeam, early stage does not has fixing device, and when laying bridge floor, crossbeam easily exists
Shift on bridge post, and when crossbeam is placed, the position also easily placed in bridge capital face is asymmetric so that crossbeam is the most horizontal
Displacement.In place of this is the deficiencies in the prior art.
Utility model content
The technical problems to be solved in the utility model is to provide a kind of bridge construction fastening equipment, it is achieved to bridge post and crossbeam
Fixing.
This utility model adopts the following technical scheme that and realizes goal of the invention:
A kind of bridge construction fastening equipment, including bridge pier, the upper end of described bridge pier is provided with bridge post, it is characterized in that: described
The top loop of bridge post is cased with retainer ring, described retainer ring is provided with one group and fixes bolt one, be provided with on the upside of described retainer ring
Symmetrical articulated slab, described articulated slab connects and has hinge bar, described hinge bar upper ring cap to have fixing bar, spiral shell on described fixing bar
Stricture of vagina connects fixing bolt two, and described fixing bar top is provided with screwed hole, is provided with bolt in described screwed hole, described
The end of bolt connects clamping plate, and described bolt is identified with scale strip.
As the further restriction to the technical program, described retainer ring is provided with laser leveler.
As the further restriction to the technical program, described retainer ring is fixed group by two semicircular ring and fixing bolt three
Become.
Compared with prior art, advantage of the present utility model and good effect are: retainer ring ring set of the present utility model exists
On bridge post so that the top of articulated slab flushes with the top of bridge post, adjust fixing by the measurement data observing laser leveler
Ring so that the holding level of retainer ring, tightens fixing bolt one, it is achieved fixing, by the most upright for fixing bar of retainer ring
In articulated slab, it is rotated down the top that fixing bolt two makes its lower end withstand articulated slab, it is achieved fixing of fixing bar.It is fixed to rotate
Position bolt, by observing scale strip so that two bolts stretch out the length of same demand relative to two screwed holes, this
Time, the distance between two clamping plates is the width of crossbeam, is placed on by crossbeam between two clamping plates, screwed in place bolt
Realize crossbeam is fixed, and crossbeam is positioned at the middle part in bridge capital face, does not have horizontal shift.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is top view of the present utility model.
In figure, 1, bridge pier, 2, bridge post, 3, retainer ring, 4, fixing bolt one, 5, hinge bar, 6, fixing bar, 7, fixing bolt
Two, 8, articulated slab, 9, bolt, 10, clamping plate, 11, scale strip, 12, laser leveler, 13, fixing bolt three.
Detailed description of the invention
With preferred embodiment, this utility model is further described in detail below in conjunction with the accompanying drawings.
Participating in Fig. 1 and Fig. 2, this utility model includes that bridge pier 1, the upper end of described bridge pier 1 are provided with bridge post 2, described bridge post 2
Top loop be cased with retainer ring 3, described retainer ring 3 is provided with one group and fixes bolt 1, be provided with on the upside of described retainer ring 3
Symmetrical articulated slab 8, described articulated slab 8 connects and has hinge bar 5, described hinge bar 5 upper ring cap to have fixing bar 6, described fixing
Threaded on bar 6 have fixing bolt 27, and described fixing bar 6 top is provided with screwed hole, is provided with location in described screwed hole
Bolt 9, the end of described bolt 9 connects clamping plate 10, described bolt 9 is identified with scale strip 11.
The side of described retainer ring 3 is provided with laser leveler 12.
Described retainer ring 3 is fixed formed by two semicircular ring and fixing bolt 3 13.
Workflow of the present utility model is: retainer ring 3 ring set of the present utility model is on bridge post 2 so that articulated slab 8
Top flushes with the top of bridge post 2, adjusts retainer ring 3 by the measurement data observing laser leveler 12 so that retainer ring 3
Keep level, tighten fixing bolt 1, it is achieved fixing of retainer ring 3, fixing bar 6 vertical straight is stood in articulated slab 8,
It is rotated down the top that fixing bolt 27 makes its lower end withstand articulated slab 8, it is achieved fixing, when not using, upwards of fixing bar 6
Rotary fixing screw bolt 27, fixing bar 6 bottom rotates along hinge bar 5, it is achieved the horizontal positioned of fixing bar 6, saves placement space.
Rotate bolt 9 so that two bolts 9 stretch out the length of same demand, now, two folders relative to two screwed holes
Distance between tight plate 10 is the width of crossbeam, is placed on by crossbeam between two clamping plates 10, and screwed in place bolt 9 realizes
Crossbeam is fixed, and the two ends of crossbeam are all located at the middle part of bridge post 2 end face, not having horizontal shift, when Roadway Construction completes
After, fixing bolt 3 13 can be unclamped, retainer ring 3 is disassembled from bridge post 2 in case next time uses.
Claims (3)
1. a bridge construction fastening equipment, including bridge pier, the upper end of described bridge pier is provided with bridge post, it is characterized in that: described bridge
The top loop of post is cased with retainer ring, described retainer ring is provided with one group and fixes bolt one, and it is right to be provided with on the upside of described retainer ring
The articulated slab claimed, described articulated slab connects and has hinge bar, described hinge bar upper ring cap to have fixing bar, screw thread on described fixing bar
Connecting and have fixing bolt two, described fixing bar top is provided with screwed hole, is provided with bolt in described screwed hole, described fixed
The end of position bolt connects clamping plate, and described bolt is identified with scale strip.
Bridge construction fastening equipment the most according to claim 1, is characterized in that: be provided with laser level in described retainer ring
Instrument.
Bridge construction fastening equipment the most according to claim 1, is characterized in that: described retainer ring is by two semicircular ring and consolidates
Determine the fixing composition of bolt three.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620559161.9U CN205662851U (en) | 2016-06-06 | 2016-06-06 | Bridge construction fastening is equipped |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620559161.9U CN205662851U (en) | 2016-06-06 | 2016-06-06 | Bridge construction fastening is equipped |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205662851U true CN205662851U (en) | 2016-10-26 |
Family
ID=57154588
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620559161.9U Expired - Fee Related CN205662851U (en) | 2016-06-06 | 2016-06-06 | Bridge construction fastening is equipped |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205662851U (en) |
-
2016
- 2016-06-06 CN CN201620559161.9U patent/CN205662851U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207347929U (en) | Crash barrier template structure and anticollision barrier casting system | |
CN207130622U (en) | Basket type anti-collision guardrail construction template | |
CN207749517U (en) | A kind of pile extension device for concrete pipe pile | |
CN206825658U (en) | The prefabricated clipping adjustable T beams pedestal for becoming length T beams | |
CN201024673Y (en) | Height mark adjustable super flat terrace mould | |
CN206752763U (en) | A kind of glass fiber cement non-dismantling formwork system and its connecting structure | |
CN208514715U (en) | A kind of scalable moulding bed of adhesion type for reinforcing bar binding | |
CN205662851U (en) | Bridge construction fastening is equipped | |
CN209114507U (en) | A kind of inspection shaft reinforcing concrete placings combined steel | |
CN213575951U (en) | Fixing device for water conservancy and hydropower construction embedded pipe | |
CN208884541U (en) | A kind of support construction of included monitoring internal force for support | |
CN208039809U (en) | The closed small space plate device of reinforced concrete structure | |
CN206385568U (en) | A kind of city integrated piping lane hoisting ring device | |
CN204551173U (en) | Pull bar locating support | |
CN204000503U (en) | The convenient long and short adjustable universal type roadbed base template of non-fragment orbit | |
CN108951983A (en) | Steel bar truss floor support plate and combination floor support plate | |
CN205893882U (en) | Linear variable concrete form | |
CN205969480U (en) | Can dismantle reinforcement fetal membrane frame | |
CN209669707U (en) | Support construction for the construction of railway bridges and culverts | |
CN211173098U (en) | Step overturning template | |
CN208701979U (en) | Steel bar truss floor support plate and combination floor support plate | |
CN209568706U (en) | A kind of beam forms of multifunctional movable | |
CN209620572U (en) | A kind of fixed device of aluminum alloy pattern plate diagonal brace support built-in fitting | |
CN209556356U (en) | Alter-pouring strips mould plate | |
CN206986732U (en) | A kind of bridge pier concrete casting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161026 Termination date: 20170606 |
|
CF01 | Termination of patent right due to non-payment of annual fee |