CN205637814U - From vertical location pole setting ware - Google Patents
From vertical location pole setting ware Download PDFInfo
- Publication number
- CN205637814U CN205637814U CN201620473884.7U CN201620473884U CN205637814U CN 205637814 U CN205637814 U CN 205637814U CN 201620473884 U CN201620473884 U CN 201620473884U CN 205637814 U CN205637814 U CN 205637814U
- Authority
- CN
- China
- Prior art keywords
- pole
- utility
- rod head
- model
- rope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Electric Cable Installation (AREA)
Abstract
本实用新型属于电网建设辅助设备领域,涉及立杆器,尤其涉及一种自垂直定位立杆器。包括杆头以及设置在杆头下方的抱杆,所述抱杆远离杆头的一端设置有用于固定抱杆的固定装置,所述抱杆与固定装置之间转动固定连接,与现有技术相比,本实用新型的优点和积极效果在于,本实用新型通过各个结构的配合设置,利用三角形原理,使电线杆在立起后自动竖直,无需再经过人工的调整,同时,本实用新型安全可靠,仅需工作人员两名即可操作,操作过程中没有需工作人员付出的重体力劳动,且所需用场地基本不受限制,设备重量轻,搬运方便,两人即可抬起安装。
The utility model belongs to the field of power grid construction auxiliary equipment and relates to a pole erector, in particular to a self-vertical positioning pole erector. It includes a rod head and a holding rod arranged under the rod head. The end of the holding rod away from the rod head is provided with a fixing device for fixing the holding rod. The rotation and fixed connection between the holding rod and the fixing device is similar to that of the prior art. Compared with the utility model, the advantages and positive effects of the utility model are that the utility model uses the triangular principle to make the utility model automatically vertical after being erected through the cooperation of various structures, and does not need to be manually adjusted. At the same time, the utility model is safe Reliable, only two workers are required to operate, there is no heavy physical labor required for the workers during the operation, and the required space is basically unlimited, the equipment is light in weight, easy to carry, and two people can lift and install it.
Description
技术领域 technical field
本实用新型属于电网建设辅助设备领域,涉及立杆器,尤其涉及一种自垂直定位立杆器。 The utility model belongs to the field of power grid construction auxiliary equipment and relates to a pole erector, in particular to a self-vertical positioning pole erector.
背景技术 Background technique
在电网搭建的过程中,需要先将电线杆立起后再在立起后的电线杆上方搭建电缆电线,目前,施工人员竖立电线杆通常采用四种方式,一种是人工抱杆立杆法:其使用两根木杆前端用铁丝或铁链连接,下端插入提拉把手,靠人力将电线杆顶起,此方法较为原始,使用人力多,施工难度大,危险性较高,另一种是机械配合人字抱杆立杆法,利用人字形的抱杆配合绞磨,来实现电线杆的竖立,但此方式也需要较多人工,需要较多的机械设备,操作较复杂,立杆定位不精确,垂直需调整,还有一种是三杆式立杆器,实际是一个简单的起重机,占地较多,场地受限概率大,因其中高度受限,不能组立较大电线杆,垂直需二次调整,使用人工较多;最后一种则是利用吊车起重机立杆,但这种方式使用成本较高,场地受限较多,也需要矫正垂直度。 In the process of building the power grid, it is necessary to erect the utility poles first and then build cables and wires above the erected utility poles. At present, construction workers usually use four methods to erect utility poles. One is the method of manually holding poles and erecting poles : The front ends of two wooden poles are connected with iron wires or chains, the lower ends are inserted into the lifting handle, and the poles are lifted up by manpower. Mechanical and herringbone holding pole method, using herringbone holding poles and winches to realize the erection of utility poles, but this method also requires more labor and more mechanical equipment, and the operation is more complicated. Inaccurate, the vertical needs to be adjusted. There is also a three-pole vertical pole, which is actually a simple crane. It occupies a lot of land and has a high probability of site limitation. Due to the limited height, it is impossible to assemble larger utility poles. Secondary adjustment is required for the vertical, which requires more labor; the last method is to use the crane to lift the pole, but this method is expensive to use, the site is more restricted, and the verticality needs to be corrected.
上述四种方式虽然在一定程度上完成电线杆的竖立,但每种方式多少存在一定的不足,比如,施工难道大、需要人力多问题,还有场地限制等技术问题,且他们还存在一个共同的技术问题,就是在施工过程中,需要工作人员不断的摆正的电线杆才能确保竖立的电线杆能够竖直。 Although the above four methods complete the erection of utility poles to a certain extent, there are certain deficiencies in each method. For example, the construction is difficult, requires a lot of manpower, and there are technical problems such as site restrictions, and they also have a common The technical problem is that during the construction process, it is necessary for the staff to constantly straighten the poles to ensure that the erected poles can be vertical.
实用新型内容 Utility model content
本实用新型针对上述的电线杆在竖立时存在的技术问题,提出一种设计合理、结构简单、施工方便且能够使电线杆自动垂直的自垂直定位立杆器。 The utility model aims at the above-mentioned technical problems in the erection of utility poles, and proposes a self-vertical positioning pole erector with reasonable design, simple structure, convenient construction and automatic vertical positioning of utility poles.
为了达到上述目的,本实用新型采用的技术方案为,本实用新型提供一种自垂直定位立杆器,包括杆头以及设置在杆头下方的抱杆,所述抱杆远离杆头的一端设置有用于固定抱杆的固定装置,所述抱杆与固定装置之间转动固定连 接,所述杆头包括呈倒置“U”型设置的杆头本体,所述杆头本体的顶部设置有用于拉升电线杆的提拉索滑轮组,所述杆头本体上还设置有用于控制抱杆沿固定装置转动的抱杆提拉滑轮组,所述提拉索滑轮组与抱杆提拉滑轮组垂直设置,所述提拉索滑轮组与抱杆转动方向垂直设置,所述抱杆包括左右对称设置固定在杆头本体上的第一抱杆和第二抱杆,所述第一抱杆和第二抱杆倾斜固定在杆头本体上,所述抱杆上还设置有用于与提拉索滑轮组通过绳索连接的电动卷扬机以及用于与抱杆提拉滑轮组通过绳索连接的手动卷扬机。作为优选,所述固定装置包括与抱杆转动固定连接旋转地锚以及套装在旋转地锚外的均压板,所述旋转地锚与抱杆之间通过转轴固定连接。 In order to achieve the above purpose, the technical solution adopted by the utility model is that the utility model provides a self-vertical positioning rod erector, which includes a rod head and a holding rod arranged below the rod head, and the end of the holding rod far away from the rod head is arranged There is a fixing device for fixing the holding rod, the rotating and fixed connection between the holding rod and the fixing device, the rod head includes a rod head body arranged in an inverted "U" shape, and the top of the rod head body is provided with a Lifting cable pulleys for lifting electric poles, the pole head body is also provided with pole-holding pulleys for controlling the rotation of the poles along the fixing device, the lifting cable pulleys are vertically arranged with the pole-holding pulleys, the The pulley block of the lifting cable is arranged perpendicular to the rotation direction of the pole. The pole includes a first pole and a second pole symmetrically arranged and fixed on the body of the pole head. The first pole and the second pole are fixed obliquely. On the rod head body, the pole is also provided with an electric winch for connecting with the pulley block of the lifting cable through a rope and a manual hoist for connecting with the pulley block of the pole through a rope. Preferably, the fixing device includes a rotating ground anchor that is rotationally and fixedly connected to the holding pole and a pressure equalizing plate sleeved outside the rotating ground anchor, and the rotating ground anchor is fixedly connected to the holding pole through a rotating shaft.
作为优选,所述第一抱杆和第二抱杆为可伸缩铝杆。 Preferably, the first holding pole and the second holding pole are telescopic aluminum poles.
作为优选,所述抱杆上设置有定位孔,所述抱杆上还设置有定位索(,所述定位索设置在第一抱杆和第二抱杆之间。 Preferably, a positioning hole is provided on the pole, and a positioning cable is also provided on the pole, and the positioning cable is arranged between the first pole and the second pole.
作为优选,所述杆头本体上设置有用于电线杆定位的定位铝板,所述定位铝板倾斜设置在杆头本体上。 Preferably, the pole head body is provided with a positioning aluminum plate for positioning the utility pole, and the positioning aluminum plate is obliquely arranged on the pole head body.
作为优选,所述定位铝板呈倒置的“U”型设置在杆头本体上。 Preferably, the positioning aluminum plate is arranged on the club head body in an inverted "U" shape.
作为优选,所述杆头本体还设置有用于绳索导向的导索管。 Preferably, the club head body is also provided with a guide tube for guiding the rope.
本实用新型还提供了上述权利自垂直定位立杆器的施工方法,包括以下步骤: The utility model also provides the construction method of the above-mentioned self-vertical positioning pole device, which includes the following steps:
a、根据所要竖直的电线杆的长度,挖取相应深度的杆坑以及马道; a. According to the length of the utility pole to be vertical, dig the pole pit and the horseway of the corresponding depth;
b、将电线杆根部放入杆坑,电线杆下部放入马道中,并保持与马道平直; b. Put the root of the utility pole into the pole pit, put the lower part of the utility pole into the horseway, and keep it straight with the horseway;
c、调整抱杆的长度使其与电线杆相配合,然后将立杆器平放,确保定位索的中心位置与杆坑的中心处于同一垂线上,抱杆方向朝电线杆头部放置; c. Adjust the length of the holding pole to match the pole, and then lay the pole stand flat to ensure that the center of the positioning cable is on the same vertical line as the center of the pole pit, and place the pole toward the head of the pole;
d、标记好抱杆底部的位置,然后用地锚机旋入地锚,将均压板套入地锚杆,打入加固钉,并通过转轴固定抱杆; d. Mark the position of the bottom of the holding pole, then use the ground anchor to screw in the ground anchor, put the pressure equalizing plate into the ground anchor, drive in the reinforcement nails, and fix the holding pole through the rotating shaft;
e、在电线杆上量出相应距离安装起吊固定抱箍,并挂接起吊索,起吊索通过提拉索滑轮组与电动卷扬机连接,在电线杆杆顶安装抱杆提拉抱箍并挂接提拉索,提拉索通过抱杆提拉滑轮组与手动卷扬机连接; e. Measure the corresponding distance on the utility pole to install the lifting and fixing hoop, and hang the lifting rope. The lifting rope is connected to the electric hoist through the pulley block of the lifting cable. The pull cable, the pull cable is connected with the manual winch through the pulley pulley set held by the pole;
f、用手动卷扬机提拉抱杆,使抱杆和电线杆接近垂直; f. Use a manual hoist to lift the pole so that the pole and the pole are close to vertical;
g、开启自动卷扬机,起吊电线杆,随电线杆升起,抱杆也随电线杆前倾,此时调整手动卷扬机,保持抱杆于电线杆起吊索最小角度至电线杆接触定位铝板,电机自动停止; g. Turn on the automatic winch, lift the utility pole, rise with the utility pole, and the holding pole will also lean forward with the utility pole. At this time, adjust the manual winch, keep the minimum angle of the sling on the utility pole and the utility pole until the utility pole touches the positioning aluminum plate, and the motor will automatically stop;
h、向杆坑内填土,并将其夯实; h. Fill the pole hole with soil and compact it;
i、待杆坑内的土夯实后,登杆摘取提拉索和抱箍; i. After the soil in the pole pit is compacted, climb up the pole to remove the lifting cable and hoop;
j、拆除抱杆,工作结束。 j. Remove the pole, and the work is over.
本实用新型还提供了上述自垂直定位立杆器的施工对象的范围,所述自垂直定位立杆器用于电线杆长度为8、10、12米规格锥形电线杆的立杆。 The utility model also provides the scope of the construction object of the above-mentioned self-vertical positioning pole erector, which is used for the poles of tapered utility poles whose lengths are 8, 10, and 12 meters.
与现有技术相比,本实用新型的优点和积极效果在于, Compared with the prior art, the utility model has the advantages and positive effects that:
1、本实用新型通过各个结构的配合设置,利用三角形原理,使电线杆在立起后自动竖直,无需再经过人工的调整,同时,本实用新型安全可靠,仅需工作人员两名即可操作,操作过程中没有需工作人员付出的重体力劳动,且所需用场地基本不受限制,设备重量轻,搬运方便,两人即可抬起安装。 1. The utility model uses the triangular principle through the coordination of various structures to make the utility pole stand upright automatically without manual adjustment. At the same time, the utility model is safe and reliable, and only two workers are needed. Operation, there is no heavy physical labor required by the staff during the operation, and the required space is basically unlimited. The equipment is light in weight and easy to carry. Two people can lift and install it.
2、本实用新型在立杆过程中,只需操作人员简单控制手动卷扬机来控制抱杆的位置即可实现电线杆的竖直,整个过程中,无需其他操作,故,节约了大量的劳动力,降低了建设成本,节约了资源。 2. In the pole erecting process of the utility model, the operator only needs to simply control the manual winch to control the position of the pole to realize the vertical pole. During the whole process, no other operations are required, so a lot of labor is saved. The construction cost is reduced and resources are saved.
3、本实用新型结构简单、加工方便、制作成本低,且使用成本也远远低于其他方式的立杆。 3. The utility model has the advantages of simple structure, convenient processing, low production cost, and the use cost is far lower than other vertical poles.
附图说明 Description of drawings
为了更清楚地说明本实用新型实施例的技术方案,下面将对实施例描述中所需要使用的附图作一简单地介绍,显而易见地,下面描述中的附图是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动性的前提下,还可以根据这些附图获得其他的附图。 In order to more clearly illustrate the technical solutions of the embodiments of the utility model, the following will briefly introduce the accompanying drawings that need to be used in the description of the embodiments. Obviously, the accompanying drawings in the following description are some embodiments of the utility model , for those skilled in the art, other drawings can also be obtained according to these drawings without paying creative labor.
图1为实施例1提供的自垂直定位立杆器的结构示意图; Fig. 1 is the structural representation of the self-vertical positioning rod erector that embodiment 1 provides;
图2为实施例1提供的杆头的结构示意图; Fig. 2 is a structural schematic diagram of the club head provided in embodiment 1;
图3为实施例1提供的固定装置的结构示意图; Fig. 3 is the structural representation of the fixing device that embodiment 1 provides;
图4为实施例1提供的自垂直定位立杆器的定位图; Fig. 4 is the positioning diagram of the self-vertical positioning pole erector that embodiment 1 provides;
图5为实施例1提供的立杆过程起始图; Fig. 5 is the starting figure of the vertical pole process that embodiment 1 provides;
图6为实施例1提供的立杆过程结束图; Fig. 6 is the end figure of the vertical rod process that embodiment 1 provides;
以上各图中,1、杆头;11、杆头本体;12、提拉索滑轮组;13、抱杆提拉滑轮组;14、定位铝板;15、导索管;2、抱杆;21、第一抱杆;22、第二抱杆;23、自动卷扬机;24、手动卷扬机;25、定位索;26、定位孔;3、固定装置;31、旋转地锚;32、均压板;33、转轴;34、加固钉;4、杆坑;5、马道;6、电线杆;7、起吊索;8、提拉索。 In the above figures, 1. Rod head; 11. Rod head body; 12. Pulley block; 13. Lifting pulley block with pole; 14. Positioning aluminum plate; 15. Guide tube; 2. Rod grip; 21. 1 pole; 22, the second pole; 23, automatic hoist; 24, manual hoist; 25, positioning cable; 26, positioning hole; 3, fixing device; 31, rotating anchor; 32, equalizing plate; 33, rotating shaft ; 34. Reinforcement nails; 4. Pole pit; 5. Horse path; 6. Telephone pole;
具体实施方式 detailed description
为了能够更清楚地理解本实用新型的上述目的、特征和优点,下面结合附图和实施例对本实用新型做进一步说明。需要说明的是,在不冲突的情况下,本申请的实施例及实施例中的特征可以相互组合。 In order to understand more clearly the above purpose, features and advantages of the utility model, the utility model will be further described below in conjunction with the accompanying drawings and embodiments. It should be noted that, in the case of no conflict, the embodiments of the present application and the features in the embodiments can be combined with each other.
在下面的描述中阐述了很多具体细节以便于充分理解本实用新型,但是,本实用新型还可以采用不同于在此描述的其他方式来实施,因此,本实用新型并不限于下面公开说明书的具体实施例的限制。 In the following description, a lot of specific details have been set forth in order to fully understand the utility model, but the utility model can also be implemented in other ways that are different from those described here. Therefore, the utility model is not limited to the specific details of the following disclosure EXAMPLE LIMITATIONS.
实施例1,如图1、图2、图3所示,本实施例提供一种自垂直定位立杆器,包括杆头1以及设置在杆头1下方的抱杆2,抱杆2远离杆头1的一端设置有用于固定抱杆2的固定装置3,抱杆2与固定装置3之间转动固定连接,所述杆头2包括呈倒置“U”型设置的杆头本体11,杆头本体11的主要作用是起到一个支架的作用,将其设置呈倒置的“U”型主要是这样的设置会产生两个支脚,方便固定抱杆2,抱杆2与杆头1之间采用螺栓固定的方式,在杆头本体11的顶部设置有用于拉升电线杆的提拉索滑轮组12,在杆头本体11上还设置有用于控制抱杆2沿固定装置3转动的抱杆提拉滑轮组13,抱杆提拉滑轮组13为在杆头本体11上设置了一个横杆(图中未标注),在横杆上设置的抱杆提拉滑轮组13,在本实施例中,所指的滑轮组都是由两个配合设置的定滑轮组成,为了实现电线杆的自动垂直,在本实施例中,将提拉索滑轮组12与抱杆提拉滑轮组13垂直设置,具体的说,提拉索滑轮组12与抱杆2转动方向垂直设置,这 样,抱杆提拉滑轮组13就沿抱杆2转动的方向设置,这样的设置,有利于在施工时稳定电线杆,使其不易发生摆动,影响固定,本实施例所指的抱杆2包括左右对称设置固定在杆头本体11上的第一抱杆21和第二抱杆22,第一抱杆21和第二抱杆22分别连接在杆头本体11的支脚上,且第一抱杆21和第二抱杆22倾斜固定在杆头本体11上,这样的设置,使第一抱杆21与第二抱杆22的顶端的延伸线和末端的连线组成一个等腰三角形,这样的设置,能够确保电线杆的垂直,当然,考虑到后期的运输,第一抱杆21和第二抱杆22活动固定在杆头本体11上,具体的说,可以通过螺栓或卡扣实现第一抱杆21、第二抱杆22与杆头本体11之间的固定,当不需要使用时,可以合拢第一抱杆21和第二抱杆22,方便运输,在本实施例中,采用螺栓固定的方式。为了减少人力的使用,在抱杆2上还设置有用于与提拉索滑轮组12通过绳索连接的电动卷扬机23以及用于与抱杆提拉滑轮组13通过绳索连接的手动卷扬机24,考虑到电线杆在提拉时,可以使用自动提拉,故设置了电动卷扬机,考虑到整个立杆器要与电线杆配合转动,故在本实施例中,使用手动卷扬机24来人工控制,具体的说,电动卷扬机为小型直流电动卷扬机:为动力装置,拉力>2吨,起提升电线杆作用,电源为12V,可使用单独蓄电池,亦可使用汽车电源;手动卷扬机为手摇绞盘式卷扬机。 Embodiment 1, as shown in Figure 1, Figure 2, and Figure 3, this embodiment provides a self-vertical positioning rod erector, including a rod head 1 and a holding rod 2 arranged below the rod head 1, and the holding rod 2 is far away from the rod One end of the head 1 is provided with a fixing device 3 for fixing the holding rod 2, and the rotating and fixed connection between the holding rod 2 and the fixing device 3, the rod head 2 includes a rod head body 11 arranged in an inverted "U" shape, and the rod head The main function of the main body 11 is to play the role of a bracket. It is set in an inverted "U" shape mainly because such a setting will produce two legs, which are convenient for fixing the pole 2. In the way of bolt fixing, the top of the pole head body 11 is provided with a pulley pulley block 12 for pulling up the utility pole, and the pole head body 11 is also provided with a pole lifter for controlling the rotation of the pole 2 along the fixing device 3 . The pulley block 13, the pulley pulley block 13 is that a cross bar (not marked in the figure) is set on the rod head body 11, and the pull pulley block 13 set on the cross bar, in the present embodiment, refers to The pulley blocks are all made up of two cooperating fixed pulleys. In order to realize the automatic vertical of the utility pole, in the present embodiment, the lifting cable pulley block 12 and the pole holding pulley block 13 are vertically arranged. Specifically, the lifting cable The pulley block 12 is vertically arranged with the rotation direction of the pole 2, so that the pulley block 13 is arranged along the direction of rotation of the pole 2. Such an arrangement is conducive to stabilizing the utility pole during construction, so that it is not easy to swing and affects the fixation. , the holding rod 2 referred to in this embodiment includes a first holding rod 21 and a second holding rod 22 which are symmetrically arranged and fixed on the head body 11, and the first holding rod 21 and the second holding rod 22 are respectively connected to the head On the legs of the main body 11, and the first holding rod 21 and the second holding rod 22 are obliquely fixed on the head body 11. Such an arrangement makes the extension line and the end of the top of the first holding rod 21 and the second holding rod 22 The connecting lines form an isosceles triangle. Such a setting can ensure the verticality of the utility pole. Of course, considering the later transportation, the first holding pole 21 and the second holding pole 22 are movably fixed on the pole head body 11. Specifically That is to say, the fixing between the first holding rod 21, the second holding rod 22 and the head body 11 can be realized by bolts or buckles. When not in use, the first holding rod 21 and the second holding rod 22 can be folded together. It is convenient for transportation. In this embodiment, it is fixed by bolts. In order to reduce the use of manpower, an electric hoist 23 for connecting with the lifting cable pulley block 12 through a rope and a manual hoist 24 for connecting with the pole pulling pulley block 13 through a rope are also provided on the pole 2. When lifting, automatic lifting can be used, so an electric hoist is provided. Considering that the whole pole device will cooperate with the utility pole to rotate, so in the present embodiment, a manual hoist 24 is used for manual control. The hoist is a small DC electric hoist: it is the power device, the pulling force is >2 tons, and it is used to lift the utility pole. The power supply is 12V. It can use a separate battery or a car power supply; the manual hoist is a hand winch type hoist.
通过上述的设置,利用提拉索滑轮组12与抱杆提拉滑轮组13来控制电线杆在竖立时的稳定,利用抱杆2的等腰设置以及与固定装置的转动设置,来实现电线杆的自动竖直,进而达到本实用新型的目的。 Through the above-mentioned setting, use the pulling cable pulley block 12 and the holding pole lifting pulley block 13 to control the stability of the electric pole when it is erected, and use the isosceles setting of the holding pole 2 and the rotation setting with the fixing device to realize the automatic installation of the electric pole. Vertical, and then reach the purpose of the utility model.
为了使本立杆器能够使用更多的场地,且能够保证立杆器的稳定性,故在本实施例中,固定装置3包括与抱杆2转动固定连接旋转地锚31以及套装在旋转地锚31外的均压板32,旋转地锚31与抱杆2之间通过转轴33固定连接,利用旋转地锚31来固定整个立杆器,然后在此基础上加设均压板32,然后通过加固钉34将均匀板32固定,进而起到更好的固定作用,且使本立杆器的使用范围更大。 In order to enable the pole erector to use more places, and to ensure the stability of the pole erector, in this embodiment, the fixing device 3 includes a rotating ground anchor 31 that is rotationally and fixedly connected with the pole 2 and is sleeved on the rotating ground anchor. The pressure equalizing plate 32 outside the 31, the rotating ground anchor 31 and the holding pole 2 are fixedly connected by the rotating shaft 33, and the rotating ground anchor 31 is used to fix the entire pole device, and then the pressure equalizing plate 32 is added on this basis, and then through the reinforcing nail 34 fixes the uniform plate 32, and then plays a better fixing effect, and makes the use range of this pole stand device larger.
为了使本实施例所提供的自垂直定位立杆器的适用范围更广,如8米杆、 10米杆、12米杆(此三类杆为现有电网建设中,最常用的锥形电线杆)的应用,在本实施例中,第一抱杆21和第二抱杆22为可伸缩铝杆,具体的说,第一抱杆1和第二抱杆均22有两个套装在一起的铝杆组成,在其连接处设置了伸缩节、锁紧母和限位栓,以便适应不同高度的电线杆。 In order to make the scope of application of the self-vertical positioning pole device provided by the present embodiment wider, such as 8 meter poles, 10 meter poles, and 12 meter poles (these three types of poles are the most commonly used tapered wires in the construction of the existing power grid. pole), in this embodiment, the first pole 21 and the second pole 22 are retractable aluminum poles, specifically, the first pole 1 and the second pole 22 have two sleeves together It is composed of aluminum poles, and telescopic joints, locking nuts and limit bolts are set at the joints to adapt to poles of different heights.
为了使抱杆在应用时能够准确的设置出其应该的程度,故在抱杆上设置有定位孔26,每个定位孔26分别对应8米杆、10米杆和12米杆,同样,为了方便整个立杆器的固定,在抱杆2上还设置有定位索25,定位索25设置在第一抱杆21和第二抱杆22之间,具体的,定位索25应与第一抱杆21和第二抱杆22末端的连线水平,定位索25设置在靠近杆头本体11的位置处,同样,为了方便第一抱杆21和第二抱杆22的合拢,定位索25可拆卸设置在第一抱杆和第二抱杆之间。 In order to enable the pole to be accurately set to its proper degree during application, positioning holes 26 are provided on the pole, and each positioning hole 26 corresponds to an 8-meter pole, a 10-meter pole and a 12-meter pole. Similarly, in order to To facilitate the fixing of the whole pole device, a positioning cable 25 is also arranged on the holding pole 2, and the positioning cable 25 is arranged between the first holding pole 21 and the second holding pole 22. Specifically, the positioning cable 25 should be connected with the first holding pole 22. The connecting line of bar 21 and the second holding bar 22 ends is horizontal, and positioning cable 25 is arranged at the position close to bar head body 11, and similarly, in order to facilitate the closing of first holding bar 21 and second holding bar 22, positioning cable 25 can The disassembly is arranged between the first holding pole and the second holding pole.
为了更佳准确的确定电线杆达到垂直状态,为在本实施例中,在杆头本体11上设置有用于电线杆定位的定位铝板14,定位铝板14倾斜设置在杆头本体11上,具体的定位铝板14呈倒置的“U”型设置在杆头本体11上,将定位铝板14设置呈倒置的“U”型主要考虑到电线杆的顶部的形状,这样,当施工时,电线杆碰到定位铝板14即可确定电线杆处于垂直状态,由于,立杆器在施工时处于倾斜状态,故定位铝板14要倾斜设置在杆头本体11上。 In order to better and accurately determine that the utility pole reaches the vertical state, in this embodiment, a positioning aluminum plate 14 for positioning the utility pole is provided on the pole head body 11, and the positioning aluminum plate 14 is obliquely arranged on the pole head body 11. Specifically The positioning aluminum plate 14 is arranged on the rod head body 11 in an inverted "U" shape, and setting the positioning aluminum plate 14 in an inverted "U" shape mainly takes into account the shape of the top of the utility pole. Positioning the aluminum plate 14 can determine that the utility pole is in a vertical state, because the pole erector is in an inclined state during construction, so the positioning aluminum plate 14 will be obliquely arranged on the pole head body 11.
考虑到无论是电动卷扬机23和手动卷扬机24都需使用绳索,为了防止绳索乱跑,故在本实施例中,在杆头本体11还设置有用于绳索导向的导索管15,在抱杆2上也设置了相应的导索管。 Considering that both the electric winch 23 and the manual winch 24 need to use ropes, in order to prevent the ropes from running around, so in this embodiment, the rod head body 11 is also provided with a guide tube 15 for rope guidance. Corresponding guide tubes are also provided.
具体在施工时,由于电线杆地上部分、两个旋转地锚连线中心至杆坑中心、杆头限位铝板至两旋转地锚连线中心连线距离组成一个三角形,只要三个长度选取好符合勾股定理,立直后即为直角三角形,即电线杆垂直于地面(横向由于两抱杆为等腰三角形,一定垂直与地面),根据数学计算和经验值,立杆器满足如下数据: Specifically, during construction, since the aboveground part of the utility pole, the distance between the center of the connection between the two rotating ground anchors and the center of the pole pit, and the distance between the pole head limit aluminum plate and the center of the connection between the two rotating ground anchors form a triangle, as long as the three lengths are selected It conforms to the Pythagorean theorem, and it becomes a right-angled triangle after standing upright, that is, the utility pole is perpendicular to the ground (the horizontal pole is an isosceles triangle, so it must be perpendicular to the ground). According to mathematical calculations and empirical values, the pole erector meets the following data:
1、杆头定位铝板至定位索中心:1.8米 1. Rod head positioning aluminum plate to the center of the positioning cable: 1.8 meters
2、立杆器可伸缩,定位孔对应8、10、12米规格锥形电线杆,定位索到两 个旋转地锚连线中心长度分别为5米、6米、7米,电线杆埋深分别为1.2、1.7、2米,地面至电线杆固定抱箍长度分别为4.6、5、5.3米。 2. The pole device is scalable, and the positioning holes correspond to 8, 10, and 12-meter-sized tapered utility poles. The lengths of the positioning cable to the center of the connection between the two rotating ground anchors are 5 meters, 6 meters, and 7 meters, respectively, and the buried depth of the utility poles They are 1.2, 1.7, and 2 meters respectively, and the lengths from the ground to the fixed hoop of the utility pole are 4.6, 5, and 5.3 meters respectively.
下面就以8米杆为例,详细描述立杆过程: Let's take the 8-meter pole as an example to describe the process of erecting the pole in detail:
如图4、图5、图6所示,收线,根据所要竖直的电线杆的长度,挖取相应深度的杆坑4以及马道5,在此处,需要的杆坑4的深度为1.2米,此也是国家标准的要求。 As shown in Fig. 4, Fig. 5, and Fig. 6, take up the line, dig the pole pit 4 and the horseway 5 of the corresponding depth according to the length of the vertical utility pole to be erected, and here, the depth of the pole pit 4 required is 1.2 m, this is also the requirement of the national standard.
然后,将电线杆6根部放入杆坑4,电线杆6下部放入马道5中,并保持与马道5平直,虽然马道5有一定的倾斜角度,但由于电线杆6的地上部分较多,其还是处于水平状态。 Then, 6 root portions of utility poles are put into pole pit 4, and utility pole 6 bottoms are put into bridleway 5, and keep straight with bridleway 5, although bridleway 5 has certain angle of inclination, because the ground part of utility pole 6 is more , which is still horizontal.
将电线杆6放置好后,调整第一抱杆和第二抱杆的长度至定位孔的8米孔处,使整个立杆器的长度能够与电线杆6相配合,然后将立杆器平放,确保定位索25的中心位置与杆坑4的中心处于同一垂线上,抱杆2方向朝电线杆6头部放置。 After the utility pole 6 is placed, adjust the length of the first pole and the second pole to the 8-meter hole of the positioning hole, so that the length of the entire pole can match the pole 6, and then level the pole Put, ensure that the center position of positioning cable 25 is on the same vertical line with the center of pole pit 4, and the pole 2 direction is placed toward the utility pole 6 head.
然后,标记好抱杆2底部的位置,开始设置固定装置3,具体的说,用地锚机旋入地锚,将均压板套入地锚杆,打入加固钉,并通过转轴固定抱杆2,在固定时,尽量使抱杆2与旋转地锚之间的转动皱一些,这样,好控制,也安全。 Then, mark the position of the bottom of the holding pole 2, and start to set the fixing device 3. Specifically, use the ground anchor to screw the ground anchor, put the pressure equalizing plate into the ground anchor, drive in the reinforcement nails, and fix the holding pole 2 through the rotating shaft. , when fixing, try to make the rotation between the pole 2 and the rotating ground anchor wrinkle, so that it is easy to control and safe.
在电线杆6上量出相应距离安装起吊固定抱箍,以8米杆为例,这个位置应处于整个电线杆6的5.8米的位置处,在此位置处挂接起吊索7,起吊索7通过提拉索滑轮组与电动卷扬机连接,在电线杆6杆顶安装抱杆提拉抱箍并挂接提拉索8,提拉索8通过抱杆提拉滑轮组与手动卷扬机连接。 Measure the corresponding distance on the utility pole 6 and install the lifting and fixing hoop. Taking the 8-meter pole as an example, this position should be at the position of 5.8 meters of the entire utility pole 6. Connect with the electric winch through the lifting cable pulley block, install the pole lifting hoop on the top of the utility pole 6 pole and articulate the lifting cable 8, and the lifting cable 8 is connected with the manual hoist through the lifting pulley block holding the pole.
待一切安装接受后,就可以进行起吊了,此时,先利用手动卷扬机提拉抱杆2,使整个立杆器和电线杆6接近垂直,然后,开启自动卷扬机,起吊电线杆6,随电线杆6升起,抱杆2也随电线杆6前倾,此时调整手动卷扬机,保持抱杆2于电线杆起吊索7最小角度至电线杆6接触定位铝板,电机自动停止,此时,由于事先设置好的位置,故此时的电线杆6一定处于垂直状态,紧固好手动卷扬机,然后,就可以向杆坑4内填土,并将其夯实;待杆坑4内的土夯 实后,登杆摘取提拉索7和抱箍;最后,拆除抱杆2,工作结束。 After everything is installed and accepted, it can be lifted. At this time, first utilize the manual hoist to lift the pole 2, so that the whole pole device and the utility pole 6 are close to vertical. Then, open the automatic hoist, lift the utility pole 6, The pole 6 rises, and the holding pole 2 also leans forward with the electric pole 6. At this time, adjust the manual hoist, keep the holding pole 2 at the minimum angle of the sling 7 on the electric pole until the electric pole 6 contacts the positioning aluminum plate, and the motor stops automatically. At this time, due to The position that is set in advance, so the utility pole 6 at this moment must be in vertical state, fasten the manual winch, then, just can fill earth in pole pit 4, and it is compacted; After the soil in pole pit 4 is compacted, Climb the pole to extract the lifting cable 7 and the hoop; finally, remove the pole 2, and the work is over.
以上所述,仅是本实用新型的较佳实施例而已,并非是对本实用新型作其它形式的限制,任何熟悉本专业的技术人员可能利用上述揭示的技术内容加以变更或改型为等同变化的等效实施例应用于其它领域,但是凡是未脱离本实用新型技术方案内容,依据本实用新型的技术实质对以上实施例所作的任何简单修改、等同变化与改型,仍属于本实用新型技术方案的保护范围。 The above is only a preferred embodiment of the utility model, and is not intended to limit the utility model in other forms. Any skilled person who is familiar with this profession may use the technical content disclosed above to change or remodel it into an equivalent change. The equivalent embodiments are applied to other fields, but any simple modifications, equivalent changes and modifications made to the above embodiments according to the technical essence of the present invention without departing from the content of the technical solution of the present utility model still belong to the technical solution of the present utility model scope of protection.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620473884.7U CN205637814U (en) | 2016-05-20 | 2016-05-20 | From vertical location pole setting ware |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620473884.7U CN205637814U (en) | 2016-05-20 | 2016-05-20 | From vertical location pole setting ware |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205637814U true CN205637814U (en) | 2016-10-12 |
Family
ID=57054448
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201620473884.7U Expired - Fee Related CN205637814U (en) | 2016-05-20 | 2016-05-20 | From vertical location pole setting ware |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205637814U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105839988A (en) * | 2016-05-20 | 2016-08-10 | 国网山东省电力公司高唐县供电公司 | Self-vertical positioning pole erecting device and construction method thereof |
-
2016
- 2016-05-20 CN CN201620473884.7U patent/CN205637814U/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105839988A (en) * | 2016-05-20 | 2016-08-10 | 国网山东省电力公司高唐县供电公司 | Self-vertical positioning pole erecting device and construction method thereof |
| WO2017197731A1 (en) * | 2016-05-20 | 2017-11-23 | 国网山东省电力公司高唐县供电公司 | Self-vertical positioning pole erection device and construction method thereof |
| CN105839988B (en) * | 2016-05-20 | 2018-01-30 | 国网山东省电力公司高唐县供电公司 | From perpendicular positioning standing device and its construction method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105839988B (en) | From perpendicular positioning standing device and its construction method | |
| CN104276514B (en) | Installation method of ground self-balancing pole | |
| CN205713411U (en) | A kind of positive lever apparatus adjusting electric pole and cross-arm direction | |
| CN205955358U (en) | Group's tower device of interior floated armful of pole of acting as go -between | |
| CN110984674A (en) | Electric power engineering construction power consumption pole correcting device | |
| CN105421859A (en) | Electricity grid telegraph pole erecting device and construction method | |
| CN202187601U (en) | Single-twisting-grinder double-pole iron tower erecting device of high-voltage power transmission line | |
| CN206309110U (en) | Electric Pole Corrector | |
| CN205688774U (en) | A kind of electric bridge scaffold | |
| CN116607795A (en) | A steel column hoisting positioning aid and positioning method | |
| CN103938914A (en) | Portable pole centralizing device and method for centralizing telegraph pole | |
| CN204277336U (en) | The vertical bracing frame of herringbone bar group | |
| CN202465182U (en) | Lifting device for live-wire operation | |
| CN207004155U (en) | A kind of adjustable tower erection instrument | |
| CN103255947B (en) | Standard transformer rack upright tube centralizer | |
| CN204150970U (en) | Seat ground self-balancing pole | |
| CN104110155B (en) | A kind of thin-wall steel tube shaft tower and processing thereof and construction method | |
| CN203359890U (en) | Small-sized electric pole hoisting device | |
| CN206233673U (en) | A kind of herringbone holding pole standing device | |
| CN205687456U (en) | A kind of portable high-pressure line guy dish delivery device | |
| CN203326472U (en) | Insulation holding pole standing tool | |
| CN205820741U (en) | A kind of single-column lifting gin pole | |
| CN102916366A (en) | Bracket type motorized winch | |
| CN113931516A (en) | Holding pole standing device | |
| CN109779382A (en) | A kind of scalable unipods post mounting accessories for steel pipe pole construction |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161012 Termination date: 20180520 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |