CN205773560U - One is simply constructed wastewater treatment equipment - Google Patents

One is simply constructed wastewater treatment equipment Download PDF

Info

Publication number
CN205773560U
CN205773560U CN201620473738.4U CN201620473738U CN205773560U CN 205773560 U CN205773560 U CN 205773560U CN 201620473738 U CN201620473738 U CN 201620473738U CN 205773560 U CN205773560 U CN 205773560U
Authority
CN
China
Prior art keywords
flocculation basin
sand
dry sump
absolute altitude
infiltration pond
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620473738.4U
Other languages
Chinese (zh)
Inventor
陈进明
王浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Engineering Co Ltd of 17th Bureau of China's Railroad Group
Second Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd
Original Assignee
Second Engineering Co Ltd of 17th Bureau of China's Railroad Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Engineering Co Ltd of 17th Bureau of China's Railroad Group filed Critical Second Engineering Co Ltd of 17th Bureau of China's Railroad Group
Priority to CN201620473738.4U priority Critical patent/CN205773560U/en
Application granted granted Critical
Publication of CN205773560U publication Critical patent/CN205773560U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Separation Of Suspended Particles By Flocculating Agents (AREA)

Abstract

One is simply constructed wastewater treatment equipment, and it relates to environmental technology field;If the absolute altitude of dry sump is less than the absolute altitude of flocculation basin, if the absolute altitude in infiltration pond is less than the absolute altitude of dry sump;If being connected by drain pipe between described flocculation basin dry sump and infiltration pond;If described flocculation basin and dry sump are formed an impermeable airtight inverted trapezoidal structure by sand pocket, plastic foil, sand pocket, sand the most successively;Described infiltration pond is formed a permeable inverted trapezoidal structure by sand, sand pocket and sand the most successively;The top of described flocculation basin is provided with operating platform, and operating platform is provided with blender and chemicals feeder.This utility model makes the particle in waste water be separated from water, and completes precipitation at sedimentation tank, completes further to filter in infiltration pond; reach the purified treatment of construction waste water, make and easy to use, simple in construction; effect is obvious, greatly reduces contaminated wastewater, protects environment.

Description

One is simply constructed wastewater treatment equipment
Technical field
This utility model relates to environmental technology field, is specifically related to one and simply constructs wastewater treatment equipment.
Background technology
The world today, water resources crisis has become the complexity that various countries are faced in policy, economic and technical Problem.China's water resource also presents the shortage of freshwater resources total amount, spatial and temporal distributions inequality, water environment pollution Destroy with aquatic ecosystem and be on the rise and water requirement increases day by day, water quality requirement improves constantly feature. But along with developing rapidly of China's economic, the raising of industrialized level, the industrial wastewater pollution day to environment Acute increasingly.The generation of environment in recent years contamination accident mostly also is trade effluent accident, in order to effectively improve Water quality, China is annual spends substantial contribution for fwaater resources protection.
At substantial amounts of capital construction building-site, earth's surface and subsoil water have been subjected to pollutant in various degree Pollute, and this situation is also deteriorating.For present situation and the problem of China job site, from technical side Face finds new outlets, and promotes the continuous utilization of waste water resource, and the sustainable development for China provides the light of abundance Water resource, has important social meaning.
Utility model content
The purpose of this utility model is the defect for prior art and deficiency, it is provided that a kind of construction waste water Purifying processing device, it is possible to effectively reduce the wastewater treatment equipment of simply constructing of the pollution to water resource.
For achieving the above object, the technical solution adopted in the utility model is: it comprises flocculation basin, some Sedimentation tank, infiltration pond;If the absolute altitude of described dry sump is less than the absolute altitude of flocculation basin, the mark in infiltration pond If height is in the absolute altitude of dry sump;If by row between described flocculation basin dry sump and infiltration pond Water pipe connects;If described flocculation basin and dry sump the most successively by sand pocket, plastic foil, sand pocket, Sand one impermeable airtight inverted trapezoidal structure of composition;Described infiltration pond is the most successively by sand, sand Bag and sand one permeable inverted trapezoidal structure of composition;The top of described flocculation basin is provided with operating platform, behaviour Make on platform, to be provided with blender and chemicals feeder.
As preferably, the tail end of described drain pipe is provided with gate valve.
As preferably, adding aluminium polychlorid in described chemicals feeder, the tail end of chemicals feeder is provided with flexible pipe, soft The tail end of pipe is provided with gate valve.
As preferably, the stirrer paddle of described blender is positioned at below flocculation basin waterline.
The mass rate of emission of the controlled controlling the water circulation of described gate valve and polyaluminium aluminum flow into the speed of flocculation basin Degree.
If the quantity of described dry sump determines according to discharge of wastewater speed.
During this utility model operation, first construction waste water is entered flocculation basin, opens the gate valve of chemicals feeder tail end, Polyaluminium aluminum flows into flocculation basin, then opens blender, by polyaluminium aluminum at flocculation basin Inside stir, make the float in waste water complete with water and separate and form cotton-shaped crystalline solid;Open wadding If the gate valve of the drain pipe tail end that solidifying pond is connected with dry sump, make the water after separation and float crystalline solid If flowing into dry sump together, if crystalline solid completes precipitation bottom dry sump, top forms clear water; If open the gate valve of the drain pipe tail end that dry sump is connected with infiltration pond, if the clear water in making dry sump Flow into infiltration pond, and seepage flow discharge after again filtering via the middle layer of sand and sand pocket oozing basin bottom.
After using said structure, what this utility model produced has the beneficial effect that described in the utility model one Plant wastewater treatment equipment of simply constructing, make waste water by adding polyaluminium aluminum inside flocculation basin In particle be separated from water, sedimentation tank complete precipitation, infiltration pond further complete filter, reach To the purified treatment of construction waste water, making and easy to use, simple in construction, effect is obvious, is substantially reduced Contaminated wastewater, protects environment.
Accompanying drawing explanation
Fig. 1 is structure chart of the present utility model.
Description of reference numerals:
If flocculation basin 1 dry sump 2, infiltration pond 3, drain pipe 4, operating platform 5, blender 6,
Chemicals feeder 7, gate valve 8.
Detailed description of the invention
In order to be illustrated more clearly that this utility model embodiment or technical scheme of the prior art, below will The accompanying drawing used required in embodiment or description of the prior art is briefly described, it should be apparent that, Accompanying drawing in describing below is only embodiments more of the present utility model, for ordinary skill people From the point of view of Yuan, on the premise of not paying creative work, it is also possible to obtain other according to these accompanying drawings Accompanying drawing.
Referring to as it is shown in figure 1, this detailed description of the invention adopt the following technical scheme that it comprise flocculation basin 1, If dry sump 2, infiltration pond 3;If the absolute altitude of described dry sump 2 is less than the absolute altitude of flocculation basin 1, If the absolute altitude in infiltration pond 3 is less than the absolute altitude of dry sump 2;If described flocculation basin 1 dry sump 2 and Infiltration is connected by drain pipe 4 between pond 3;If described flocculation basin 1 and dry sump 2 are from inside to outside An impermeable airtight inverted trapezoidal structure is formed successively by sand pocket, plastic foil, sand pocket, sand;Described Infiltration pond 3 is formed a permeable inverted trapezoidal structure by sand, sand pocket and sand the most successively;Described The top of flocculation basin 1 is provided with operating platform 5, and operating platform 5 is provided with blender 6 and chemicals feeder 7.
As preferably, the tail end of described drain pipe 4 is provided with gate valve 8.
As preferably, adding aluminium polychlorid in described chemicals feeder 7, the tail end of chemicals feeder 7 is provided with flexible pipe, The tail end of flexible pipe is provided with gate valve 8.
As preferably, the stirrer paddle of described blender 6 is positioned at below flocculation basin 1 waterline.
The mass rate of emission of the described controlled controlling the water circulation of gate valve 8 and polyaluminium aluminum flow into flocculation basin 1 Speed.
If the quantity of described dry sump 2 determines according to discharge of wastewater speed.
During the operation of this detailed description of the invention, first construction waste water is entered flocculation basin 1, open chemicals feeder 7 tail end Gate valve 8, polyaluminium aluminum flow into flocculation basin 1, then open blender 6, by aluminium polychlorid Material stirs in flocculation basin 1, makes the float in waste water complete with water and separates and formed cotton-shaped Crystalline solid;If opening the gate valve 8 of drain pipe 4 tail end that flocculation basin 1 is connected with dry sump 2, make separation If water after flows into dry sump 2 together with float crystalline solid, if crystalline solid is complete bottom dry sump 2 Becoming precipitation, top forms clear water;If opening drain pipe 4 tail end that dry sump 2 is connected with infiltration pond 3 Gate valve 8, if making clear water in dry sump 2 flow into infiltration pond 3, and via in bottom infiltration pond 3 After layer of sand and sand pocket filter again, seepage flow discharges.
The construction method of this detailed description of the invention is:
1, excavation pit, foundation ditch volume is needed to comprise flocculation basin, sedimentation tank according to construction discharge of wastewater speed And the capacity requirement in infiltration pond;
2, bottom foundation ditch, lay one layer of medium sand, when plastic foil is destroyed, waste water can be filtered;
3, according to flocculation basin, sedimentation tank and the amount of capacity in infiltration pond, code is built bottom it and the first of border Layer sand pocket;First code builds infiltration pond sand pocket, when its end face is identical with sedimentation tank elevation of bottom, at flocculation basin And fill medium sand in sedimentation tank, then the sand pocket code simultaneously carrying out infiltration pond and sedimentation tank is built;Pond to be precipitated sand When bag end face is identical with absolute altitude at the bottom of flocculation basin, in flocculation basin, fill medium sand, carry out flocculation basin simultaneously, sink The sand pocket code in pond, shallow lake and infiltration pond is built to top mark high;During sand pocket code is built, bury drain pipe underground;
4, after ground floor sand pocket code is built and terminated, in flocculation basin and sedimentation tank, lay plastic foil and shakeout, interior Side code again builds one layer of sand pocket, is oozing basin bottom one layer of medium sand filter course of laying simultaneously;
5, operating platform and blender, chemicals feeder are installed, so far complete the construction of this detailed description of the invention.
After using said structure, what this detailed description of the invention produced has the beneficial effect that this detailed description of the invention Described one is simply constructed wastewater treatment equipment, by adding polyaluminium aluminum inside flocculation basin Particle in waste water is separated from water, completes precipitation at sedimentation tank, complete further in infiltration pond Filtering, reach the purified treatment of construction waste water, make and easy to use, simple in construction, effect is obvious, Greatly reduce contaminated wastewater, protect environment.
Of the present utility model ultimate principle and principal character and of the present utility model have more than been shown and described Advantage.Skilled person will appreciate that of the industry, this utility model is not restricted to the described embodiments, on State and principle of the present utility model is simply described, new without departing from this practicality described in embodiment and description On the premise of type spirit and scope, this utility model also has various changes and modifications, and these change and change Enter in the range of both falling within claimed this utility model.This utility model claims scope by appended Claims and equivalent thereof define.

Claims (4)

1. a simple construction wastewater treatment equipment, it is characterised in that: it comprises flocculation basin, some precipitations Pond, infiltration pond;If the absolute altitude of described dry sump is less than the absolute altitude of flocculation basin, the absolute altitude in infiltration pond is low If the absolute altitude in dry sump;If passing through drain pipe between described flocculation basin dry sump and infiltration pond Connect;If described flocculation basin and dry sump are the most successively by sand pocket, plastic foil, sand pocket, sand Form an impermeable airtight inverted trapezoidal structure;Described infiltration pond is the most successively by sand, sand pocket And sand one permeable inverted trapezoidal structure of composition;The top of described flocculation basin is provided with operating platform, operation Blender and chemicals feeder it is provided with on platform.
One the most according to claim 1 is simply constructed wastewater treatment equipment, it is characterised in that: institute The tail end of the drain pipe stated is provided with gate valve.
One the most according to claim 1 is simply constructed wastewater treatment equipment, it is characterised in that: institute Adding aluminium polychlorid in stating chemicals feeder, the tail end of chemicals feeder is provided with flexible pipe, and the tail end of flexible pipe is provided with gate valve.
One the most according to claim 1 is simply constructed wastewater treatment equipment, it is characterised in that: institute The stirrer paddle stating blender is positioned at below flocculation basin waterline.
CN201620473738.4U 2016-05-23 2016-05-23 One is simply constructed wastewater treatment equipment Expired - Fee Related CN205773560U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620473738.4U CN205773560U (en) 2016-05-23 2016-05-23 One is simply constructed wastewater treatment equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620473738.4U CN205773560U (en) 2016-05-23 2016-05-23 One is simply constructed wastewater treatment equipment

Publications (1)

Publication Number Publication Date
CN205773560U true CN205773560U (en) 2016-12-07

Family

ID=58116182

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620473738.4U Expired - Fee Related CN205773560U (en) 2016-05-23 2016-05-23 One is simply constructed wastewater treatment equipment

Country Status (1)

Country Link
CN (1) CN205773560U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111593814A (en) * 2020-04-27 2020-08-28 荣乐明 House building construction site waste water and rainwater cyclic utilization device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111593814A (en) * 2020-04-27 2020-08-28 荣乐明 House building construction site waste water and rainwater cyclic utilization device
CN111593814B (en) * 2020-04-27 2021-04-27 荣乐明 House building construction site waste water and rainwater cyclic utilization device

Similar Documents

Publication Publication Date Title
CN104174191B (en) Integrated grit chamber for treating rainwater and treatment method
CN103334469B (en) The treatment system removed for inner city pollution of river bed mud and treatment process
CN204457515U (en) A kind of bored pile mud circulation treatment system
CN106049390B (en) A kind of sand setting suitable for river controlling projects blocks dirty integrated apparatus
CN105735449B (en) A kind of urban road rainwater collecting and treating system
CN109020091A (en) A kind of combined type artificial marsh sewage treatment system and its processing method
CN206233333U (en) Initial rainwater filtering, precipitating, discarding and collecting treatment system
CN203498891U (en) Treatment system for removing polluted bed mud in river channel of central urban area
CN108990452B (en) Coupling diving layer salt and fresh water replacing and leaching desalting device
CN108781576B (en) Beach desalting method coupling water circulation
CN106186639A (en) Lake, river is gushed polluted bed mud and is processed remaining soil regenerative system
CN114232663B (en) Variable-permeability underground curtain for preventing seawater intrusion and land source pollution and construction method thereof
CN204982778U (en) High -efficient artifical lake system that adjusts that purifies
CN205773560U (en) One is simply constructed wastewater treatment equipment
CN206752629U (en) A kind of municipal works rainwater inspection well
CN203989972U (en) Integrated grit chamber for treating rainwater
CN2761722Y (en) Penetration type city rainwater drainage installation
CN104631599B (en) A kind of urgent flood discharge of rain flood
CN207608997U (en) A kind of Tiny ecosystem filter bed rainwater ecological utilizes device
CN103452082B (en) Environment-friendly recession port with silt filtering, anti-blocking and high-efficiency drainage functions
CN205934883U (en) Sand setting blocks dirty integrated device suitable for river regulation engineering
JP2006082005A (en) Muddy water treatment system and muddy water treatment method therefor
CN105498351B (en) Cast-in-situ bored pile mud sediment filter and its construction method
CN207160181U (en) A kind of water resource for pollution of area source is regulated and stored and purification facility
CN205917658U (en) A water -drawing channel structure for complex geological condition area

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161207

Termination date: 20200523

CF01 Termination of patent right due to non-payment of annual fee