CN205617395U - 防范山体滑坡和泥石流危害的结构工程 - Google Patents
防范山体滑坡和泥石流危害的结构工程 Download PDFInfo
- Publication number
- CN205617395U CN205617395U CN201620317358.1U CN201620317358U CN205617395U CN 205617395 U CN205617395 U CN 205617395U CN 201620317358 U CN201620317358 U CN 201620317358U CN 205617395 U CN205617395 U CN 205617395U
- Authority
- CN
- China
- Prior art keywords
- reinforcing bar
- oblique pull
- steel column
- pull reinforcing
- low level
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
本实用新型公开了一种防范山体滑坡和泥石流危害的结构工程,此结构工程的主要构件有:1、钢柱,2、平拉钢筋,3、岩孔,4、高位斜拉钢筋,5、低位斜拉钢筋,增阻钢板等,钢柱是采用废钢轨浇注在用钻机打的岩石孔中,钢柱钢柱之间焊上平行的钢筋若干,为加大整体阻抗山体滑坡的压力,又在每根钢柱的顶端和中段焊上斜拉钢筋,这些斜拉钢筋又深浇注在相应的岩孔中,如是则大大地增大了整体阻抗山体滑坡的强度。
Description
一、技术领域
本实用新型涉及一种防范地质灾害的结构工程,特别是防范山体滑坡和泥石流危害的结构工程。
二、背景技术
众所周知,山体滑坡或泥石流情况的发生,这本是地球演变过程中的一种地质现象,这二者有时同时发生,有时是单体发生,产生的原因多半是由于暴雨冲刷使一些不稳定的山石伴着泥土滚落下来形成泥石流,其来势快,危害程度高,难以预测,所以阻防困难。而山体滑坡往往有二种情况,一种是岩层与岩层之间,由于风化和重力作用而产生位移,形成山体滑坡,而另一种山体滑坡现象的发生是由于暴雨或雨期较长,从而将处于临界点的岩层或第四纪沉积物冲压下来,不过这种山体滑坡是有一个渐变的过程,人们如警惕性高是可以观察得到的,也就能提前采取逃避措施免以伤害。
三、发明内容
而本实用新型正是针对后者采取一种阻防其危害的结构工程,具体说就是在可能或有潜在滑坡危险的地域,预先做好阻防或降低山体滑坡危害的结构工程,即在可能发生山体滑坡的山坡前方,预先深埋若干根钢柱(即图1的1),这种钢柱可用废钢轨代替,钢轨高度不小于6米,其埋入地下不小于3米,这些立柱的横向间距不大于3米,立柱与立柱之间用尺寸相当的钢筋焊接在一起,这些钢筋的纵向间距不大于1米,为加强对这些立柱的拉力,再在立柱的2米处和立柱的顶端分别焊接二根斜拉杆,这二根斜拉杆的底端埋在山坡的相应地方,这二根斜拉杆的底端长度约1.5-2米埋在基岩中,为此要在基岩上钻二个相应的孔,并用水泥浇注其中以固化二斜拉杆的强度,亦即增加斜拉杆对钢柱的拉力,为增大斜拉杆对立柱的拉力,特在钢筋4和5的下端增焊二块钢板9,这样随山体滑落下来的砂石块沉积物 增多,也就增大了钢柱以及平焊在钢柱上的钢筋抗阻强度,以达到本发明所述的阻抗山体滑坡的危害。
四、附图说明
图1是本实用新型纵向剖视图。
图中1、钢柱,2、平拉钢筋,3、岩孔,4、高位斜拉钢筋,5、低位斜拉钢筋,6、山体,7、高位斜拉钢筋水泥孔,8、低位斜拉钢筋水泥孔,9、增阻钢板,10、虚线拟示沉积物。
图2是本实用新型C向视图。
图中1、钢立柱,2、平拉钢筋,3、地下水泥岩孔,4、高位斜拉钢筋,5、低位斜拉钢筋。
五、具体实施方式
根据附图对本实用新型作进一步描述:
图1中钢柱1是采用已废的钢轨,长度不小于6米(或更长些),将其立于岩孔3里,岩孔3是用钻机打孔,钻头采用可取岩芯的钻头钻孔应打在基岩里,其孔径要大于钢柱断面最大对角线的1.3倍,孔深不小于钢柱长度的1/2,钢柱1立于孔内后在其周围浇注水泥沙石使其凝固牢固,然后再在钢柱1上焊接若干根平行的钢筋,其密度应当是下密上疏,其主要起阻隔滑下来的泥土石块的作用,但又不影响山洪的排泄,这样就减小了山洪对钢柱1的压力,但如果采用挡土墙的原理来阻止山体滑坡,其后果就有可能是实得其反,就像深圳光明新区渣土受纳场的12.20滑坡事故,就是堵而不疏造成的。
为了增强钢柱1的阻抗力,特在面向山坡一面的相应钢柱上也就是在图示4、5处焊上两根斜拉钢筋4、5,斜拉钢筋4、5的底端同样是分别浇注在相应的岩孔7和岩孔8中,岩孔7和岩孔8在山坡稳固基岩岩石中,其深度应不小于2米,岩孔7和岩孔8同样是用钻机调整一角度后用可取岩芯的钻头打出大口径的的岩孔,然后将斜拉钢筋4和5的底端用水泥浇注在岩孔7和岩孔8中,为了进一步增强斜拉钢筋对钢柱的拉力,特在两斜拉钢筋的底端焊接两个增阻钢板,这样当山体滑坡的堆积物越来越多时,斜拉钢筋4和5对钢柱的拉力就越发强劲,也就是钢柱的稳固性抗阻性就越来越强,防范山体滑坡的危害性就越大。
Claims (2)
1.一种防范山体滑坡和泥石流危害的结构工程,其上主要由以下构件所组成,它们是钢柱(1),平拉钢筋(2),岩孔(3),高位斜拉钢筋(4),低位斜拉钢筋(5),山坡(6),高位斜拉钢筋水泥岩孔(7),低位斜拉钢筋水泥岩孔(8),增阻钢板(9),其特征是:钢柱(1)为废钢轨,其长度不小于6米,将钢柱(1)埋于深3米的岩孔(3)里,再在岩孔(3)里浇注泥浆沙石,岩孔(3)直径应大于钢柱断面最大对角线的1.3倍,钢柱与钢柱之间的距离不大于3米,在钢柱与钢柱之间用平拉钢筋(2、2′)焊接在一起,这些平拉钢筋(2、2′)的间距不大于60公分,下边密而上边间距疏,为进一步增强钢柱(1)的阻抗能力,特在钢柱(1)的上端焊接一根高位斜拉钢筋(4)和下端处焊接一根低位斜拉钢筋(5),高位斜拉钢筋(4)和低位斜拉钢筋(5)的底端同样分别用水泥浇注在高位斜拉钢筋水泥岩孔(7)和低位斜拉钢筋水泥岩孔(8)里,高位斜拉钢筋水泥岩孔(7)和低位斜拉钢筋水泥岩孔(8)的深度均不小于2米,岩孔应钻在基岩里而不应在砂石堆里。
2.根据权利要求1所述的防范山体滑坡和泥石流危害的结构工程,其特征是:为增大高位斜拉钢筋(4)和低位斜拉钢筋(5)对钢柱(1)的拉力,特在高位斜拉钢筋(4)和低位斜拉钢筋(5)的下端增焊二块增阻钢板(9),这样随山体滑落下来的砂石块堆积物的增多,高位斜拉钢筋(4)和低位斜拉钢筋(5)的抗拉力就越发增强,无疑其阻抗山体滑坡和泥石流的危害功能就越有保障。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620317358.1U CN205617395U (zh) | 2016-04-15 | 2016-04-15 | 防范山体滑坡和泥石流危害的结构工程 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620317358.1U CN205617395U (zh) | 2016-04-15 | 2016-04-15 | 防范山体滑坡和泥石流危害的结构工程 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205617395U true CN205617395U (zh) | 2016-10-05 |
Family
ID=57029481
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620317358.1U Expired - Fee Related CN205617395U (zh) | 2016-04-15 | 2016-04-15 | 防范山体滑坡和泥石流危害的结构工程 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205617395U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105839648A (zh) * | 2016-04-15 | 2016-08-10 | 麦永光 | 防范山体滑坡和泥石流危害的结构工程 |
CN107358787A (zh) * | 2017-09-19 | 2017-11-17 | 成都微鑫通时代科技有限公司 | 一种泥石流地质灾害的预警设备 |
-
2016
- 2016-04-15 CN CN201620317358.1U patent/CN205617395U/zh not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105839648A (zh) * | 2016-04-15 | 2016-08-10 | 麦永光 | 防范山体滑坡和泥石流危害的结构工程 |
CN107358787A (zh) * | 2017-09-19 | 2017-11-17 | 成都微鑫通时代科技有限公司 | 一种泥石流地质灾害的预警设备 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108589718B (zh) | 岩溶区桩基施工方法 | |
CN103696784B (zh) | 一种浅埋大跨隧道下穿建构筑物的大直径长管幕施工方法 | |
CN106121661A (zh) | 一种隧道洞身通过黄土分界面富水地层施工方法 | |
CN207633352U (zh) | 一种用于快速抢险施工的边坡加固结构 | |
CN102644275A (zh) | 复杂地质条件下旋挖组合成桩施工方法 | |
CN104420486B (zh) | 一种在已有扩展浅基础底部增设钢管桩的方法及结构 | |
CN104988907A (zh) | 一种混凝土桩的施工方法 | |
CN105239578B (zh) | 富水砂层深基坑水下施工方法 | |
CN203403404U (zh) | 高效灌注桩设备 | |
CN113174961B (zh) | 一种基坑边坡支护方法 | |
CN113605434A (zh) | 用于高速铁路岩溶的桥梁桩基施工方法 | |
CN205617395U (zh) | 防范山体滑坡和泥石流危害的结构工程 | |
CN101144265A (zh) | 大体积混凝土结构深孔植筋施工方法 | |
CN113668527A (zh) | 深厚填石淤泥地层旋挖桩施工下插长钢护筒的施工方法 | |
JP6413469B2 (ja) | 杭基礎及び杭基礎の構築方法 | |
KR101145393B1 (ko) | 대형 블록식 보강토 옹벽 | |
CN203213131U (zh) | 一种排水下沉与不排水下沉相结合的沉井 | |
CN102797254B (zh) | 一种长螺旋钻孔挤密半取土扩底灌注桩施工方法 | |
JP2014088687A (ja) | 杭体造成方法 | |
CN105386444B (zh) | 一种基础桩成孔装置及成孔方法 | |
CN101481913A (zh) | 嵌岩地下连续墙冲孔槽段施工方法 | |
CN105839648A (zh) | 防范山体滑坡和泥石流危害的结构工程 | |
CN110397044A (zh) | 抗承压水突涌的基坑施工方法及基坑结构 | |
CN103556555B (zh) | 加固路堤软基的钉形钻孔桩复合地基结构的施工方法 | |
CN106245668A (zh) | 一种桁架式桩基础及其施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20181018 Address after: 300171 No. 67, Guang Rui Xi Road, Hedong District, Tianjin. Patentee after: Tianjin Hua exploration Environmental Management Engineering Co.,Ltd. Address before: 300050 room 105, Nanhai building, Luoyang Road, Tianjin, 105. Patentee before: Yong Guang Ma |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161005 |