CN205636851U - Novel desilting ship - Google Patents
Novel desilting ship Download PDFInfo
- Publication number
- CN205636851U CN205636851U CN201620433969.2U CN201620433969U CN205636851U CN 205636851 U CN205636851 U CN 205636851U CN 201620433969 U CN201620433969 U CN 201620433969U CN 205636851 U CN205636851 U CN 205636851U
- Authority
- CN
- China
- Prior art keywords
- dredger
- reamer
- desilting
- main body
- novel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
The utility model provides a novel desilting ship, include: the desilting owner body and power equipment desilting owner body front end is provided with reamer frame gallows desilting owner body front end is provided with the inner groovy be provided with desilting equipment in the inner groovy, be provided with the dredge pump and get rid of the system on the desilting ship. The utility model discloses beneficial effect has: the hull volume is less, can the adjusted stream says the narrower dredging engineering of width, because this ship has adopted the guide pile and has removed the stake, can solve the break down problem of location difficulty of river course, there is the lift of regulation post under the drain, can the orificial height of choke exit tube, make the effect of its desilting better, it connects the reamer lifting wheel who inhales on the mud pipe with steel cable for the take -up device and comes common rising and the decline that mud was managed that realizes inhaling to inhale the drive sleeve pipe of mud pipe on through lift hydraulic press control lift post, this desilting ship can the efficient silt in to the river course carry out effectual clearance, keep the unobstructed of river course.
Description
Technical field
This utility model relates to environment protection equipment technical field, especially relates to a kind of novel dredger.
Background technology
Along with domestic economy high speed development, Process of Urbanization Construction paces are accelerated, urban planning, construction speed-raising,
Many city domestic sewage, the unprocessed direct discharges of trade effluent.Cause river course, urban district and river, suburb
Road pollutes.Blocking is serious.It is thus desirable to dredger carrys out river regulation environment.
Dredger, i.e. removes the instrument of benthal deposit.Power typically has diesel engine, two kinds of motor.
Hull i.e. buoyancy aid, uses assembly box-shaped structure.There are Accrete clearing device, power set, transporter etc..
Removed benthal deposit by power drive Accrete clearing device, transporter pass out to specify position.
The i.e. jet absorption type of jet absorption type dredger inhales large junk, mainly has a buoyancy aid, feed bin, sand suction pump, water jet pump,
With the suction salon head of hydraulic giant, upper suction pipe, lower suction pipe, power, running gear etc. forms.This ship is maximum
Bright spot Shi Xi salon head.Be equipped with a giant above, water jet pump water through hydraulic giant direct-injection bottom
Silt, silt splashes to rise under the injection of water under high pressure and is inhaling around salon's head, inhaled through inhaling salon's head
Husky pumping rises and is entered feed bin by upper suction pipe.It is cheap that jet absorption type inhales large junk, uses simple, operation
Convenient.It is applicable to water-bed pasture and water etc. and twines the reservoir area that jail thing is few, river bed, operation at the operation such as man-made lake.
Strand suction dredger is the primary ship type of dredger, by buoyancy aid, and reamer, upper suction pipe, lower suction pipe,
Pump, power etc. forms.He utilizes the reamer of lower suction pipe leading portion, and benthal deposit is cut by drag head device
After agitation is loose, through lower suction pipe by pumping, upper suction pipe is had to pass out to specify position.This ship efficiency is high,
Low cost.Husky aqueous mixtures is processed per hour 50 sides to 500 sides according to ship type.Ultra-large type dredger
Disposal ability side over 1000.
Existing dredger mainly has the cutter suction dredger that reamer and slush pump are constituted, traditional strand suction
Dredger Technical comparing falls behind, and often causes dredging water pollution and work surface to be uneven, especially
Be the mud point degree of depth deeper time, excavate be unable to reach cleaning mud point the degree of depth, when cleaning mud point become
During change place, relying on power peculiar to vessel to be moved by hull, therefore power consumption is big, production efficiency is low, desilting matter
It is poor to measure.
Utility model content
The purpose of this utility model is to provide a kind of novel dredger, to solve to exist in prior art
Power consumption big, production efficiency is low and the ropy technical problem of desilting.
The novel dredger of one that this utility model provides, including: dredger main body and power-equipment,
Described dredger body front end is provided with reamer frame suspension bracket, is provided with in described dredger body front end
Inner groovy, is provided with desilting equipment in described inner groovy, is provided with dredge pump and gets rid of system on dredger
System;
On rear side of described dredger main body, it is provided with guide pile, described guide pile side is provided with movement
Slideway, is provided with mobile station on described mobile slideway, is provided with mobile stake on a mobile station, in institute
State and in mobile station, be provided with the movable hydraulic bar being connected with dredger main body, be used for driving mobile station moving
Movement on sliding way;So dredger needs location when, it is possible to the situation according to river course will
Mobile stake is adjusted so that it is mobile stake and guide pile all can play good positioning action, it is ensured that clear
Stablizing of silt ship.
Further, described power-equipment includes hydraulic oil pump and drives the electromotor of hydraulic oil pump, institute
Stating the connection of hydraulic oil pump one end and have the connecting tube for connecting dredging tube, the other end connects to be had for spoil disposal
Discharge pipe, by the hydraulic oil pump of driven by engine, it is achieved dredging tube by near reamer mud inhale
Walk.
Further, described desilting equipment includes dredging tube, reamer and reamer motor;Described dredging tube
On be provided with reamer motor, described reamer motor is provided with described reamer;Described dredging tube passes through
Suction sleeve connects described connecting tube, drives reamer to rotate by reamer motor so that it is the mud of alluvial
The other dredging tube that splashes siphons away, and reaches the purpose of cleaning alluvial mud.
Further, described dredging tube is provided with reamer lifting wheel, described reamer liter near reamer one end
Fall wheel walks around the fixed pulley on described reamer frame suspension bracket and the volume being arranged in dredger main body by wirerope
Winding apparatus connects, it is achieved to dredging tube pull-up from water, facilitate the navigation of dredger.
Further, described inner groovy both sides are provided with windlass, and dredger body front end is provided with anchor
Bracket, is placed with the anchor being connected with windlass by anchor chain on anchor bracket, for the location of dredger,
Dredger is made to come to a complete stop.
Further, described dredging tube is provided with drive sleeve, described drive sleeve is provided with
For the raise-lower hydraulic post of dredging tube lifting, described raise-lower hydraulic post is connected to the liter in dredger main body
On descending liquid press, raise-lower hydraulic post is driven to be that drive sleeve drives the upper of dredging tube by raise-lower hydraulic machine
Rise and decline.
Further, it is provided with control room on rear side of the raise-lower hydraulic machine of described dredger main body, described
It is provided with pump cabin on rear side of control room, on rear side of described pump cabin, is provided with described mobile station.
Further, described dredge pump removal system includes discharge pipe and for regulating the regulation liter of discharge pipe
Fall post, described regulation lifting column is positioned in dredger main body.
Further, described control room is provided with display lamp, including portside light, starboard light, taillight
With anchor lantern etc., for the lamp of various instructions.
Further, described dredger main body is provided with lifebuoy.
In sum, this utility model has the advantages that
1, hull small volume, it is possible to adapt to the dredging work of river course narrower width;
2, have employed guide pile and mobile stake due to this ship, it is possible to solve river course and cast anchor the asking of location difficulty
Topic;
3, there is regulation lifting column under drain, it is possible to the height of the regulation discharge pipe mouth of pipe so that it is desilting
Effect is more preferable;
4, dredging tube controls the drive sleeve on lifting column and coiler device wirerope by raise-lower hydraulic machine
Connect the reamer lifting wheel on dredging tube and jointly realize the raising and lowering of dredging tube.
5, the mud in river course can effectively be cleared up by this dredger efficiently, keeps river course
Unobstructed.
Accompanying drawing explanation
In order to be illustrated more clearly that this utility model detailed description of the invention or technical side of the prior art
Case, will make simply the accompanying drawing used required in detailed description of the invention or description of the prior art below
Introduce, it should be apparent that, the accompanying drawing in describing below is embodiments more of the present utility model, right
From the point of view of those of ordinary skill in the art, on the premise of not paying creative work, it is also possible to according to
These accompanying drawings obtain other accompanying drawing.
The side structure schematic diagram of a kind of novel dredger that Fig. 1 provides for this utility model embodiment;
Fig. 2 is the plan structure schematic diagram of a kind of novel dredger shown in Fig. 1.
Reference:
1-dredging tube;2-reamer;3-reamer frame suspension bracket;
4-anchor;401-anchor bracket;5-suction sleeve;
6-reamer motor;7-connecting tube;8-hydraulic oil pump;
9-discharge pipe;10-regulates lifting column;11-guide pile;
12-electromotor;13-drive sleeve;14-raise-lower hydraulic post;
15-windlass;16-raise-lower hydraulic machine;17-mobile station;
18-moves stake;19-control room;20-pump cabin;
21-display lamp;22-lifebuoy;23-moves slideway.
Detailed description of the invention
Below in conjunction with accompanying drawing, the technical solution of the utility model is clearly and completely described, aobvious
So, described embodiment is a part of embodiment of this utility model rather than whole embodiments.
Based on the embodiment in this utility model, those of ordinary skill in the art are not making creative work
The every other embodiment obtained under premise, broadly falls into the scope of this utility model protection.
In description of the present utility model, it should be noted that term " " center ", " on ", D score,
Orientation or the position relationship of the instruction such as "left", "right", " vertically ", " level ", " interior ", " outward " are
Based on orientation shown in the drawings or position relationship, it is for only for ease of description this utility model and simplification is retouched
State rather than indicate or imply that the device of indication or element must have specific orientation, with specifically
Azimuth configuration and operation, therefore it is not intended that to restriction of the present utility model.Additionally, term " the
One ", " second ", " the 3rd " are only used for describing purpose, and it is not intended that instruction or imply relatively heavy
The property wanted.
In description of the present utility model, it should be noted that unless otherwise clearly defined and limited,
Term " is installed ", " being connected ", " connection " should be interpreted broadly, and connects for example, it may be fixing,
Can also be to removably connect, or be integrally connected;Can be to be mechanically connected, it is also possible to be electrical connection;
Can be to be joined directly together, it is also possible to be indirectly connected to by intermediary, can be two element internals
Connection.For the ordinary skill in the art, can understand that above-mentioned term is at this with concrete condition
Concrete meaning in utility model.
The side structure schematic diagram of a kind of novel dredger that Fig. 1 provides for this utility model embodiment;
Fig. 2 is the plan structure schematic diagram of a kind of novel dredger shown in Fig. 1.
As shown in Figure 1-2, the novel dredger of one that the present embodiment provides, including: dredger main body
And power-equipment, dredger body front end is provided with reamer frame suspension bracket 3, sets in dredger body front end
It is equipped with inner groovy, in inner groovy, is provided with desilting equipment, dredger is provided with dredge pump and gets rid of system
System;
On rear side of dredger main body, it is provided with guide pile 11, guide pile 11 side is provided with mobile slideway
23, mobile slideway 23 is provided with mobile station 17, mobile station 17 is provided with mobile stake 18,
Mobile station 17 is provided with the movable hydraulic bar being connected with dredger main body, is used for driving mobile station 17
Movement on mobile slideway 23;So dredger needs location when, it is possible to according to river course
Movement stake 18 is adjusted by situation so that it is it is the most fixed that mobile stake 18 and guide pile 11 all can play
Position effect, it is ensured that stablizing of dredger.
In the present embodiment, power-equipment it is provided with in dredger main body for driving dredger and dredge pump
Removal system;At the guide pile 11 that the rear side of dredger main body is arranged, for dredger is fixed, make
It can be stable carry out desilting;Can firmly local pacify owing to finding the when that guide pile 11 being fixed
Dress, after its position is fixing, needs to carry out again fixing dredger main body, so could be able to make
Dredger is more stable work when.
Movable hydraulic bar can promote mobile station 17 to move on mobile slideway 23;Thus move stake 18
Position also be able to mobile, mobile stake 18 is inserted in riverbed when, it is possible at mobile slideway 23
The relatively firm place of upper selection is inserted, so more preferable to the effect that dredger is fixing.
It is all the dredger of guide pile 11 with the first two, using guide pile 11 to fix when, by
Being fixing in the relative position of two guide piles 11, two guide piles 11 all find firm riverbed fixed
Position is inconvenient, and a general guide pile 11 selects preferable place to position, and another one is fixed
Position stake 11 can only nonoptional position, and this sample loading mode does not has one of them to use mobile stake 18
Good positioning effect.
As it is shown in figure 1, further, power-equipment includes hydraulic oil pump 8 and drives hydraulic oil pump 8
Electromotor 12, hydraulic oil pump 8 one end connect have the connecting tube 7 for connecting dredging tube 1, another
End connects the discharge pipe 9 for spoil disposal, the hydraulic oil pump 8 driven by electromotor 12, it is achieved inhale
Mud near reamer 2 is siphoned away by mud pipe 1.
Electromotor 12, while providing power to dredger, is also connected with hydraulic oil pump 8, electromotor
12 is Diesel engine 12, and Diesel engine 12 provides power, hydraulic oil pump 8 to hydraulic oil pump 8
Water inlet be connected with connecting tube 7, the outlet of hydraulic oil pump 8 is connected with discharge pipe 9, mud from
Connecting tube 7 enters, and is flowed in hydraulic oil pump 8 from water inlet, discharges through discharge pipe 9 from outlet.
Further, desilting equipment includes dredging tube 1, reamer 2 and reamer motor 6;On dredging tube 1
It is provided with reamer motor 6, reamer motor 6 is provided with reamer 2;Dredging tube 1 passes through suction sleeve
5 connect connecting tube 7, drive reamer 2 to rotate by reamer motor 6 so that it is the mud of alluvial splashes not
Dredging tube 1 siphons away, and reaches the purpose of cleaning alluvial mud.
Reamer motor 6 drives the rotation that reamer 2 is at full speed, stirs scattered by the mud in river course, by dredging tube 1
Siphon away, play the effect of cleaning mud, between dredging tube 1 and connecting tube 7, have suction sleeve 5, due to
Dredging tube 1 is oscilaltion, and dredging tube 1 realizes being flexible coupling by suction sleeve 5 with connecting tube 7.
Further, dredging tube 1 is provided with reamer 2 lifting wheel, 2 liters of reamer near reamer 2 one end
Fall wheel walks around the fixed pulley on reamer frame suspension bracket 3 and the winding being arranged in dredger main body by wirerope
Device connects, it is achieved to dredging tube 1 pull-up from water, facilitate the navigation of dredger.
Dredger main body is provided with coiler device, coiler device has wirerope, wirerope walk around reamer
Fixed pulley on frame suspension bracket 3, reamer 2 lifting wheel being connected in dredger main body, filled by winding
Put, the position of dredging tube 1 is adjusted.
As in figure 2 it is shown, further, inner groovy both sides are provided with windlass 15, before dredger main body
End is provided with anchor bracket 401, is placed with and is connected with windlass 15 by anchor 4 chain on anchor bracket 401
Anchor 4, for the location of dredger, makes dredger come to a complete stop.
Arranging windlass 15 in dredger main body, the dredger body front end in windlass 15 front arranges anchor torr
Frame 401, anchor 4 is placed on anchor bracket 401, has anchor 4 chain between anchor 4 and windlass 15;Pass through anchor
Machine 15 realizes casting anchor 4, thus is come to a complete stop by ship.
Further, dredging tube 1 is provided with drive sleeve 13, drive sleeve 13 is provided with use
In the raise-lower hydraulic post 14 of dredging tube 1 lifting, raise-lower hydraulic post 14 is connected to the liter in dredger main body
On descending liquid press 16, raise-lower hydraulic post 14 is driven to be that drive sleeve 13 carries by raise-lower hydraulic machine 16
The raising and lowering of dynamic dredging tube 1.
Further, on rear side of the raise-lower hydraulic machine 16 of dredger main body, it is provided with control room 19, is controlling
Pump cabin 20 it is provided with, the mobile station 17 being provided with on rear side of pump cabin 20 on rear side of room 19.
GPS navigation equipment, electronic chart, AIS is had, for desilting is clicked in control room 19
Row location, then after dredger being fixed on desilting position with guide pile 11 and mobile stake 18, carry out clear
The work become silted up.
Further, dredge pump removal system includes discharge pipe 9 and for regulating the regulation liter of discharge pipe 9
Fall post 10, regulation lifting column 10 is positioned in dredger main body.
Dredge pump removal system is connected with hydraulic oil pump 8, and mud is drained into dredge pump and gets rid of by hydraulic oil pump 8
In system, mud is got rid of on rear side of the ship of dredger by dredge pump removal system, and discharge pipe 9 is S type,
One end is connected with hydraulic oil pump 8, and the other end is towards the rear of ship, and discharge pipe 9 is flexible pipe, by row
Go out pipe 9 lower end regulation lifting column 10 can regulate discharge pipe 9 opening towards and height, come
It is adjusted according to the situation that mud is discharged, reaches the optimal effect obtaining blowdown mud.
Further, control room 19 is provided with display lamp 21, including portside light, starboard light, tail
Lamp and anchor 4 lamp etc., for the lamp of various instructions.
Further, described dredger main body is provided with lifebuoy 22, for danger and disaster when
Save oneself or rescue people.
In sum, this utility model has the advantages that
1, hull small volume, it is possible to adapt to the dredging work of river course narrower width;
2, have employed guide pile 11 and mobile stake 18 due to this ship, it is possible to solve river course and cast anchor 4 location
The problem of difficulty;
3, there is regulation lifting column 10 under drain, it is possible to the height of regulation discharge pipe 9 mouth of pipe so that it is clear
The effect become silted up is more preferable;
4, dredging tube 1 controls the drive sleeve 13 on lifting column and winding dress by raise-lower hydraulic machine 16
Put reamer 2 lifting wheel connected on dredging tube 1 with wirerope jointly realize dredging tube 1 rising and under
Fall.
5, the mud in river course can effectively be cleared up by this dredger efficiently, keeps river course
Unobstructed.
It is last it is noted that various embodiments above is only in order to illustrate the technical solution of the utility model,
It is not intended to limit;Although this utility model being described in detail with reference to foregoing embodiments,
It will be understood by those within the art that: it still can be to the skill described in foregoing embodiments
Art scheme is modified, or the most some or all of technical characteristic is carried out equivalent;And this
A little amendments or replacement, do not make the essence of appropriate technical solution depart from this utility model each embodiment skill
The scope of art scheme.
Claims (10)
1. a novel dredger, it is characterised in that including: dredger main body and power-equipment,
Described dredger body front end is provided with reamer frame suspension bracket, in described dredger body front end is provided with
Groove, is provided with desilting equipment in described inner groovy, is provided with dredge pump removal system on dredger;
On rear side of described dredger main body, it is provided with guide pile, described guide pile side is provided with movement
Slideway, is provided with mobile station on described mobile slideway, is provided with mobile stake on a mobile station, in institute
State and in mobile station, be provided with the movable hydraulic bar being connected with dredger main body, be used for driving mobile station moving
Movement on sliding way.
The novel dredger of one the most according to claim 1, it is characterised in that described power sets
The standby electromotor including hydraulic oil pump and driving hydraulic oil pump, described hydraulic oil pump one end connect have for
Connecting the connecting tube of dredging tube, the other end connects the discharge pipe for spoil disposal.
The novel dredger of one the most according to claim 2, it is characterised in that described desilting sets
For including dredging tube, reamer and reamer motor;Reamer motor it is provided with, described on described dredging tube
Described reamer it is provided with on reamer motor;Described dredging tube connects described connecting tube by suction sleeve.
The novel dredger of one the most according to claim 3, it is characterised in that described dredging tube
Reamer one end is provided with reamer lifting wheel, and described reamer lifting wheel walks around described reamer by wirerope
Fixed pulley on frame suspension bracket is connected with the coiler device being arranged in dredger main body.
The novel dredger of one the most according to claim 1, it is characterised in that described inner groovy
Both sides are provided with windlass, and dredger body front end is provided with anchor bracket, are placed with logical on anchor bracket
Cross the anchor that anchor chain is connected with windlass.
The novel dredger of one the most according to claim 2, it is characterised in that described dredging tube
On be provided with drive sleeve, described drive sleeve is provided with for dredging tube lifting raise-lower hydraulic
Post, described raise-lower hydraulic post is connected on the raise-lower hydraulic machine in dredger main body.
The novel dredger of one the most according to claim 6, it is characterised in that described dredger
It is provided with control room on rear side of the raise-lower hydraulic machine of main body, on rear side of described control room, is provided with pump cabin,
Described mobile station it is provided with on rear side of described pump cabin.
The novel dredger of one the most according to claim 1, it is characterised in that described dredge pump
Removal system includes discharge pipe and for regulating the regulation lifting column of discharge pipe, described regulation lifting column position
In dredger main body.
The novel dredger of one the most according to claim 7, it is characterised in that described control
Display lamp it is provided with on room.
10. according to the novel dredger of one described in claim 1-9 any one, it is characterised in that
It is provided with lifebuoy in described dredger main body.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620433969.2U CN205636851U (en) | 2016-05-12 | 2016-05-12 | Novel desilting ship |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620433969.2U CN205636851U (en) | 2016-05-12 | 2016-05-12 | Novel desilting ship |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205636851U true CN205636851U (en) | 2016-10-12 |
Family
ID=57059278
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620433969.2U Expired - Fee Related CN205636851U (en) | 2016-05-12 | 2016-05-12 | Novel desilting ship |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205636851U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108222107A (en) * | 2018-03-19 | 2018-06-29 | 江苏省水利机械制造有限公司 | A kind of integral type dredging dehydration equipment |
CN108589810A (en) * | 2018-02-06 | 2018-09-28 | 芜湖市皖南造船有限公司 | A kind of small silt-cleaning vessel |
CN111038652A (en) * | 2019-12-25 | 2020-04-21 | 微山瀚海建工有限公司 | Multifunctional engineering ship |
CN118087643A (en) * | 2024-04-17 | 2024-05-28 | 江苏航宇环境科技有限公司 | Environment-friendly dredging device |
-
2016
- 2016-05-12 CN CN201620433969.2U patent/CN205636851U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108589810A (en) * | 2018-02-06 | 2018-09-28 | 芜湖市皖南造船有限公司 | A kind of small silt-cleaning vessel |
CN108222107A (en) * | 2018-03-19 | 2018-06-29 | 江苏省水利机械制造有限公司 | A kind of integral type dredging dehydration equipment |
CN108222107B (en) * | 2018-03-19 | 2023-04-07 | 江苏省水利机械制造有限公司 | Integral type desilting dewatering equipment |
CN111038652A (en) * | 2019-12-25 | 2020-04-21 | 微山瀚海建工有限公司 | Multifunctional engineering ship |
CN118087643A (en) * | 2024-04-17 | 2024-05-28 | 江苏航宇环境科技有限公司 | Environment-friendly dredging device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205636851U (en) | Novel desilting ship | |
CN206762343U (en) | Suitable for the floating type blowdown apparatus of industrial collecting-tank | |
CN104631439A (en) | Pump suction reverse circulation pile foundation construction device and method | |
JP3763789B2 (en) | Mud removal system | |
CN102995686B (en) | Pool dredging system | |
CN210194725U (en) | Submersible dredging robot | |
CN110106934A (en) | A kind of underwater intelligent silt remover | |
CN206646567U (en) | Self-propulsion type is multi-functional to take out sapin platform | |
CN106812171B (en) | Portable three-floating-body silt extraction system for small and medium-sized reservoirs | |
CN204551723U (en) | Sewage well sludge sand stone cleaning device | |
CN108505574A (en) | Environment protection-type multi-function operation ship | |
JP2000220164A (en) | Dredging device | |
CN210238614U (en) | Underwater intelligent silt remover | |
CN211472644U (en) | Water conservancy water and electricity is ditch desilting device for construction | |
CN113089753A (en) | Foundation pit sludge removal equipment for hydraulic engineering | |
KR20020029287A (en) | Apparatus for inhale removing sludge by using siphon principle and method for controlling moving thereof | |
CN205773560U (en) | One is simply constructed wastewater treatment equipment | |
CN216195035U (en) | Environment-friendly dredging device for river regulation engineering | |
CN113897922B (en) | Small-sized underwater dredging device and method suitable for gate grids | |
CN215977456U (en) | Silt cleaning equipment | |
CN219386452U (en) | Full-automatic sand pumping equipment for sand sedimentation tank | |
CN205189030U (en) | Large -traffic hank is inhaled ship bull energy dissipation dress and is refuted device | |
CN219033352U (en) | Port channel dredging device | |
CN210827640U (en) | A reservoir desilting device for hydraulic engineering construction | |
CN220580953U (en) | Drill bit diversion rectangular deep hole drilling machine suitable for soil stratum |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161012 Termination date: 20180512 |