CN205641358U - High voltage equipment phytotron penetrability test device - Google Patents

High voltage equipment phytotron penetrability test device Download PDF

Info

Publication number
CN205641358U
CN205641358U CN201620260976.7U CN201620260976U CN205641358U CN 205641358 U CN205641358 U CN 205641358U CN 201620260976 U CN201620260976 U CN 201620260976U CN 205641358 U CN205641358 U CN 205641358U
Authority
CN
China
Prior art keywords
refrigeration
temperature
permeability test
resistance wire
electric
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620260976.7U
Other languages
Chinese (zh)
Inventor
孙利朋
赵世华
巢亚峰
李欣
吴水锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Hunan Electric Power Co Ltd
State Grid Hunan Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Hunan Electric Power Co Ltd
State Grid Hunan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Hunan Electric Power Co Ltd, State Grid Hunan Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201620260976.7U priority Critical patent/CN205641358U/en
Application granted granted Critical
Publication of CN205641358U publication Critical patent/CN205641358U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/70Efficient control or regulation technologies, e.g. for control of refrigerant flow, motor or heating

Landscapes

  • Air Humidification (AREA)
  • Testing Resistance To Weather, Investigating Materials By Mechanical Methods (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

The utility model discloses a high voltage equipment phytotron penetrability test device, the device include water purifier group, water tank, electric heat steam fog device, the experimental controller of hot fog pipeline, ultrasonic humidifier, warm and humid acidimeter, axial fan, resistance wire, refrigeration indoor set, tuber pipe, refrigeration off -premises station and penetrability, whole device simple structure, convenient operation, weather roof portion have adopted the design of static pressure layer, and indoor temperature and the hygrometry of weather distributes evenly, weather room wall is equipped with heat preservation storehouse board, and the heat preservation and the moisturizing effect of the indoor portion of weather are better, can avoid the frequent start -stop of atmospheric control equipment, have prolonged equipment life. Process of the test moderate temperature and hygrometry can automation and manual control, and control accuracy is higher, experimental good reproducibility, and can satisfy national standard's regulation, can control indoor temperature of weather and hygrometry value wantonly, adjust specific conductivity, provide great flexibility for carrying out research.

Description

A kind of high voltage installation phjytotron permeability test device
Technical field
This utility model belongs to electrical engineering technical field, relates to a kind of high voltage installation phjytotron permeability test device.
Background technology
In south China much areas, rainfall throughout the year is abundant, have a humid climate, in running, its internal unit suffers from the serious threat such as condensation, filth to high voltage installation (especially 10~35kV metal armouring equipment), dielectric strength is substantially reduced, and cause the major accident that high voltage installation burns, bring massive losses to the safe operation of electrical network.For examination high voltage installation to condensation and filthy anti-invasion ability, the national standard " GB 3906-2006 " of China specify that permeability test condition and test requirements document, but the most domestic permeability test device not having mature and reliable, this pilot project is difficult to carry out.
Permeability test device mostly uses the method that barber and refrigeration unit jointly control at present, Temperature and Humidity Control difficulty is bigger, the problem existed has: after 1) barber sprays into climatic chamber, climatic chamber constant temperature can be caused to raise, and permeability test for up to 7 hours, stable in different tests demands temperature and humidity, difficult control of temperature;2) raise for suppression climatic chamber temperature, need frequent starting refrigeration unit, easily reduce the service life of refrigeration unit;3), after starting refrigeration unit, the humidity of climatic chamber reduces speed, and humidity is difficult to control to every time.
Therefore, it is necessary to a kind of high voltage installation phjytotron permeability test device of design.
Utility model content
Backward situation for prior art, a kind of high voltage installation phjytotron permeability test device and control method thereof are provided, use the temperature and humidity that this device can need according to the permeability test different tests stage, automatically distant control permeability test system and device, improves the stability of artificial permeability test condition.
A kind of high voltage installation phjytotron permeability test device, including pure water unit 1, water tank 2, electric-heating steam mist device 3, hot mist pipeline 4, ultrasonic humidifier 5, Hygrothermograph 6, axial flow blower 7, resistance wire 8, refrigeration indoor set 9, airduct 10, refrigeration off-premises station 13 and permeability test controller 14;
Described ultrasonic humidifier 5, Hygrothermograph 6, axial flow blower 7, resistance wire 8, refrigeration indoor set 9 and airduct 10 are arranged at artificial climate chamber interior;
Described ultrasonic humidifier 5 and axial flow blower 7 are respectively provided with internal both sides in the controlled environment chamber;
Described water purification unit 1 is connected with water tank 2;Water tank 2 is connected with electric-heating steam mist device 3 and ultrasonic humidifier 5 respectively by water pipe;
Described hot mist pipeline 4 is connected with electric-heating steam mist device 3, and hot mist is introduced artificial climate chamber interior;Axial flow blower 7, resistance wire 8, refrigeration indoor set 9, airduct 10 assemble the most successively, and form an entirety;
Described refrigeration off-premises station 13 is connected with refrigeration indoor set 9 by pipeline;
Described refrigeration off-premises station 13, axial flow blower 7, resistance wire 8, ultrasonic humidifier 5 and electric-heating steam mist device 3 are controlled by described permeability test controller 14, and described Hygrothermograph 6 is connected with permeability test controller 14 by signal output cable.
Described artificial climate chamber interior walls is provided with heat room plate 12.
Also include the static pressure layer 11 being arranged on artificial climate indoor top, and described static pressure layer is arranged on below described heat room plate.Described pure water unit 1 is used for producing pure water;Water tank 2 is for storing the pure water that pure water unit 1 produces, and pure water manually can be adjusted to the water of suitable electrical conductivity by test requirements document;Electric-heating steam mist device 3 is used for producing electricity barber, and its mist amount produced is less, is mainly used in the accurate control of humidity;Hot mist pipeline 4 is indoor for the electric barber that electric-heating steam mist device 3 produces is delivered to artificial climate;Ultrasonic humidifier 5 is used for producing mist, and its mist amount produced is relatively big, quickly humidifies in being mainly used in the short time;Hygrothermograph 6 is for measuring the temperature and humidity within climatic chamber;Resistance wire 8 is used for adding hot-air, produces steam;Refrigeration indoor set 9 and refrigeration off-premises station 13 associated working, be used for producing cold air;Axial flow blower 7 is used for producing wind, by the hot-air produced at resistance wire 8 and refrigeration indoor set 9 or cold air, is blown to static pressure layer 11 through airduct 10;Airduct 10 is used for carrying cold air or hot-air to static pressure layer 11;Static pressure layer 11, for the kinetic energy of air-flow is converted into static pressure, makes air-flow be evenly distributed in inside climatic chamber;Permeability test controller 14 is for the test value according to Hygrothermograph 6, control electric-heating steam mist device 3, ultrasonic humidifier 5, axial flow blower 7, resistance wire 8, refrigeration indoor set 9 and refrigeration off-premises station 13, meet humidity and the temperature requirement in permeability test each stage.
Beneficial effect
This utility model provides a kind of high voltage installation phjytotron permeability test device, this device includes pure water unit 1, water tank 2, electric-heating steam mist device 3, hot mist pipeline 4, ultrasonic humidifier 5, Hygrothermograph 6, axial flow blower 7, resistance wire 8, refrigeration indoor set 9, airduct 10, refrigeration off-premises station 13 and permeability test controller 14;Whole apparatus structure is simple and convenient to operate, and climatic chamber top have employed the design of static pressure layer, and temperature and relative humidity in climatic chamber are evenly distributed;Climatic chamber wall is provided with heat room plate, and insulation and moistening effect within climatic chamber are preferable, can avoid the frequent start-stop of Temperature and Humidity Control equipment, extend service life of equipment.In process of the test, temperature and relative humidity can automatically and manually control, and control accuracy is higher, and test repeatability is good, and can meet the regulation of national standard;Can arbitrarily control the temperature in climatic chamber and rh value, regulation water conductivity, provide bigger motility for carrying out scientific research project.
Accompanying drawing explanation
Fig. 1 is the structural representation of device described in the utility model;
Description of symbols: 1 pure water unit, 2 water tanks, 3 electric-heating steam mist devices, 4 hot mist pipelines, 5 ultrasonic humidifiers, 6 Hygrothermographs, 7 axial flow blowers, 8 resistance wires, 9 refrigeration indoor sets, 10 airducts, 11 static pressure layers, 12 heat room plates, 13 refrigeration off-premises stations, 14 permeability test controllers.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, this utility model patent is described in more detail.
As shown in Figure 1, a kind of high voltage installation phjytotron permeability test device, including pure water unit 1, water tank 2, electric-heating steam mist device 3, hot mist pipeline 4, ultrasonic humidifier 5, Hygrothermograph 6, axial flow blower 7, resistance wire 8, refrigeration indoor set 9, airduct 10, refrigeration off-premises station 13 and permeability test controller 14;
Described ultrasonic humidifier 5, Hygrothermograph 6, axial flow blower 7, resistance wire 8, refrigeration indoor set 9 and airduct 10 are arranged at artificial climate chamber interior;
Described ultrasonic humidifier 5 and axial flow blower 7 are respectively provided with internal both sides in the controlled environment chamber;
Described water purification unit 1 is connected with water tank 2;Water tank 2 is connected with electric-heating steam mist device 3 and ultrasonic humidifier 5 respectively by water pipe;
Described hot mist pipeline 4 is connected with electric-heating steam mist device 3, and hot mist is introduced artificial climate chamber interior;Axial flow blower 7, resistance wire 8, refrigeration indoor set 9, airduct 10 assemble the most successively, and form an entirety;
Described refrigeration off-premises station 13 is connected with refrigeration indoor set 9 by pipeline;
Described refrigeration off-premises station 13, axial flow blower 7, resistance wire 8, ultrasonic humidifier 5 and electric-heating steam mist device 3 are controlled by described permeability test controller 14, and described Hygrothermograph 6 is connected with permeability test controller 14 by signal output cable.
Described artificial climate chamber interior walls is provided with heat room plate 12.
Also include the static pressure layer 11 being arranged on artificial climate indoor top, and described static pressure layer is arranged on below described heat room plate.
According to standard GB/T 3906-2006 for the temperature and humidity requirement of permeability test, when using high voltage installation phjytotron permeability test device described in the utility model to test, specific works process comprises the following steps:
Step 1: open pure water unit 1, is full of pure water, according to the demand of test water electrical conductivity, electrical conductivity of water in manual adjustment water tank 2 so that it is meet test requirements document in making water tank 2;
Step 2: it is 25 DEG C that permeability test controller 14 arranges the initial temperature of test, the climatic chamber temperature measured according to Hygrothermograph 6, start axial flow blower 7, resistance wire 8 or refrigeration indoor set 9 and refrigeration off-premises station 13;
When climatic chamber temperature is less than 22 DEG C, start axial flow blower 7 and resistance wire 8, until climatic chamber temperature reaches 25 DEG C;
When climatic chamber temperature is higher than 28 DEG C, starts axial flow blower 7, refrigeration indoor set 9 and refrigeration off-premises station 13, make ambient temperature control in 22 DEG C of-28 DEG C of scopes, and make it maintain 0.5h under this condition;
In the process, the control logic of permeability test controller 14 is as follows: if ambient temperature is more than 28 DEG C, starts refrigeration indoor set 9 and refrigeration off-premises station 13, makes temperature reduce, when temperature is down to 25 DEG C, stops refrigeration;When ambient temperature is reduced to 23 DEG C, starts resistance wire 8, make that the temperature rises, when temperature rises to 25 DEG C, stop heating;
Step 3: when the temperature in climatic chamber is in 22 DEG C of-28 DEG C of scopes, start permeability test, it is 40 DEG C that permeability test controller 14 arrange test temperature to control target, it is 95% that relative humidity controls target, start electric-heating steam mist device 3, ultrasonic humidifier 5, axial flow blower 7 and resistance wire 8, make the ambient temperature in climatic chamber and humidity all be stepped up;
When ambient temperature is less than 40 DEG C, and when relative humidity reaches 95%, holding shaft flow fan 7 and resistance wire 8 are persistently opened, and make ambient temperature step up to 40 DEG C, when ambient temperature reaches 40 DEG C, close ultrasonic humidifier 5;
If relative humidity is down to 93% scope, then starts electric-heating steam mist device 3, make humidity increase, when relative humidity rises to 97%, close electric-heating steam mist device 3;
Step 4: when the temperature in climatic chamber rises to 40 DEG C, permeability test controller 14 controls electric-heating steam mist device 3, axial flow blower 7, resistance wire 8, refrigeration indoor set 9 and refrigeration off-premises station 13, temperature is made to control in 38 DEG C of-42 DEG C of scopes, relative humidity controls at 92%-98%, and makes step 3 and always holding time of step 4 reach 4.5h;
When ambient temperature reaches 41 DEG C, start refrigeration indoor set 9 and refrigeration off-premises station 13, make temperature reduce, when temperature is down to 40 DEG C, stop refrigeration;
When ambient temperature reaches 39 DEG C, start resistance wire 8, make that the temperature rises, when temperature rises to 40 DEG C, stop heating;
If relative humidity is down to 93%, starts electric-heating steam mist device 3, make humidity increase, when relative humidity rises to 97%, close electric-heating steam mist device 3;
Step 5: permeability test controller 14 controls to start axial flow blower 7, refrigeration indoor set 9 and refrigeration off-premises station 13, close other all heating and humidification apparatus, making the temperature in climatic chamber be down to 25 DEG C by 40 DEG C in 0.5h, the relative humidity of environment can be down to less than 80%;
Step 6: it is 25 DEG C that permeability test controller 14 arrange test temperature to control target, it is 80% that relative humidity controls target, control electric-heating steam mist device 3, ultrasonic humidifier 5, axial flow blower 7, resistance wire 8, refrigeration indoor set 9 and refrigeration off-premises station 13, making temperature maintain in 23 DEG C of-27 DEG C of scopes, relative humidity steps up to 80%;
Keep electric-heating steam mist device 3 and ultrasonic humidifier 5 persistently to open, make relative humidity be promoted to rapidly 80%;
When ambient temperature reaches 26 DEG C, start refrigeration indoor set 9 and refrigeration off-premises station 13, make temperature reduce, when temperature is down to 25 DEG C, stop refrigeration;
When ambient temperature reaches 24 DEG C, start resistance wire 8, make that the temperature rises, when temperature rises to 25 DEG C, stop heating;
Step 7: permeability test controller 14 controls electric-heating steam mist device 3, axial flow blower 7, resistance wire 8, refrigeration indoor set 9 and refrigeration off-premises station 13, temperature is made to control in 23 DEG C of-27 DEG C of scopes, relative humidity controls at 77%-83%, and makes this stage maintain 2.5h;
If relative humidity is down to 78%, starts electric-heating steam mist device 3, make humidity increase, when relative humidity rises to 82%, close electric-heating steam mist device 3;
Step 8: it is 25 DEG C that permeability test controller 14 arrange test temperature to control target, it is 95% that relative humidity controls target, control electric-heating steam mist device 3, ultrasonic humidifier 5, axial flow blower 7, resistance wire 8, refrigeration indoor set 9 and refrigeration off-premises station 13, and maintain 0.5h;
Identical with the temperature controlled processes in step 6 at this stage permeability test controller 14 temperature controlled processes, the control process of relative humidity is identical with the temperature controlled processes in step 3.
Described pure water unit 1 is used for producing pure water;Water tank 2 is for storing the pure water that pure water unit 1 produces, and pure water manually can be adjusted to the water of suitable electrical conductivity by test requirements document;Electric-heating steam mist device 3 is used for producing electricity barber, and its mist amount produced is less, is mainly used in the accurate control of humidity;Hot mist pipeline 4 is indoor for the electric barber that electric-heating steam mist device 3 produces is delivered to artificial climate;Ultrasonic humidifier 5 is used for producing mist, and its mist amount produced is relatively big, quickly humidifies in being mainly used in the short time;Hygrothermograph 6 is for measuring the temperature and humidity within climatic chamber;Resistance wire 8 is used for adding hot-air, produces steam;Refrigeration indoor set 9 and refrigeration off-premises station 13 associated working, be used for producing cold air;Axial flow blower 7 is used for producing wind, by the hot-air produced at resistance wire 8 and refrigeration indoor set 9 or cold air, is blown to static pressure layer 11 through airduct 10;Airduct 10 is used for carrying cold air or hot-air to static pressure layer 11;Static pressure layer 11, for the kinetic energy of air-flow is converted into static pressure, makes air-flow be evenly distributed in inside climatic chamber;Permeability test controller 14 is for the test value according to Hygrothermograph 6, control electric-heating steam mist device 3, ultrasonic humidifier 5, axial flow blower 7, resistance wire 8, refrigeration indoor set 9 and refrigeration off-premises station 13, meet humidity and the temperature requirement in permeability test each stage.
High voltage installation phjytotron permeability test device embodiment is as follows:
Embodiment 1:
Pure water unit 1 is that Shanghai Ke Zhi environmental protection equipment company limited produces, and model is KZ500, and aquifer yield is 0.5t/h;Water tank 2 uses commercially available 304 stainless steel water tanks, and volume is 2m3;Electric-heating steam mist device 3 is created heating equipment company limited for Yancheng and is produced, and model is LDR0.1-0.7 type, and nominal steam yield is 10kg/h;Hot mist pipeline 4 uses commercially available 304 stainless steel tubes to process, caliber ф 25mm;Ultrasonic humidifier 5 uses dolantin to praise the HSJ-4 type ultrasonic humidifier that Science and Technology Ltd. produces, and specified steam production is 80kg/h;Hygrothermograph 6 uses the W4052 type humiture transducer that Te An instrument and equipment company limited produces, and temperature measurement range is-40 DEG C~150 DEG C, and relative humidity measurement scope is 5%~110%;Axial flow blower 7 uses the T35-11 type axial fan that Zhejiang three standing grain blower fan company limited produces, blast 39-483Pa, air quantity 826-67892m3/h;The Aludirome resistance wire coiling voluntarily that resistance wire 8 uses Xinghua City Feng Cheng electric heating appliance company limited to produce forms, and heating power is 50kW;Refrigeration indoor set 9 and refrigeration off-premises station 13 use the middle temperature refrigeration unit that upper the most marine dew Refrigeration Engineering company limited produces, and model is SJ-40WF, and refrigeration work consumption is 150kW;Airduct 10 uses commercially available common 304 corrosion resistant plates to process;Static pressure layer 11 uses commercially available common 304 perforate corrosion resistant plates to process;Heat room plate 12 uses the hard polyaminoester heat room plate that tall building, Beijing hundred building technology company limited produces, and thickness is 150mm;Permeability test controller 14 uses Beijing easily to contain the CTSK-100 type controller that calm and peaceful Science and Technology Ltd. produces.
High voltage installation phjytotron permeability test apparatus control method embodiment is as follows:
Embodiment 1:
(1) opening pure water unit 1, be full of pure water in making water tank 2, according to the demand of test water electrical conductivity, in manual adjustment water tank 2, electrical conductivity of water is 280 μ S/cm;
(2) permeability test controller 14 arranges the initial temperature of test is 25 DEG C, the climatic chamber temperature that Hygrothermograph 6 is measured is 18 DEG C, start axial flow blower 7, resistance wire 8 adds hot-air, after 20min, climatic chamber temperature has reached 25 DEG C, and hereafter, permeability test controller 14 controls resistance wire 8, refrigeration indoor set 9 and refrigeration off-premises station 13, make ambient temperature-stable at 25 DEG C ± 3 DEG C, and make it maintain 0.5h under this condition;
(3) permeability test controller 14 arrange test temperature to control target is 40 DEG C, it is 95% that relative humidity controls target, start electric-heating steam mist device 3, ultrasonic humidifier 5, axial flow blower 7 and resistance wire 8, the ambient temperature in climatic chamber and humidity is made all to be stepped up, through 15min, ambient temperature is 29.5 DEG C, when relative humidity reaches 95%, permeability test controller 14 cuts out ultrasonic humidifier 5, holding shaft flow fan 7 and resistance wire 8 are persistently opened, ambient temperature is made to be stepped up, the regulation of humidity is only regulated by electric-heating steam mist device 3, if relative humidity is down to 93%, start electric-heating steam mist device 3, humidity is made to increase, when relative humidity rises to 97%, close electric-heating steam mist device 3;
(4) through 80min, when temperature in climatic chamber rises to 40 DEG C, permeability test controller 14 controls electric-heating steam mist device 3, axial flow blower 7, resistance wire 8, refrigeration indoor set 9 and refrigeration off-premises station 13, temperature is made to control at 38 DEG C-42 DEG C, relative humidity controls at 92%-98%, and makes step (three) and always holding time of step (four) reach 4.5h;
(5) permeability test controller 14 controls to start axial flow blower 7, refrigeration indoor set 9 and refrigeration off-premises station 13, closes other all heating and humidification apparatus, and the temperature in 15min, climatic chamber is down to 25 DEG C by 40 DEG C, and relative humidity is down to 68%;
(6) permeability test controller 14 arrange test temperature to control target is 25 DEG C, it is 80% that relative humidity controls target, control electric-heating steam mist device 3, ultrasonic humidifier 5, axial flow blower 7, resistance wire 8, refrigeration indoor set 9 and refrigeration off-premises station 13, making temperature maintain 23 DEG C-27 DEG C, through 5min, relative humidity is promoted to 80%, temperature control logic is: keeps electric-heating steam mist device 3 and ultrasonic humidifier 5 persistently to open, makes relative humidity be promoted to rapidly 80%;When ambient temperature reaches 26 DEG C, start refrigeration indoor set 9 and refrigeration off-premises station 13, make temperature reduce, when temperature is down to 25 DEG C, stop refrigeration;When ambient temperature reaches 25 DEG C-1 DEG C, start resistance wire 8, make that the temperature rises, when temperature rises to 25 DEG C, stop heating;
(7) 80% is reached when envionmental humidity, when temperature maintains 23 DEG C-27 DEG C, permeability test controller 14 cuts out ultrasonic humidifier, control electric-heating steam mist device 3, axial flow blower 7, resistance wire 8, refrigeration indoor set 9 and refrigeration off-premises station 13, temperature is made to control at 23 DEG C-27 DEG C, relative humidity controls at 77%-83%, and make this stage maintain 2.5h, identical with step (six) at the temperature control logic of this stage permeability test controller 14, the control logic of relative humidity is: if relative humidity is down to 78%, start electric-heating steam mist device 3, humidity is made to increase, when relative humidity rises to 82%, close electric-heating steam mist device 3;
(8) permeability test controller 14 arrange test temperature to control target is 25 DEG C, it is 95% that relative humidity controls target, control electric-heating steam mist device 3, ultrasonic humidifier 5, axial flow blower 7, resistance wire 8, refrigeration indoor set 9 and refrigeration off-premises station 13, and maintain 0.5h, off-test, closes all devices.Identical in control logical AND step (six) of this stage permeability test controller 14 temperature, control logical AND step (three) of relative humidity is identical.
Above-mentioned high voltage installation phjytotron permeability test device is proven the most feasible, is fully achieved expected design.

Claims (3)

1. a high voltage installation phjytotron permeability test device, it is characterized in that, including pure water unit (1), water tank (2), electric-heating steam mist device (3), hot mist pipeline (4), ultrasonic humidifier (5), Hygrothermograph (6), axial flow blower (7), resistance wire (8), refrigeration indoor set (9), airduct (10), refrigeration off-premises station (13) and permeability test controller (14);
Described ultrasonic humidifier (5), Hygrothermograph (6), axial flow blower (7), resistance wire (8), refrigeration indoor set (9) and airduct (10) are arranged at artificial climate chamber interior;
Described ultrasonic humidifier (5) and axial flow blower (7) are respectively provided with internal both sides in the controlled environment chamber;
Described water purification unit (1) is connected with water tank (2);Water tank (2) is connected with electric-heating steam mist device (3) and ultrasonic humidifier (5) respectively by water pipe;
Described hot mist pipeline (4) is connected with electric-heating steam mist device (3), and hot mist is introduced artificial climate chamber interior;Axial flow blower (7), resistance wire (8), refrigeration indoor set (9), airduct (10) assemble the most successively, and form an entirety;
Described refrigeration off-premises station (13) is connected with refrigeration indoor set (9) by pipeline;
Described refrigeration off-premises station (13), axial flow blower (7), resistance wire (8), ultrasonic humidifier (5) and electric-heating steam mist device (3) are controlled by described permeability test controller (14), and described Hygrothermograph (6) is connected with permeability test controller (14) by signal output cable.
Device the most according to claim 1, it is characterised in that be provided with heat room plate (12) in described artificial climate chamber interior walls.
Device the most according to claim 2, it is characterised in that also include the static pressure layer (11) being arranged on artificial climate indoor top, and described static pressure layer is arranged on below described heat room plate.
CN201620260976.7U 2016-03-31 2016-03-31 High voltage equipment phytotron penetrability test device Expired - Fee Related CN205641358U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620260976.7U CN205641358U (en) 2016-03-31 2016-03-31 High voltage equipment phytotron penetrability test device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620260976.7U CN205641358U (en) 2016-03-31 2016-03-31 High voltage equipment phytotron penetrability test device

Publications (1)

Publication Number Publication Date
CN205641358U true CN205641358U (en) 2016-10-12

Family

ID=57066093

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620260976.7U Expired - Fee Related CN205641358U (en) 2016-03-31 2016-03-31 High voltage equipment phytotron penetrability test device

Country Status (1)

Country Link
CN (1) CN205641358U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105864957A (en) * 2016-03-31 2016-08-17 国家电网公司 Penetrability test device for high-voltage equipment phytotron and control method of penetrability test device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105864957A (en) * 2016-03-31 2016-08-17 国家电网公司 Penetrability test device for high-voltage equipment phytotron and control method of penetrability test device
CN105864957B (en) * 2016-03-31 2018-09-11 国家电网公司 A kind of high voltage installation phjytotron permeability test device and its control method

Similar Documents

Publication Publication Date Title
CN107200147A (en) Jelly cloud icing temperature control simulation laboratory suitable for middle-size and small-size aircraft
CN101126792A (en) Large scale multifunctional artificial climate room system for electrical test
CN103207140A (en) Device for wire comprehensive factor aging test
CN102671719B (en) The artificial Laboratory Module of the Northwest's flat war particular surroundings health support
CN204538522U (en) A kind of ring main unit of ventilation rainproof heat radiation
CN102088167A (en) Control system for improving operation environment of substation equipment
CN103700308A (en) Switch cabinet condensation simulation device
CN206658820U (en) A kind of high altitude localities hatching house for being favorably improved laying hen hatching rate
CN205641358U (en) High voltage equipment phytotron penetrability test device
CN105811275A (en) Rotary dehumidifier-type condensation dehumidification device for metal-clad equipment and control method of rotary dehumidifier-type condensation dehumidification device
CN105864957A (en) Penetrability test device for high-voltage equipment phytotron and control method of penetrability test device
CN201348305Y (en) Solar warmer
CN204720502U (en) A kind of solidifying lead acid battery polar plate room
CN201585378U (en) Automatic temperature and humidity control system of drying room of vermicelli production line
CN204678566U (en) The energy-saving Evaporative Cooling Air-conditioning System of anti-freeze formula
CN206641380U (en) A kind of solid heat storage electricity coaster for baking tobacco and tobacco flue-curing house
Wang et al. Application of solar air collector and floor air supply heating system in winter
CN205282941U (en) High voltage power distribution cabinet that dispels heat
CN201818061U (en) Zero-energy house
CN115394174A (en) Method and system for building indoor and outdoor hot and humid environments of reduced-scale building model
CN202532948U (en) Cooling system of equipment chamber
CN202468398U (en) Air exhaust fan device for monitoring air humidity in kitchen
CN206760372U (en) A kind of pig house device for monitoring temperature
CN201358593Y (en) Energy-saving and environment-friendly house
CN205156117U (en) Heat preservation set

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161012

Termination date: 20190331

CF01 Termination of patent right due to non-payment of annual fee