CN205617190U - Husky infiltration ditch of bamboo -shaped collection - Google Patents
Husky infiltration ditch of bamboo -shaped collection Download PDFInfo
- Publication number
- CN205617190U CN205617190U CN201620448567.XU CN201620448567U CN205617190U CN 205617190 U CN205617190 U CN 205617190U CN 201620448567 U CN201620448567 U CN 201620448567U CN 205617190 U CN205617190 U CN 205617190U
- Authority
- CN
- China
- Prior art keywords
- bamboo
- infiltration ditch
- shaped
- utility
- model
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model discloses a husky infiltration ditch of bamboo -shaped collection, including infiltration ditch body, this the internal build of infiltration ditch has a plurality of bamboo -shaped check to keep off, is the distance between adjacent bamboo -shaped check keep off 8 10m, bamboo -shaped check fender top is 30cm far from the height on ground, bamboo -shaped check fender vertical section is trapezoidally, and the top width is not less than 100cm, and the bottom width is not less than 260cm, gives during the husky infiltration ditch excavation of collection remaining. The utility model discloses simple structure, reasonable in design can not only change the way that converges of flood, effectually converges and dredges the flood, can also effectively increase the ability of infiltrating of retaining, and the eluvium that forms to the wind erosion is the deposit effectively to reach the retaining sediment trapping, deposit dust and sand, the purpose of preventing and treating soil erosion.
Description
Technical field
This utility model relates to conservation technology field, specifically a kind of Bamboo-shaped collection sand infiltration ditch.
Background technology
The Gobi desert region instantaneous point heavy rain is easily formed runoff yield excess, to the development construction item band of the current Large scale construction in this region
Carry out flood threat, and caused certain property loss, under this background, how to have reduced as far as possible this earth's surface, region
On the premise of disturbance, laying is effectively oozed drainage measure and is just seemed the most urgent.Examine for making during Construction of Wind Power at present
Repair roads (containing marching into the arena road), road both sides directly can be excavated, after excavation, naturally form gutter, but by
Little in the Gobi desert region relief difference, this gutter the flood that instantaneous point heavy rain is formed can be played limited conflux with
Elicitation effect, it is impossible to effectively retain, increase is infiltrated, and the road often resulting in part lowered zones is destroyed by rush of water.
Utility model content
The purpose of this utility model is to provide a kind of Bamboo-shaped collection sand infiltration ditch, with asking of solving to propose in above-mentioned background technology
Topic.
For achieving the above object, the following technical scheme of this utility model offer:
A kind of Bamboo-shaped collection sand infiltration ditch, including infiltration ditch body, this internal build of described infiltration ditch has some Bamboo-shaped lattice to keep off,
The adjacent distance between Bamboo-shaped lattice gear is 8-10m;The Bamboo-shaped lattice gear top height far from ground is 30cm.
As further program of the utility model: described Bamboo-shaped lattice gear vertical section is trapezoidal, and top width is not less than 100cm,
Bottom width is not less than 260cm.
Compared with prior art, the beneficial effects of the utility model are: this utility model simple in construction, reasonable in design, not only
The approach that confluxes of flood can be changed, effectively flood confluxed and dredge, moreover it is possible to being effectively increased and retain infiltration capacity, for wind
The eluvium that erosion is formed can also effectively deposit, thus reaches water-retention sediment trapping, deposits sand and dust, the purpose of preventing and treating Soil erosion.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the A-A sectional view of Fig. 1.
Fig. 3 is the schematic enlarged-scale view of Bamboo-shaped lattice gear.
In figure: 1-seeps water ditch body, 2-Bamboo-shaped lattice keep off, 3-ground.
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is carried out clearly
Chu, it is fully described by, it is clear that described embodiment is only a part of embodiment of this utility model rather than whole
Embodiment.Based on the embodiment in this utility model, those of ordinary skill in the art are not under making creative work premise
The every other embodiment obtained, broadly falls into the scope of this utility model protection.
Refer to Fig. 1~3, a kind of Bamboo-shaped collection sand infiltration ditch, including infiltration ditch body 1, repair in described infiltration ditch body 1
Having built some Bamboo-shaped lattice gear 2, the adjacent distance between Bamboo-shaped lattice gear 2 is 8-10m;Bamboo-shaped lattice keep off 2 tops away from
The height on ground 3 is 30cm, it can be ensured that flood passes through.
Further, it is trapezoidal that Bamboo-shaped lattice described in the utility model keep off 2 vertical sections, and top width is not less than 100cm, and bottom width is not
Less than 260cm, give reservation during collection sand infiltration ditch excavation, it is possible to ensure not destroyed by rush of water by flood.
For preventing instantaneous point heavy rain from the flood of wind energy turbine set engineering being threatened, and eluvium is deposited, for Construction of Wind Power mistake
Journey is overhauled the build feature of road, builds collection sand infiltration ditch by design frequency, to change the approach that confluxes of flood, thus reach
To water-retention sediment trapping, deposit sand and dust, the purpose of preventing and treating Soil erosion.
It is obvious to a person skilled in the art that this utility model is not limited to the details of above-mentioned one exemplary embodiment, Er Qie
In the case of spirit or essential attributes of the present utility model, it is possible to realize this utility model in other specific forms.
Therefore, no matter from the point of view of which point, all should regard embodiment as exemplary, and be nonrestrictive, this practicality is new
The scope of type is limited by claims rather than described above, it is intended that by the containing of equivalency in claim that fall
All changes in justice and scope are included in this utility model.Should not be considered as any reference in claim limiting
Involved claim.
Although moreover, it will be appreciated that this specification is been described by according to embodiment, but the most each embodiment only comprises
One independent technical scheme, this narrating mode of description is only the most for clarity sake, and those skilled in the art should be by
Description is as an entirety, and the technical scheme in each embodiment can also be through appropriately combined, and forming those skilled in the art can
With other embodiments understood.
Claims (2)
1. a Bamboo-shaped collection sand infiltration ditch, including infiltration ditch body (1), it is characterised in that: described infiltration ditch body (1)
Interior build has some Bamboo-shaped lattice to keep off (2), and the adjacent distance between Bamboo-shaped lattice gear (2) is 8-10m;Bamboo-shaped lattice
Gear (2) top height far from ground (3) is 30cm.
Bamboo-shaped collection sand the most according to claim 1 infiltration ditch, it is characterised in that: described Bamboo-shaped lattice gear (2)
Vertical section is trapezoidal, and top width is not less than 100cm, and bottom width is not less than 260cm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620448567.XU CN205617190U (en) | 2016-05-18 | 2016-05-18 | Husky infiltration ditch of bamboo -shaped collection |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620448567.XU CN205617190U (en) | 2016-05-18 | 2016-05-18 | Husky infiltration ditch of bamboo -shaped collection |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205617190U true CN205617190U (en) | 2016-10-05 |
Family
ID=57023596
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620448567.XU Expired - Fee Related CN205617190U (en) | 2016-05-18 | 2016-05-18 | Husky infiltration ditch of bamboo -shaped collection |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205617190U (en) |
-
2016
- 2016-05-18 CN CN201620448567.XU patent/CN205617190U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103603320B (en) | A kind of LID type storm-collector and design and calculation method thereof | |
CN106149625B (en) | A kind of ecological self-purification type landscape revetment reconstruction structure and its construction method | |
Ritzema et al. | Coping with climate change in a densely populated delta: A paradigm shift in flood and water management in the Netherlands | |
CN105970875A (en) | Method for promoting siltation and sand consolidation on beach by utilizing natural energy | |
CN103603666B (en) | Tailing pond sand excavation method | |
Gorczyca et al. | Contemporary trends in the Białka River channel development in the Western Carpathians | |
CN107829482A (en) | A kind of large-scale karst depression flood drainage system and its method of drainning off floodwaters | |
CN102373675B (en) | Fabricated culvert member and construction method thereof | |
CN207633300U (en) | A kind of Gullied Rolling Loess Region mud-stone flow disaster recycling control structure | |
CN207567892U (en) | A kind of large size karst depression flood drainage system | |
CN102720266A (en) | Siphon type dredging device for water storage and drainage tunnel | |
CN205617190U (en) | Husky infiltration ditch of bamboo -shaped collection | |
CN202881901U (en) | Stepped undercurrent type ecological embankment structure | |
CN106400649A (en) | Permeable clogging-preventing pavement structure | |
CN206752629U (en) | A kind of municipal works rainwater inspection well | |
KR101170789B1 (en) | Complex debris barrier of eco-friendly | |
Alam et al. | Protection works against wave attacks in the haor areas of Bangladesh: analysis of sustainability | |
CN107130644A (en) | Coffering composite geo-membrane and gravelly clay combination against seepage construction method | |
CN103774698B (en) | Soil engineering drainage-free construction method | |
Brinded et al. | Eller Beck Flood Storage Reservoir–the challenges of low impact flood storage design | |
KR100961733B1 (en) | Multilevel hydroelectric powergeneration system having tunnel-type water reserving equipment | |
CN216108603U (en) | Steel slag retaining wall structure for slope support | |
CN212358351U (en) | Foundation ditch is backfilled with falling drainage system | |
CN208981489U (en) | A kind of runoff interception structure using bamboo permeable catch-basin | |
Phienwej et al. | Subsidence and flooding in Bangkok |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161005 Termination date: 20170518 |