CN205637158U - Device for connecting completely assembling formula precast concrete structure - Google Patents

Device for connecting completely assembling formula precast concrete structure Download PDF

Info

Publication number
CN205637158U
CN205637158U CN201620454645.7U CN201620454645U CN205637158U CN 205637158 U CN205637158 U CN 205637158U CN 201620454645 U CN201620454645 U CN 201620454645U CN 205637158 U CN205637158 U CN 205637158U
Authority
CN
China
Prior art keywords
junction
hole
connector
joint
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620454645.7U
Other languages
Chinese (zh)
Inventor
许耀海
罗益军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Ke Zhu Construction Management Co., Ltd.
Guangdong Yongji Building Foundation Co., Ltd.
GUANGZHOU YONGWAN PREFABRICATED PART CO., LTD.
Original Assignee
Guangzhou Yongwan Prefabricated Part Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Yongwan Prefabricated Part Co Ltd filed Critical Guangzhou Yongwan Prefabricated Part Co Ltd
Priority to CN201620454645.7U priority Critical patent/CN205637158U/en
Application granted granted Critical
Publication of CN205637158U publication Critical patent/CN205637158U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a device for connecting completely assembling formula precast concrete structure, including first connecting piece, second connecting piece, sleeve and fixing bolt, the one end of this first connecting piece has T shape and connects, and the other end of first connecting piece has first U -shaped and connects, and this first U -shaped joint has first fixed orifices, the one end of this second connecting piece has the 2nd T shape and connects, and the other end of second connecting piece has the second U -shaped and connects, and this second U -shaped connects and has the second fixed orifices, and T shape connect with the 2nd T shape connect respectively with two prefabricated component in the biography reinforcing bar fixed connection that does all can. Through utilizing T shape to connect with a plurality of biographies power reinforcing bar fixed connection and inlay the shaping in prefabricated component, the utility model discloses simple structure can connect a plurality of biographies power reinforcing bar one -time Setup to installing firmly on prefabricated beam column, realizing prefabricated component's on -the -spot concatenation installation, the atress is equitable, construction convenience, and on -the -spot construction cycle is short, and can reduce the site operation and pollute.

Description

A kind of attachment means of complete prefabricated xoncrete structure
Technical field
This utility model relates to prefabricated components art, refers in particular to one the most prefabricated The attachment means of xoncrete structure.
Background technology
Buildings in general is formed by cast-in-site, exists long in time limit, and efficiency of construction is low, The heavy-polluted defect of site operation.House industrialization is the inexorable trend of Building Trade in China development, Xoncrete structure is prefabricated in the factory, on-site consolidation, it is achieved the prefabricated industrialization of element factory, Reduce the workload of site operation, reduce on-site concrete wet trade, improve the work of builder Make condition, reduce site operation and pollute, raise labour efficiency, reduce energy consumption, be current China Building industry problem demanding prompt solution.
Utility model content
In view of this, this utility model for the disappearance of prior art existence, its main purpose is Thering is provided the attachment means of a kind of complete prefabricated xoncrete structure, it can realize two prefabricated Component is stably mounted on beam column.
For achieving the above object, this utility model uses such as purgation technical scheme:
A kind of attachment means of complete prefabricated xoncrete structure, include the first connector, Second connector, sleeve and fixing bolt;One end of this first connector has the first T-shaped Joint, the other end of the first connector has the first U-joint, and this first U-joint has First fixing hole;One end of this second connector has the second T junction, the second connector The other end has the second U-joint, and this second U-joint has the second fixing hole, and this is first years old T junction and the second T junction produced by insert molding respectively is in two prefabricated components, and the first T-shaped Joint and the second T junction are fixing with the power transmission reinforcing bar in two prefabricated components respectively to be connected;This set Jacket casing is located at outside the first connector and the second connector, the first U-joint and the second U-joint Be respectively positioned in sleeve, the first U-joint and the second U-joint each other to slotting occlusion, sleeve Middle part is provided through hole;This fixing bolt is fixed through through hole, the first fixing hole and second Hole.
Preferably, described first T junction is provided with multiple first connecting hole, multiple power transmissions Reinforcing bar is connected fixing through the first corresponding connecting hole with the first T junction riveted.
Preferably, described second T junction is provided with multiple second connecting hole, multiple power transmissions Reinforcing bar is connected fixing through the second corresponding connecting hole with the second T junction riveted.
Preferably, the two ends of described sleeve are provided with grout hole, and grouting material is filled by grout hole To sleeve.
This utility model compared with prior art has clear advantage and beneficial effect, concrete and Speech, as shown from the above technical solution:
By utilize T junction and multiple power transmission reinforcing bars fixing is connected also produced by insert molding at prefabricated structure In part, this utility model simple in construction, multiple power transmission bar one-times can be installed and connect, and surely Admittedly be arranged on prefabricated beam column, it is achieved the on-the-spot splicing of prefabricated components is installed, reasonable stress, Easy construction, the site operation cycle is short, and can reduce site operation pollution.
For more clearly illustrating architectural feature of the present utility model and effect, below in conjunction with the accompanying drawings with This utility model is described in detail by specific embodiment:
Accompanying drawing explanation
Fig. 1 is the schematic cross-section of the preferred embodiment of this utility model.
Accompanying drawing identifier declaration:
10, first connector the 11, first T junction
12, first U-joint the 101, first fixing hole
102, first connecting hole the 20, second connector
21, second T junction the 22, second U-joint
201, second fixing hole the 202, second connecting hole
30, sleeve 31, through hole
32, grout hole 40, fixing bolt
50, power transmission reinforcing bar 60, grouting material
Detailed description of the invention
Refer to shown in Fig. 1, that show the concrete knot of the preferred embodiment of this utility model Structure, includes first connector the 10, second connector 20, sleeve 30 and fixing bolt 40.
One end of this first connector 10 has the first T junction 11, the first connector 10 The other end has the first U-joint 12, and this first U-joint 12 has the first fixing hole 101.
One end of this second connector 20 has the second T junction 21, the second connector 20 The other end has the second U-joint 22, and this second U-joint 22 has the second fixing hole 201,
This first T junction 11 and the second T junction 21 produced by insert molding respectively is at two prefabricated structures In part, and the first T junction 11 and the second T junction 21 respectively with in two prefabricated components Power transmission reinforcing bar 50 is fixing to be connected;In the present embodiment, described first T junction 11 is arranged Having multiple first connecting hole 102, multiple power transmission reinforcing bars 50 are through the first corresponding connecting hole 102 And it is connected fixing with the first T junction 11 riveted, and, on described second T junction 21 Being provided with multiple second connecting hole 202, multiple power transmission reinforcing bars 50 are through the second corresponding connecting hole 202 and be connected fixing with the second T junction 21 riveted.This first connector 10 and second connects Fitting 20 is high strength steel material.
This sleeve 30 is sheathed on outside the first connector 10 and the second connector 20, and the first U-shaped connects 12 and second U-joint 22 be respectively positioned in sleeve 30, the first U-joint 12 and second U-joint 22 is each other to slotting occlusion, and the middle part of sleeve 30 is provided through hole 31;Further, Described sleeve 30 is carbon fibre materials, and the two ends of described sleeve 30 are provided with grout hole 32, fills Slurry 60 is filled to sleeve 30 by grout hole 32, and this sleeve 30 is arranged at prefabricated beam column Through hole in, and the two ends of sleeve 30 insert in the blind hole of two prefabricated components respectively.
This fixing bolt 40 is through through hole the 31, first fixing hole 101 and the second fixing hole 201.
During use, first, by the first connector 10 and the second connector 20 respectively with corresponding Power transmission reinforcing bar 50 is fixing to be connected, and molds two prefabricated components with corresponding power transmission reinforcing bar; Then, sleeve 30 is inserted in the through hole of prefabricated beam column, then, by the first connector 10 He Second connector 20 inserts from the two ends of sleeve 30 respectively, makes the first U-joint 12 and second U-joint 22 is each other to slotting occlusion, then, by lock bolt 40 leading to through prefabricated beam column Hole, through hole the 31, first fixing hole 101 and the second fixing hole 201 so that the first connector 10, the second connector 20 and sleeve 30 are fixed in the through hole of prefabricated beam column, then, pass through Grouting material 60 is filled to sleeve 30 by grout hole 32.
Design focal point of the present utility model is: by utilizing T junction solid with multiple power transmission reinforcing bars Calmly connect and produced by insert molding is in prefabricated components, this utility model simple in construction, can be by multiple biographies Power bar one-time is installed and is connected, and is firmly mounted on prefabricated beam column, it is achieved prefabricated components On-the-spot splicing is installed, reasonable stress, easy construction, and the site operation cycle is short, and can reduce existing Field construction pollution.
Know-why of the present utility model is described above in association with specific embodiment.These only describe It is to explain principle of the present utility model, and can not be construed to this practicality new by any way The restriction of type protection domain.Based on explanation herein, those skilled in the art need not pay Performing creative labour can associate other detailed description of the invention of the present utility model, these modes Within falling within protection domain of the present utility model.

Claims (4)

1. the attachment means of a complete prefabricated xoncrete structure, it is characterised in that: include There are the first connector, the second connector, sleeve and fixing bolt;The one of this first connector End has the first T junction, and the other end of the first connector has the first U-joint, and this is the years old One U-joint has the first fixing hole;One end of this second connector has the second T junction, The other end of the second connector has the second U-joint, and it is solid that this second U-joint has second Determine hole, this first T junction and the second T junction produced by insert molding respectively in two prefabricated components, And first T junction and the second T junction fix with the power transmission reinforcing bar in two prefabricated components respectively Connect;This sleeve is sheathed on outside the first connector and the second connector, the first U-joint and Two U-joints are respectively positioned in sleeve, and the first U-joint and the second U-joint are stung inserting each other Closing, the middle part of sleeve is provided through hole;This fixing bolt passes through hole, the first fixing hole With the second fixing hole.
The connection dress of a kind of complete prefabricated xoncrete structure the most as claimed in claim 1 Put, it is characterised in that: it is provided with multiple first connecting hole on described first T junction, multiple Power transmission reinforcing bar is connected fixing through the first corresponding connecting hole with the first T junction riveted.
The connection dress of a kind of complete prefabricated xoncrete structure the most as claimed in claim 1 Put, it is characterised in that: it is provided with multiple second connecting hole on described second T junction, multiple Power transmission reinforcing bar is connected fixing through the second corresponding connecting hole with the second T junction riveted.
The connection dress of a kind of complete prefabricated xoncrete structure the most as claimed in claim 1 Put, it is characterised in that: the two ends of described sleeve are provided with grout hole, and grouting material passes through grout hole Fill to sleeve.
CN201620454645.7U 2016-05-18 2016-05-18 Device for connecting completely assembling formula precast concrete structure Active CN205637158U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620454645.7U CN205637158U (en) 2016-05-18 2016-05-18 Device for connecting completely assembling formula precast concrete structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620454645.7U CN205637158U (en) 2016-05-18 2016-05-18 Device for connecting completely assembling formula precast concrete structure

Publications (1)

Publication Number Publication Date
CN205637158U true CN205637158U (en) 2016-10-12

Family

ID=57057576

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620454645.7U Active CN205637158U (en) 2016-05-18 2016-05-18 Device for connecting completely assembling formula precast concrete structure

Country Status (1)

Country Link
CN (1) CN205637158U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110258935A (en) * 2019-04-30 2019-09-20 由中国 A kind of prefabricated house building element
CN110552443A (en) * 2019-08-20 2019-12-10 湖北正浩建设集团有限公司 residential system of steel pipe concrete close-packed column steel plate energy-consuming shear wall structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110258935A (en) * 2019-04-30 2019-09-20 由中国 A kind of prefabricated house building element
CN110258935B (en) * 2019-04-30 2021-05-14 广东长海建设工程有限公司 Prefabricated building component
CN110552443A (en) * 2019-08-20 2019-12-10 湖北正浩建设集团有限公司 residential system of steel pipe concrete close-packed column steel plate energy-consuming shear wall structure

Similar Documents

Publication Publication Date Title
CN204023778U (en) The connected node of prefabricated assembled concrete beam column
CN104060717B (en) A kind of fabricated shear wall structural wall board fractionation-assemble method
CN204826426U (en) Grout sleeve for steel bar connection
CN103015572B (en) The method of attachment of body of wall and floor and special syndeton thereof and ready-package house
CN205777098U (en) A kind of detachable assembling type concrete-filled circular steel tube column
CN107023076A (en) A kind of assembly concrete pole steel beam connecting node and preparation method thereof
CN208441231U (en) A kind of beam column built from concrete dry method connecting node
CN105064625A (en) Grout sleeve for reinforcement connection and reinforcement connecting method
CN211499913U (en) Low-energy-consumption prefabricated house
CN206873767U (en) A kind of reinforcing bar grout sleeve for the connection of prefabricated concrete structure ductility
CN103924710A (en) Steel plate welding node structure of low-layer assembly type composite wall house
CN106320537A (en) Prefabricated concrete-filled square steel tube column and steel girder connecting joint
CN205637158U (en) Device for connecting completely assembling formula precast concrete structure
CN203066257U (en) Beam column rigid connection node of recombinant bamboo frame structure
CN204826423U (en) Prefabricated assembled is reinforcing bar sleeve grout connecting piece for concrete member
CN206328893U (en) A kind of new vertical piece dry type connection shear wall
CN206157913U (en) Assembled square steel tube concrete post and girder steel connected node
CN206722139U (en) A kind of assembled integral shear wall building structure
CN204023777U (en) The connected node of prefabricated assembled concrete beam column
CN205134547U (en) Assembled roof beam shear connector
CN110607842A (en) Assembled beam column connecting node of steel beam
CN103669597B (en) Prefabricated reinforced concrete longeron and beam connecting structure
CN205637121U (en) Device for connecting prefabricated assembled concrete beam column
CN208347002U (en) A kind of noose connection structure for being connected between prefabricated panel
CN210086553U (en) Dry-type connected precast concrete wall and foundation connection node

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170731

Address after: 511400 Guangdong city of Guangzhou province Nansha District Dagang village Zhenlong Lung Fu Road (Yongji Pipe Company Limited A region) second layer (temporary premises)

Co-patentee after: FOSHAN VANKE PROPERTY SERVICE CO., LTD.

Patentee after: GUANGZHOU YONGWAN PREFABRICATED PART CO., LTD.

Co-patentee after: Guangdong Yongji Building Foundation Co., Ltd.

Address before: 510000 Guangdong city of Guangzhou province Nansha District Dagang village Zhenlong Lung Fu Road (Yongji Pipe Company Limited A region) second layer (temporary site is valid until March 9, 2017)

Patentee before: GUANGZHOU YONGWAN PREFABRICATED PART CO., LTD.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180115

Address after: 511400 Guangdong city of Guangzhou province Nansha District Dagang village Zhenlong Lung Fu Road (Yongji Pipe Company Limited A region) second layer (temporary premises)

Co-patentee after: Guangdong Ke Zhu Construction Management Co., Ltd.

Patentee after: GUANGZHOU YONGWAN PREFABRICATED PART CO., LTD.

Co-patentee after: Guangdong Yongji Building Foundation Co., Ltd.

Address before: 511400 Guangdong city of Guangzhou province Nansha District Dagang village Zhenlong Lung Fu Road (Yongji Pipe Company Limited A region) second layer (temporary premises)

Co-patentee before: FOSHAN VANKE PROPERTY SERVICE CO., LTD.

Patentee before: GUANGZHOU YONGWAN PREFABRICATED PART CO., LTD.

Co-patentee before: Guangdong Yongji Building Foundation Co., Ltd.