China
Prior art keywords
winch
cable wire
building materials
track
slope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620469594.5U
Other languages
Chinese (zh)
Inventor
佟晓冬
谭河
孙锦阳
刘泽东
武艺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Highway Fifth Engineering Co Ltd
Original Assignee
CCCC First Highway Fifth Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Highway Fifth Engineering Co Ltd filed Critical CCCC First Highway Fifth Engineering Co Ltd
Priority to CN201620469594.5U priority Critical patent/CN205636741U/en
Application granted granted Critical
Publication of CN205636741U publication Critical patent/CN205636741U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a slope construction's building materials loading attachment has track (1) in side slope bottom to fixed mounting between the top, track (1) but upper portion slidable mounting has travelling car (2), bottom fixed mounting has the 1st winch (3) and 1 angle pulley (4) in the side slope, the cable wire of the 1st winch (3) is walked around 1 angle pulley (4) back, fixed arriving the rear portion of travelling car (2), there are the 2nd winch (5) and 2 angle pulley (6) at side slope top fixed mounting, the cable wire of the 2nd winch (5) is walked around 2 angle pulley (6) back, fixed arriving the top of travelling car (2). The advantage does: (1 )It is can be steadily safe with the specific position of the high -efficient quick transport of building materials to the side slope to save the manpower, reduced the work load of work, improved transport efficiency, (2 )The advantage that still has simple structure, with low costs and long service life.

Description

The building materials feeding device of slope construction
Technical field
This utility model belongs to civil engineering technical field, is specifically related to the building materials feeding dress of a kind of slope construction Put.
Background technology
How concrete, sandstone etc., in its work progress, are built by side slope big for height, that the gradient is steep What material was stable from ground is transported to the differing heights position of side slope, is a technology facing of current slope construction Difficult point.
In prior art, commonly used artificial conveyance mode, have waste time and energy, transfer efficiency low and peace The problems such as full hidden danger is many.Therefore, current slope construction the problems referred to above in the urgent need to address.
Utility model content
The defect existed for prior art, this utility model provides the building materials feeding device of a kind of slope construction, Can effectively solve the problems referred to above.
The technical solution adopted in the utility model is as follows:
This utility model provides the building materials feeding device of a kind of slope construction, consolidates bottom side slope between top Dingan County is provided with mobile dolly (2) equipped with track (1), described track (1) upper slidable;
The 1st winch (3) and the 1st angle pulley (4) it is installed with bottom side slope;Described 1st winch (3) Cable wire walk around described 1st angle pulley (4) after, be fixed to the rear portion of described mobile dolly (2);
The 2nd winch (5) and the 2nd angle pulley (6) it is installed with at side slope top;Described 2nd winch (5) Cable wire walk around described 2nd angle pulley (6) after, be fixed to the top of described mobile dolly (2).
Preferably, described 1st winch (3) includes the 1st hoist engine, the 1st servo-driver and the 1st servomotor; Described 1st hoist engine is wound with cable wire;Described 1st servo-driver is by described in described 1st driven by servomotor The spool of the 1st hoist engine rotates, thus carries out folding and unfolding cable wire;
Described 2nd winch (5) includes the 2nd hoist engine, the 2nd servo-driver and the 2nd servomotor;Described 2 hoist engines are wound with cable wire;Described 2nd servo-driver is by described in described 2nd driven by servomotor volume 2 The spool raising machine rotates, thus carries out folding and unfolding cable wire.
Preferably, described 1st winch (3) and described 2nd winch (5) are only also respectively provided with click Determine device and brake.
Preferably, master controller, the 1st force detection sensor and the 2nd force detection sensor are also included;Institute State the 1st force detection sensor for detecting the real-time strain value of the cable wire of described 1st winch (3);Described 2 force detection sensors are used for detecting the real-time strain value of the cable wire of described 2nd winch (5);
Described master controller respectively with described 1st servo-driver, described 2nd servo-driver, described 1st strand The click fastening device of car (3), the brake of described 1st winch (3), described 2nd winch (5) Click fastening device, the brake of described 2nd winch (5), described 1st force detection sensor and Described 2nd force detection sensor connects.
Preferably, described track (1) is two parallel left tracks and right track;Described left track and described Right track is for having reeded I-steel.
Preferably, described mobile dolly (2) includes that wagon box, described wagon box are pivotally mounted to above base; The left bottom front of described base and left bottom rear are installed with left front roller and left back rolling respectively Wheel;After the bottom right side front of described base and bottom right side rear are installed with right front wheel and the right side respectively Roller;Wherein, described left front roller and described left back roller are placed in described left track;Described right front wheel It is placed in described right track with described right rear roller.
The building materials feeding device of the slope construction that this utility model provides has the advantage that
(1) ad-hoc location that building materials the most quickly can be transported to side slope of steady safety, thus save Manpower, reduces the workload of work, improves transfer efficiency;
(2) also there is simple in construction, low cost and the advantage of length in service life.
Accompanying drawing explanation
The structural representation of the building materials feeding device of the slope construction that Fig. 1 provides for this utility model.
Detailed description of the invention
In order to make this utility model be solved the technical problem that, technical scheme and beneficial effect clearer, Below in conjunction with drawings and Examples, this utility model is further elaborated.Should be appreciated that herein Described specific embodiment, only in order to explain this utility model, is not used to limit this utility model.
In conjunction with Fig. 1, this utility model provides the building materials feeding device of a kind of slope construction, to top bottom side slope Being installed with track 1 between portion, track 1 upper slidable is provided with mobile dolly 2;
The 1st winch the 3 and the 1st angle pulley 4 it is installed with bottom side slope;The cable wire of the 1st winch 3 walks around the 1st After angle pulley 4, it is fixed to the rear portion of mobile dolly 2;
The 2nd winch the 5 and the 2nd angle pulley 6 it is installed with at side slope top;The cable wire of the 2nd winch 5 walks around the 2nd After angle pulley 6, it is fixed to the top of mobile dolly 2.
Wherein, the 1st winch 3 includes the 1st hoist engine, the 1st servo-driver and the 1st servomotor;1st elevator Machine is wound with cable wire;1st servo-driver is rotated by the spool of the 1st driven by servomotor the 1st hoist engine, from And carry out folding and unfolding cable wire;2nd winch 5 includes the 2nd hoist engine, the 2nd servo-driver and the 2nd servomotor;The 2 hoist engines are wound with cable wire;2nd servo-driver is turned by the spool of the 2nd driven by servomotor the 2nd hoist engine Dynamic, thus carry out folding and unfolding cable wire.1st winch the 3 and the 2nd winch 5 is also respectively provided with click fastening device And brake.
Also include master controller, the 1st force detection sensor and the 2nd force detection sensor;1st tension force detection Sensor is for the real-time strain value of the cable wire of detection the 1st winch 3;2nd force detection sensor is for detection the The real-time strain value of the cable wire of 2 winches 5;Master controller respectively with the 1st servo-driver, the 2nd servo-driver, The click fastening device of the 1st winch 3, the brake of the 1st winch 3, the click fastening of the 2nd winch 5 Device, the brake of the 2nd winch 5, the 1st force detection sensor and the 2nd force detection sensor connect.
In actual application, for improving the stability that mobile dolly moves along track, reduce to greatest extent simultaneously The cost of whole device, track 1 uses two parallel left tracks and right track;Left track and right track are tool Reeded I-steel.Mobile dolly 2 includes that wagon box, wagon box are pivotally mounted to above base;A left side for base Side bottom front and left bottom rear are installed with left front roller and left back roller respectively;The right side of base Bottom front and bottom right side rear are installed with right front wheel and right rear roller respectively;Wherein, left front rolling Wheel and left back roller are placed in left track;Right front wheel and right rear roller are placed in right track.Accordingly, because Mobile dolly 2 uses four rolling, can improve the stability that mobile dolly moves.
The building materials feeding device of the slope construction that this utility model provides, its work process is:
(1) move dolly initial placement in the bottom of track, in the wagon box of mobile dolly, put into building materials;
(2) the 1st winch and the 2nd winch are controlled by master controller, make the 2nd winch being positioned at top, slope continuous Rope closing, and be in the 1st winch at the bottom of slope and constantly put rope, thus mobile dolly is drawn to the ad-hoc location of side slope;
In this process, master controller passes through the 1st force detection sensor and the 2nd force detection sensor, Tension value and the tension value of the 2nd hoist line of the 1st hoist line can be detected in real time;Therefore, master controller The 1st winch and the withdrawing rope speed of the 2nd winch can be adjusted according to the tension value of cable wire, make the 1st hoist line and 2nd hoist line is in tension stress, thus ensures that mobile dolly, in the stability of climbing process, prevents In mobile dolly wagon box, building materials are shaken and are spread to outside.
(3) when after the ad-hoc location that mobile dolly is drawn to side slope, rotate wagon box, make to install on wagon box Dump gate towards staff, then open Dump gate, building materials unloaded down;It is then shut off Dump gate;
(4) the 1st winch and the 2nd winch are controlled by master controller again, make to be positioned at the 2nd winch on top, slope not Break and put rope, and be in the 1st continuous rope closing of winch at the bottom of slope, thus mobile dolly is drawn at the bottom of the slope of side slope, Again after dolly hopper loads building materials, repeat said process, it is achieved the purpose of mobile cart transport building materials.
As can be seen here, the building materials feeding device of the slope construction that this utility model provides has the advantage that
(1) ad-hoc location that building materials the most quickly can be transported to side slope of steady safety, thus save Manpower, reduces the workload of work, improves transfer efficiency;
(2) also there is simple in construction, low cost and the advantage of length in service life.
The above is only preferred implementation of the present utility model, it is noted that for the art For those of ordinary skill, on the premise of without departing from this utility model principle, it is also possible to make some improvement And retouching, these improvements and modifications also should regard protection domain of the present utility model.

Claims (6)

1. the building materials feeding device of a slope construction, it is characterised in that consolidate between top bottom side slope Dingan County is provided with mobile dolly (2) equipped with track (1), described track (1) upper slidable;
The 1st winch (3) and the 1st angle pulley (4) it is installed with bottom side slope;Described 1st winch (3) Cable wire walk around described 1st angle pulley (4) after, be fixed to the rear portion of described mobile dolly (2);
The 2nd winch (5) and the 2nd angle pulley (6) it is installed with at side slope top;Described 2nd winch (5) Cable wire walk around described 2nd angle pulley (6) after, be fixed to the top of described mobile dolly (2).
The building materials feeding device of slope construction the most according to claim 1, it is characterised in that the described 1st Winch (3) includes the 1st hoist engine, the 1st servo-driver and the 1st servomotor;Described 1st hoist engine is wound around There is cable wire;Described 1st servo-driver is turned by the spool of the 1st hoist engine described in described 1st driven by servomotor Dynamic, thus carry out folding and unfolding cable wire;
Described 2nd winch (5) includes the 2nd hoist engine, the 2nd servo-driver and the 2nd servomotor;Described 2 hoist engines are wound with cable wire;Described 2nd servo-driver is by described in described 2nd driven by servomotor volume 2 The spool raising machine rotates, thus carries out folding and unfolding cable wire.
The building materials feeding device of slope construction the most according to claim 2, it is characterised in that the described 1st Winch (3) and described 2nd winch (5) are also respectively provided with click fastening device and brake.
The building materials feeding device of slope construction the most according to claim 3, it is characterised in that also include Master controller, the 1st force detection sensor and the 2nd force detection sensor;Described 1st force detection sensor For detecting the real-time strain value of the cable wire of described 1st winch (3);Described 2nd force detection sensor is used for Detect the real-time strain value of the cable wire of described 2nd winch (5);
Described master controller respectively with described 1st servo-driver, described 2nd servo-driver, described 1st strand The click fastening device of car (3), the brake of described 1st winch (3), described 2nd winch (5) Click fastening device, the brake of described 2nd winch (5), described 1st force detection sensor and Described 2nd force detection sensor connects.
The building materials feeding device of slope construction the most according to claim 1, it is characterised in that described rail Road (1) is two parallel left tracks and right track;Described left track and described right track are reeded for tool I-steel.
The building materials feeding device of slope construction the most according to claim 5, it is characterised in that described shifting Dynamic dolly (2) includes that wagon box, described wagon box are pivotally mounted to above base;The left bottom of described base Front and left bottom rear are installed with left front roller and left back roller respectively;At the bottom of the right side of described base Front, portion and bottom right side rear are installed with right front wheel and right rear roller respectively;Wherein, described left front Roller and described left back roller are placed in described left track;Described right front wheel and described right rear roller are placed in institute State in right track.
CN201620469594.5U 2016-05-20 2016-05-20 Slope construction's building materials loading attachment Active CN205636741U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620469594.5U CN205636741U (en) 2016-05-20 2016-05-20 Slope construction's building materials loading attachment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620469594.5U CN205636741U (en) 2016-05-20 2016-05-20 Slope construction's building materials loading attachment

Publications (1)

Publication Number Publication Date
CN205636741U true CN205636741U (en) 2016-10-12

Family

ID=57054468

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620469594.5U Active CN205636741U (en) 2016-05-20 2016-05-20 Slope construction's building materials loading attachment

Country Status (1)

Country Link
CN (1) CN205636741U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106939605A (en) * 2017-05-12 2017-07-11 山东大学 The haulage equipment and method for carrying of a kind of slope protection block
CN107268630A (en) * 2017-07-06 2017-10-20 中交路桥建设有限公司 A kind of side slope protection construction material transport system and method
CN108502475A (en) * 2018-06-24 2018-09-07 苏州盛迪通电子科技有限公司 A kind of construction material track conveying device being adapted to talus side slope and application method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106939605A (en) * 2017-05-12 2017-07-11 山东大学 The haulage equipment and method for carrying of a kind of slope protection block
CN106939605B (en) * 2017-05-12 2022-05-10 山东大学 Slope protection building block carrying equipment and method
CN107268630A (en) * 2017-07-06 2017-10-20 中交路桥建设有限公司 A kind of side slope protection construction material transport system and method
CN108502475A (en) * 2018-06-24 2018-09-07 苏州盛迪通电子科技有限公司 A kind of construction material track conveying device being adapted to talus side slope and application method

Similar Documents

Publication Publication Date Title
CN204433827U (en) A kind of grain delivery trolley and magazine loading attachment
CN201494438U (en) Simple and fast installation cableway for maintenance and rush repair of mountain pipeline
CN205636741U (en) Slope construction's building materials loading attachment
CN202899040U (en) Crossing tunnel box girder transporting and mounting all-in-one machine
CN201377184Y (en) Ultra-long roofing contour plate vertical lifting transporting device
CN208120594U (en) A kind of section of jurisdiction for subway work vertical transport system automatically grabs handler
CN202323703U (en) Beam bottom checking trolley
CN107500109A (en) A kind of overhead crane with electric hoists
CN205973518U (en) Track portal jib crane
CN210117190U (en) Small material hoister
CN202214033U (en) Uncoiling and paving device for double-coiled adhesive tape of belt type conveyor
CN201257920Y (en) Special type equipment detecting vehicle
CN104828628B (en) Layout machine structure, cloth spreading device and layout machine
CN106516556A (en) Multi-functional vehicle traveling on truss
CN204074810U (en) Coil of strip device gone up automatically by a kind of uncoiler
CN208022551U (en) A kind of stair transporting equipment
CN206368568U (en) The counter weight device of multi-storied garage
CN207738303U (en) A kind of generator unit stator lifting steering
CN202017347U (en) Externally-hung discharging platform device
CN206767163U (en) A kind of pressure sensitive automatic loading machine
CN106087756A (en) The erecting device of Wavelike steel webplate and installation method
CN201933467U (en) Combined trolley used for dam face construction of face rockfill dam
CN206872077U (en) A kind of tiltable carrier loader platform
CN205634685U (en) Cable crane hoist
CN205170256U (en) A there is rail loop wheel machine device for TBM tunnel construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant